Tender Type
Request for Quotation
Delivery Location
George Airport - - George -
Organization Type
GOVERNMENT
Published
21 Oct 2026
OCDS Reference
ocds-9t57fa-174953
The airports company of south africa requires a contractor to design and build temporary ablution facilities and repair existing ablution infrastructure at george airport in the western cape, with a 17-month contract period. The works must comply with nbr, SANS 10400 and other relevant SANS standards, using only sabs or agreement board approved materials. A registered surveyor must indicate boundary pegs on site. The scope is supported by architectural drawing 4627-ST3-ARC-2026.03.03 at 1:200 scale. The single most consequential bidder consideration is that this is a design-and-build construction contract with a 17-month operational period, requiring both design capability and construction execution within airport operational constraints.
Closing: 13 November 2026 at 12:00 β submission method and address not stated in available text; recover from full tender document.
Mandatory briefing or site visit: not stated in available text; verify with issuing body whether airport access induction or pre-bid site inspection is required.
CIDB grading: not stated in available text; construction work of this nature typically requires CIDB registration β confirm minimum grade with ACSA.
B-BBEE requirements: not stated in available text; PPPFA preference points system (80/20 or 90/10) and required B-BBEE level not recoverable from supplied extracts.
CSD registration and SARS tax clearance: standard for all public sector tenders; confirm TCS pin validity period covers closing date.
Design capability: bidder must demonstrate ability to design temporary ablution facilities, not solely construct to provided designs.
Standards compliance: all materials SABS or Agreement Board approved; all work to NBR, SANS 10400 and relevant SANS standards.
Contract period: 17 months from commencement β pricing must cover full design, construction, and operational/maintenance period.
Local content: percentage requirement not stated in available text; verify if SBD 6.2 applies.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tenderβs issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Date & Time
Friday, 13 November 2026 - 12:00
Venue
Acsa Offices, 1st Floor, Terminal Building, Outeniqua Building, George Airport
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Quotation
George Airport - - George -
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Important Dates
Source: 8. 4627 ST3 ARC 20260303 ACSA AB REV03.pdf (unknown)21 Oct
2026
Tender Published
Tender was published
13 Nov
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
5. 4627 ST3 ARC 20260401 SAN REV04.pdf
Analysis completed but response format was invalid
3. GRJ Temporary Ablutions_Unpriced BOQ.pdf
Design and build for the installation of temporary ablution facilities and repair of existing ablution facilities at George Airport, for a period of 17 months, for Airports Company South Africa. The works include alterations, earthworks, concrete, masonry, waterproofing, carpentry, ceilings, partitions, floor coverings, ironmongery, and metalwork, all measured under a provisional bill of quantities.
4. GATEX Ablutions - Bills of Quantities.xlsx
Airports Company South Africa requires a design and build contractor for the installation of temporary ablution facilities and repair of existing ablution facilities at George Airport over a 17-month period. The works comprise demolition, alterations, new builders work, earthworks, concrete, masonry, waterproofing, carpentry, suspended ceilings, drywall partitions, toilet cubicles, floor coverings, ironmongery and aluminium windows and doors, all measured in a provisional bill of quantities to be remeasured during construction.
2. NEC3 ECC - George Airport Ablutions.pdf
Design and build of temporary ablution facilities and repair of existing ablution infrastructure at George Airport for a 17-month period, under NEC3 ECC Option B (priced contract with bill of quantities).
9. 4627 ST3 ARC 20260303 GFP &FFP REV03.pdf
The Airports Company South Africa requires design and construction of temporary ablution facilities and repair of existing ablution units at George Airport for a 17βmonth period. Bidders must comply with South African standards, use SABSβapproved materials, and submit all mandatory tender forms.
8. 4627 ST3 ARC 20260303 ACSA AB REV03.pdf
Design and build contract for the installation of temporary ablution facilities and the repair of existing ablution facilities at George Airport, for a period of 17 months, for Airports Company South Africa. The works cover male, female and disabled toilet and washroom areas across ground and first floor layouts, including new and existing WC cubicles, basins, ceilings, louvres, tiling, water and sewer connections.
6. 4627 ST3 ARC 20260303 AR AB REV03.pdf
Design and build of temporary ablution facilities and repair of existing ablution facilities at George Airport, for Airports Company South Africa, over a 17-month period. The work includes a new ablution block with male, female, and family facilities, associated structural and cladding works, and repairs to existing ablutions.
CIDB Bid document_RFQ 10564_20 Oct 2026.pdf
Design and build for the installation of temporary ablution facilities and repair of existing ablution facilities at George Airport, operated by Airports Company South Africa (ACSA). The contract runs for 17 months and requires a CIDB contractor grading of 3 GB or higher. Bidders must attend a compulsory briefing and site inspection, and submit their bid electronically by 13 November 2026 at 12:00.
7. 4627 ST3 ARC 20260303 DEP AB REV03.pdf
Design and build installation of temporary ablution facilities and repair of existing ablution facilities at Airports Company South Africa George Airport for a period of 17 months.
To download these documents and access AI-powered analysis, visit the main tender page.
Win ACSA tenders with AI Matching Engine, airport-infrastructure intelligence, compliance analysis, and application support for aviation operations.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
RΒ 4Β 929Β 337
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically β no action required from you.
Closing date: 13 November 2026 at 12:00
Technical Specifications
Source: 8. 4627 ST3 ARC 20260303 ACSA AB REV03.pdf (unknown)Design and build temporary ablution facilities and repair existing ablution facilities at George Airport. Contract period: 17 months. All materials must be SABS or agreement board approved.
Important Dates
Source: CIDB Bid document_RFQ 10564_20 Oct 2026.pdf (RFQ)Document available: 21 October 2026 (free download from eTenders and ACSA tender bulletin)
Compulsory briefing session: 30 October 2026 at 11:00
Briefing venue: ACSA Boardroom, 1st Floor, Terminal Building, Outeniqua Boardroom, George Airport (opposite Wimpy Restaurant entrance)
Compulsory site inspection: immediately after briefing (restricted area access required)
Site inspection requirements: arrive 2 hours early for temporary airport permit processing (R50 per person); bring ID/driverβs licence, safety boots, reflector vest
Query closure deadline: 06 November 2026
Employer response to queries: by 10 November 2026 at 12:00
Closing date and time: 13 November 2026 at 12:00
Tender offer validity: 12 weeks (84 days) from closing date
Addenda issued until: 10 working days before closing
Contact Information
Source: CIDB Bid document_RFQ 10564_20 Oct 2026.pdf (RFQ)SCM and Technical Enquiries:
Submission address (email): [email protected]
Service delivery address:
George Airport
Terminal Building
Outeniqua Boardroom, 1st Floor
Western Cape
South Africa
Submission Guidelines
Source: CIDB Bid document_RFQ 10564_20 Oct 2026.pdf (RFQ)Submission method: email to [email protected]
Submission format: at least four separate attachments, each β€ 4 MB, using the same subject heading as the invitation
Closing time: 13 November 2026 at 12:00 (South African Time)
Late submissions: not accepted under any circumstances
Returnable documents (all must be completed, signed and submitted):
Disqualification risks:
Evaluation Criteria
Source: CIDB Bid document_RFQ 10564_20 Oct 2026.pdf (RFQ)Evaluation follows five sequential stages:
Stage 1 β Responsiveness Test (C.3.8): tender must comply with all conditions, be fully completed and signed, and contain no material deviation.
Stage 2 β Mandatory Administration Criteria (all must be met):
Stage 3 β Functionality Evaluation (minimum threshold 70/100):
Stage 4 β Price and Preference (80/20 system, applicable to bids β€ R50 million):
Stage 5 β Objective Criteria: award to highest points scorer unless objective criteria justify otherwise
Technical Specifications
Source: CIDB Bid document_RFQ 10564_20 Oct 2026.pdf (RFQ)Scope: Design and build installation of temporary ablution facilities and repair of existing ablution facilities at George Airport
Contract period: 17 months
Location: George Airport, Western Cape (restricted area β temporary airport permits required)
Work nature: General building works (civil/building infrastructure)
Key deliverables:
Capacity requirements:
Site access: Restricted area; bidders must obtain temporary permits (R50/person) and arrive 2 hours before briefing
Safety gear required for site inspection: safety boots, reflector vest, ID/driverβs licence
Financial Requirements
Source: CIDB Bid document_RFQ 10564_20 Oct 2026.pdf (RFQ)Pricing basis: Fixed price β rates and prices remain firm for full contract duration (no contract price adjustments, foreign exchange fluctuations, or escalation)
VAT: Shown separately as addition to tendered total
Pricing schedules: Complete C2.1 (Pricing Assumptions) and C2.2 (Pricing/Activity Schedules) in prescribed format
Bid security / guarantees: Not explicitly stated in extracted text; tenderer must submit securities, bonds, guarantees, policies and insurance certificates as required by contract data if requested before contract formation (C.2.20)
Insurance: Requirements detailed in Appendix 2 (attached separately); employerβs insurance extent may not cover full contract requirements β tenderer advised to seek qualified advice
Payment terms: Not specified in extracted text
Financial capacity: No explicit turnover threshold stated; evaluation considers financial resources as part of Stage 5 acceptance criteria (C.3.13)
Compliance Requirements
Source: CIDB Bid document_RFQ 10564_20 Oct 2026.pdf (RFQ)Mandatory eligibility:
Description
Source: 4. GATEX Ablutions - Bills of Quantities.xlsx (unknown)Procurement description
Evaluation Criteria
Source: 4. GATEX Ablutions - Bills of Quantities.xlsx (unknown)Evaluation criteria (from tender document)
Technical Specifications
Source: 4. GATEX Ablutions - Bills of Quantities.xlsx (unknown)Scope of work
Financial Requirements
Source: 4. GATEX Ablutions - Bills of Quantities.xlsx (unknown)Pricing and financial provisions
Compliance Requirements
Source: 4. GATEX Ablutions - Bills of Quantities.xlsx (unknown)Mandatory compliance requirements
Description
Source: 7. 4627 ST3 ARC 20260303 DEP AB REV03.pdfScope: construction work for temporary ablutions. All materials must be SABS or agreement board approved as specified. Boundary pegs must be indicated on site by a registered surveyor.
Technical Specifications
Source: 7. 4627 ST3 ARC 20260303 DEP AB REV03.pdf (unknown)Scope: Design and build of temporary ablution facilities and repair of existing ablution at George Airport, Ablution Departures, for 17 months.
Location: Ptn 78 of Farm 208 (Unregistered), George.
Materials: All materials must be SABS or agreement board approved as specified.
Standards: All work must be carried out in accordance with NBR, SANS 10400 and other relevant SANS standards.
Setting out: Boundary pegs must be indicated on site by a registered surveyor.
Construction: Wood and slate framed in 50 x 25 mm mild steel channel welded to structure, 100 mm off concrete apron.
Finishes: Moisture board painted Dulux Sandstone Beige; ceiling height 2400 mm.
Glazing: Glass panels to be frosted; louvres at 2495.
Facilities: Male, female, unisex and family ablution areas with WCs; noted areas include 10 m2, 14 m2 and 4 m2.
Description
Source: 6. 4627 ST3 ARC 20260303 AR AB REV03.pdf (unknown)Scope: design and build for installation of temporary ablution facilities and repair of existing ablution over 17 months at George Airport.
Structure: wood slate framed in 50x25mm mild steel channel, welded on structure, 100mm off concrete apron. Ceiling height 2400mm.
Finishes: Dulux Sandstone Beige D1 grade wood slates; moisture board painted to 10520 standards. Aluminum louvers at 2650mm.
Materials: all SABS or Agreement Board approved.
Compliance: NBR, SANS 10400 and relevant SANS standards. Boundary pegs by registered surveyor.
Layout: separate male and female facilities, 4+ cubicles each, wash hand basins, lobby with new DB, universal access ramp at 1:10, 850mm door openings.
Demolition and making good of existing structures as required.
Location: George Airport, Ptn 78 of Farm 208 (Unregistered), George, Western Cape.
Architect: L.M.J Xesha Moyo, SACAP Reg. Number 57362192.
Evaluation Criteria
Source: 6. 4627 ST3 ARC 20260303 AR AB REV03.pdf (unknown)Evaluation approach
Mandatory registration
Returnable forms β all must be completed, signed and submitted:
Professional registration
Technical Specifications
Source: 6. 4627 ST3 ARC 20260303 AR AB REV03.pdf (unknown)Scope
Structure and finishes
Compliance
Layout
Demolition
Project location
Compliance Requirements
Source: 6. 4627 ST3 ARC 20260303 AR AB REV03.pdf (unknown)Mandatory registrations
Professional registration
CIDB
B-bbee
Local content
Description
Source: 2. NEC3 ECC - George Airport Ablutions.pdf (RFQ)Scope: design and build for the installation of temporary ablution facilities and repair of existing ablution at George Airport for 17 months, under the jurisdiction of Airports Company South Africa (ACSA).
Work packages: Work Packages 1 and 2 involve the design, supply and installation of two prefabricated ablution units; Work Packages 3 and 4 involve the repair and refurbishment of two existing ablution facilities within the terminal.
Important Dates
Source: 2. NEC3 ECC - George Airport Ablutions.pdf (RFQ)Closing: 13 November 2026 at 12:00
Submission of Programme: 1 week after signing of the contract by ACSA
Training: 3 weeks after signing of the contract by ACSA
Approval of Health and Safety File by CHSA: 2 weeks after signing of the contract by ACSA
Site Handover and Commencement of designs and Works: 1 week upon approval of the Health and Safety file by the ACSA OHS Department and obtaining airport access permits
Programme Updates: at intervals no longer than 2 weeks
Completion of construction work: 20 weeks after Site Handover
Completion date for the whole of the works: 14 months after signing of the contract by ACSA
Defects liability period ends: 52 weeks after certified completion of the works
Contact Information
Source: 2. NEC3 ECC - George Airport Ablutions.pdf (RFQ)Employer: Airports Company South Africa SOC Limited
Employer address: Cape Town International Airport, Private Bag X9002, Cape Town, 7525
Project Manager: Ukhukhula Holdings (Pty) Ltd
Project Manager address: TBC
Project Manager telephone: N/A
Project Manager e-mail: TBC
Supervisor: Ukhukhula Holdings (Pty) Ltd
Supervisor address: TBC
Submission Guidelines
Source: 2. NEC3 ECC - George Airport Ablutions.pdf (RFQ)Returnable documents must be completed, signed and submitted with the offer:
Technical Specifications
Source: 2. NEC3 ECC - George Airport Ablutions.pdf (RFQ)Scope: design and build for the installation of temporary ablution facilities and repair of existing ablution at George Airport for a period of 17 months.
Location: George Airport, landside and airside of the Terminal Building.
Works:
Work Packages 1 and 2: design, supply and installation of two prefabricated ablution units.
Work Packages 3 and 4: repair and refurbishment of two existing ablution facilities within the terminal.
Standards: comply with SANS 10400 and ACSA operational and security requirements; maintain health, safety, hygiene and accessibility standards.
Key personnel required: Professional Architect or Senior Architectural Technologist; Construction Manager or Site Supervisor; Health and Safety Officer.
Architecture services: plans scrutiny, design work for the ablution facilities, supervision, quality inspections and certification of handover.
Electrical connections: Certificate of Compliance required; metered connection for billing; water and electricity provided by ACSA.
Site access: police clearance required; all contractor employees checked for criminal records; no permits issued to employees with criminal records or pending criminal process; foreign nationals require a valid working permit.
Methodology
Source: 2. NEC3 ECC - George Airport Ablutions.pdf (RFQ)Work Package 1 - Temporary Landside Ablution Facility: design of a prefabricated containerised ablution for the Employer's approval; supply, delivery and offloading; positioning; reinforced concrete base or plinth preparation; modification of the existing brick wall within the vacant cellphone retail shop to form the ablution facility.
Experience & Qualifications
Source: 2. NEC3 ECC - George Airport Ablutions.pdf (RFQ)Key personnel required:
CVs and further key person data are appended to the tender schedule.
Subcontractors: within 5 days of request by the Project Manager, the Contractor must provide proof that payment obligations to subcontractors have been discharged.
Joint ventures: within 1 week of the Contract Date, notify the Project Manager and the Employer of the key person authorised to bind the contractor; do not materially alter the composition of the joint venture without prior written consent.
Pricing Schedule
Source: 2. NEC3 ECC - George Airport Ablutions.pdf (RFQ)Offered total of prices: inclusive of VAT, with the VAT portion indicated separately.
Professional fees: fixed and will not be adjusted.
Escalations: not applicable.
Materials off site: the Employer will not pay for materials off site.
Mark-up restrictions: no mark-up on permit costs or on site services provided by ACSA (water, electricity); for third-party procured items, VAT is excluded from mark-up calculations, all discounts are deducted prior to mark-up, and the price includes delivery to site.
Financial Requirements
Source: 2. NEC3 ECC - George Airport Ablutions.pdf (RFQ)Pricing method: NEC3 Option B, re-measurement contract priced against the Bill of Quantities.
Currency: South African Rand.
Bid offer: inclusive of VAT, with the VAT portion indicated separately.
Prices: fully inclusive of all costs, risks, liabilities, obligations, overheads and profit.
Professional fees: fixed and will not be adjusted.
Escalations: not applicable.
Employer will not pay for materials off site.
No mark-up on permit costs or on site services provided by ACSA (water, electricity).
Third-party procured items: VAT excluded from mark-up calculations; all discounts deducted prior to mark-up; price includes delivery to site.
Provisional sums, estimated quantities and contingency: reimbursed against proven costs upon approval by the ACSA representative; these are allowances and ACSA is not obliged to expend the full or any portion.
Performance bond: 10% of the contract value; unconditional, on-demand, provided by a bank or insurer accepted by the Project Manager and the Employer; valid until the end of the contract period.
Retention: 5% of the Prices; 2.5% released at Completion of the works and the remaining 2.5% released after the Defects Period.
Delay damages: 0.05% per day up to a maximum of 10% of the contract value.
Payment: assessment interval between the 15th and 20th day of each successive month; payment within four (4) weeks after approval of the tax invoice by ACSA.
Permit costs: application and training costs paid upfront by the successful bidder and reimbursed against proof of payment; no mark-up; costs for lost permits and replacement employees are not reimbursed.
Compliance Requirements
Source: 2. NEC3 ECC - George Airport Ablutions.pdf (RFQ)CIDB: tender prepared in accordance with the CIDB Standard for Uniformity in Construction Procurement.
Insurance: contractor provides insurance as per Annexure C5.7, in the joint names of the Parties, covering events at the Contractor's risk from the starting date until the Defects Certificate or termination certificate; minimum indemnity for death or bodily injury of employees as prescribed by the Compensation for Occupational Injuries and Diseases Act.
Quality management system: contractor implements and maintains a quality management system per the Works Information; quality plan submitted to the Project Manager for acceptance within two (2) weeks after signing of the contract by ACSA.
Health and safety: Health and Safety File approval by CHSA within two (2) weeks after signing of the contract by ACSA; site handover upon approval and obtaining airport access permits.
Permits and clearances: police clearance required for site access; all contractor employees checked for criminal records; foreign nationals require a valid working permit.
Ethics: compliance with the Prevention and Combating of Corrupt Activities Act; no corrupt offers, payments or benefits.
Confidentiality: all contract information treated as confidential; no images of the works without prior written consent of the Project Manager.
Intellectual property: irrevocable, transferrable, non-exclusive, royalty-free licence to the Employer to use and copy IP related to the works.
Cession and assignment: no cession, delegation or assignment without written Employer consent; joint ventures are jointly and severally liable; the key person authorised to bind the contractor must be notified within 1 week of the Contract Date.
Subcontractors: proof of payment to subcontractors within 5 days of Project Manager request.
Health & Safety
Source: 2. NEC3 ECC - George Airport Ablutions.pdf (RFQ)Health and Safety File: approval by CHSA within two (2) weeks after signing of the contract by ACSA.
Site Handover: occurs one week upon approval of the Health and Safety file by the ACSA OHS Department and obtaining airport access permits.
Standards: maintain compliance with applicable health, safety, hygiene and accessibility standards in accordance with SANS 10400 and ACSA operational and security requirements.
Site access: police clearance required.
Employee screening: all contractor employees checked for criminal records; no permits issued to employees with criminal records or pending criminal process; foreign nationals require a valid working permit.
Objectives: maintain adequate ablution capacity for passengers, airport staff and operational personnel; relieve capacity constraints on existing ablution facilities; enable refurbishment of existing ablutions without disruption through temporary alternatives and additional brick and mortar ablutions.
Contractual Terms
Source: 2. NEC3 ECC - George Airport Ablutions.pdf (RFQ)Contract: NEC3 Engineering and Construction Contract (ECC), main Option B (priced contract with bill of quantities), dispute resolution Option W1, secondary options X7 (delay damages), X13 (performance bond), X15 (limitation of liability for design), X16 (retention), X18 (limitation of liability) and Z (additional conditions).
Delay damages: 0.05% per day up to a maximum of 10% of the contract value.
Performance bond: 10% of the contract value; unconditional, on-demand, from a bank or insurer accepted by the Project Manager and the Employer; valid until the end of the contract period.
Retention: 5% of the Prices; 2.5% released at Completion of the works and the remaining 2.5% released after the Defects Period.
Limitation of liability: neither party liable for indirect or consequential loss, including loss of profit, income or revenue.
Z clauses: cession, delegation and assignment require written Employer consent; joint ventures are jointly and severally liable; ethics and anti-corruption compliance; confidentiality; intellectual property licence to the Employer; liens and encumbrances on equipment.
Section
Source: 2. NEC3 ECC - George Airport Ablutions.pdf (RFQ)Quality plan: the Contractor must submit a quality plan to the Project Manager for acceptance within two (2) weeks after signing of the contract by ACSA. A quality plan may be rejected if it does not allow the Contractor to provide the Works. Any changes to the quality plan must be submitted to the Project Manager for acceptance. An instruction to correct failure to comply with the quality plan is not a compensation event.
Description
Source: 9. 4627 ST3 ARC 20260303 GFP &FFP REV03.pdf (unknown)Layout
Technical Specifications
Source: 9. 4627 ST3 ARC 20260303 GFP &FFP REV03.pdf (unknown)Scope
Materials and standards
Reference drawing
Methodology
Source: 9. 4627 ST3 ARC 20260303 GFP &FFP REV03.pdf (unknown)Drawing use
Description
Source: 3. GRJ Temporary Ablutions_Unpriced BOQ.pdf (unknown)Partitions and cubicles
Restroom cubicles
Flooring and ironmongery
Aluminium and metalwork
Submission Guidelines
Source: 3. GRJ Temporary Ablutions_Unpriced BOQ.pdf (unknown)Pricing returnable
Bid content
Site awareness
Technical Specifications
Source: 3. GRJ Temporary Ablutions_Unpriced BOQ.pdf (unknown)Main scope
Site establishment and public interface
Demolition and alterations
Earthworks and concrete
Masonry, waterproofing and finishes
Metalwork, electrical and plumbing
Quality Management
Source: 3. GRJ Temporary Ablutions_Unpriced BOQ.pdf (unknown)Testing, records and handover
Plumbing and drainage
Mirrors and paintwork
Prefabricated mobile units
Commercial allowances in the BOQ
Pricing Schedule
Source: 3. GRJ Temporary Ablutions_Unpriced BOQ.pdf (unknown)Builders' BOQ structure
Pricing method
Electrical general items
Electrical quantities
Financial Requirements
Source: 3. GRJ Temporary Ablutions_Unpriced BOQ.pdf (unknown)Pricing basis
Electrical pricing
Provisional sums and allowances
Guarantees
Costing check
Compliance Requirements
Source: 3. GRJ Temporary Ablutions_Unpriced BOQ.pdf (unknown)Professional and statutory compliance
Product, testing and documentation compliance
Health & Safety
Source: 3. GRJ Temporary Ablutions_Unpriced BOQ.pdf (unknown)Health, safety and site controls
Environmental
Source: 3. GRJ Temporary Ablutions_Unpriced BOQ.pdf (unknown)Materials, waste and site care
Contractual Terms
Source: 3. GRJ Temporary Ablutions_Unpriced BOQ.pdf (unknown)Contract framework
Pricing and risk allocation
Site, access and insurance
Guarantees and cost clarification
Description
Source: 5. 4627 ST3 ARC 20260401 SAN REV04.pdf (unknown)Project scope
Important Dates
Source: 5. 4627 ST3 ARC 20260401 SAN REV04.pdf (unknown)Closing date: 13 November 2026
Closing time: 12:00
Technical Specifications
Source: 5. 4627 ST3 ARC 20260401 SAN REV04.pdf (unknown)Scope and programme
Technical requirements
Quality Management
Source: 5. 4627 ST3 ARC 20260401 SAN REV04.pdf (unknown)Quality and performance
Compliance Requirements
Source: 5. 4627 ST3 ARC 20260401 SAN REV04.pdf (unknown)Construction compliance
Requirements
Source: 5. 4627 ST3 ARC 20260401 SAN REV04.pdf (unknown)Fixtures and equipment
Finishes and construction
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
George Airport - - George -
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
9
Last checked
21 Oct 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
Everything South African construction contractors need to know about how procurement officers verify cidb grades: what gauteng contractors must ensure is correct β april 2026 update β covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
How established construction firms use Joint Ventures with EMEs and QSEs to meet B-BBEE preferential procurement targets and access set-aside contracts.
Everything South African construction contractors need to know about cidb grading system explained: what every gauteng contractor must know in 2026 β april 2026 update β covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Everything South African construction contractors need to know about cidb vs nhbrc: understanding dual registration requirements for residential projects in gauteng β april 2026 update β covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
π‘ Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Construction. Unlock full pricing strategies, bid frequency, and historical win rates.