Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
3233 Nokukhanya Luthuli Street - Groutville - KwaDukuza - 4450
Organization Type
GOVERNMENT
Published
18 Nov 2026
OCDS Reference
ocds-9t57fa-178735
The luthuli museum requires registered professional engineering consultants to assess the condition of its conservancy sewer system (three 8 000 l tanks showing structural failure) and to oversee the repair and upgrade project through all six stages, from inception to close-out. The team must include an ecsa-registered civil/structural engineer, a sacqsp-registered quantity surveyor and a sacpcmp-registered project manager, each with at least five years' relevant experience. Bidders must attend the compulsory site inspection on 25 november 2026 at 11:00 and submit a single pdf by email by 2 december 2026 at 11:00. The most consequential consideration is that only bids scoring at least 70 out of 100 on functionality will proceed to the 80/20 price and specific-goals evaluation.
Compulsory site inspection: 25 November 2026 at 11:00 at the Luthuli Museum, 3233 Nokukhanya Luthuli Street, Groutville, KwaDukuza, 4450; arrival after 11:15 counts as non-attendance and disqualifies the bid.
Closing: 2 December 2026 at 11:00; email a single combined PDF to [email protected]; hand delivery is not accepted and late or incomplete submissions are invalid.
Functionality threshold: technical proposal scored out of 100, with a minimum of 70 required to reach the 80/20 price and specific-goals stage; CVs of the quantity surveyor, civil engineer, project manager and structural engineer carry 40 points and each role needs at least five years' built-environment experience.
Professional team: civil/structural engineer registered with ECSA, quantity surveyor with SACQSP and project manager with SACPCMP; minimum five years' experience in sewerage and wastewater infrastructure design.
Mandatory documents: CSD full registration report, valid SARS tax pin, valid B-BBEE affidavit or certificate, CIDB contractor grading 1EB or higher, CIPC documents, certified director IDs, public liability insurance, COIDA letter of good standing, at least three traceable reference letters not older than five years, and a detailed methodology.
Specific-goal points: 20 points under the 80/20 system, awarded only for 100% Black equity ownership (10), women ownership of 51% or more (4), 100% youth ownership (4) and disability ownership (2); certified director IDs not older than three months and a doctor's certificate for disability are required to claim.
Pricing: fixed, final and binding for 120 days from closing, inclusive of all tests, fees, disbursements and 15% VAT; no additional costs will be accepted after appointment and no sub-contracting is permitted without the Project Officer's approval.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tenderβs issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Check the registered grade against the tender conditions, or estimate a possible grade. Check CIDB registration Β· Estimate a CIDB grade.
Date & Time
Wednesday, 02 December 2026 - 11:00
Venue
Luthuli Museum, 3233 Nokukhanya Luthuli Street, Groutville, 4450
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Request for Quotation
3233 Nokukhanya Luthuli Street - Groutville - KwaDukuza - 4450
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: Professional Engineering Technologist (Pr.Tech Eng), CESA Membership
AI Document Analysis Stages
Description
18 Nov
2026
Tender Published
Tender was published
02 Dec
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
LM 20260088 - APPOINTMENT OF PROFESSIONAL ENGINEERING CONSULTANTS TO CONDUCT A SEWER SYSTEM CONDITIONAL ASSESSMENT AT LUTHULI MUSEUM.pdf
Appointment of professional engineering consultants to conduct a conditional assessment of the conservancy sewer system at Luthuli Museum, then oversee the repair and/or upgrade project through all six professional stages to close-out. The system comprises three 8 000 L conservancy tanks buried in front of the Nokukhanya Luthuli Resource Centre building, constructed in 2018 and now showing structural failure and recurring blockages.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
Luthuli museumMatched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
RΒ 420Β 000
Range
Based on 13 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically β no action required from you.
The Luthuli Museum requires professional engineering consultants to assess the condition of its conservancy sewer system and to provide solutions for repair and upgrade. The system consists of three 8 000 L conservancy tanks installed in 2018 in front of the Nokukhanya Luthuli Resource Centre building. The tanks are showing structural failure and the museum experiences blockages and rapid filling.
The consultant will implement six project stages: inception and briefing; concept and feasibility with cost estimates; design development and approval; tender documentation and procurement; execution (construction and contract administration); and close-out (as-built).
The consultant may also be requested to provide ad hoc services as and when required, billed separately. The consultant must be able to sign off design drawings for submission and approval by the local municipality, so only professionally registered individuals may be appointed to the team.
The conditional assessment must cover: review of historic records and reports; pre-inspection safety and preparation; physical and structural integrity assessment; hydraulic and functional assessment; olfactory signs; environmental and siting compliance; and a condition scoring matrix. The list is not exhaustive; the consultant must include all necessary tests and studies.
The scope includes visual and physical inspection (surface and underground loads, existing services, structural displacement, CCTV, geotechnical investigation, survey); watertightness and leak testing (exfiltration and infiltration); compliance verification against SANS 10400 Part P, boundary clearances and manhole/ventilation access; environmental and site review (soil and groundwater, vehicle access for honey-sucker trucks); reporting and remediation (engineering report with risk ratings on a scale of 1 to 5 and recommendations, plus an intervention plan with scope, drawings, timeline, costs and specifications); project implementation (prepare specifications and bid documentation for a contractor); project monitoring and reporting; and as-built and close-out (as-built drawings and close-out report).
The professional team must include a Civil/Structural Engineer, a Quantity Surveyor and a Project Manager, all registered with their respective bodies (ECSA, SACQSP, SACPCMP). The consultant must include all professionals anticipated to be required; no additional costs will be accepted after appointment.
Phase 1 (investigation and feasibility) includes reviewing geotechnical and material reports and as-built drawings, conditional assessment, tests and calculations (CCTV, geotechnical investigation, survey, capacity, consumption, current and future demand), a comprehensive report with findings and options, concept and preliminary design drawings, and detailed design drawings and specifications. It also includes bill of quantities and project expenditure: reviewing and recommending total project costs and BOQ, producing the final consolidated BOQ, monthly cost reports and cash flow forecasts, interim payment certificates, variation/claims assessment reports and a final account statement.
Phase 2 includes procurement support (assist with bid document preparation, advertisement, briefing meeting, tender closing, and provide technical support during evaluation and contractor appointment); construction management and supervision (oversee construction for compliance with design and standards, quality control inspections and material approval, monthly progress and compliance reports, certify payment claims, OHS specification and compliance); and project close-out and handover (conditional assessment and investigation report, tender documentation and inspection reports, as-built drawings and final completion report).
The consultant must indicate the required duration of the assignment, including tests and reporting. Reporting requirements: weekly or biweekly progress updates during design and construction, monthly site supervision reports, minutes of site meetings and incident or deviation reports.
Important Dates
Source: LM 20260088 - APPOINTMENT OF PROFESSIONAL ENGINEERING CONSULTANTS TO CONDUCT A SEWER SYSTEM CONDITIONAL ASSESSMENT AT LUTHULI MUSEUM.pdf (RFQ)Compulsory briefing and site inspection
Closing
RFQ issue date: 18 November 2026
Contact Information
Source: LM 20260088 - APPOINTMENT OF PROFESSIONAL ENGINEERING CONSULTANTS TO CONDUCT A SEWER SYSTEM CONDITIONAL ASSESSMENT AT LUTHULI MUSEUM.pdf (RFQ)Enquiries
Submission
Site and delivery address
The Luthuli Museum
3233 Nokukhanya Luthuli Street
Groutville
KwaDukuza
4450
Submission Guidelines
Source: LM 20260088 - APPOINTMENT OF PROFESSIONAL ENGINEERING CONSULTANTS TO CONDUCT A SEWER SYSTEM CONDITIONAL ASSESSMENT AT LUTHULI MUSEUM.pdf (RFQ)Submission method
Returnable documents (all must be completed, signed and included)
Disqualification risks
Evaluation Criteria
Source: LM 20260088 - APPOINTMENT OF PROFESSIONAL ENGINEERING CONSULTANTS TO CONDUCT A SEWER SYSTEM CONDITIONAL ASSESSMENT AT LUTHULI MUSEUM.pdf (RFQ)Evaluation stages
Functionality scoring (100 points)
Price and specific goals (100 points)
Documents required to claim specific-goal points
Technical Specifications
Source: LM 20260088 - APPOINTMENT OF PROFESSIONAL ENGINEERING CONSULTANTS TO CONDUCT A SEWER SYSTEM CONDITIONAL ASSESSMENT AT LUTHULI MUSEUM.pdf (RFQ)Purpose
Project stages (all six required)
Conditional assessment activities
Scope of work
Professional team required
Deliverables
Reporting requirements
Duration
Ad hoc services
Experience & Qualifications
Source: LM 20260088 - APPOINTMENT OF PROFESSIONAL ENGINEERING CONSULTANTS TO CONDUCT A SEWER SYSTEM CONDITIONAL ASSESSMENT AT LUTHULI MUSEUM.pdfExperience and qualifications required
Quality Management
Source: LM 20260088 - APPOINTMENT OF PROFESSIONAL ENGINEERING CONSULTANTS TO CONDUCT A SEWER SYSTEM CONDITIONAL ASSESSMENT AT LUTHULI MUSEUM.pdfQuality requirements
Reporting
Pricing Schedule
Source: LM 20260088 - APPOINTMENT OF PROFESSIONAL ENGINEERING CONSULTANTS TO CONDUCT A SEWER SYSTEM CONDITIONAL ASSESSMENT AT LUTHULI MUSEUM.pdfPricing schedule
Pricing items (all fixed-price or rates)
Schedule of proposed team
Submission of documents
Financial Requirements
Source: LM 20260088 - APPOINTMENT OF PROFESSIONAL ENGINEERING CONSULTANTS TO CONDUCT A SEWER SYSTEM CONDITIONAL ASSESSMENT AT LUTHULI MUSEUM.pdf (RFQ)Pricing
Disbursements
Payment
Bid security
Compliance Requirements
Source: LM 20260088 - APPOINTMENT OF PROFESSIONAL ENGINEERING CONSULTANTS TO CONDUCT A SEWER SYSTEM CONDITIONAL ASSESSMENT AT LUTHULI MUSEUM.pdf (RFQ)Mandatory eligibility
B-bbee
Local content
Health & Safety
Source: LM 20260088 - APPOINTMENT OF PROFESSIONAL ENGINEERING CONSULTANTS TO CONDUCT A SEWER SYSTEM CONDITIONAL ASSESSMENT AT LUTHULI MUSEUM.pdfHealth and safety requirements
Environmental
Source: LM 20260088 - APPOINTMENT OF PROFESSIONAL ENGINEERING CONSULTANTS TO CONDUCT A SEWER SYSTEM CONDITIONAL ASSESSMENT AT LUTHULI MUSEUM.pdfEnvironmental requirements
Contractual Terms
Source: LM 20260088 - APPOINTMENT OF PROFESSIONAL ENGINEERING CONSULTANTS TO CONDUCT A SEWER SYSTEM CONDITIONAL ASSESSMENT AT LUTHULI MUSEUM.pdfThe contract is subject to the General Conditions of Contract (GCC), which must be initialled on every page and may not be amended. Special conditions of contract, where applicable, take precedence over the GCC.
Key GCC provisions
Special conditions
Special Conditions
Source: LM 20260088 - APPOINTMENT OF PROFESSIONAL ENGINEERING CONSULTANTS TO CONDUCT A SEWER SYSTEM CONDITIONAL ASSESSMENT AT LUTHULI MUSEUM.pdfSpecial conditions
Section
Source: LM 20260088 - APPOINTMENT OF PROFESSIONAL ENGINEERING CONSULTANTS TO CONDUCT A SEWER SYSTEM CONDITIONAL ASSESSMENT AT LUTHULI MUSEUM.pdfEvaluation is in three stages: mandatory criteria, functionality, and price with specific goals.
Mandatory criteria (failure eliminates the bid)
Functionality evaluation (100 points; minimum 70 to proceed)
Price and specific goals (100 points)
Documents required to claim specific-goal points
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve architectural, building design, or professional built-environment services.
Act 44 of 2000
Relevant where architectural work or professional building-design services may be required.
Relevant because this tender appears to involve architectural, building design, or professional built-environment services.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve architectural, building design, or professional built-environment services.
Address
3233 Nokukhanya Luthuli Street, Groutville, 4450, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
18 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Contact
032-559-8063[email protected]luthulimuseum.org.za3233 Nokukhanya Luthuli Street, Groutville, 4450, South Africa
Key Personnel
Learn how to submit a winning bid with these related articles
How consulting engineers, engineering firms, and multidisciplinary practices can win public sector infrastructure contracts in South Africa β from ECSA registration and CESA membership to fee proposals, QBS scoring, and building a winning tender response.
A method for reading public procurement data as evidence: threshold clustering, repeat awards, single-bidder patterns and director links. Signals are not proof, so learn how to test and document them.
A practical guide to using the Tenders-SA Forensic Analysis workbench for supplier audits, department scans, pair analysis, and AI-generated case narratives to identify procurement irregularities.
How Tenders-SA built a forensic analysis workbench that detects procurement irregularities across 80+ indicators spanning 8 families β from market concentration and single-bidder patterns to OCPO restricted supplier cross-referencing and AI-generated case narratives.
π‘ Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Architectural and engineering activities; technical testing and analysis. Unlock full pricing strategies, bid frequency, and historical win rates.