Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Issuing Organization
Airports Company South Africa (ACSA)Location
Eastern Cape
Closing Date
28 Sept 2026
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
Allister Miller Dr - Walmer - Gqeberha - 6070
Organization Type
GOVERNMENT
Published
07 Sept 2026
OCDS Reference
ocds-9t57fa-169214
Airports company south africa is procuring the installation of airside emergency gates and repairs to existing gates over an 18-month period at chief dawid stuurman airport in gqeberha. Bidders must hold a CIDB contractor grading of 3 sq or higher and attend a compulsory briefing and site inspection on 15 september 2026. The contract will be awarded under an 80/20 preference point system, with functionality evaluated first and a minimum threshold of 60 out of 100 points required to proceed to price evaluation.
CIDB grading: Bidders must hold a CIDB contractor grading of 3 SQ or higher.
Compulsory briefing and site inspection: Attendance is mandatory on 15 September 2026 at 09:00 at the Information desk, Dawid Stuurman International Airport; bidders must bring an ID document or driver's licence, safety boots and a reflector vest, and a permit fee applies.
Closing date and time: Bids must be deposited in the Tender Box at the Administrator Office, Aeropark Office Complex, Block A, 1st Floor, Allister Miller Drive, Walmer, Gqeberha, 6065, by 28 September 2026 at 13:00 (South African Time); late bids will not be accepted.
Submission format: Submit one original plus one copy and an electronic copy on a USB flash drive, sealed in separate packages marked "ORIGINAL" and "COPY", with the employer's address and the bidder's return address on the outside.
Tax compliance: Bidders must provide a SARS Tax Compliance Status PIN or a printed TCS certificate; if registered on the Central Supplier Database, a CSD number may be provided. Each party in a consortium, joint venture or subcontracting arrangement must submit a separate TCS certificate or PIN.
Functionality threshold: Bidders must achieve a minimum of 60 points out of 100 in the functionality evaluation to be considered for price and preference evaluation.
Preference points: Claims are scored out of 20 under the 80/20 system, with points for B-BBEE status level (Level 1: 5 points down to Level 8: 0.1) and additional points for black youth majority-owned, black women majority-owned, and majority-owned by people with disabilities entities; proof must be submitted as a sworn affidavit or a SANAS-accredited B-BBEE certificate.
Pricing: Prices must be fixed for the full 18-month contract duration, stated in Rand, inclusive of all duties and taxes except VAT, which must be shown separately; no price adjustments will be allowed.
Enquiries: Technical and procedural enquiries must be directed to Joseph Rulash at 011 409 3943 or [email protected]; the closing date for enquiries is 21 September 2026, and bidders may not contact any other ACSA employee regarding this tender.
Date & Time
Monday, 28 September 2026 - 13:00
Venue
Information desk, Chief Dawid Stuurman Airport
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
A permit fee may apply
Categories
Request for Quotation
Allister Miller Dr - Walmer - Gqeberha - 6070
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: RFQ_16867_ Airside emergency gate installation and repairs of existing gates for a period of 18 months.pdf. You don’t need to refresh — this page will pick up the updated review automatically.
07 Sept
2026
Tender Published
Tender was published
28 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
RFQ_16867_ Airside emergency gate installation and repairs of existing gates for a period of 18 months.pdf
Functionality Evaluation Criteria.pdf
This tender is for the installation of emergency gates and the repair of existing gates at Chief Dawid Stuurman International Airport, with a contract period of 18 months. The project is managed by the Airports Company of South Africa (ACSA) and is located in the Eastern Cape. The closing date for submissions is September 28, 2026, at 13:00 UTC.
NEC 3 ECC - Airside Gate Installation.pdf
Analysis completed but response format was invalid
To download these documents and access AI-powered analysis, visit the main tender page.
Win ACSA tenders with AI Matching Engine, airport-infrastructure intelligence, compliance analysis, and application support for aviation operations.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 758 712
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Important Dates
Source: RFQ_16867_ Airside emergency gate installation and repairs of existing gates for a period of 18 months.pdf (TENDER)Closing date: 28 September 2026 at 13:00 (South African Time). Compulsory briefing/site inspection: 15 September 2026 at 09:00 AM at Information desk, Dawid Stuurman International Airport. Closing date for enquiries: 21 September 2026. Tender document available from 07 September 2026. Tender offer validity: 12 weeks (84 days) after closing time.
Contact Information
Source: RFQ_16867_ Airside emergency gate installation and repairs of existing gates for a period of 18 months.pdf (TENDER)Technical enquiries: Contact Person Joseph Rulash, Telephone 011 409 3943, Email [email protected]. Bidding procedure enquiries: Contact Person Joseph Rulash, Telephone 011 409 3943, Email [email protected]. Queries relating to issue of documents may be addressed to [email protected]. Bidders may not contact any ACSA employee on this tender other than those listed above.
Submission Guidelines
Source: RFQ_16867_ Airside emergency gate installation and repairs of existing gates for a period of 18 months.pdf (TENDER)Bids must be delivered by the stipulated time to the correct address. Late bids will not be accepted. Bids must be submitted on the official forms provided (not to be re-typed) or in the manner prescribed in the bid document. Bids must be placed inside the Tender Box at: Administrator Office, Aeropark Office Complex, Block A, 1st Floor, Allister Miller Drive, Walmer, Eastern Cape, South Africa, P O Box 5787, Walmer, Gqeberha, 6065. Submit bids during working hours Monday to Friday. The Bid Register must be completed when submitting/depositing the tender document. The bid document and the contract document must be completed and returned in its entirety together with the necessary supporting information. Tenders may only be submitted on the tender documentation that is issued. Telegraphic, telephonic, telex, facsimile tenders will not be accepted. Bids must be sealed as separate packages marked "ORIGINAL" and "COPY", with the employer's address and identification details on the outside, as well as the tenderer's name and contact address. Submit one original plus one copy and an electronic format (USB Flash Drive).
Evaluation Criteria
Source: RFQ_16867_ Airside emergency gate installation and repairs of existing gates for a period of 18 months.pdf (TENDER)Stage 1: Test for Responsiveness (as per clause C.3.8). Stage 2: Mandatory Administration Criteria - Attendance of compulsory briefing session and site inspection; Fully completed and signed form of offer; Only tenderers who are a CIDB contractor grading of 3 SQ or higher. Stage 4: Functionality Evaluation Criteria - Points allocated for functionality based on criteria in the attached evaluation criteria document; an overall minimum threshold of 60 points out of 100 must be achieved for the tender to be eligible for further evaluation on Price and Preference (80/20 split). Stage 4: Price and Preference - Based on Preferential Procurement Regulations 2022, 80/20 preference point system for bids with rand value equal to or below R50 million. Maximum 80 points for price using formula: Ps = 80(1 - (Pt - Pmin)/Pmin). Preference points scored out of 20 for specific goals. Stage 5: Objective Criteria Evaluation - Tender awarded to bidder with highest points unless objective criteria justify another award.
Technical Specifications
Source: RFQ_16867_ Airside emergency gate installation and repairs of existing gates for a period of 18 months.pdf (TENDER)Airside emergency gate installation and repairs of existing gates for a period of 18 months at Chief Dawid Stuurman Airport. Scope of work includes installation and repairs of gates. Site inspection is compulsory and will provide understanding of the airport and requirements. Bidders must bring ID document or driver's license, safety boots, and reflector vest for site inspection. Permit fee will be applicable.
Financial Requirements
Source: RFQ_16867_ Airside emergency gate installation and repairs of existing gates for a period of 18 months.pdf (TENDER)Prices must be fixed for the duration of the contract and not subject to adjustment. Rates and prices must be in Rand. Include all duties, taxes (except VAT) and levies in rates and prices. Show VAT separately. Contract not subject to price adjustments; all rates and prices remain fixed, final and binding for the full duration. No contract price adjustments, foreign fluctuations, etc.
Compliance Requirements
Source: RFQ_16867_ Airside emergency gate installation and repairs of existing gates for a period of 18 months.pdf (TENDER)Tax Compliance: Bidders must submit their unique Personal Identification Number (PIN) issued by SARS, or a printed Tax Compliance Status (TCS) certificate. For consortia/joint ventures/sub-contractors, each party must submit a separate TCS certificate/PIN/CSD number. If no TCS PIN available but registered on Central Supplier Database (CSD), provide CSD number. Failure to comply may render bid invalid. CIDB: Only tenderers with CIDB contractor grading of 3 SQ or higher may submit. B-BBEE: Preference points claimed based on B-BBEE status level (Level 1: 5 points, Level 2: 4.5, Level 3: 4, Level 4: 3, Level 5: 2, Level 6: 0.5, Level 7: 0.3, Level 8: 0.1). Additional points for black youth majority-owned entities (5), black women majority-owned entities (5), company majority owned by people with disabilities (5). Proof required: original or certified copy of valid sworn affidavit, or B-BBEE certificate from SANAS accredited rating agency. For joint ventures, consolidated B-BBEE certificate required. Returnable forms: SBD 1 (Invitation to Bid), SBD 4 (Declaration of Interest), SBD 9 (Certificate of Independent Bid Determination), and other forms as listed in the document.
Description
Source: Functionality Evaluation Criteria.pdfconstruction regulations and the provisions of the project
Important Dates
Source: Functionality Evaluation Criteria.pdf (unknown)Compulsory briefing session and site inspection: date, time and venue not stated in the document. Attendance is mandatory.
Contact Information
Source: Functionality Evaluation Criteria.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"es rendered, value of contract,"}
Submission Guidelines
Source: Functionality Evaluation Criteria.pdf (unknown)Returnable documents:
Evaluation Criteria
Source: Functionality Evaluation Criteria.pdf (unknown)Stage 1: Mandatory requirements (pass/fail).
Stage 2: Functionality evaluation (100 points total):
Technical Specifications
Source: Functionality Evaluation Criteria.pdf (unknown)The work involves installation of an airside emergency gate and repairs to existing gates at Chief Dawid Stuurman International Airport. The project must comply with construction regulations and project-specific Health & Safety requirements. The functionality evaluation assesses the tenderer's technical ability based on experience to deliver the required product in accordance with specialised quality, reliability and functionality.
Experience & Qualifications
Source: Functionality Evaluation Criteria.pdfThe tenderer must demonstrate technical ability based on experience to deliver the required product in accordance with specialised quality, reliability and functionality. Experience is evidenced by completion certificates or reference letters for similar projects. Similar projects include all types of fencing works construction/rehabilitation, installation of gates, rehabilitation of gates, or completed fence/gates maintenance contracts. References must be verifiable and include client letterhead, scope of services, value of contract, completion date, contact person name and contact details. Appointment letters, purchase orders and payment certificates are not accepted as valid references.
Financial Requirements
Source: Functionality Evaluation Criteria.pdf (unknown)Payment terms are not detailed in the document. Note: payment certificates are not accepted as valid references for experience scoring.
Compliance Requirements
Source: Functionality Evaluation Criteria.pdf (unknown)Mandatory requirements:
Functionality evaluation (Stage 2):
Section
Source: Functionality Evaluation Criteria.pdfNo points will be allocated for appointment letters, purchase orders and payment certificates; these will not be accepted as valid references for this tender.
Contact Information
Source: NEC 3 ECC - Airside Gate Installation.pdf (unknown){"name":null,"email":null,"phone":"+27 41 507 7362","department":null,"address":"e conditions of contract"}
Evaluation Criteria
Source: NEC 3 ECC - Airside Gate Installation.pdf (unknown)Unable to extract eligibility criteria
Technical Specifications
Source: NEC 3 ECC - Airside Gate Installation.pdf (unknown)Construction contract (ecc)
Between AIRPORTS COMPANY SOUTH AFRICA SOC LIMITED
Applicable at Chief Dawid Stuurman International Airport
(Registration Number: 1993/004149/30)
and
(Registration Number: ___________________)
for AIRSIDE EMERGENCY GATE INSTALLATION AND REPAIRS OF EXISTING
Gates at chief dawid stuurman international airport for a
Period of 18 months
Contents: No of pages
Part C1 Agreements & Contract Data [7]
Part C2 Pricing Data [32]
Part C3 Scope of Works
Quality Management
Source: NEC 3 ECC - Airside Gate Installation.pdf40.2 The quality policy statement and quality plan are provided within 4 weeks of the Contract Date.
41.2 The defects date is 52 weeks after Completion of the whole of the works
43.2 The defects correction period is Four (4) weeks
Pricing Schedule
Source: NEC 3 ECC - Airside Gate Installation.pdfPeriod of 18 months
Contents: No of pages
Part C1 Agreements & Contract Data [7]
Part C2 Pricing Data [32]
Part C3 Scope of Works [45]
Part C4 Site Information [55]
Agreements and Contract Data Part C1 P a g e | 1
Part C1 Agreements and Contract Data, (which includes this Form of Offer and
Acceptance)
Part C2 Pricing Data
Part C3 Scope of Work: Works Information
Part C4 Site Information
and drawings and documents (or parts thereof), which may be incorporated by reference into the above
listed Parts.
A Priced contract with bill of Refer to Part C2: Pricing Data section of this contract
quantities
Compliance Requirements
Source: NEC 3 ECC - Airside Gate Installation.pdf (unknown)Principal contractor or contractor is in good standing with the Compensation Fund or Licensed
Health & Safety
Source: NEC 3 ECC - Airside Gate Installation.pdf(Registration Number: 1993/004149/30)
and
(Registration Number: ___________________)
for AIRSIDE EMERGENCY GATE INSTALLATION AND REPAIRS OF EXISTING
the Project Manager, the Supervisor, or the Adjudicator does not constitute a waiver of rights, and
does not give rise to an estoppel unless the Parties agree otherwise and confirm such agreement
in writing.
Z2 Providing the Works
Z2.1 Delete core clause 20.1 and replace with the following:
design, scope, and Works information that is 5% or more
Z19.2 The Project Manager requires the written consent of the Employer if an action will result in the Completion
Date being extended by more than 30 days.
Z20 Delegation
As stipulated by Section 37(2) of the Occupational Health and Safety Act No. as amended the
Z20.1 As part of this contract the Contractor acknowledge that it (mandatory) is an employer in its own right with
duties as prescribed in the Occupational Health and Safety Act No as amended and agree to
ensure that all work being performed, or Equipment, Plant and Materials being used, are in accordance with
the provisions of the said Act, and in particular with regard to the Construction Regulations
Z21 Lead Design
11.2 The working areas are: Airport Airside at Chief Dawid Stuurman Int Airport
24.1 The Contractor’s key person are: CV’s to be appended to Tender Schedule
Part c1: agreements and contract data
C1.4: Occupational health and safety agreement
AGREEMENT IN TERMS OF SECTION 37(2) OF THE OCCUPATIONAL HEALTH & SAFETY ACT (ACT ) & CONSTRUCTION REGULATION 5.1(k)
To assist Airport Company South Africa (ACSA) in order to comply with the requirements of:
Act).
user of the plant
CONTRACTOR) for unlawful acts or omissions of Mandataries (CONTRACTORS) save where a
provisions of the Occupational Health & Safety Act (OHS Act) and applicable Regulations.
respective employees will at all times comply with the following conditions:
close supervision of the Mandatary’s employees who are to be trained to understand the hazards
associated with any work that the Mandatary performs on the Client’s premises.
assignment shall immediately be forwarded to the Client.
before commencement of any work in the Client’s premises. A baseline risk assessment
document will include identification of hazards and risk, analysis and evaluation of the risks and
hazards identified, a documented plan and safe work procedures to mitigate, reduce or control
the risks identified, and a monitoring and review plan of the risks and hazards.
they inquire into Occupational Health & Safety.
in writing anything he/she deems to be unhealthy and /or unsafe. He has versed his employees in
this regard.
and other persons in any way whilst performing work on the Client’s premises.
procedure is duly completed, signed and received by the Client.
In terms of section 37(2) of the Occupational Health & Safety Act and section 5.1(k) of the Construction
Regulations 2014,
I .......................................a duly authorised 16.2 Appointee acting for and on behalf of
.......................................................(company name) undertake to ensure that the requirements and the
provision of the OHSAct and its regulations are complied with.
Mandatary – WCA/ Federated Employers Mutual No...........................................
Contractual Terms
Source: NEC 3 ECC - Airside Gate Installation.pdfSchedule of Deviations (if any), contact the Employer’s agent (whose details are given in the Contract
Data) to arrange the delivery of any securities, bonds, guarantees, proof of insurance and any other
documentation to be provided in terms of the conditions of contract identified in the Contract Data. Failure
to fulfil any of these obligations in accordance with those terms shall constitute a repudiation of this
agreement.
Unless the tenderer (now Contractor) within five (5) working days of the date of such receipt notifies the
Main Option B: Priced contract with Bill of Quantities
Dispute resolution Option W1: Dispute resolution procedure
Secondary Options X7: Delay damages
(incorporating amendments)
X16: Retention
X18: Limitation of liability
Z: Additional conditions of contract
of the NEC3 Engineering and Construction Contract, April
2013
Agreements and Contract Data Part C1 P a g e | 6
13.6 The period of retention is 12 months following Completion or earlier termination of
a contract
2 The Parties’ main responsibilities
20.1 The Employer provides access to the following persons, places and things
84.1 The Contractor provides the The Insurance Clauses which is attached at the end of the
insurance stated in Contract Data. The insurances are in the joint names of the
for insurance in respect of death and Diseases Act No.
of or bodily injury to employees
of the Contractor arising out of
and in the course of their
employment in connection with
this contract for any one event is:
9 Termination Applicable as per Section 9 of the NEC3 ECC (April 2013)
Option W1
W1.1 The Adjudicator is The person appointed jointly by the parties from the list of
adjudicators contained below
W1.2 The Adjudicator nominating body The current Chairman of Johannesburg Advocate’s Bar
is Council
W1.4 The tribunal is Arbitration
W1.4 If the tribunal is arbitration, the The arbitration procedure is set out in The Rules for the
arbitration procedure is Conduct of Arbitrations 2013 Edition, 7th Edition, published
by The Association of Arbitrators, (Southern Africa)
W1.4 The place where arbitration is to Johannesburg, South Africa.
be held is
W1.4 The person or organisation who The Arbitrator is the person selected by the Parties as and
will choose an arbitrator when a dispute arises in terms of the relevant Z Clause, from
the Panel of Arbitrators provided under the relevant Z clause
if the arbitration procedure does not state who selects an
arbitrator. The Arbitrator nominating body is the Chairman of
the Johannesburg Advocates Bar Council.
X16 Retention
X16.1 The retention free amount is R
The retention percentage is 10% of the Prices, 50% of retention will be released at
Practical Completion of the works and the remaining 50%
will be released after the Defects Period
X18 Limitation of Liability
X18.1 The Contractor’s liability to the Nil - Neither Party is liable to the other for any consequential
consequential loss is limited to of income or loss of revenue
X18.2 For any one event, the Total of the losses incurred and/or repairs to the damages
Contractor’s liability to the caused
to the Employer’s property is
limited to
X18.3 The Contractor’s total liability to Total of the losses incurred and/or repairs to the damages
the Employer for defects due to caused
his design which are not listed on
the Defects Certificate is limited
to
X18.4 The Contractor’s total liability to The Contractor’s total direct liability to the Employer for all
the Employer for all matters matters arising under or in connection with this contract,
arising under or in connection other than the excluded matters, is limited to the total of the
with this contract, other than losses incurred and/or repairs to the damages caused and
excluded matters, is limited to applies in contract, tort or delict and otherwise to the extent
allowed under the law of the contract.
risks
works, Plant and Materials),
Agreements and Contract Data Part C1 P a g e | 10
X18.5 The end of liability date is The date on which the liability in question prescribes in
accordance with the Prescription Act No. (as
amended or in terms of any replacement legislation) for any
other matter
Z The Additional conditions of Z1 – Z20
contract are
between Completion and the defects date stated in the Contract Data
Z5 Termination
Agreements and Contract Data Part C1 P a g e | 11
contract period. If the terms of the performance bond specify its expiry date and the end of the
contract period does not coincide with such expiry date, four weeks prior to the said expiry date,
the Contractor extends the validity of the performance bond until the end of the contract period. If
the Contractor fails to so extend the validity of the performance bond, the Employer may claim the
full amount of the performance bond and retain the proceeds as cash security
Z7 Limitation of liability:
Z7.1 Insert the following new clause as Option X18.6:
limited to R0.00
Z7.2 Notwithstanding any other clause in this contract, any proceeds received from any insurances or
any proceeds which would have been received from any insurances but for the conduct of the
Z8 Cession, delegation and assignment
Z8.1 The Contractor shall not cede, delegate or assign any of its rights or obligations to any person
without the written consent of the Employer, which consent shall not be unreasonably withheld.
This clause shall be binding on the liquidator/business rescue practitioner /trustee (whether
provisional or not) of the Contractor
Z8.2 The Employer may cede and delegate its rights and obligations under this contract to any person
or entity
Z9 Joint and several liability
Z9.1 If the Contractor constitutes a joint venture, consortium or other unincorporated grouping of two
or more persons, these persons are deemed to be jointly and severally liable to the Employer for
the performance of the Contract.
Z9.2 The Contractor shall, within 1 week of the Contract Date, notify the Project Manager and the
Z9.3 The Contractor does not materially alter the composition of the joint venture, consortium or other
unincorporated grouping of two or more persons without prior written consent of the Employer.
Z10 Ethics
Z10.1 The Contractor undertakes:
Z10.1.1 not to give any offer, payment, consideration, or benefit of any kind, which constitutes or could be
construed as an illegal or corrupt practice, either directly or indirectly, as an inducement or reward
for the award or in execution of this contract;
Z10.1.2 to comply with all laws, regulations or policies relating to the prevention and combating of bribery,
corruption and money laundering to which it or the Employer is subject, including but not limited
to the Prevention and Combating of Corrupt Activities Act, .
Z10.2 The Contractor’s breach of this clause constitutes grounds for terminating the Contractor’s
obligation to Provide the Works or taking any other action as appropriate against the Contractor
(including civil or criminal action). However, lawful inducements and rewards shall not constitute
grounds for termination.
Z10.3 If the Contractor is found guilty by a competent court, administrative or regulatory body of
participating in illegal or corrupt practices, including but not limited to the making of offers (directly
or indirectly), payments, gifts, gratuity, commission or benefits of any kind, which are in any way
whatsoever in connection with the contract with the Employer, the Employer shall be entitled to
terminate the contract in accordance with the procedures stated in core clause 92.2. the amount
due on termination is A1.
Z11 Confidentiality
Z11.1 All information obtained in terms of this contract or arising from the implementation of this contract
shall be treated as confidential by the Contractor and shall not be used or divulged or published
to any person not being a party to this contract, without the prior written consent of the Project
Z12.2 The Contractor co-operates with the Employer and facilitates and permits the use of all required
information, materials and other matter (including but not limited to documents and all other
drawings, CAD materials, data, software, models, plans, designs, programs, diagrams,
evaluations, materials, specifications, schedules, reports, calculations, manuals or other
documents or recorded information (electronic or otherwise) which have been or are at any time
prepared by or on behalf of the Contractor under the contract or otherwise for and/or in connection
with the works) and generally does all things required by the Project Manager to achieve this end.
Z13 Liens and Encumbrances
Z13.1 The Contractor keeps the Equipment used to Provide the Services free of all liens and other
encumbrances at all times. The Contractor, vis-a-vis the Employer, waives all and any liens which
he may from time to time have, or become entitled to over such Equipment and any part thereof
and procures that his Subcontractors similarly, vis-a-vis the Employer, waive all liens they may
have or become entitled to over such Equipment from time to time
Z14 Intellectual Property
Z14.1 Intellectual Property (“IP”) rights means all rights in and to any patent, design, copyright, trade
mark, trade name, trade secret or other intellectual or industrial property right relating to the Works.
Z14.2 IP rights remain vested in the originator and shall not be used for any reason whatsoever other
than carrying out the works.
Z14.3 The Contractor gives the Employer an irrevocable, transferrable, non-exclusive, royalty free
licence to use and copy all IP related to the works for the purposes of constructing, repairing,
demolishing, operating and maintaining the works
Z14.4 The written approval of the Contractor is to be obtained before the Contractor's IP made available
to any third party which approval will not be unreasonably withheld or delayed. Prior to making
any Contractor's IP available to any third party the Employer shall obtain a written confidentiality
undertaking from any such third party on terms no less onerous than the terms the Employer
would use to protect its IP
Z14.5 The Contractor shall indemnify and hold the Employer harmless against and from any claim
alleging an infringement of IP rights (“the claim”), which arises out of or in relation to:
Agreements and Contract Data Part C1 P a g e | 14
Z14.5.1 the Contractor’s design, manufacture, construction or execution of the Works
Z14.5.2 the use of the Contractor’s Equipment, or
Z14.5.3 the proper use of the Works.
Z14.6 The Employer shall, at the request and cost of the Contractor, assist in contesting the claim and
the Contractor may (at its cost) conduct negotiations for the settlement of the claim, and any
litigation or arbitration which may arise from it.
Z16 Dispute resolution:
Z16.1 Appointment of the
when a dispute arises, from
the Panel of Adjudicators Name Location Contact details
below. The referring party (phone & e mail)
nominates an Adjudicator, Adv. Ghandi Gauteng +27 11 282 3700
which nomination is either Badela [email protected]
accepted or rejected by the Mr. Errol Tate Pr. Durban +27 11 262 4001
other party. In the instance of Eng. [email protected]
a rejection of the nominated Adv. Saleem Gauteng +27 11 535 1800
Adjudicator, the referring Ebrahim [email protected]
Party refers the appointment Mr. Sebe Gauteng +27 11 442 8555
deadlock to the Chairman of Msutwana Pr. [email protected]
the Johannesburg Bar Eng.
Council, who appoints an Mr. Sam Amod Gauteng [email protected]
when a dispute arises from
the Panel of Arbitrators below. Name Location Contact details
The referring party (phone & e mail)
nominates an Arbitrator, which Adv. Ghandi Badela Gauteng +27 11 282 3700
nomination is either accepted [email protected]
or rejected by the other party. Mr. Errol Tate Pr. Durban +27 11 262 4001
In the instance of a rejection Eng. [email protected]
of the nominated Arbitrator, Adv. Saleem Gauteng +27 11 535 1800
the referring Party refers the Ebrahim [email protected]
appointment deadlock to the a
Chairman of the Mr. Sebe Msutwana Gauteng +27 11 442 8555
Johannesburg Bar Council, Pr. Eng. [email protected]
who appoints an Arbitrator Mr. Sam Amod Gauteng [email protected]
listed in the Panel of
Arbitrators below Adv. Sias Ryneke Gauteng 083 653 2281
.za
Mr. Emeka Ogbugo Pretoria +27 12 349 2027
(Quantity Surveyor) [email protected]
Z17 Notification of a compensation event
Z17.1 Delete “eight weeks” in clause 61.3 and replace with “four weeks”. Delete the words “unless the event
arises from the Project Manager or the Supervisor giving an instruction, issuing a certificate, changing an
earlier decision or correcting an assumption.
Z19 Communication
Z19.1 Add a new Core Clause 14.5 and 14.6 to read as follows:
shall remain in force whilst they and /or their employees are present on the Client’s premises, or
which shall remain in force for that duration of their contractual relationship with the Client, whichever
period is the longest.
a. Public Liability Insurance Cover as required by the Subcontract Agreement.
b. Any other Insurance cover that will adequately makes provision for any possible losses and/or
claims arising from their and /or their Subcontractors and/or their respective employee’s acts
and/or omissions on the Client’s premises.
Agreements and Contract Data Part C1 P a g e | 21
Part c1: agreements and contract data
C1.5: Acsa insurance clauses
Contract value does not exceed r150 million, and the construction period does not
Exceed 36 months, and the defects liability period does not exceed 24 months
the extent relevant to the Contract.
1.1 Notwithstanding anything elsewhere contained in this Contract and without limiting the obligations,
liabilities or responsibilities of the Contractor in anyway whatsoever (including but not limited to any
requirement for the provision by the Contractor of any other insurances) the Employer shall effect
and maintain for the duration of the construction and maintenance periods of the Contract - as
appropriate in the joint names of the Employer, the Contractor and where relevant Sub-Contractors
the following insurances which are subject to the terms, limits, exceptions and conditions of the
a) Contract Works/Contractors Public Liability/ Removal Of Lateral Support Liability
Section 1 Of The Policy – Contract Works
property insured, which is in a defective condition due to defect in design, plan specification,
material or workmanship.
This insurance contains the following limitations and warrantees;
caused directly or indirectly by rain, inundation or flood, Insurers liability shall be limited in
respect of the aggregate length of open trenches at any one time to 2,500 meters.
Exposed Layer Works (applicable to works involving paving, roadways, bulk
earthworks and runways and taxiways)
runways (including taxiways) caused directly or indirectly by rain, inundation or flood, Insurers
liability shall be limited in respect of the aggregate length of Exposed Layer Works at any one
time to 2,500 meters.
Agreements and Contract Data Part C1 P a g e | 24
Section II of the Policy – Contractors Public Liability
accidental death of or injury to persons and/or loss of or damage to property(other than the
Works the subject matter of this Contract) arising from the execution of the Contract with a
limit of indemnity of R100,000,000 in respect of any one occurrence or series of occurrences
consequent on or attributable to one source or original cause.
Section III of the Policy – Removal Of Lateral Support Liability
event of accidental death of or injury to persons and/or loss of or damage to property (other
than the Works the subject matter of this Contract) arising out of or in connection with shock
or vibration or the removal or weakening of or interference with support to property in the
vicinity of the Contract Site and arising out of or in connection with the Insured Contract (but
not in respect of tunnelling works) and occurring during the Period of Insurance.
The Limit of Indemnity being limited to R50,000,000 attributable to one source or original
cause
b. Contract Works SASRIA – Providing physical loss of or damage to the Works, Temporary
kind or description whatsoever.
The SASRIA Contract Works policy is limited to R500,000,000 (Incl. VAT) in the aggregate
during the policy period of insurance.
http://www.sasria.co.za/ which notes the covers and policy exclusions.
c) Aviation Liability Insurance which provides indemnity against legal liability in the event of
accidental death of or injury to persons and/or loss of or damage to property (other than the
Works the subject matter of this Contract) arising from the execution of the Contract with a
limit of indemnity of R2,000,000,000 in respect of any one occurrence or series of
occurrences consequent on or to one source or original cause.
d) Design & Construct Professional Indemnity Insurance which provides indemnity against
legal liability to pay compensation as a result of any actual or alleged negligent act, error or
omission in the performance of the Professional Duties of the insured and arising from the
execution of this project. The limit of indemnity under this insurance shall be *R25,000,000 in
the aggregate during the annual policy period of insurance that ACSA effect such cover
during the policy period from 1 April to 31 March during each policy period of
insurance.
Agreements and Contract Data Part C1 P a g e | 25
*The limits of indemnity applies to all ACSA contracts as a whole and does not apply
specifically to this contract. The aggregate limit could be exhausted by claims under
other ACSA contracts and there is no guarantee that this insurance cover will provide
sufficient cover to this specific contract should the aggregate limit be exhausted.
a) Labour and construction work which would normally be the responsibility of the building
or engineering contractor.
b) Supervision of the construction works usually undertaken by a building or engineering
contractor.
policies and the Contractor shall be deemed to be fully aware of all the conditions, limits,
limitations, exclusions/exceptions and deductibles that are contained in the Employer arranged
policies. Copies of the Employer arranged policies are obtainable on request from the Employer
and if the Contractor is of the opinion that additional insurance is required, such shall be for the
1.3 The Employer shall pay the premium in connection with the insurances effected by the Employer.
connection with the insurances effected by the Employer.
1.4 The Contractor shall not include any premium charges for this insurance except to the extent,
which he may deem necessary in his own interests to effect supplementary insurance to the
insurance effected by the Employer. The Employer reserves the right to call for full information
regarding insurance costs included by the Contractor.
1.6 The Contractor and/or any other party who obtains indemnity under the policies effected under 1.1
shall become liable for the deductibles (first amount payable) which are applicable in respect of each
occurrence or series of occurrences attributable to one source or cause giving rise to loss or damage
or indemnifiable liability. The deductibles applicable to the policies effected under 1.1 are as follows:
a) Contract Works/Contractors Public Liability/ Removal of Lateral Support Liability
will apply in respect of each and every occurrence or series of occurrences arising out of
or in connection with any one event giving rise to loss or damage:
Section 1 Of The Policy – Contract Works
In respect of all loss or damage R150,000 but increased to R250,000 in respect of loss
or damage arising out of or in connection with testing and commissioning.
Section 2 Of The Policy – Contractors Public Liability
R75,000 each and every claim in respect of Property Damage.
Section 3 Of The Policy – Removal Of Lateral Support Liability
R75,000 each and every claim.
b) Contract Works SASRIA
In respect of theft as a result of the SASRIA perils insured - R25,000 each and every
occurrence .
c) Aviation Liability Insurance ;
In respect of each and every loss or damage or injury - US$250,000.
d) Design & Construct Professional Indemnity Insurance
a) In respect of contracts under R50 million at award – R5,000,000.
b) In respect of contracts over R50 million at award – R10,000,000
1.7 In the event of any occurrence which is likely to give rise to a claim under the insurance arranged
by the Employer, the Contractor shall:
a) In addition to any statutory requirement or other requirements contained in the Contract
immediately notify the Employer and the Employer's Insurance Brokers by telephone, mobile
phone or email giving the circumstances, nature and an estimate of the loss or damage or
liability. The Contractor must also complete the Claim Advice Form (Appendix “A” ).
D: +27 (0)11 723 1400
M: +27 (0)74 535 9075
b) Preserve damage and make it available for inspection by a representative of the Insurers.
c) Wherever possible, photographs of damage should be taken.
d) Inform the police authorities promptly in the event of loss or damage by theft, burglary or
any malicious persons(s) for the purpose of recovering any property so lost, discovering the
guilty person or persons, and having him, her or them duly prosecuted.
e) Advise the Insurers of any other insurance(s) which may cover the same loss, damage or
injury, or any part thereof.
f) Give to the Insurers every assistance to enable the Insurers to settle or resist any claim
against the Insured, or institute any proceedings;
g) On completion the Claims Advice Form, the form must be sent to the Employers Insurance
Brokers for further action (the original may be emailed to the Employers Insurance Broker).
(Please do not remove the Claims Advice Form out of this document. Rather photocopy the
form and send the copy to the Employers Insurance Brokers).
h) The Employer and the employers Insurance brokers / Insurers or their appointed loss
adjusters shall have the right to make all and any enquiry's on the Site of the Works or
elsewhere as to the cause and results of any such occurrence and the Contractor shall co-
operate in carrying out such enquiry's.
i) The Contractor, Project Managers and Consultants must allow free access to Insurers’
assessors for the purpose of investigating and assessing the loss or damage.
j) The Contractor must not proceed with the making good any off the loss without the
prior authorisation of the Insurers.
k) The Contractor must keep separate records of the costs involved in making good any loss
or damage and these records should be available at all times for inspection by Insurers.
equipment.
l) Where required by the Employer, negotiate the settlement of claims with the Insurer or their
appointed loss adjusters through the Employer's Insurance Brokers and shall obtain the
In addition to Clause 1.1 in respect of the insurances effected by the Employer the
following Insurances to be effected by the Contractor :
2.1 Without limiting the Contractor’s obligations, responsibilities and liabilities, the Contractor and
Sub-contractor shall maintain at the Contractor's and Subcontractor’s expense and where
applicable provide as a minimum the following insurances:
a) Insurance of Construction Plant and Equipment (including tools offices and other
temporary structures and contents) and other things (except those intended for
incorporation into the Works) brought onto the site for a sum sufficient to provide for their
replacement.
provided to the Employer.
b) Contractor’s Common Law Liability/ Worker’s Compensation Insurance
indemnity of not less than R20,000,000 and/or workmen's compensation insurance
covering personal injury to or death of the employees of the Contractor engaged in
connection with the Works to the minimum value required by applicable law.
insurance in respect of its Subcontractor’s personnel performing the Works.
the Contractor shall indemnify and hold harmless the Employer against any such claim.
provided to the Employer.
c) Motor Vehicle Liability Insurance comprising (as a minimum) "Balance of Third Party" Risks including
Passenger Liability indemnity with a limit of indemnity of not less than R5 000 000 for all owned, non-owned,
leased and hired vehicles.
d) Insurance For Buy-Down Cover Of Employer’s Deductibles
be noted by endorsement to the relevant Policies of Insurance.
any insurance maintained by the Employer.
f) Public Liability insurances in excess of the Employers Public Liability insurances as stated under clause
1.1(a).
g) Aviation Liability insurances in excess of the Employers Aviation Liability insurances as
stated under clause 1.1(c).
Agreements and Contract Data Part C1 P a g e | 29
Section
Source: NEC 3 ECC - Airside Gate Installation.pdfevaluations, materials, specifications, schedules, reports, calculations, manuals or other
40.2 The quality policy statement and quality plan are provided within 4 weeks of the Contract Date.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Allister Miller Dr - Walmer - Gqeberha - 6070
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
3
Last checked
08 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Get deep intelligence on Services: General. Unlock full pricing strategies, bid frequency, and historical win rates.
Learn how to submit a winning bid with these related articles
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Your meticulously crafted General sector tender submission can be disqualified for a single, seemingly minor compliance oversight. The reality for South African contractors is that technical competence is no longer sufficient; it is underpinned by a non-negotiable framework of documentary compliance. This regulatory guide: mastering CSD and BBBEE compliance for general sector tenders in south africa provides a comprehensive, step-by-step breakdown of the mandatory registrations and certificates you must secure and present. We detail the precise requirements for CSD, BBBEE, SARS TCS, CIPC, and COIDA, explaining their function within the procurement ecosystem governed by the PFMA and PPPFA. Learn the actionable steps to prepare your business, avoid the most common disqualifying errors, and leverage technology to streamline your compliance process for successful bidding in 2026 and beyond.
For South African General contractors, the path to government procurement is paved with non-negotiable regulatory requirements. The most common barrier to entry is not a lack of capability, but a failure to master the foundational compliance frameworks that govern every bid. This complete regulatory guide to CSD and BBBEE compliance for General sector tender suppliers in South Africa demystifies the process. It provides a meticulous, step-by-step field manual for ensuring your company is fully compliant and audit-ready, enabling you to confidently access the R billions in opportunities across infrastructure maintenance, facilities management, and service delivery within the General sector.
Everything South African general contractors need to know about the complete guide to csd and bbbee compliance for general sector suppliers in south africa — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
💡 Want more tendering tips and strategies?
Explore Our Blog