Tender Type
Request for Quotation
Delivery Location
Riversdae - Riversdale - Riversdale - 6529
Organization Type
GOVERNMENT
Published
04 Sept 2026
OCDS Reference
ocds-9t57fa-169206
SENTECH limited is seeking a service provider to repair and reinstate the existing clearvu and vibracrete fencing at its solar plant in riverview, western cape. Bidders must consent to SENTECH processing their personal information for the evaluation of the proposal and possible inclusion in sentech's supplier database. The most consequential requirement is that the bidder’s response will be assessed under sentech’s RFP process and personal information will be verified and background-checked.
Bidders must consent to Sentech processing their personal information for the evaluation of their proposal and potential registration on Sentech's supplier database.
Bidders must consent to their personal information being shared with third parties and stored in other jurisdictions, including for FICA verification and background screening purposes.
Bidders must confirm access to and provide their personal information in line with Sentech's External Privacy Policy.
Bidders acknowledge that Sentech authorised agents will access personal information for Know Your Customer checks and verification.
Bidders must complete and sign the Sentech Supplier Consent Form as part of the RFP response.
Bidders may withdraw consent, but Sentech may then be unable to process the RFP submission or retain the supplier's details on its database.
Date & Time
Thursday, 24 September 2026 - 12:00
Venue
null
Categories
Request for Quotation
Riversdae - Riversdale - Riversdale - 6529
04 Sept
2026
Tender Published
Tender was published
24 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
RFX RIVERSDALE.pdf
Sentech Limited is appointing a service provider to repair and reinstate the existing ClearVu security fence and vibracrete fence at the Riversdale C4 Solar Plant. The works involve removing damaged sections, installing new posts, reusing existing panels where possible, installing an electric fence, and commissioning the security system.
Continue with tenders sharing this issuer, category, or province.
Median Estimate
R 5 112 763
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Important Dates
Source: RFX RIVERSDALE.pdf (RFQ){"closingDate":"24 September 2026","closingTime":"12:00","briefingSession":"{"date":"24 September 2026","time":"12:40","venue":"12:40 on Riversdale","is_compulsory":false}"}
Briefing Session
Source: RFX RIVERSDALE.pdf (RFQ)Compulsory site briefing commencing at 12:40 at Riversdale Sentech Site (Call 066 259 5397).
Contact Information
Source: RFX RIVERSDALE.pdf (RFQ){"name":null,"email":"[email protected]","phone":"066 259 5397","department":null,"address":"validity stated in the RFQ, or other period"}
Evaluation Criteria
Source: RFX RIVERSDALE.pdf (RFQ)Bidder must be registered on the Sentech Supplier Database, be tax compliant, submit a quotation on company letterhead, fully completed and signed in black ink, received by 24 September 2026 12:00 GMT+0000 via email, and provide a valid B‑BBEE certificate to claim preference points (though not mandatory for eligibility).
Technical Specifications
Source: RFX RIVERSDALE.pdf (RFQ)Sentech SOC Ltd is a State-Owned Company and South Africa's leading provider of
broadcasting signal distribution services. Sentech owns and operates
telecommunications infrastructure throughout South Africa, including transmission
sites with critical electrical and renewable energy infrastructure.
The perimeter security fence surrounding the Riversdale C4 Solar Plant sustained
damage as a result of severe weather conditions and heavy winds. The damaged
fence has compromised the security of the solar plant and requires urgent repair and
reinstatement.
Sentech intends appointing a suitably qualified and experienced Contractor to remove
the damaged sections of the existing ClearVu fence, replace damaged structural
components, reinstate the fence using existing reusable materials where possible,
install new support members, reinstate the electric fence, and commission the
complete security system.
The Contractor shall provide all labour, supervision, plant, equipment, transport,
materials and consumables required to complete the Works.
3.1 Preliminary and General
The Contractor shall:
3.2 Removal of Existing Damaged Fence
The Contractor shall carefully remove damaged sections of the existing ClearVu fence.
The works include:
o ClearVu panels
o Underdigs
o Fixings where suitable
3.3 Supply and Installation of New Fence Posts
Supply, deliver and install:
o Base plates (where applicable)
o Galvanised nuts
o Bolts
o Washers
o Protective caps
Posts shall be installed plumb, aligned and securely founded in concrete.
3.4 Reinstallation of Existing Fence Panels
The Contractor shall reinstall:
including:
The completed fence shall be straight, secure and tensioned.
3.5 Installation of Additional Strut Posts
Supply and install:
including:
The purpose of these posts is to improve structural stability against future high wind
loading.
3.6 Electric Fence
Supply and install approximately:
110 metres of Electric Fence
The installation shall include:
3.7 Commissioning of Electric Fence
The Contractor shall:
3.8 Removal of Damaged Vibracrete Fence
The Contractor shall:
3.9 Installation of Replacement Vibracrete Fence
Supply and install replacement Vibracrete fence comprising:
All works shall match the existing fence unless otherwise instructed.
3.10 Quality Assurance
The Contractor shall provide:
3.11 Occupational Health and Safety
Prior to commencement the Contractor shall submit:
No work may commence until written approval has been obtained from Sentech.
3.12 Constraints
The Contractor shall allow for:
Extensions of time shall be considered in accordance with GCC 2025.
ClearVu Fence
Strut Posts
Electric Fence
Vibracrete Fence
Region Site
Southern Region Riversdale C4 Solar Plant
Methodology
Source: RFX RIVERSDALE.pdf (RFQ)Scope of Works: Provide all labour, supervision, plant, equipment, transport, materials and consumables. Preliminary and General: attend compulsory site briefing, verify dimensions, inspect damage, protect infrastructure, maintain site security, remove debris, reinstate ground, submit weekly progress reports with photos. Removal of damaged fence: remove ~55 damaged ClearVu panels, posts, foundations; retain reusable panels, underdigs, fixings; dispose of damaged material. Supply and install 18 new ClearVu posts (3300mm) with base plates, nuts, bolts, washers, caps; install plumb and aligned in concrete. Reinstall existing panels and underdigs with alignment, levelling, bolting, final tightening. Install 14 heavy duty strut posts with foundations, bracing, brackets. Electric fence: supply and install ~110m with brackets, insulators, wires, tensioners, connectors, warning signs, earth spikes, lightning protection. Commissioning: test voltage, earthing, energizer, demonstrate operation, repair faults, submit certificate. Remove damaged Vibracrete sections and posts, dispose waste. Install replacement Vibracrete fence with new posts, panels, foundations, alignment, backfilling, finishing. Quality assurance: material compliance certificates, electric fence compliance docs, inspection records, warranties, final inspection. OHS: submit Health & Safety File, risk assessments, method statements, proof of competency, medical certificates, public liability insurance, COID registration before work. Constraints: high wind, restricted access, working near operational solar infrastructure, material lead times, operational requirements. Extensions of time per GCC 2025.
Quality Management
Source: RFX RIVERSDALE.pdf3.10 Quality Assurance
4.1.1. Site hand over meeting
contract. This is the first meeting on site of all the relevant parties who will be
involved in the contract for its entire duration.
4.1.2. Progress meetings
over meeting. The Infrastructure Services Manager shall carry out additional
intermediate site inspections.
4.1.3. SENTECH line of reporting problems
immediately to the Infrastructure Services Manager.
the Operations Manager.
4.2. Quality assurance
milestones established at the site handover meeting.
out site inspections before, during and upon completion of the contract.
4.3. Execution programme
Timeous completion of the project is of utmost importance for Sentech.
To ensure and to assist the contractor to monitor his or her own progress, he
or she will be required to provide Sentech with a detailed execution schedule
when providing a quotation.
This schedule should be in the Bar Chart format.
It should highlight the following key information but not limited to:
❖ Name of site
❖ Activity description
❖ Activity duration
❖ Dates for key milestones during the execution of the
by the contractor
❖ Milestone 1:
When the surface preparation has been completed.
Milestone 2:
❖ Quality inspection must be conducted on completion of each coat of paint
before applying the next coat.
❖ As soon as one section received its final coat of paint, a quality inspection
should be conducted before moving to the next section.
Pricing Schedule
Source: RFX RIVERSDALE.pdfItem Description Unit Qty Rate Amount
Section 1 –
Preliminaries
Establishment and De1 Sum 1
establishment
2 Health & Safety File Sum 1
Sub Total:
Section 1
Section 2 –
Clearvu
Fence
Repairs
Remove damaged ClearVu
3 No 55
fence panels and posts
Supply 3300 mm ClearVu
4 posts complete with nuts, No 18
bolts and washers
Install new posts using
5 existing ClearVu panels and No 55
underdigs
Supply and install heavy6 No 14
duty strut posts
Supply and install electric
7 m 110
fence
Test and commission
8 Sum 1
electric fence
Remove damaged
9 Sum 1
Vibracrete fence
Supply and install
10 replacement Vibracrete Sum 1
fence
Sub Total Section
Totals: Section1 R
and Section2
Excl Vat
Contingencies @ R
15%
Totals Including R
Contingencies
VAT at 15% R
Total Including Vat R
the roads may be paved with a bituminous surface in other instances maybe
concrete or concrete strips roads. The contractors are requested to use 4 x 4
vehicles to access our sites.
paved and concrete roads cannot be accessed with an ordinary vehicle.
difficult for ordinary vehicles.
unauthorized entry.
broadcasting signal distribution services. Sentech owns and operates
telecommunications infrastructure throughout South Africa, including transmission
sites with critical electrical and renewable energy infrastructure.
The perimeter security fence surrounding the Riversdale C4 Solar Plant sustained
damage as a result of severe weather conditions and heavy winds. The damaged
fence has compromised the security of the solar plant and requires urgent repair and
reinstatement.
Southern Region Riversdale C4 Solar Plant
Bill of quantities
Compliance Requirements
Source: RFX RIVERSDALE.pdf (RFQ)No specific requirements found
B-BBEE Details: ble below.
Evaluation Method 1. Stage 1 – Administrative Responsiveness Evaluation
All the Quotations will be evaluated against the Administrative
responsiveness requirements as set out in section 1 of the RFQ Data.
The proposals that COMPLY with the Mandatory evaluation criteria be
evaluated against the Functional Criteria. Suppliers meeting the minimum
requirement will be evaluated further.
Suppliers with the lowest Price offered will score the highest points. Only
Suppliers that submit a valid B-BBEE Certificate can claim preference
points in line with the 80/20
Suppliers with the highest number of points will be recommended for the award of
this quotation, unless there are compelling and justifiable reasons not to do so.
Reference proof
What Proof is
supplied by
required to show
Compliant reference the page
Mandatory Eligibility compliance to
(Indicate Yes or number where the
Criteria Mandatory Eligibility
No) information is
Criteria
located in your
Tender submission
NOTE: Bidders that do not comply with all the above criteria will not be evaluated further.
Annexure 1 to be fully completed. If not completed, bidders will be disqualified
Sentech’s Specific goals emanate from the section 2(1)d of the Preferential Procurement
Policy Act which may include contracting with persons or categories of persons, historically
disadvantaged by unfair discrimination on the basis of race, gender and disability. The
Reconstruction and Development Programme as published in Government Gazette No 16085
dated 23 November 1994
Sentech will award preference points as follows:
Goal Points Evidence required
Historically di
B-BBEE Requirements
Source: RFX RIVERSDALE.pdf (RFQ)Preference Point allocation – 80/20: Specific goals include historically disadvantaged on race (8 points for ≥51% black ownership, 3 for 25.1-50%, 1 for 5-25%, 0 below 5%), gender (10 points for ≥51% women ownership, 6 for 25.1-50%, 2 for 5-25%, 0 below 5%), disability (2 points with doctor's note). Total 20 points. Price calculation formula: Ps = 80 [1 - (Pt - Pmin)/Pmin].
Health & Safety
Source: RFX RIVERSDALE.pdf (RFQ)Safety Requirements: Appointed service provider to compile health and safety file per Sentech requirements, submit to OHS Specialist within 7 days after PO/Safety File Specification. Competent mast climbers with valid certificates. Medical fitness certificates from Occupational Medical Practitioner. Detailed safe working methodology. Valid public liability insurance. Health and Safety compliance undertaking by CEO/MD. COID/FEM registration.
Contractual Terms
Source: RFX RIVERSDALE.pdfThe Works shall be executed in accordance with:
2.1 Defects Liability Period
Twelve (12) months from Practical Completion.
2.2 Warranties
The Contractor shall provide:
2.3 Project Duration
The works shall be completed within three (3) weeks after approval of the Health and
Safety File and site handover.
of Deviations (if any), contact the Employer’s agent to arrange the delivery of any securities, bonds, guarantees,
proof of insurance and any other documentation to be provided in terms of the conditions of contract identified in
the RFQ. Failure to fulfil any of these obligations in accordance with those terms shall constitute a repudiation of
this agreement.
2.3 Project Duration
The works shall be completed within three (3) weeks after approval of the Health and
task in line with the requirements
Public liability – valid construction/project public liability insurance
Health and safety compliance assurance – Company’s Health and Safety
compliance undertaking by the CEO/Managing Director
Special Conditions
Source: RFX RIVERSDALE.pdf (RFQ)Site Access: Access via gravel roads, some paved/concrete, 4x4 vehicles recommended, steep and tight turns. Communication Protocol: Site handover meeting, progress meetings, line of reporting problems to Infrastructure Services Manager or Operations Manager. Constraints: unpredictable weather, OHS regulations limit work in inclement conditions, high winds and mist, contractors to allow for weather delays, extension of time granted but no monetary compensation. Sentech House Rules: contractor to familiarize with rules, keep site clean, dispose debris at designated landfill.
Requirements
Source: RFX RIVERSDALE.pdf (RFQ)Must be tax compliant, registered on Sentech Supplier Database, quotations on company letterhead, received on or before closing date/time, fully completed and signed in BLACK ink, submitted via Email or specified method. Preliminary and General: attend compulsory site briefing, verify dimensions, inspect damage, protect infrastructure, maintain site security, remove debris, reinstate ground, submit weekly progress reports with photos. Milestones include surface preparation completion, quality inspection after each coat of paint, final coat inspection before moving to next section.
Section
Source: RFX RIVERSDALE.pdfStage 1 – Administrative Responsiveness Evaluation against mandatory eligibility criteria in section 1 of the RFQ Data. Bidders not complying with all criteria will not be evaluated further. Stage 2 – B-BBEE preference points claimed in line with 80/20 preference point system. Suppliers with highest number of points recommended for award, unless compelling and justifiable reasons not to do so.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Standard Bidding (SDB) 4_Annexure A.pdf
Sentech Limited seeks a service provider to repair and reinstall the Clearvu security fence and Vibracrete fence at the Riversdale C4 Solar Plant in Western Cape. The tender submission deadline is Thursday 24 September 2026 at 12:00 GMT+0000.
SENTECH SUPPLIER CONSENT FORM.pdf
Sentech Limited invites proposals from service providers to repair and reinstate the existing clearvu security fence and vibracrete fence at the Riversdale C4 Solar Plant.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
Sentech LimitedContact Person
ZULU ZANELE
Phone
011-471-4443
[email protected]
Address
Riversdae - Riversdale - Riversdale - 6529
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
3
Last checked
22 Sept 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Description
Source: Standard Bidding (SDB) 4_Annexure A.pdfSupply chain management system should
This declaration prove to be false.
.................................... .....................................................
Signature Date
.................................... ......................................................
Position Name of bidder
Contact Information
Source: Standard Bidding (SDB) 4_Annexure A.pdf (TENDER){"name":null,"email":null,"phone":null,"department":"SUPPLY CHAIN MANAGEMENT","address":null}
Evaluation Criteria
Source: Standard Bidding (SDB) 4_Annexure A.pdf (TENDER)Automatic disqualification occurs if the bidder is employed by the state or has a relationship with Sentech Limited employees. Additional disqualification may apply for lacking CSD registration, tax clearance (SARS TCS/tax pin), insufficient B-BBEE level, inadequate CIDB construction grading, missing CIPC registration, or failing local content percentage requirements.
Technical Specifications
Source: Standard Bidding (SDB) 4_Annexure A.pdf (TENDER)Supply chain management system should
This declaration prove to be false.
.................................... .....................................................
Signature Date
.................................... ......................................................
Position Name of bidder
Compliance Requirements
Source: Standard Bidding (SDB) 4_Annexure A.pdf (TENDER)No specific requirements found
Section
Source: Standard Bidding (SDB) 4_Annexure A.pdfagreements or arrangements with any competitor regarding the quality,
Description
Source: SENTECH SUPPLIER CONSENT FORM.pdfThe document is a consent form for suppliers responding to a Sentech Request for Proposal (RFP). It explains how Sentech will process personal information shared by the supplier for the purpose of evaluating the RFP and registering the supplier on Sentech's database of suppliers.
Submission Guidelines
Source: SENTECH SUPPLIER CONSENT FORM.pdf (RFP)Returnable documents: the Sentech Supplier Consent Form, completed and signed by an authorised representative, must accompany the submission. The form gives Sentech consent to process personal information for evaluating the RFP and registering the supplier on Sentech's database. Withdrawal of consent may prevent processing of the RFP. Ensure the supplier name, date and signature are provided.
Evaluation Criteria
Source: SENTECH SUPPLIER CONSENT FORM.pdf (RFP)The supplier must be registered on Sentech's database, provide signed consent for processing personal information, and pass verification and background checks under FICA. Any other statutory or regulatory requirements stated in the tender documentation must also be met.
Technical Specifications
Source: SENTECH SUPPLIER CONSENT FORM.pdf (RFP)internally for the purposes of assessing current and future services required by Sentech. We may
Compliance Requirements
Source: SENTECH SUPPLIER CONSENT FORM.pdf (RFP)Sentech Supplier Consent Form: consent to process personal information for RFP evaluation and supplier database registration, including verification and background checks. Withdrawal of consent may prevent the RFP from being processed.
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Data conflicts
None detected
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Construction. Unlock full pricing strategies, bid frequency, and historical win rates.