Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Issuing Organization
Independent Communications Authority of South Africa (ICASA)Location
Gauteng
Closing Date
07 Sept 2026
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
350 Witch-Hazel Avenue, Eco-Park, Eco-Park - Centurion - Pretoria - 0157
Organization Type
GOVERNMENT
Published
13 Aug 2026
OCDS Reference
ocds-9t57fa-165566
Icasa seeks a single service provider to deliver a fully integrated offsite data backup and cyber recovery solution across its microsoft and linux estate for five years, covering 80 vm workloads, 4 physical servers, 30 tb of disaster recovery capacity, microsoft 365 backup for 400 users, and migration of approximately 70 tb from the existing acronis cloud. The most consequential requirement is oem partner accreditation combined with the ability to provide a complete end-to-end managed service as a single provider — failure on either disqualifies the bid.
Closing date and time: 7 September 2026 at 11:00; submission method and physical or electronic address must be confirmed against the main bid invitation.
Mandatory condition: evidence of being a fully accredited OEM solution partner — non-compliance disqualifies the bid.
Mandatory condition: ability to deliver a complete end-to-end managed service for backups, DR testing and recovery as a single provider.
Mandatory condition: own backup software, licences, appliance and hardware supporting the Hyper-V and VMware clusters and hosting existing VMs per Annexure C.
Mandatory condition: all data encrypted at rest and in transit, with confidentiality secured per industry-recognised standards and compliance with PAIA and POPI.
Functionality threshold of 70 out of 100 to proceed to price and specific goals; minimum three contactable customer references on letterhead for DR or business continuity work delivered in the last five years.
ISO/IEC 27001 or SOC 2 certificate submitted annually; fixed monthly pricing for the 5-year contract; indicative invocation cost per day, week and month for disaster declaration.
Date & Time
Monday, 07 September 2026 - 11:00
Venue
null
Categories
Request for Bid(Open-Tender)
350 Witch-Hazel Avenue, Eco-Park, Eco-Park - Centurion - Pretoria - 0157
13 Aug
2026
Tender Published
Tender was published
07 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
GCC-ICASA-10-2026.pdf
ICASA is appointing a service provider to deliver fully integrated offsite data backup and cloud data protection services for a five-year period, under the 80/20 PPPFA preferential procurement framework.
Continue with tenders sharing this issuer, category, or province.
Median Estimate
R 2 327 600
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Learn how to submit a winning bid with these related articles
Win consulting, legal, accounting, and engineering service contracts with government. Learn registration requirements and proposal strategies.
Comprehensive guide to Institute of IT Professionals South Africa membership. Certification levels, requirements for ICT professionals, and how IITPSA membership enhances credibility for SITA and government IT tenders.
Definitive guide to Health Professions Council of South Africa registration for healthcare professionals bidding on government tenders. Covers the 12 professional boards, step-by-step registration, CPD requirements, foreign qualification evaluation, provincial health department tender opportunities, and how AI Tender Matching on Tenders-SA.org helps you find HPCSA-requiring contracts.
A strategic guide to getting listed on government consultancy, legal, and engineering panels. Learn why panels are the gateway to steady public sector work.
💡 Want more tendering tips and strategies?
Explore Our BlogTenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
AI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Description
Source: Annexure A Terms of Reference for Disaster Recovery and Backup Solution..pdfAppointment of a service provider to deliver a fully integrated offsite data backup and cloud data protection solution for ICASA for a period of five years, under the 80/20 PPPFA Preferential Procurement Regulations, 2022.
Purpose: provide a backup and cyber recovery solution that meets ICASA's operational, business continuity and information security requirements.
Background: integrated business and IT continuity and data backups are critical to protect ICASA against business continuity disruption from theft, fire or any other disaster affecting the IT server room. The head office hosts a Microsoft and Linux environment for central authentication, file sharing, centralised application hosting and a Storage Area Network, interconnecting to eight regional offices through 10 Mbps MPLS links and a centralised 200 Mbps internet link. A 2 x 300 MB SD-WAN tunnel connects the ICASA datacentre to the Acronis Cloud for backups and restores.
Important Dates
Source: Annexure A Terms of Reference for Disaster Recovery and Backup Solution..pdf (unknown)Contact Information
Source: Annexure A Terms of Reference for Disaster Recovery and Backup Solution..pdf (unknown)Procuring entity address (no named SCM or technical contact is provided in the extracted text):
Bidder enquiries channel, responsible officer, email and telephone numbers are not stated in the extracted text and must be confirmed against the main bid invitation.
Submission Guidelines
Source: Annexure A Terms of Reference for Disaster Recovery and Backup Solution..pdf (unknown)This document is Annexure A (Terms of Reference) only; submission method, address, and the full returnable documents list are not stated in the extracted text and must be confirmed against the main bid invitation.
Mandatory conditions that must be met for the bid to proceed:
No briefing session will be held.
Evaluation Criteria
Source: Annexure A Terms of Reference for Disaster Recovery and Backup Solution..pdf (unknown)Evaluation runs in four phases:
Functionality scoring (out of 100, minimum threshold 70 to proceed to price and specific goals):
Only bidders scoring 70 or above on functionality are evaluated further on price and specific goals.
Technical Specifications
Source: Annexure A Terms of Reference for Disaster Recovery and Backup Solution..pdf (unknown)Scope: fully integrated offsite data backup and cyber recovery solution for ICASA's Microsoft and Linux environment, including the head office datacentre, eight regional offices linked via 10 Mbps MPLS, and the existing Acronis cloud (2 x 300 MB SD-WAN tunnel). Contract duration: five years.
Quantities and deliverables:
Technical requirements (Annexure A):
Reporting requirements (Annexure B):
Methodology
Source: Annexure A Terms of Reference for Disaster Recovery and Backup Solution..pdf (unknown)Business Impact Analysis (Annexure C) summarises risks, impacts and strategy options across ICASA's business units and critical ICT systems, with RTO and RPO values. Examples include: File and Print Services (RTO 90 days), Email via Microsoft Exchange Online (RTO 4 hours, RPO 1 hour), Domain Controller logon (RTO 4 hours, RPO 1 day), JD Edwards Finance systems (RTO 8 hours, RPO 8 hours), Supplier Verification (RTO 48 hours), Voice Communications (RTO 4 hours), Backup and archiving (RTO 4 hours, RPO 24 hours), Licensing Administration via Spektrum or ASMS (RTO 8 hours, RPO 4 hours), Internet access (RTO 4 hours), Payroll via VIP (RTO 30 days), Regulatory Complaints and Interference handling via EDRMS and CRM (RTO 48 hours, RPO 24 hours), Inspections (RTO 4 hours, RPO 24 hours), HR administration (RTO 30 days, RPO 24 days), Electronic Banking (RTO 30 days), and Requests for Interconnect Agreements (RTO 5 days, RPO 2 days).
Annexure C also contains the hypervisor inventory: VM names, host nodes, storage allocation and usage, operating system, backup frequency, and DR-enabled status across Hyper-V, Physical, Azure, and VMware platforms. The grand total storage is approximately 90,392 GB across all platforms.
Experience & Qualifications
Source: Annexure A Terms of Reference for Disaster Recovery and Backup Solution..pdfBidder experience requirement:
Quality Management
Source: Annexure A Terms of Reference for Disaster Recovery and Backup Solution..pdfQuality and assurance obligations:
Pricing Schedule
Source: Annexure A Terms of Reference for Disaster Recovery and Backup Solution..pdfPricing requirements:
Financial Requirements
Source: Annexure A Terms of Reference for Disaster Recovery and Backup Solution..pdf (unknown)Compliance Requirements
Source: Annexure A Terms of Reference for Disaster Recovery and Backup Solution..pdf (unknown)Mandatory conditions (failure to meet any one disqualifies the bid):
Ongoing compliance obligations:
Standard National Treasury returnable forms (SBD 1, SBD 4, SBD 6.1, SBD 8, SBD 9, Authority to Sign / Board Resolution, and any others required by the main bid invitation) are not reproduced here; bidders must complete, sign and submit each one as instructed in the main bid pack.
B-BBEE Requirements
Source: Annexure A Terms of Reference for Disaster Recovery and Backup Solution..pdf (unknown)Phase 4 evaluates price and specific goals under the preference point scoring system set out in the Preferential Procurement Regulations, 2022, made under the Preferential Procurement Policy Framework Act. The tender applies the 80/20 system. Specific goals, B-BBEE level thresholds, and points allocation are not stated in the extracted text and must be confirmed against the main bid invitation and SBD 6.1.
Contractual Terms
Source: Annexure A Terms of Reference for Disaster Recovery and Backup Solution..pdfContract duration: five years.
Key contractual obligations drawn from the terms of reference:
Termination, penalty, and dispute-resolution clauses are not stated in the extracted text and must be confirmed against the main bid pack and the signed SLA.
Requirements
Source: Annexure A Terms of Reference for Disaster Recovery and Backup Solution..pdf (unknown)Specifications (terms of reference for backup and disaster recovery solution for five years):
Mandatory conditions:
Annexure A technical requirements: hosting (fixed site) or hybrid cloud solution; recovery of ICASA's systems on the proposed infrastructure; storage to support 100 TB raw data with 15% per annum growth; daily backups retained 14 days, weekly 4 weeks, monthly 12 months, annual forever; RTO and RPO per Annexure C and D; sufficient hardware for recovery with 10% per annum server growth; service provider to supply all software licences; at contract end the 12 monthly and annual backups handed over to ICASA at no extra cost; 6 working days per annum for DR testing in two 3-day blocks; dedicated technical support; written report on each recoverability test; technical staff for implementation, migration and testing; verification and revision of backup processes; recording of recovery times; procedures for adding new servers and for recovery or failover; ISO/IEC 27001 or SOC 2 certificate submitted annually; Business Continuity Policy and Plan; IT Backup Strategy; DR Policy and Plan; Business Impact and Risk Assessments; SLA-driven managed service; vendor to demonstrate security policies; network management for replication; fixed pricing for 5 years with monthly payments; variable costs for exceeding limits; backup of Microsoft 365 for 400 licensed users; automated server patching; copy of current Acronis backups (approximately 70 TB) to the proposed solution.
Annexure B reporting requirements: daily backup status report emailed to the ICASA team; monthly report showing per-day backup status and available data storage space; monthly SLA report covering backup status, scheduled DR tests, and a list of all user profiles with their roles that have access to the ICASA tenant on the proposed solution; quarterly SLA meetings (face-to-face or via Microsoft Teams).
Invocation costs: indicative cost per day, week and month in the event ICASA declares a disaster and its servers must run on the proposed solution.
Section
Source: Annexure A Terms of Reference for Disaster Recovery and Backup Solution..pdfEvaluation runs in four phases: administrative compliance, screening of mandatory documents, functionality evaluation, and price and specific goals.
Functionality scoring (out of 100, minimum threshold 70 to proceed to price and specific goals):
Only bidders scoring 70 or above on functionality are evaluated further on price and specific goals under the 80/20 PPPFA preference point system.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Annexure J Bid Document.pdf
ICASA is procuring a service provider for fully integrated offsite data backup and cloud data protection services for a five-year period, evaluated under the 80/20 PPPFA preferential procurement framework. The contract requires a single prime bidder (or consortium/JV) to deliver the full scope of services, with no briefing session and a closing date of 7 September 2026.
Annexure A Terms of Reference for Disaster Recovery and Backup Solution..pdf
ICASA seeks a single service provider to deliver a fully integrated offsite data backup and cloud data protection service for five years, covering 80 virtual machines, 4 physical servers, 400 Microsoft 365 users, disaster recovery testing, and migration of approximately 70 TB of existing Acronis backups, with an 80/20 PPPFA preferential procurement evaluation.
To download these documents and access AI-powered analysis, visit the main tender page.
Contact Person
Jowi Molomo
Phone
012-568-3810
[email protected]
Address
350 Witch-Hazel Avenue, Eco-Park, Eco-Park - Centurion - Pretoria - 0157
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
3
Last checked
13 Aug 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubDescription
Source: GCC-ICASA-10-2026.pdfThe tender covers the supply of goods or rendering of services as specified in the bidding documents.
Contact Information
Source: GCC-ICASA-10-2026.pdf (unknown){"name":null,"email":null,"phone":null,"department":"or an organization acting on behalf of","address":null}
Submission Guidelines
Source: GCC-ICASA-10-2026.pdf (unknown)Returnable documents: SBD 1 (Invitation to Bid), SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 8 (Declaration of Past Supply Chain Management Practices), SBD 9 (Certificate of Independent Bid Determination), and any other forms specified in the tender documents. All must be completed, signed, and submitted with the bid. Bids must be submitted by the closing time; late bids will be disqualified.
Evaluation Criteria
Source: GCC-ICASA-10-2026.pdf (unknown)Evaluation will follow the 80/20 preference point system under the PPPFA 2000 and Preferential Procurement Regulations 2022. Bidders must have a valid tax clearance certificate from SARS and must not have outstanding tax matters. Bidders must not engage in corrupt, fraudulent, or collusive practices. Bidders must comply with the National Industrial Participation (NIP) Programme if applicable. Bidders must not engage in restrictive practices under the Competition Act.
Technical Specifications
Source: GCC-ICASA-10-2026.pdf (unknown)The tender is for the appointment of a service provider to assist ICASA with fully integrated offsite data backup and cloud data protection services for a period of 5 years. Specific technical requirements are not detailed in the provided document.
Quality Management
Source: GCC-ICASA-10-2026.pdfGoods supplied must conform to the standards mentioned in the bidding documents and specifications. The supplier must not disclose contract documents or information without prior written consent, and must permit inspection of records and audit by the purchaser.
Financial Requirements
Source: GCC-ICASA-10-2026.pdf (unknown)Performance security: within 30 days of notification of contract award, the successful bidder must furnish performance security in the amount specified in the Special Conditions of Contract (SCC). The security may be a bank guarantee, irrevocable letter of credit, or cashier's/certified cheque. Payment will be made in Rand, within 30 days of invoice submission, unless otherwise specified in the SCC.
Compliance Requirements
Source: GCC-ICASA-10-2026.pdf (unknown)Valid tax clearance certificate from SARS (original) must be submitted prior to award. Bidders must not have outstanding tax matters. Bidders must complete and sign the required standard forms, including SBD 1, SBD 4, SBD 6.1, SBD 8, and SBD 9. Bidders must comply with the National Industrial Participation (NIP) Programme if applicable. Bidders must not engage in restrictive practices under the Competition Act.
Health & Safety
Source: GCC-ICASA-10-2026.pdfNo specific health and safety requirements are stated in the provided document.
Contractual Terms
Source: GCC-ICASA-10-2026.pdfThe National Industrial Participation (NIP) Programme applies to all contracts subject to the NIP obligation. Collusive bidding (bid rigging) is prohibited under the Competition Act. If a bidder engages in restrictive practices, the purchaser may refer the matter to the Competition Commission, and if found guilty, may invalidate the bid, terminate the contract, restrict the bidder from doing business with the public sector for up to ten years, and/or claim damages.
Section
Source: GCC-ICASA-10-2026.pdfThe evaluation will consider the ability to supply goods or services of similar quality and quantity as specified.
Description
Source: Annexure J Bid Document.pdf1.1 Purpose of bid 5
1.2 Enquiries 5
1.3 Confidential Information Disclosure Notice 5
Definitions and icasa mandate 5
Acronyms and abbreviations 7
General rules and instructions 8
4.1 Confidentiality 8
4.2 News and Press Releases 9
4.3 Precedence of Documents 9
4.4 Preferential Procurement Reform 9
4.5 Language 10
4.6 Gender 10
4.7 Headings 10
4.8 Formal Contract 10
4.9 Procedure for the submission of a proposal 10
Response format 11
Reasons for disqualification 12
Bid preparation 12
General commercial conditions of contract/bid 13
1.1. Purpose of the bid
Appointment of the service provider to assist icasa with fully integrated
Offsite data backup & cloud data protection services for a period of 5 years on
An 80/20 PPPFA 2000, preferential procurement regulation: 2022.
1.2. Enquiries
Should it be necessary for a bidder to obtain clarity on any matter arising from or referred to in this RFB
document, your enquiries can be referred in writing to the contact person(s) listed below:
ICASA reserves the right to place responses to such queries on the website.
Telephone (012) 568 3629
Bid Administration Office
E-mail [email protected]
1.3. Confidential Information Disclosure Notice
(i) This document contains information that is the property of the Independent Communication
Authority of South Africa.
(ii) No part of the contents may be used, copied, disclosed or conveyed in whole or in part to any
party in any manner whatsoever other than for proposal building purposes without prior written
permission from ICASA.
(iii) All copyright and Intellectual Property herein vests with ICASA.
2.1. The Independent Communications Authority of South Africa [hereinafter referred to as “ICASA”] is the
regulator of telecommunications and the broadcasting sectors. It was established in July 2000 in terms
of the Independent Communications Authority of South Africa Act No.. It took over the
functions of two previous regulators, the South African Telecommunications Regulatory Authority
(SATRA) and the Independent Broadcasting Authority (IBA). The two bodies were merged into ICASA
to facilitate effective and seamless regulation of telecommunications and broadcasting and to
accommodate the convergence of technologies.
2.2. ICASA derives its mandate from two statutes. These are the ICASA Act , and the Electronic
Communications Act
Functions of ICASA:
The Authority regulates the telecommunications and broadcasting industries in the public interest.
Its key functions are:
against licensees
Plan, control and manage the frequency spectrum and
Protect consumers from unfair business practices, poor quality services and harmful or inferior
products.
“Acceptable Bid” - means any bid, which, in all respects, complies with the specifications and conditions
of the request for proposal as set out in this document.
“Bid” - means a written offer in a prescribed or stipulated form in response to an invitation by an organ of state
for the provision of services or goods.
“Bidders” - means any enterprise, consortium or person, partnership, company, close corporation, company
or any other form of enterprise or person, legal or natural, which has been invited by ICASA to submit a proposal
in response to this invitation.
.
“Client” - means all internal clients of ICASA procurement processes.
“Comparative Price” - means the price after deduction or addition of non-company price factors,
unconditional discounts.
“Content Partners” - means any successful bidder that enters into a partnership agreement with ICASA to
provide the goods and services stipulated in the Bid document.
“Consortium” - means several entities join force under a large project umbrella to gain a strategic
collaborative advantage
“Company Price” - means the price that is only subject to adjustments in accordance with the actual increase
or decrease resulting from the change, imposition or abolition of customs or excise duty and any other duty,
levy or tax which, in terms of a law or regulation is binding on the contractor and demonstrably has
an influence on the price of any supplies or the rendering cost of any service, for the execution of a contract.
“Goods” – means any work, equipment, machinery, tools, materials or anything of whatever nature to be
rendered to ICASA or ICASA’ s delegate by the successful bidder in terms of the proposal.
“Internal Collaboration” - means collaborative arrangements within a group of companies or within various
strategic business units/subsidiaries/operating divisions in order to gain a strategic position whilst sharing
resources, profits and losses as well as risks.
“Joint Ownership” - (also known as equity JV’s) means the establishment by two parent companies of a child
company for a specific task within which both parents invest in order to overcome the limited capabilities vested
within them in order that they can both benefit from the combined investment.
“Joint Venture” - (Project) means two or more businesses joining together under a contractual agreement to
conduct a specific business enterprise with both parties sharing profit and losses. The venture is for one specific
project only, rather than for a continuing business relationship as in a strategic alliance. It is about sharing risk
with others and providing one or more missing and needed assets and competencies.
“Licenses” - means conditional use of another party’s intellectual property rights.
“Management” - in relation to an enterprise or business, means an activity inclusive of control, and performed
on a daily basis, by any person who is a principal executive officer of the company, by whatever name that
person may be designated, and whether or not that person is a director.
“Non-company Price (s)” - means all price (s) other than “company” price (s).
“Organ of State” - means a constitutional institution defined in the Public Finance Management Act, Act .
“Person (s)” - refers to a natural and/or juristic person (s).
“Rand Value” - means the total estimated value of a contract in Rand denomination, which is calculated at the
time of proposal invitations and includes all applicable taxes and excise duties.
“Successful Bidder” - means the organization or person with whom the order is placed or who is contracted
to execute the work as detailed in the proposal.
“Prime Bidder” – means any person (natural or juristic) who forwards an acceptable proposal in response to
this RFB with the intention of being the main contractor should the proposal be awarded to him/her.
“Bidder Agent” - means any person mandated by a prime bidder or consortium/joint venture to do business
for and on behalf of, or to represent in a business transaction, the prime bidder and thereby acquire rights for
the prime bidder or consortium/joint venture against ICASA or an organ of state and incur obligations binding
the prime bidder or consortium/joint venture in favor of ICASA or an organ of state.
“SMME” – bears the same meaning assigned to this expression in the National Small Business Act,
1996 (Act No. )
“Service Partners” - means any successful bidder who is awarded the proposal or who entered into an
agreement with ICASA and/or its clients to offer consulting services in areas such as but not limited to, strategic
e-business consulting, evaluation, implementation and continuous improvement or system integration.
“Support Partners” - means any successful bidder who entered into partnership agreement with ICASA
and/or its clients for the provision of support services to a specific solution.
“Sub-Contracting” - means the primary contractor’s assigning or leasing or making out work to, or employing
another person to support such primary contractor in executing part of a project in terms of a contract.
“Trust” - means the arrangement through which the property of one person is made over or bequeathed to a
trustee to administer such property for the benefit of another person.
“Trustee” - means any person, including the founder of a trust, to whom property is bequeathed in order for
such property to be administered for the benefit of another person.
The following acronyms and abbreviations are used in this proposal and must be similarly used in the proposal
submitted in response and shall have the meaning ascribed thereto below:
Abbreviations/Acronyms Description
CPI Consumer Price Index.
FDS Functional Design Specification
PPPFA Preferential Procurement Policy Framework Act
RFB Request for Bid
RFP Request for Proposal
RSA Republic of South Africa
ICASA Independent Communications Authority of South Africa
SLA Service Level Agreement
4.1. Confidentiality
4.1.1. Some of the information contained in this document may be of a confidential nature and must only be
used for purposes of responding to this RFB. This confidentiality clause extends to bidder partners and/
or implementation agents, whom you may decide to involve in preparing a response to this RFB.
4.1.2. For purposes of this process, the term “Confidential Information” shall include all technical and business
information, including, without limiting the generality of the foregoing, all secret knowledge and
information (including any and all financial, commercial, market, technical, functional and scientific
information, and information relating to a party’s strategic objectives and planning and its past, present
and future research and development), technical, functional and scientific requirements and
specifications, data concerning business relationships, demonstrations, processes, machinery, know-
how, architectural information, information contained in a party’s software and associated material and
documentation, plans, designs and drawings and all material of whatever description, whether subject
to or protected by copyright, patent or trademark, registered or un-registered, or otherwise disclosed
or communicated before or after the date of this process.
4.1.3. The receiving party shall not, during the period of validity of this process, or at any time thereafter, use
or disclose, directly or indirectly, the confidential information of ICASA (even if received before the date
of this process) to any person whether in the employment of the receiving party or not, who does not
take part in the performance of this process.
4.1.4. The receiving party shall take all such steps as may be reasonably necessary to prevent ICASA’s
confidential information coming into the possession of unauthorized third parties. In protecting the
receiving party’s confidential information, ICASA shall use the same degree of care, but no less than a
reasonable degree of care, to prevent the unauthorized use or disclosure of the confidential information
as the receiving party uses to protect its own confidential information.
4.1.5. Any documentation, software or records relating to confidential information of ICASA, which comes
into the possession of the receiving party during the period of validity of this process or at any time
thereafter or which has so come into its possession before the period of validity of this process:
and to the extent that such copying is necessary for the performance of this process and
all other processes as contemplated in; and
investigations and negotiations, and the receiving party shall not retain any extracts.
4.2. News and Press Releases
Bidders or their agents shall not make any news releases concerning this RFB or the awarding of the
same or any resulting agreement(s) without the consent of, and then only in co-ordination with ICASA.
4.3. Precedence of Documents
4.3.1. This RFB consists of a number of sections. Where there is a contradiction in terms between the clauses,
phrases, words, stipulations or terms and herein referred to generally as stipulations in this RFB and the
stipulations in any other document attached hereto, or the RFB submitted hereto, the relevant
stipulations in this RFB shall take precedence.
4.3.2. Bidders shall refrain from incorporating any additional stipulations in its proposal submitted in terms
hereof other than in the form of a clearly marked recommendation that ICASA may in its sole discretion
elect to import or to ignore. Any such inclusion shall not be used for any purpose of interpretation unless
it has been so imported or acknowledged by ICASA.
4.3.3. It is acknowledged that all stipulations in the PPPFA are not equally applicable to all matters addressed
in this RFB. It however remains the exclusive domain and election of ICASA as to which of these
stipulations are applicable and to what extent. Bidders are hereby acknowledging that the decision of
ICASA in this regard is final and binding. The onus to enquire and obtain clarity in this regard rests with
the bidder (s). The bidder (s) shall take care to restrict its enquiries in this regard to the most reasonable
interpretations required to ensure the necessary consensus.
4.4. Preferential Procurement Reform
The Preferential Procurement Regulations, 2022 pertaining to the Preferential Procurement Policy
Framework Act, Act No .
In accordance with this Act, bidders are required to submit proof in order to claim points for specific
goals.
4.5. Language
Bids shall be submitted in English.
4.6. Gender
Where applicable any word implying any gender shall be interpreted to imply all other genders.
4.7. Headings
Headings are incorporated into this proposal and submitted in response thereto, for ease of
reference only and shall not form part thereof for any purpose of interpretation or for any other
purpose.
4.8. Formal contract
This RFB, all the appended documentation and the proposal in response thereto read together,
forms the basis for a formal contract to be negotiated and finalized between ICASA and the
successful service provider to whom ICASA will award the bid to, either in whole or in part.
4.9. Procedure for the submission of a proposal
4.9.1. One (1) original, three (3) hard copies and 1 (one) electronic copy (on USB) in PDF format of the Bid
shall be submitted on the date of closure of the Bid. NB: Pricing must be submitted in a separate
sealed envelope.
representative of the bidder and initialed on each and every page of the bid proposal.
electronic copies is the same as in the hard copies.
drive in a sealed padded envelope and be clearly marked.
4.9.2. Bidders shall submit proposal responses in accordance with the prescribed manner of submission as
specified above.
4.9.3. Bids must be submitted in a prescribed response format herewith reflected as Response Format,
and be sealed in an envelope.
4.9.4. Bids must be deposited into ICASA’s proposal box on or before 07 September 2026 not later than
11h00. The tender box is situated at the reception area of ICASA Head Office in Centurion.
4.9.5. All Bids in this regard shall only be accepted if they have been placed in the proposal box before or on
the closing date and stipulated time.
4.9.6. Bid responses sent by post or courier must reach this office and be deposited into the proposal box on
or before the closing date. Failure to comply with this requirement will result in your proposal being
treated as a “late proposal” and will not be entertained. Such proposal will be returned to the respective
bidders.
4.9.7. No proposal shall be accepted by ICASA if submitted in any manner other than as prescribed above.
Bidders shall submit response in accordance with the response format specified below; failure to do
so may result in a disqualification of bidder’s response.
SCHEDULE 1: Mandatory Documents
Valid tax clearance certificate. If a Consortium valid tax clearance must be submitted for each entity,
the legal agreement must attached. In the case of a Joint Venture tax clearance certificates must be
submitted for each individual entity. Failure to submit these documents will result in disqualification.
SCHEDULE 2: Executive Summary
The executive summary must cover the following:
o Paragraph 1The Bidder needs to indicate to us that he is responding as a Prime contractor, joint
venture, consortium or partnership and list the parties concerned
o Paragraph 2The Bidder needs to inform us that as the executive committee of the company we
have duly designated the following employee name and surname to act on our behalf for the
consortium, joint venture, partnership or Prime contractor.
o Paragraph 3The Bidder markets themselves by informing us that they have done similar work for
other companies and must provide us with contact details as references.
o Paragraph 4The Bidder gives us a short summary or clarification of their response.
SCHEDULE 3: Functional response
SCHEDULE 4: Price
SCHEDULE 5: PPPFA Points
SCHEDULE 6: Standard Bid documents
The following attached SBD documents must be completed:
SCHEDULE 7: Bidders profile
Bidder background information materials:
o Bidder Operating Organization – Provide an overview of the operating structure and
geographical locations of the company at the national, regional, and local levels.
o Company Contact(s) –Provide the name, title, street address, city, state, telephone and fax
numbers and e-mail of the primary company’s contact person, and for any sub-
Contractors.
ICASA reserves the right to disqualify any bidders who do not comply with one or more of the following bid
requirements, and such disqualification may take place without prior notice to the offending bidder:
RFB.
memberships that do not exist false credentials, experience, etc.
RFB.
(3) hard copies and one (1) electronic copy (on USB) in PDF format.
document
6.1. There will be no discussions with any enterprise until evaluation of the proposal has been completed.
Any subsequent discussions shall be at the discretion of ICASA. Unless specifically provided for in the
proposal document, proposal submitted by means of telegram, telex, facsimile or similar means will not
be considered.
All questions in respect of this proposal must be addressed to Supply Chain Unit by e-mail
address: [email protected]
All additions to the proposal documents i.e. appendices, supporting documentations, technical
specifications and other support documentation covering the equipment offered etc. shall be neatly
bound as part of the schedule concerned.
Bidders shall provide full and accurate answers to the questions posed in this document, and, are
required to explicitly state either "Comply/Accept (with a)" or "Do not comply/Do not accept (with
an X)" regarding compliance to the requirements. Where necessary the bidder shall substantiate
their response to a specific question.
8.1.
The laws of the Republic of South Africa shall govern this RFB and any Accept Do not accept
agreement entered. Bidders accept hereby that the courts of the
Republic of South Africa shall have jurisdiction.
Comment
8.2.
ICASA shall not be liable for any costs incurred by the bidder in the Accept Do not accept
preparation of response to this RFB. The preparation of response will be
made without obligation to acquire any of the items included in any
bidder’s proposal or to select any proposal, or to discuss the reasons why
such bidder’s or any other proposal was accepted or rejected.
Comment
8.3.
ICASA may request written clarification or further information regarding Accept Do not accept
any aspect of this proposal. The bidders must supply the requested
information in writing within two (2) days after the request has been
made, otherwise the proposal may be disqualified.
Comment
8.4.
In the case of consortium, Joint Venture or subcontractors, bidders are Accept Do not accept
required to provide copies of signed agreements stipulating the work
split and Rand value.
Comment
8.5.
ICASA reserves the right to; cancel/reject any proposal and not to award Accept Do not accept
the proposal to the lowest bidder or award parts of the proposal to
different bidders, or not to award the proposal at all.
Comment
8.6.
By submitting a proposal in response to this RFB, the bidders accept Accept Do not accept
the evaluation criteria as it stands.
Comment
8.7.
The bidder should not qualify the proposal with own conditions. Accept Do not accept
Caution: If the bidder does not specifically withdraw its own conditions
of proposal when called upon to do so, the bid response may be
disqualified.
Comment
8.8.
Should the bidder withdraw the proposal before the proposal validity period Accept Do not accept
expires, ICASA reserves the right to recover any additional expense
incurred by ICASA having to accept any less favorable proposal or the
additional expenditure incurred by ICASA in the preparation of a new RFB
and by the subsequent acceptance of any less favorable proposal.
Comment
8.9.
Delivery of and acceptance of correspondence between ICASA and the Accept Do not accept
bidder sent by prepaid registered post (by air mail if appropriate) in a
correctly addressed envelope to either party’s postal address or address
for service of legal documents will be deemed to have been received
and accepted after (2) two days from the date of postage to the South
African Post Office Ltd.
Comment
8.10.
Should the parties at any time before and or after the award of the Accept Do not accept
proposal and prior to, and or after conclusion of the contract fail to agree
on any significant product price or service price adjustments, change in
technical specification, change in services, etc. ICASA shall be entitled
within 14 (fourteen) days of such failure to agree, to recall the letter of
award and cancel the proposal.
Such cancellation shall mean that ICASA reserves the right to award the
same proposal to next best bidders as it deems fit.
Comment
8.11.
In the case of a consortium or JV each of the authorized enterprise’s Accept Do not accept
members and/or partners of the different enterprises must co-sign this
document.
Comment
8.12.
Any amendment or change of any nature made to this RFB shall only be Accept Do not accept
of force and effect if it is in writing, signed by ICASA authorized
signatory and added to this RFB as an addendum.
Comment
8.13.
Failure or neglect by either party to (at any time) enforce any of the Accept Do not accept
provisions of this proposal shall not, in any manner, be construed to be
a waiver of any of that party’s right in that regard and in terms of this
proposal. Such failure or neglect shall not, in any manner, affect the
continued, unaltered validity of this proposal, or prejudice the right of that
party to institute subsequent action.
Comment
8.14.
Bidders who make use of sub-contractors. Accept Do not accept
The proposal will however be awarded to the bidder as a primary
contractor who will be responsible for the management of the awarded
proposal. No separate contract will be entered into between ICASA and
any such sub-contractors. Copies of the signed agreements between the
relevant parties must be attached to the proposal responses.
8.15.
No interest shall be payable on accounts due to the successful bidder in Accept Do not accept
an event of a dispute arising on any stipulation in the contract.
Comment
8.16.
ICASA will not be held liable for any expenses incurred by bidders, in Accept Do not accept
preparing and submitting the proposal.
Comment
8.17.
If the successful bidder disregards contractual Accept Do not accept
Specifications, this action may result in the termination of the contract.
Comment
8.18.
The bidders’ response to this bid or parts of the response may be Accept Do not accept
included as a whole or by reference in the final contract.
8.19
All bidders’ who do not sign the declaration forms will not be Accept Do not accept
considered for preference points.
Comment
8.20.
In the evaluation of proposal, the Authority reserves the right to Accept Do not accept
conduct independent reference checks.
Comment
8.21.
ICASA will not respond to any enquiries seventy-two (72) Accept Do not accept
hours before the closing date of the bid
Comment
8.22
Should the bidder change any wording or phrase in this document, the Accept Do not accept
bid will be evaluated as though no change has been effected and the
original wording or phrasing will be used.
Comment
8.23.
Should the evaluation of this bid not be completed within the validity Accept Do not accept
period of the bid, ICASA has discretion to extend the validity period.
Comment
8.24.
Upon receipt of the request to extend the validity period of the bid, the Accept Do not accept
bidder must respond within the required timeframes and in writing on
whether or not s/he agrees to hold his/her original bid responses valid
under the same terms and conditions for a further period.
Comment
8.25.
Accept Do not acceptICASA will not make any upfront/deposit payments to a successful
service provider. Payments will only be made in accordance to the
deliverables that will be agreed upon by the both parties.
Comment
8.26.
All bidders must make disclosure of any potential conflict of interests. The Comply Do not comply
Authority will make the final determination as to whether the potential
conflict of interest precludes the award of the tender to the service provider.
Comment
8.27.
Accept Do not accept Respondents may not alter the wording of any criterion/question posed in
this document. During the evaluation, it shall be assumed that all
criteria/questions are worded as they were in the original document and the
answers shall be evaluated on this basis
Comment
Special requirements
8.28.
International companies are encouraged to partner with local companies. Comply Do not comply
International companies are requested to provide an agreement between
themselves and the local entity.
Comment
8.29.
ICASA reserves the right not to accept the lowest bid price from a service Accept Do not Accept
provider. Similarly the Authority reserves the right not to select any of the
prospective service providers submitting proposals. The Authority will take
into consideration specific goals. Proof of this to accompany the bid
response ( CIPC Document, a doctors letter confirming disability, CSD
Registration Report).
Comment
9.EVALUATION Of the bid
9.1. The following evaluation approach will be applied:
Mandatory Documents
Individual
Bidder
Joint Venture
entities
Consortium
entities and
Subcontracting
Where reference letters, testimonials and experience are required the following will be applied: The primary
bidder will be considered together with those of the members of the consortium or joint venture, subject to the
applicable mandatory requirements being met.
Should the mandatory documents not be submitted the bidders may be disqualified from functionality
evaluation and no points for specific goals will be awarded.
The below mentioned threshold will be used when evaluating the bid responses:
No. Functionality Criteria per Category Weight
A Price 80
B. Specific Goals 20
Total 100
Evaluation of Functional criteria kindly refer to ANNEXURE A
Only bidders who passed the minimum cut-off points of 80/100 for functionality
will be evaluated further for price and specific goals.
The PPPFA preference points will contribute 20 points towards the evaluation criteria
as per the below table:
No Specific Groups Allocation Points
Woman Owned 7
Black Owned (as per BBB-EE Act definition) 6
Youth 4
People living with Disability 3
Total 20
Yes, see attached Terms of Reference ANNEXURE A
Purpose of the bid
Appointment of the service provider to assist icasa with fully integrated
Offsite data backup & cloud data protection services for a period of 5
Years on an 80/20 PPPFA 2000, preferential procurement regulation: 2022.
Attached as annexure a
ANNEXURE A3 (To be submitted in a separate
envelope) Name of Company:
Financials and price
structure
B1. Please indicate your TOTAL BID price here: R........................... (in words).............................
...................................................................... (Mandatory)
B2. Important: It is mandatory to indicate your total bid price as requested above. This price must
be the same as the total bid price you submit in your pricing schedule. Should the total bid
prices differ, the one indicated above will be taken into consideration.
B3. NB: All prices must be VAT inclusive and must be quoted in South African
Rand (ZAR). B4 Are the rates quoted firm for the full period of the contract?
B5 Mandatory: If not firm for the full period, provide details of the basis on which
adjustments will be applied for. E.g. CPI, and also details of the cost breakdown:
B6 Important: all the consortium or joint venture partners must submit a complete set of
the latest audited financial statements.
B7
No price adjustments that are 100% linked to exchange rate variations will be Comply Do not comply
allowed.
Comment
B8
The bidder must indicate CLEARLY which portion of the purchase price as well Comply Do not comply
as the monthly costs is linked to the exchange rate.
Comment
B9
All additional costs must be clearly specified. Comply Do not comply
Comment
B10
The applicable rate of exchange for this bid shall be the spot rate
Accept Do not Accept
Comment
Checklist of bidding documentation before submitting
Nb!! Please take note that all standard bidding (sbd) forms must be completed,
Signed and submitted with your proposal. Failure to do so may invalidate your bid
NB: Has the following forms been completed, signed and submitted with your proposal?
Documentation Checked by bidder Checked by SCM
Officials
Registration on CSD
Invitation to Bid SBD 1
Pricing schedule (Non-firm Price’s Professional
services)
Sbd 3.1
Declaration of interest – SBD 4
Preference point claim – SBD 6.1
Contract form (rendering of services) – SBD 7.1
Declaration of Bidder’s Past Supply Chain
Management Practices – SBD 8
Certificate of Independent Bid Determination- SBD
ID documents of Directors
Company registration documents
Important Dates
Source: Annexure J Bid Document.pdf (TENDER)Closing: 07 September 2026 at 11h00.
No briefing session is scheduled.
Bid validity: 120 calendar days from the closing date (07 September 2026).
Enquiries will not be answered within 72 hours before closing.
Contact Information
Source: Annexure J Bid Document.pdf (TENDER)Bid Administration Office
Telephone: (012) 568 3629
Email: [email protected]
Enquiries must be made in writing; ICASA may publish responses on its website.
Submission address: Block C Reception, 350 Witch-Hazel Street, Eco-Park, Centurion.
Submission Guidelines
Source: Annexure J Bid Document.pdf (TENDER)Submission: One (1) original signed in ink and initialled on every page, three (3) hard copies, and one (1) electronic copy on USB in PDF. Pricing must be in a separate sealed envelope. Deliver to the ICASA bid box at Block C Reception, 350 Witch-Hazel Street, Eco-Park, Centurion, before 11h00 on 07 September 2026. Late, electronic or faxed bids will not be accepted; post/courier must be deposited before closing. Bids must be sealed and submitted on official forms (not retyped).
Returnable forms and documents:
Disqualification risks: missing or incomplete documents, not registered on CSD, unbound tender, incorrect number of copies, failing functionality cut-off, fraudulent or untrue information, uncontactable referees, or blacklisting on National Treasury database.
Returnable Documents
Source: Annexure J Bid Document.pdf (TENDER)Bidders must complete and submit the following schedules: Schedule 1 - Mandatory Documents (valid tax clearance certificate, with separate certificates for each JV/consortium/sub-contractor entity plus signed legal agreement); Schedule 2 - Executive Summary (bidder structure, designated representative, references, response summary); Schedule 3 - Functional Response; Schedule 4 - Price; Schedule 5 - PPPFA Points; Schedule 6 - Standard Bid Documents (SBD 1, 2, 3.1, 4, 5, 6.1, 7.1, 8, 9, and Declaration in terms of Fronting); Schedule 7 - Bidder Profile (shareholder certificates, credentials, company structure, legal agreements, operating organisation overview, company contacts). Bidders must indicate bidding structure (Individual, Joint Venture, Consortium, With Sub-Contractors, or Other) and provide registration, VAT, contact, and address details. A submission checklist confirms CSD registration, ID documents of directors, company registration documents, company profile, and declaration in terms of fronting practices must accompany the proposal.
Evaluation Criteria
Source: Annexure J Bid Document.pdf (TENDER)Evaluation is in four phases:
Phase 1: screening of mandatory documents (tax clearance certificates/PINs for each entity in JV/consortium/subcontracting, signed legal agreements).
Phase 2: mandatory requirements.
Phase 3: functionality evaluation with a minimum cut-off of 80/100.
Phase 4: price (80 points) and specific goals (20 points).
Specific goals: Woman Owned 7, Black Owned (per B-BBEE Act) 6, Youth 4, People living with Disability 3. Proof of specific goals must accompany the bid (CIPC document, doctor's letter confirming disability, CSD registration report). Only bidders who pass the functionality cut-off proceed to Phase 4.
Technical Specifications
Source: Annexure J Bid Document.pdf (TENDER)Scope: appointment of a service provider for fully integrated offsite data backup and cloud data protection services for ICASA for a period of 5 years. The detailed functional criteria are set out in Annexure A of the bid document. Bids must be submitted in English. The service is subject to the General Conditions of Contract and any special conditions of contract.
Experience & Qualifications
Source: Annexure J Bid Document.pdfDeclaration in terms of fronting Practices
Sbd 1
Part a
Invitation to bid
YOU ARE HEREBY INVITED TO BID FOR REQUIREMENTS OF THE (Independent Communications Authority of South Africa)
Bid
NUMBER: ICASA 10-2026 CLOSING DATE: 07 September 2026 CLOSING TIME: 11:00
Appointment of the service provider to assist icasa with fully integrated offsite
Description data backup & cloud data protection services for a period of 5 years on an 80/20
PPPFA 2000, preferential procurement regulation: 2022.
Bid response documents may be deposited in the bid box situated at (street address)
Block C Reception
350 Witch-Hazel Avenue
Eco Point Office
Eco Point Office Park
Centurion
Bidding procedure enquiries may be directed
To technical enquiries may be directed to:
CONTACT PERSON Bid Administration office CONTACT PERSON Bid Administration office
Telephone
Number telephone number
Facsimile
Number facsimile number
E-MAIL ADDRESS [email protected] E-MAIL ADDRESS [email protected]
Supplier information
Name of bidder
Postal address
Street address
Telephone
Number code number
Cellphone
Number
Facsimile
Number code number
E-mail address
VAT
Registration
Number
Supplier tax central
Compliance compliance supplier
Or
Status system pin: database
No: MAAA
[ Cipc document, a doctors letter confirming disability, csd registration report must be
Submitted in order to qualify for preference points ]
Are you the
Accredited
Are you a foreign
Representative
Based supplier for
In south africa
The goods /services
FOR THE GOODS Yes No Yes No
/Works offered?
/Services
/Works [if yes enclose proof] [if yes, answer part b:3 ]
Offered?
Questionnaire to bidding foreign suppliers
Is the entity a resident of the republic of south africa (RSA)? yes NO
Does the entity have a branch in the RSA? yes NO
Does the entity have a permanent establishment in the RSA? yes NO
Does the entity have any source of income in the RSA? yes NO
Is the entity liable in the RSA for any form of taxation? Yes NO
If the answer is “NO” to all of the above, then IT is not a requirement to register for a tax compliance
Status system pin code from the south african revenue service (SARS) and if not register as per 2.3
Below.
Part b
Terms and conditions for bidding
1.1. Bids must be delivered by the stipulated time to the correct address. Late bids will not be
Accepted for consideration.
1.2. All bids must be submitted on the official forms provided–(not to be re-typed) or in the manner
Prescribed in the bid document.
1.3. This bid is subject to the preferential procurement policy framework act, 2000 and the
Preferential procurement regulations, 2022, the general conditions of contract (gcc) and, if
Applicable, any other special conditions of contract.
1.4. The successful bidder will be required to fill in and sign a written contract form (sbd7).
2.1 Bidders must ensure compliance with their tax obligations.
2.2 Bidders are required to submit their unique personal identification number (pin) issued by SARS
To enable the organ of state to verify the taxpayer’s profile and tax status.
2.3 Application for tax compliance status (tcs) pin may be made via e-filing through the SARS website
2.4 Bidders may also submit a printed tcs certificate together with the bid.
2.5 In bids where consortia / joint ventures / sub-contractors are involved, each party must submit
A separate tcs certificate / pin / csd number.
2.6 Where NO tcs is available but the bidder is registered on the central supplier database (csd), a
Csd number must be provided.
2.7 NO bids will be considered from persons in the service of the state, companies with directors
Who are persons in the service of the state, or close corporations with members persons in
The service of the state.”
Nb: failure to provide / or comply with any of the above particulars may render the bid invalid.
Signature of bidder: ...................................................
Capacity under which this bid is signed: ...................................................
(Proof of authority must be submitted e.g. company resolution)
Date: ...................................................
Tax clearance certificate requirements sbd 2
It is a condition of the bid that the taxes of the successful bidder must be in order, or that satisfactory
arrangements have been made with the Receiver of Revenue to meet his / her tax obligations.
“Application for Tax Clearance Certificate)” and submit it to any SARS branch office nationally. The Tax
Clearance Certificate Requirements are also applicable to foreign bidders/individuals who wish to submit
bids.
(one) year from date of approval / Tax Clearance Certificate Pin.
submitted together with the bid. Failure to submit any of the aforementioned will result in the
invalidation of the bid.
must submit a separate Tax Clearance Certificate / Tax Clearance Certificate Pin / CSD registration
number.
branch office nationally or on the website www.sars.gov.za.
this provision, taxpayers will need to register with SARS as eFilers through the website
Sbd 3.1 Pricing schedule
Name of bidder: .............................................................................. Bid NO.:
Closing time on:
Offer to be valid for 120 calendar days from the closing
Date of bid.
Item description bid price in RSA currency
No. INCLUSIVE OF VALUE ADDED TAX
of proposals.
estimated time for completion of all phases and including all
expenses inclusive of VAT for the project.
R.......................................................................
.........................................................................
for example consumer price index.
..........................................................................
Invoices must be rendered in terms hereof)
---------------------------------------------------------------------- R------------------------------ -------------
--------------------------------------------------------------------- R------------------------------ --------------
----------------------------------------------------------------------- R------------------------- --------------
-------------------------------------------------------------------- R------------------------------ ---------------
To be spent
--------------------------------------------------------------------- R------------------------------------------
days
--------------------------------------------------------------------- R------------------------------- ----------
-days
--------------------------------------------------------------------- R------------------------------- ----------
-days
--------------------------------------------------------------------- R------------------------------- ---------
-days
5.1 Travel expenses (specify, for example rate/km and total km, class of air travel, etc.).
Only actual costs are recoverable. Proof of the expenses incurred must accompany
certified invoices.
Description of expense to be incurred rate quantity
Amount
------------------------------------------------ ------------------------------- ............................
R...............
............................
R............... ............................
............................
R...............
Total: r..........................................................
5.2 Other expenses, for example accommodation (specify, e.g. Three star hotel, bed and
breakfast, telephone cost, reproduction cost etc.). On basis of these particulars, certified
invoices will be checked for correctness. Proof of the expenses must accompany invoices.
Description of expense to be incurred rate quantity
Amount
------------------------------------------------ ------------------------------- ............................
R...............
------------------------------------------------ ------------------------------- ............................
R...............
------------------------------------------------ ------------------------------- ............................
R...............
Total: r..........................................................
.........................................................................
.........................................................................
.........................................................................
applied for, for example consumer price index.
..........................................................................
requirements, and such disqualification may take place without prior notice to the offending bidder:
RFB.
memberships that do not exist false credentials, experience, etc.
RFB.
(3) hard copies and one (1) electronic copy (on USB) in PDF format.
document
6.1. There will be no discussions with any enterprise until evaluation of the proposal has been completed.
Joint Venture
entities
Consortium
entities and
Subcontracting
Where reference letters, testimonials and experience are required the following will be applied: The primary
bidder will be considered together with those of the members of the consortium or joint venture, subject to the
applicable mandatory requirements being met.
Pricing Schedule
Source: Annexure J Bid Document.pdfforms the basis for a formal contract to be negotiated and finalized between ICASA and the
successful service provider to whom ICASA will award the bid to, either in whole or in part.
4.9. Procedure for the submission of a proposal
4.9.1. One (1) original, three (3) hard copies and 1 (one) electronic copy (on USB) in PDF format of the Bid
shall be submitted on the date of closure of the Bid. NB: Pricing must be submitted in a separate
sealed envelope.
representative of the bidder and initialed on each and every page of the bid proposal.
electronic copies is the same as in the hard copies.
drive in a sealed padded envelope and be clearly marked.
4.9.2. Bidders shall submit proposal responses in accordance with the prescribed manner of submission as
specified above.
4.9.3. Bids must be submitted in a prescribed response format herewith reflected as Response Format,
and be sealed in an envelope.
4.9.4. Bids must be deposited into ICASA’s proposal box on or before 07 September 2026 not later than
11h00. The tender box is situated at the reception area of ICASA Head Office in Centurion.
4.9.5. All Bids in this regard shall only be accepted if they have been placed in the proposal box before or on
the closing date and stipulated time.
4.9.6. Bid responses sent by post or courier must reach this office and be deposited into the proposal box on
or before the closing date. Failure to comply with this requirement will result in your proposal being
treated as a “late proposal” and will not be entertained. Such proposal will be returned to the respective
bidders.
4.9.7. No proposal shall be accepted by ICASA if submitted in any manner other than as prescribed above.
structure
B1. Please indicate your TOTAL BID price here: R........................... (in words).............................
...................................................................... (Mandatory)
B2. Important: It is mandatory to indicate your total bid price as requested above. This price must
be the same as the total bid price you submit in your pricing schedule. Should the total bid
prices differ, the one indicated above will be taken into consideration.
B3. NB: All prices must be VAT inclusive and must be quoted in South African
Rand (ZAR). B4 Are the rates quoted firm for the full period of the contract?
B5 Mandatory: If not firm for the full period, provide details of the basis on which
adjustments will be applied for. E.g. CPI, and also details of the cost breakdown:
B6 Important: all the consortium or joint venture partners must submit a complete set of
the latest audited financial statements.
B7
No price adjustments that are 100% linked to exchange rate variations will be Comply Do not comply
allowed.
Invitation to Bid SBD 1
Pricing schedule (Non-firm Price’s Professional
services)
Sbd 3.1
Declaration of interest – SBD 4
Preference point claim – SBD 6.1
Contract form (rendering of services) – SBD 7.1
Declaration of Bidder’s Past Supply Chain
Management Practices – SBD 8
this provision, taxpayers will need to register with SARS as eFilers through the website
Sbd 3.1 Pricing schedule
Name of bidder: .............................................................................. Bid NO.:
.........................................................................
for example consumer price index.
..........................................................................
Invoices must be rendered in terms hereof)
.........................................................................
.........................................................................
.........................................................................
Financial Requirements
Source: Annexure J Bid Document.pdf (TENDER)Pricing must be submitted in a separate sealed envelope. All prices must be VAT inclusive in South African Rand (ZAR). The total bid price must be stated and must match the pricing schedule; if they differ, the total bid price page prevails. Rates must be firm for the full contract period; if not, provide the basis of adjustment (e.g. CPI) and cost breakdown. No price adjustments that are 100% linked to exchange rate variations will be allowed; any exchange-rate-linked portion of purchase price or monthly costs must be clearly indicated. The applicable exchange rate is the spot rate. All additional costs must be specified. The pricing schedule covers personnel hourly/daily rates, project phases with cost per phase and man-days, travel expenses (rate/km, total km, class of air travel) and other expenses (accommodation, telephone, reproduction) - actual costs recoverable with proof. Consortium/JV partners must submit complete latest audited financial statements. No upfront or deposit payments will be made; payments are against agreed deliverables.
Compliance Requirements
Source: Annexure J Bid Document.pdf (TENDER)Valid tax clearance certificate/s been submitted of consortium,
Valid tax clearance certificate
valid tax clearance must be submitted for each entity,
Tax compliance
Tax compliance requirements
Tax compliance status (tcs) pin may be made via e-filing through the SARS website
CSD Registration Report)
Csd registration report must be
Csd number
Csd number must be provided
CSD registration number / Tax Clearance Certificate must be
CSD registration
Central supplier database with the
Central Supplier Database
Central supplier database (csd), a
so may result in a disqualification of bidder’s response.
Valid tax clearance certificate. If a Consortium valid tax clearance must be submitted for each entity,
Prospective bidders must be registered on the central supplier database with the
Vat registration Number
Has an certified valid tax clearance certificate/s been submitted of consortium,
Please indicate the type of your company e.G. Private company or closed
Points Allocation: 20 points
B-BBEE Details: the original document and the
answers shall be evaluated on this basis
Comment
Special requirements
8.28.
International companies are encouraged to partner with local companies. Comply Do not comply
International companies are requested to provide an agreement between
themselves and the local entity.
Comment
8.29.
ICASA reserves the right not to accept the lowest bid price from a service Accept Do not Accept
provider. Similarly the Authority reserves the right not to select any of the
prospective service providers submitting proposals. The Authority will take
into consideration specific goals. Proof of this to accompany the bid
response ( CIPC Document, a doctors letter confirming disability, CSD
Registration Report).
Comment
9.EVALUATION Of the bid
9.1. The following evaluation approach will be applied:
Mandatory Documents
Individual
Bidder
Joint Venture
entities
Consortium
entities and
Subcontracting
Where reference letters, testimonials and experience are required the following will be applied: The primary
bidder will be considered together with those of the members of the consortium or joint venture, subject to the
applicable mandatory requirements being met.
Should the mandatory documents not be submitted the bidders may be disqualified from functionality
evaluation and no points for specific goals will be awarded.
B-BBEE Requirements
Source: Annexure J Bid Document.pdf (TENDER)Under the 80/20 PPPFA preference points system, 20 points are allocated to specific goals: Woman Owned (7), Black Owned per BBBEE Act definition (6), Youth (4), and People living with Disability (3). Bidders must submit a CIPC document, a doctor's letter confirming disability, and a CSD Registration Report to qualify for preference points.
Health & Safety
Source: Annexure J Bid Document.pdfThe following must be furnished (failure to do so shall result in your bid being
Disqualified)
Contractual Terms
Source: Annexure J Bid Document.pdf (TENDER)Confidentiality: bidders must treat all RFB information as confidential, restrict use to proposal preparation, and surrender materials on demand. No news or press releases about the RFB or award may be issued without ICASA's consent. Precedence: this RFB's stipulations override any contradictory terms in bidder submissions. The RFB, appended documentation, and accepted proposal together form the basis for a formal contract. South African law governs and SA courts have jurisdiction.
Special Conditions
Source: Annexure J Bid Document.pdf (TENDER)General commercial conditions include: ICASA bears no liability for bid preparation costs and may request written clarification within 2 days or disqualify; consortium/JV bidders must submit signed agreements with work split and Rand value; ICASA may cancel, reject, or split awards and is not bound to accept the lowest price; bidders may not qualify proposals with own conditions; withdrawal before validity expiry exposes bidder to recovery of additional costs; correspondence by prepaid registered post deemed received 2 days after posting; failure to agree on price/specification changes allows ICASA to recall the letter of award within 14 days; amendments only valid if in writing and signed by ICASA; failure to enforce is not a waiver; sub-contractors are managed by the prime bidder with no separate ICASA contract; no interest payable on disputed accounts; disregarding specifications may terminate the contract; bidder responses may be incorporated into the final contract; unsigned declaration forms disqualify from preference points; ICASA may conduct independent reference checks; altered wording evaluated against original; validity period may be extended at ICASA's discretion; no upfront or deposit payments will be made; conflict of interest disclosure required; international companies must partner with local entities and provide the agreement.
Section
Source: Annexure J Bid Document.pdfthe internal evaluation process has not been finalised within the
Protection services for a period of 5 years on an 80/20 PPPFA
Should the mandatory documents not be submitted the bidders may be disqualified from functionality
evaluation and no points for specific goals will be awarded.
No. Functionality Criteria per Category Weight
B. Specific Goals 20
Evaluation of Functional criteria kindly refer to ANNEXURE A
Only bidders who passed the minimum cut-off points of 80/100 for functionality
will be evaluated further for price and specific goals.
The PPPFA preference points will contribute 20 points towards the evaluation criteria
No Specific Groups Allocation Points
Years on an 80/20 PPPFA 2000, preferential procurement regulation: 2022.
into consideration specific goals. Proof of this to accompany the bid
9.EVALUATION Of the bid
9.1. The following evaluation approach will be applied
Data conflicts
None detected
Get deep intelligence on Services: Professional. Unlock full pricing strategies, bid frequency, and historical win rates.