ESKOM requires the supply, delivery and installation of uninterruptible power supply (UPS) units and batteries at its oil laboratories in bloemfontein, klerksdorp, port elizabeth and witbank. The work is governed by ESKOM specification 240-105658000 and the iso 9001 standard, with quality requirements applying both before and after contract award. Bidders must complete and sign form a (240-68099512 rev 10), selecting exactly one pre-contract quality category and indicating whether a site assessment applies. The most consequential consideration is that the tenderer's quality representative must sign the form and the bidder must accept eskom's supplier quality requirements; failure to do so may render the bid non-responsive.
Key Requirements
Closing date and time: 20 November 2026 at 08:00 (UTC). Submission method and address are not stated in the available document; bidders must confirm with Eskom.
Mandatory returnable: Form A (Tender & Contract Quality Requirements, 240-68099512 Rev 10) must be completed and signed by the tenderer's quality representative to acknowledge and accept Eskom specification 240-105658000 and ISO 9001.
Quality category selection: exactly one pre-contract award quality category must be selected (Category 1, 2, 3, 4, or the main supplier and sub-supplier capability and capacity assessment); selecting more than one is not permitted.
Site assessment indicator: the form requires the bidder to state whether a site assessment is applicable.
Post-contract quality obligations: the successful bidder will be subject to contract execution, supplier quality performance monitoring and supplier quality audit.
Standard conditions: Eskom rights of access, rights to information, preservation, quality audits related conditions, management of nonconformities and nonconforming outputs, and special processes apply.
ISO 9001 compliance: clauses 4 to 10 and quality principles 1 to 7 apply in full; the bidder's quality system must align with these requirements.
Professional Services & Consulting Industry Profile
Regulatory Bodies
SAGCSAICA
Tenders in this industry often require registration with these bodies.
Typical Documents
5 items
Company Registration (CIPC)
Tax Clearance Certificate
B-BBEE Certificate
CSD Registration
Company Profile
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
Document240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfReview complete
Description
Important Dates
06 Nov
2026
PUBLICATION
Tender Published
Tender was published
20 Nov
2026
DEADLINE
Closing Date
Tender closing date
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
9 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Supply, delivery, and installation of UPS and batteries for laboratories in Bloemfontein, Klerksdorp, Port Elizabeth, and Witbank Oil Laboratories, procured by Eskom in Gauteng.
Supply, delivery, installation and commissioning of 3-phase 400VAC 25 kVA UPS systems with 4-hour battery banks at four Eskom oil laboratories in Bloemfontein, Klerksdorp, Port Elizabeth and Witbank. The contract is an NEC3 Term Service Short Contract with a priced schedule covering four complete UPS units, installation labour, delivery to each site and accommodation.
E3511CXMWPR_Invitation to Tender (ITT)_06 November 2026.pdf
Supply, delivery, and installation of UPS and batteries for four oil laboratories located in Bloemfontein, Klerksdorp, Port Elizabeth, and Witbank. The tender requires technical 75% compliance for shortlisting, B-BBEE preference points under PPPFA 80/20, and submission of multiple standard forms including SBD 1, SBD 4, SBD 6.1, and SBD 6.2.
Supply, delivery and installation of UPS units and batteries for Eskom's oil laboratories in Bloemfontein, Klerksdorp, Port Elizabeth and Witbank. Bidders must submit a set of occupational health and safety returnables alongside the bid.
Supply, delivery and installation of uninterruptible power supplies (UPS) and batteries for four Eskom oil laboratories located in Bloemfontein, Klerksdorp, Port Elizabeth and Witbank. Bidders must submit a Contract Quality Plan covering quality management, inspection and test planning, sub-supplier control, records, non-conformance management and post-delivery support.
Tender Evaluations Environmental Requirements -UPS and Batteries -27 Aug 2026.pdf
Supply, delivery and installation of UPS units and batteries at four Eskom oil laboratories in Bloemfontein, Klerksdorp, Port Elizabeth and Witbank. Bidders must submit environmental documentation covering policy, aspects and impacts, and a method statement for the works.
Supply, delivery and installation of UPS units and batteries for Eskom's oil laboratories in Bloemfontein, Klerksdorp, Port Elizabeth and Witbank. The scope is governed by Eskom's tender and contract quality requirements specification 240-105658000 and the ISO 9001 standard.
Supply, delivery and installation of UPS units and batteries for Eskom's oil laboratories in Bloemfontein, Klerksdorp, Port Elizabeth and Witbank. Bidders are evaluated on technical criteria with a minimum qualifying score of 80%.
Supply, delivery, and installation of UPS and batteries for laboratories in Bloemfontein, Klerksdorp, Port Elizabeth, and Witbank Oil Laboratories, procured by Eskom in Gauteng province.
Supply, delivery and installation of uninterruptible power supplies (UPS) and batteries for Eskom's oil laboratories in Bloemfontein, Klerksdorp, Port Elizabeth and Witbank. Bidders are invited to tender for the equipment and installation work across the four laboratory sites.
240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf
Eskom requires the supply, delivery and installation of UPS units and batteries for its oil laboratories in Bloemfontein, Klerksdorp, Port Elizabeth and Witbank. Suppliers must operate a quality management system conforming to ISO 9001 and comply with Eskom's Supplier Quality Management specification throughout the contract.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Similar Tenders
Matched by category & region
Supplier Readiness Hub
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Supplies: GeneralFind supplies: general tenders and contract opportunities in South Africa. Browse active government procurement opportunities updated daily.
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Document read
Compliance review
Bid-ready summary
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf
The specification sets the minimum quality requirements for existing and potential Eskom suppliers and the criteria for evaluation, selection, supplier registration, assessment, performance monitoring and auditing. Eskom requires suppliers to develop, implement, maintain and continually improve a quality management system based on ISO 9001, and to apply it throughout the contract for externally provided products, services and processes. The specification applies across Eskom divisions, subsidiaries, suppliers and sub-suppliers, and forms part of all RFIs, RFQs, RFPs and procurement contracts.
Submission Guidelines
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)
Returnable documents
Form A (240-68099512): Tender and Contract Quality Requirements — must be completed, signed and returned with the bid to acknowledge and accept the applicable quality category and ISO 9001 obligations.
Quality returnables per the List of Tender Returnable (240-12248652): the specific documents required depend on the quality category (1 to 4) assigned to this procurement.
Category 1 returnables: valid ISO 9001 (or applicable QMS) certificate; latest internal and external audit reports including nonconformities and corrective actions; documented roles, responsibilities and authorities; draft contract quality plan meeting ISO 10005; example ITP/QCP from similar or previous work; documented control of externally provided processes, products and services; management review records.
Category 2 returnables: objective evidence of an implemented ISO 9001 QMS (QMS manual or equivalent, quality policy, quality objectives, control of documented information, internal audit procedure, control of nonconforming outputs, nonconformity and corrective action procedure); latest internal audit reports; draft contract quality plan; example ITP/QCP; control of externally provided processes; roles and responsibilities; management review records.
Categories 3 and 4: returnables are selected per tender using 240-12248652; the specification does not list them separately.
Submission format
Submit the signed Form A and all category-specific quality documentation with the bid, as listed in 240-12248652.
The contract quality plan and ITP/QCP must be specific to the scope of work described in the tender documents.
Evaluation Criteria
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)
Quality evaluation
The assigned Eskom quality representative selects the applicable quality requirements using guideline 240-125473040 (QM 58 Selection Criteria) and records them in Form A.
Only one quality category (1, 2, 3 or 4) applies to a procurement process.
Bidders are evaluated against the returnables for the assigned category, as listed in 240-12248652.
The Tender Evaluation Scorecard (240-168873697) is the scoring instrument.
Form A Sections A and E must be completed and signed by the bidder to confirm acceptance of the Eskom supplier quality requirements and ISO 9001 obligations.
Where a new product or service is introduced, industry recommended practices or applicable codes apply where no SANS equivalent exists (for example UL 9540 or IEEE 1790 for BESS).
Eskom may conduct capability and capacity assessments, including at sub-supplier facilities.
Technical Specifications
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)
Scope
Supply, delivery and installation of UPS units and batteries at the Bloemfontein, Klerksdorp, Port Elizabeth and Witbank oil laboratories.
Quality management system
The supplier and every sub-supplier must develop, implement, maintain and continually improve a formal QMS conforming to the latest ISO 9001, or an applicable equivalent QMS standard.
A valid ISO 9001 certificate from an accredited certification body is required unless the applicable quality category excludes it.
The QMS must cover design, manufacturing, maintenance, testing, storage, delivery, installation, commissioning and project management where these fall within the sub-supplier's scope.
The supplier must notify Eskom before implementing any change to the QMS or quality staff that affects the quality system.
Sub-supplier management
The main supplier defines and manages the quality assurance and control elements for each sub-supplier's scope.
The main supplier must run a sub-supplier performance programme covering QMS verification, audits and surveillances, CQP and QCP review, nonconformity and defect management, inspection and test plans, risk management, documentation and awareness.
Eskom may assess sub-supplier facilities.
Contract Quality Plan (CQP)
A documented, implemented and maintained CQP is required where specified in the evaluation criteria or returnables list.
The CQP must follow ISO 10005 and address records management (including material tests, positive material identification and material certification), free access for inspection, final documentation and manufacturing data book submission before shipment, welding controls (welder qualification records, welding procedure specifications and procedure qualification records), special installation and fabrication procedures, qualification of personnel performing special processes, training records, and storage and preservation requirements.
The CQP must be submitted before the kick-off or pre-fabrication meeting and before manufacturing starts, whichever is earlier.
The Eskom CQP template (240-109253698) may be used where the supplier has no template.
Quality Control Plan / Inspection and Test Plan (QCP/ITP)
A QCP/ITP is required for all manufacturing, fabrication, assembly and installation stages, identifying verification activities, intervention points and test methods per ISO 10005.
Eskom or its inspection agency must review and accept the QCP/ITP, and may insert hold and witness points, before work starts.
Changes to an accepted QCP/ITP need Eskom agreement before the affected activity begins.
The ITP must cover material certification, fabrication, in-process inspection, final acceptance testing, packaging, pre-shipment and transport inspection, preservation, site acceptance testing, construction and erection, and pre-commissioning and commissioning.
Each sub-supplier scope requires a separate QCP/ITP; the main supplier remains accountable for all sub-supplier QCPs/ITPs.
Once signed, the ITPs and QCPs become addenda to the main contract.
The QCP/ITP must record the Eskom contract number and title, supplier order number, area of works, work description with components and activity dates, a unique QCP/ITP number, the sequence of operations, reference specifications and drawings, acceptance criteria with clause references, intervention points, sign-off provisions and inspection and test records.
The Eskom QCP/ITP template (240-109253302) may be used where the supplier has no template.
Meetings and inspections
A quality kick-off meeting is held at contract start and, if required, at the start of each phase.
Coordination meetings must be arranged with Eskom before orders are placed; 14 days' advance notice is required.
Mandatory pre-inspection meetings are convened by Eskom or its inspection agency and attended by supplier and sub-supplier representatives, including quality representatives.
Eskom may appoint resident quality inspectors at supplier or sub-supplier premises and on site; the supplier must provide workspace at no cost.
Eskom may appoint any organisation as an approved inspection authority or inspection agency, and the supplier and sub-suppliers may not obstruct that organisation.
Preservation
The supplier must operate a preservation management programme covering the period from transfer of ownership or management responsibility through storage and transit to final delivery or installation.
The programme must address protection against atmospheric conditions, sunlight, temperature, soil, dust, humidity, salt spray and corrosive atmospheres, and maintenance of coatings, coverings, fasteners and lines.
Special precautions are required for valves, electric motors and components, rotating equipment, piping and fittings, instrumentation, flange faces, gaskets, coatings and insulation, including periodic shaft rotation, engine turnover and lubrication.
Preservation requirements must be documented in purchase orders and work authorisations and communicated to sub-suppliers and to project logistics, construction, quality and security functions.
Eskom must have free and unrestricted access to all preservation records.
Methodology
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf
Preservation programme
The supplier must deploy a documented programme identifying pre-operation preservation requirements for all physical assets, including bulk materials, consumables, equipment systems, system components and other procured or supplied materials transferred to project control but not yet in operational use.
Where equipment and materials management is delegated, the programme must communicate pre-operation preservation requirements to sub-suppliers.
The programme must document processes and procedures for monitoring compliance.
Compliance monitoring starts with inclusion of preservation requirements in engineering instructions and procurement documentation, and continues until equipment or materials are incorporated into an operating system or structure.
Compliance evaluation frequency must anticipate transfers of responsibility between project functions (procurement to logistics, logistics to fabrication, fabrication to logistics, logistics to construction) and between subcontracted service providers.
Supplier engineering must document preservation requirements for all systems, components, equipment, materials, customer-supplied materials and other goods, and communicate them to procurement, logistics, construction management, quality, security and other functions.
The programme must address temporary, long-term and in-transit preservation, including protection against atmospheric conditions, sunlight, temperature, soil, dust, humidity, salt spray and corrosive atmospheres, and procedures for applying, monitoring and maintaining coatings, coverings, fasteners and lines.
The programme must cover evaluation of preservation work plans and execution by parties providing transport, handling or storage services, and oversight of preservation plan preparation and execution at all work locations.
A records management process must be established in line with Eskom information management requirements, giving Eskom ready access to all preservation records.
Quality Management
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf
QMS requirements
The supplier and sub-suppliers must develop, implement, maintain and improve a formal QMS conforming to the latest ISO 9001 or an applicable equivalent standard.
The QMS must include the documented information required by ISO 9001, such as a quality manual, quality plans, work procedures, work instructions, method statements and workflow documentation.
A valid ISO 9001 certificate from an accredited certification body is required unless the applicable quality category excludes it.
The QMS requirement applies equally to sub-suppliers whose scope covers design, manufacturing, maintenance, testing, storage, delivery, installation, commissioning or project management.
The supplier must notify Eskom before implementing changes to the QMS or quality staff that affect the quality system.
The main supplier must run a sub-supplier performance programme covering QMS verification, audits and surveillances, CQP and QCP review, nonconformity and defect management, inspection and test plans, risk management, documentation and awareness.
Quality plans
A documented, implemented and maintained contract or project quality plan and/or QCP/ITP is required where specified in the evaluation criteria or returnables list.
Production and service provision must follow the agreed CQP and/or QCP/ITP.
The CQP must follow ISO 10005 and address records management, inspection access, final documentation and data book submission, welding controls, special installation and fabrication procedures, qualification of special-process personnel, training records, and storage and preservation requirements.
The CQP must be submitted before the kick-off or pre-fabrication meeting and before manufacturing starts, whichever is earlier.
The Eskom CQP template (240-109253698) may be used where the supplier has no template.
Quality control plans
A QCP/ITP is required for all manufacturing, fabrication, assembly and installation stages, identifying verification activities, intervention points and test methods per ISO 10005.
Eskom or its inspection agency must review and accept the QCP/ITP, and may insert hold and witness points, before work starts.
Changes to an accepted QCP/ITP need Eskom agreement before the affected activity begins.
The ITP must cover material certification, fabrication, in-process inspection, final acceptance testing, packaging, pre-shipment and transport inspection, preservation, site acceptance testing, construction and erection, and pre-commissioning and commissioning.
Each sub-supplier scope requires a separate QCP/ITP; the main supplier remains accountable for all sub-supplier QCPs/ITPs.
Once signed, the ITPs and QCPs become addenda to the main contract.
The QCP/ITP must record the Eskom contract number and title, supplier order number, area of works, work description with components and activity dates, a unique QCP/ITP number, the sequence of operations, reference specifications and drawings, acceptance criteria with clause references, intervention points, sign-off provisions and inspection and test records.
The Eskom QCP/ITP template (240-109253302) may be used where the supplier has no template.
Meetings and inspections
A quality kick-off meeting is held at contract start and, if required, at the start of each phase.
Coordination meetings must be arranged with Eskom before orders are placed; 14 days' advance notice is required.
Mandatory pre-inspection meetings are convened by Eskom or its inspection agency and attended by supplier and sub-supplier representatives, including quality representatives.
Eskom may appoint resident quality inspectors at supplier or sub-supplier premises and on site; the supplier must provide workspace at no cost.
Eskom may appoint any organisation as an approved inspection authority or inspection agency, and the supplier and sub-suppliers may not obstruct that organisation.
Compliance Requirements
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)
Quality management system
A formal QMS conforming to the latest ISO 9001, or an applicable equivalent QMS standard, is required for the supplier and all sub-suppliers.
A valid ISO 9001 certificate from an accredited certification body is required unless the applicable quality category excludes it.
The QMS must be documented, implemented, maintained and reviewed, and must cover the sub-supplier activities within scope.
Returnable forms and documents
Form A (240-68099512): signed acknowledgement and acceptance of the applicable quality category and ISO 9001 obligations.
Quality returnables per 240-12248652 for the assigned category (1 to 4).
Category 1: ISO 9001 certificate, internal and external audit reports with nonconformities and corrective actions, documented roles and responsibilities, draft contract quality plan to ISO 10005, example ITP/QCP, control of externally provided processes, management review records.
Category 2: QMS manual or equivalent, quality policy, quality objectives, control of documented information, internal audit procedure, control of nonconforming outputs, nonconformity and corrective action procedure, latest internal audit reports, draft contract quality plan, example ITP/QCP, control of externally provided processes, roles and responsibilities, management review records.
Personnel and special processes
Personnel performing special processes (non-destructive examination, welding, coating, heat treatment) must be suitably qualified and registered with statutory bodies where legally required.
Training records must show unit standards or National Qualifications Framework completion and the accreditation number of the training provider.
Eskom may require the removal of quality personnel who lack the relevant competence.
Standards
ISO 9001 and ISO 10005 apply; ISO 9000, ISO 10006, ISO 9004, SANS 10845-1 and IAEA GS-R-3.1 are referenced.
Where no SANS equivalent exists for a new product or service, industry recommended practices or applicable codes apply.
Health & Safety
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf
The specification references Eskom's SHEQ Policy (32-727) and the IAEA Safety Standard GS-R-3.1 on application of the management system for facilities and activities. No further health and safety requirements are stated in the specification.
Contractual Terms
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf
Preservation obligations
The supplier's preservation management programme must cover the period from transfer of ownership or management responsibility through temporary or long-term storage and transit to final delivery or installation.
Storage and material control must follow manufacturer recommendations, specifications and project-specific requirements.
Special precautions are required for valves, electric motors and components, mechanical and rotating equipment, piping and fittings, instrumentation, flange faces, gaskets, coatings and insulation, including periodic shaft rotation, engine turnover and lubrication.
Preservation requirements must be documented in purchase orders, work authorisations and communications with sub-suppliers.
Sub-supplier input into preservation protocols must be documented.
Preservation requirements must be communicated to project logistics, construction management, quality, security and other functions.
Sub-supplier responsibility for executing preservation programme elements must be clearly designated, including access to records and provision of equipment, tools or services.
Preservation responsibilities must be defined within the project team and implemented at all work locations.
Project team responsibility for oversight of preservation must be designated at every stage of project development.
Eskom must have free and unrestricted access to all preservation records for inspection and audit.
Section
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf
The assigned Eskom quality representative selects the applicable quality requirements using guideline 240-125473040 and records them in Form A. Only one quality category (1 to 4) applies per procurement. Bidders are evaluated against the returnables for that category, as listed in 240-12248652, using the Tender Evaluation Scorecard (240-168873697). Form A Sections A and E must be signed to confirm acceptance of the Eskom quality requirements and ISO 9001 obligations. Where a new product or service is introduced, industry recommended practices or applicable codes apply where no SANS equivalent exists.
DocumentEskom General Conditions of Purchase.pdfReview complete
Technical Specifications
Source: Eskom General Conditions of Purchase.pdf (unknown)
Scope
Supply, delivery and installation of uninterruptible power supplies (UPS) and batteries.
Sites: Bloemfontein, Klerksdorp, Port Elizabeth and Witbank oil laboratories.
Document37-2 agreement form.docxReview complete
Submission Guidelines
Source: 37-2 agreement form.docx (unknown)
Returnable document
Section 37(2) Agreement (Occupational Health and Safety Act 85 of 1993): the contractor accepts employer duties under the Act, confirms receipt of the SHE specifications and commits to comply with them; must be signed by an authorised representative of the contractor and by Eskom, with witnesses.
The agreement must be completed with the contractor's name, the project/service details and contract number, and the place and date of signature.
Any variation, waiver or departure from the agreement is valid only if recorded in writing and signed by both parties.
Compliance Requirements
Source: 37-2 agreement form.docx (unknown)
Occupational health and safety
The contractor is an employer in its own right under the Occupational Health and Safety Act 85 of 1993, as amended.
All work performed and all machinery or plant used must comply with the Act.
The contractor must ensure its employees adhere to the Act.
The contractor must comply with the SHE specifications issued for the project or service.
The SHE specifications are treated as the agreed arrangements and procedures that secure the contractor's compliance with the Act, as contemplated in section 37(2).
Section A: objective evidence of a documented quality management system aligned to ISO 9001:2015 — QMS manual or scope document, top-management-approved quality policy and quality objectives, document and record control (clause 7.5), control of nonconforming outputs (clause 8.7), nonconformity and corrective action (clause 10.2), internal audit (clause 9.2).
Section B: evidence the QMS operates in practice — organisation chart and responsibility matrix covering the quality management function (clause 5.3), plus criteria for evaluation, selection, performance monitoring and re-evaluation of external providers (clause 8.4).
Section C: draft contract quality plan specific to this scope of work, prepared to ISO 10005.
Section D: quality control plan, checklist or inspection and test plan (ITP) for the scope of work, prepared to ISO 10005; an example from similar or previous work is acceptable.
Section E: Form A completed and signed, plus a training plan.
Disqualification risks:
Any required quality deliverable in an applied section left out or not completed.
Form A unsigned.
Evaluation Criteria
Source: 240-12248652_UPS Batteries.docx (unknown)
Quality evaluation only — the returnable documents are scored per section:
Section A (QMS requirements, ISO 9001): 7 points
Section B (QMS in operation): 2 points
Section C (draft contract quality plan): 1 point
Section D (quality control plan / ITP): 1 point
Section E (additional requirements, Form A and training plan): 2 points
Sections marked as applicable are evaluated; sections not applied are not scored.
Technical Specifications
Source: 240-12248652_UPS Batteries.docx (unknown)
Scope
Supply, delivery and installation of uninterruptible power supplies (UPS) and batteries.
Organisation chart and responsibility matrix naming the quality management role.
External provider control criteria covering evaluation, selection, performance monitoring and re-evaluation.
Draft contract quality plan for the scope of work (ISO 10005).
Quality control plan, checklist or inspection and test plan for the scope of work (ISO 10005).
Training plan.
Compliance Requirements
Source: 240-12248652_UPS Batteries.docx (unknown)
Quality management system
A documented QMS aligned to ISO 9001:2015 is required; certification is not mandatory provided objective evidence of a compliant documented system is submitted.
Evidence must cover document and record control (clause 7.5), control of nonconforming outputs (clause 8.7), nonconformity and corrective action (clause 10.2) and internal audit (clause 9.2).
Organisation chart and responsibility matrix must show defined roles, responsibilities and authorities, including the quality management function (clause 5.3).
External provider control must set out criteria for evaluation, selection, performance monitoring and re-evaluation (clause 8.4).
Quality plans
Draft contract quality plan prepared to ISO 10005.
Quality control plan, checklist or inspection and test plan prepared to ISO 10005.
Forms
Form A: completed and signed as part of the additional requirements.
Training plan: submitted with the additional requirements.
DocumentAnnexure I - Tax Evaluation Questionnaire.docReview complete
Contact Information
Source: Annexure I - Tax Evaluation Questionnaire.doc (unknown)
Source: Annexure I - Tax Evaluation Questionnaire.doc (unknown)
The completed Evaluation Pack must be returned to Eskom. The signed summary sheet and signed affidavits must be copied to Group Tax at [email protected]. The pack must be submitted to the contractor's Eskom representative for referral to Eskom Group Tax Department in Megawatt Park. The contractor or its duly authorised representative must declare that all questions have been answered truthfully.
Evaluation Criteria
Source: Annexure I - Tax Evaluation Questionnaire.doc (unknown)
The Evaluation Pack determines the tax classification of the contractor (Independent Contractor, Personal Service Provider, Labour Broker or Dependent Contractor). Companies, close corporations and trusts complete Evaluation Pack A; individuals complete Evaluation Pack B. The answers determine which appendices must be signed. If the contractor is not a South African resident, Appendix 9 must be signed and the pack referred to Eskom Group Tax. Failure to sign the required affidavits or declarations may result in PAYE being withheld from payments.
Compliance Requirements
Source: Annexure I - Tax Evaluation Questionnaire.doc (unknown)
Contractors must complete the Evaluation Pack applicable to their entity type: Pack A for companies, close corporations or trusts; Pack B for individuals. The pack must be signed by the contractor or a duly authorised representative. Depending on the answers, the following appendices must be signed and submitted:
Appendix 1: Affidavit confirming employment of three or more full-time employees who are not connected persons.
Appendix 2: Affidavit confirming no connected person will personally render services to Eskom.
Appendix 3: Affidavit confirming services will not be performed mainly at Eskom and/or not controlled or supervised by Eskom.
Appendix 4: Affidavit confirming not more than 80% of income is or is likely to be received from any one client.
Appendix 5: Affidavit confirming an individual provides a service as opposed to people.
Appendix 6: Declaration that the contractor is a labour broker.
Appendix 7: Declaration that the contractor is a dependent contractor or personal service provider.
Appendix 8: Declaration that the contractor is an independent supplier or contractor.
Appendix 9: Declaration that the contractor is a non-resident of the Republic of South Africa.
Appendix 10: Definitions as per the Income Tax Act.
If any required affidavit or declaration is not signed, PAYE will be withheld from payments.
Supply, delivery and installation of UPS units and batteries at oil laboratories in Bloemfontein, Klerksdorp, Port Elizabeth and Witbank (evaluation refers to three laboratories).
Installation must be carried out by a trade-tested Electrician.
UPS equipment must meet five standards: IEC 62040-1 (safety, CB certified), IEC 62040-2 (EMC), IEC 62040-3 (performance), RoHS directive 2011/65/EU and WEEE directive 2012/19/EU.
Technical evaluation only; a bid must achieve a minimum weighted technical score of 80% to be considered further.
Scoring breakdown (total 100%):
Proof of registered installer: 10% (Yes = 10%, No = 0%)
Method statement describing how the UPS and battery installation will be carried out: 20% (Yes = 20%, No = 0%)
Previous experience installing UPS and batteries, evidenced by reference letters or prior orders/contracts: 20% (0–1 year = 5%, 1–2 years = 15%, more than 3 years = 30%)
Trade test qualification for the Electrician performing the installation: 20% (Yes = 20%, No = 0%)
Proof that the UPS meets all five listed standards (IEC 62040-1, IEC 62040-2, IEC 62040-3, RoHS directive 2011/65/EU, WEEE directive 2012/19/EU): 20% (all five CB certificates submitted = 20%)
Company letterhead confirmation of ability to supply and install UPS and batteries at all three laboratories: 10% (Yes = 10%, No = 0%)
Scope: supply, delivery and installation of UPS units and batteries at three oil laboratories (Bloemfontein, Klerksdorp, Port Elizabeth and Witbank — the evaluation refers to three laboratories).
Technical requirements:
UPS must comply with:
Safety: IEC 62040-1 (CB certified)
Emc: iec 62040-2
Performance: IEC 62040-3
RoHS: EU directive 2011/65/EU
WEEE: EU directive 2012/19/EU
Proof of compliance: CB certificates for all five standards must be submitted.
Installation must be performed by a qualified Electrician holding a trade test qualification.
A method statement detailing the installation approach is required.
The contractor must confirm on company letterhead the ability to supply and install at all three laboratories.
Methodology
Source: Appendix B- Technical evaluation.pdf
A method statement is required, clearly describing how the UPS and battery installation will be executed. This carries 20% of the technical score.
Trade test qualification for the Electrician who will perform the installation.
Previous experience in UPS and battery installation, supported by reference letters or prior orders/contracts.
UPS compliance certificates: CB certificates for IEC 62040-1, IEC 62040-2, IEC 62040-3, RoHS directive 2011/65/EU and WEEE directive 2012/19/EU.
Company letterhead confirmation of ability to supply and install at all three laboratories.
Health & Safety
Source: Appendix B- Technical evaluation.pdf
UPS safety compliance: IEC 62040-1 with CB certification must be demonstrated by submitted CB certificates.
Section
Source: Appendix B- Technical evaluation.pdf
Technical evaluation with a minimum threshold of 80%.
Scoring:
Registered installer proof: 10% (Yes/No)
Method statement for UPS and battery installation: 20% (Yes/No)
Previous UPS and battery installation experience: 20% (0–1 year = 5%, 1–2 years = 15%, more than 3 years = 30%)
Electrician trade test qualification: 20% (Yes/No)
UPS compliance certificates (all five standards): 20% (all five CB certificates = 20%)
Company letterhead confirmation of ability to supply and install at all three laboratories: 10% (Yes/No)
Total: 100%
Threshold: 80%
DocumentAcknowledgement Form Life-saving Rules.docxReview complete
Compliance Requirements
Source: Acknowledgement Form Life-saving Rules.docx (unknown)
Safety compliance
All Eskom employees, subsidiaries, agents, consultants, contractors and any person entering Eskom sites must comply with Eskom's Life-saving Rules.
Eskom applies a zero-tolerance stance to any violation of these rules.
The rules cover: isolating, testing, earthing and creating an equipotential zone before touching; hooking up at height; buckling up; sobriety; holding a permit to work; and safe live working.
Personnel must sign the Acknowledgement Form Life-saving Rules, pledging to know and follow the rules and the Life-saving Rules Standard (240-62196227).
DocumentOHS Evaluation.docxReview complete
Description
Source: OHS Evaluation.docx
Supply, delivery and installation of UPS units and batteries at Eskom oil laboratories in Bloemfontein, Klerksdorp, Port Elizabeth and Witbank.
Submission Guidelines
Source: OHS Evaluation.docx (unknown)
Returnable OHS documents — all must be completed and submitted with the bid:
Annexure B: signed acknowledgement of Eskom's OHS legal and other requirements.
OHS Plan: addresses the OHS risks of the scope of work and aligns with the health and safety specification.
Baseline OHS Risk Assessment (BRA): identifies, assesses and manages safety, health and environmental risks, with the assessment methodology included.
Valid Letter of Good Standing: COIDA or equivalent.
OHS policy: signed by the CEO and compliant with Section 7 of the OHS Act.
37(2) Eskom Agreement: signed and submitted.
Acknowledgement Form: Life-saving Rules.
Technical Specifications
Source: OHS Evaluation.docx (unknown)
Supply, delivery and installation of UPS units and batteries at four Eskom oil laboratories:
Bloemfontein
Klerksdorp
Port Elizabeth
Witbank
Compliance Requirements
Source: OHS Evaluation.docx (unknown)
OHS compliance — the following must be in place and submitted:
Signed Annexure B acknowledging Eskom's OHS legal and other requirements.
OHS Plan aligned with the health and safety specification for the scope of work.
Baseline OHS Risk Assessment covering safety, health and environmental risks, including the methodology used.
Valid Letter of Good Standing (COIDA or equivalent).
OHS policy signed by the CEO and compliant with Section 7 of the OHS Act.
Signed 37(2) Eskom Agreement.
Signed acknowledgement of the Life-saving Rules.
Document240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docxReview complete
Submission Guidelines
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx (unknown)
Returnable document
Quality Control Plan or Inspection Test Plan (QCP/ITP): the supplier must submit a plan setting out each activity, the inspection and test method, the controlling document, acceptance criteria, the intervention point and the records to be kept, for approval before work proceeds.
Intervention points to be marked against each activity
Hold point: work may not continue until the point is released.
Witness point: the activity is witnessed, either 100% (W1) or by sample (W2).
Approval (AP): the document requires approval.
Information only (IN): the document is submitted for information.
Document review: 100% review (R1) or sample review (R2).
Testing: 100% testing (T1) or sample testing (T2).
Inspection: 100% inspection (A1) or sample inspection (A2).
Surveillance (S) and verification (V) by the Approved Inspection Authority, where applicable.
Approval of the plan
The plan is signed off by the contractor or supplier, the subcontractor where applicable, Eskom, and the Approved Inspection Authority where applicable.
Technical Specifications
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx (unknown)
Scope
Supply, delivery and installation of uninterruptible power supplies and batteries at the Bloemfontein, Klerksdorp, Port Elizabeth and Witbank oil laboratories.
Quality control plan requirements
Each activity is listed with a description of the requirement and its date.
Each activity is classified as statutory (S) or non-statutory (N).
Each activity records the inspection and test method, for example visual inspection, microscopy, non-destructive testing, liquid or dye penetrant, magnetic particle or eddy current testing.
Each activity records the controlling document and the acceptance criteria, for example functionality, performance measures, regulatory compliance or chemical testing.
Each activity records the inspection body: internal or third-party inspection, for the supplier and for Eskom, and the Approved Inspection Authority or notified body where applicable.
Each activity records the records to be retained as evidence.
Compliance Requirements
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx (unknown)
Quality plan submission
A Quality Control Plan or Inspection Test Plan (QCP/ITP) must be completed and approved before execution, covering every activity, its inspection and test method, acceptance criteria, intervention point and records.
Activities must be classified as statutory or non-statutory.
Third-party inspection and Approved Inspection Authority involvement must be identified where applicable.
Document240-68099512 Form A Rev 10_UPS Batteries .pdfReview complete
Submission Guidelines
Source: 240-68099512 Form A Rev 10_UPS Batteries .pdf (unknown)
Returnable document
Form A (Tender & Contract Quality Requirements, document 240-68099512 Rev 10): the tenderer must complete and sign to acknowledge and accept Eskom's supplier quality requirements under specification 240-105658000 and ISO 9001.
On the form, select exactly one pre-contract award quality category (Category 1 to 4, or the main supplier and sub-supplier capability and capacity assessment) and indicate whether a site assessment applies.
The tenderer's quality representative must be named, designated, dated and signed on the form.
Methodology
Source: 240-68099512 Form A Rev 10_UPS Batteries .pdf
ISO 9001 clauses applied
Clause 4: context of the organisation.
Clause 5: leadership.
Clause 6: planning.
Clause 7: support.
Clause 8: operation.
Clause 9: performance evaluation.
Clause 10: improvement.
ISO 9001 quality principles applied
Principle 1: customer focus.
Principle 2: leadership.
Principle 3: engagement of people.
Principle 4: process approach.
Principle 5: improvement.
Principle 6: evidence-based decision making.
Principle 7: relationship management.
Quality Management
Source: 240-68099512 Form A Rev 10_UPS Batteries .pdf
Applicable standard
Eskom specification 240-105658000 and ISO 9001.
Post-contract award obligations
Contract execution.
Supplier quality performance monitoring.
Supplier quality audit.
Standard conditions
Eskom rights of access.
Eskom rights to information.
Preservation.
Quality audits related conditions.
Management of nonconformities and nonconforming outputs identified by Eskom.
Special processes.
ISO 9001 clauses applied
Clauses 4 to 10: context of the organisation, leadership, planning, support, operation, performance evaluation and improvement.
ISO 9001 quality principles applied
Principles 1 to 7: customer focus, leadership, engagement of people, process approach, improvement, evidence-based decision making and relationship management.
Acknowledgement
The tenderer's quality representative must complete and sign Form A to confirm acceptance of these requirements.
Compliance Requirements
Source: 240-68099512 Form A Rev 10_UPS Batteries .pdf (unknown)
Quality system
The bidder must accept and comply with Eskom specification 240-105658000 and the ISO 9001 standard.
Form A (Tender & Contract Quality Requirements, 240-68099512 Rev 10) must be completed and signed by the tenderer's quality representative.
Exactly one pre-contract award quality category must be selected; selecting more than one is not permitted.
The tenderer must indicate whether a site assessment is applicable.
Health & Safety
Source: 240-68099512 Form A Rev 10_UPS Batteries .pdf
Eskom's quality representative is Duncan Ntshangase, Officer Safety Health and Quality, who signed the form on 01/09/2026.
Section
Source: 240-68099512 Form A Rev 10_UPS Batteries .pdf
Quality compliance
The bidder must complete and sign Form A to accept Eskom's supplier quality requirements under specification 240-105658000 and ISO 9001.
Pre-contract award quality requirements apply.
Post-contract award obligations that apply: supplier quality performance monitoring, supplier quality audit and quality audits related conditions.
DocumentC1 to C3 TSSC3 all parts - Draft V1.docReview complete
Description
Source: C1 to C3 TSSC3 all parts - Draft V1.doc
Supply, delivery, installation and commissioning of complete UPS systems and batteries at four Eskom Oil Laboratories: Bloemfontein, Klerksdorp, Port Elizabeth and Witbank. The contract is the NEC3 Term Service Short Contract (April 2013) with additional conditions Z1 to Z14.
Contact Information
Source: C1 to C3 TSSC3 all parts - Draft V1.doc (unknown)
Site contacts:
Bloemfontein: Siyabonga Zondo, 051 404 5140
Witbank: Gcina Franck Kaba, 013 693 2240
Klerksdorp: Fortunate Moraba, 018 464 6765
Port Elizabeth: Ovayo Mfuku, 041 502 4183
Delivery addresses:
Bloemfontein: Loco Street, East End, Bloemfontein
Witbank: Oil Lab, Building 76, Electric Workshop, Eskom Park
Klerksdorp: Goue Road, Townlands
Port Elizabeth: C/o Eastcape Training Centre - Workshop 2, Spondo Road, Struandale, Port Elizabeth
Source: C1 to C3 TSSC3 all parts - Draft V1.doc (unknown)
Submission method: not stated in the available contract documents.
Returnable documents:
Form of Offer and Acceptance (C1.1): signed offer stating the total price exclusive of VAT, VAT at 15%, and total inclusive of VAT, with the tenderer's CIDB registration number entered.
Contract Data provided by the Contractor: complete all fields, including contractor name, address, telephone, fax, email, and the overhead and profit percentages added to Defined Cost for people and for other Defined Cost.
Price List (Part 2): rates and prices for each item in Part 1, with the total of the Prices entered in the Contract Data.
Schedule of Deviations: the only channel for amendments or deviations; no other written or oral communication has contractual effect.
Insurance certificates: to be provided to the Employer's agent within one week of receiving the completed agreement.
Disqualification risks:
Failure to provide securities, bonds, guarantees, proof of insurance or other required documentation within one week of the agreement coming into effect constitutes repudiation of the agreement.
Deviations not recorded in the signed Schedule of Deviations are invalid.
Evaluation Criteria
Source: C1 to C3 TSSC3 all parts - Draft V1.doc (unknown)
Technical criteria (100% weighting) for UPS and battery installation and commissioning:
Proof of registered installer: 10% (Yes = 10%, No = 0).
Method statement showing how the UPS and battery installation will be executed: 20% (Yes = 20%, No = 0).
Previous experience in UPS and battery installation, evidenced by reference letters or previous orders/contracts: 20% (0 to 1 year = 5%, 1 to 2 years = 15%, more than 3 years = 30%).
Trade test qualifications for the electrician performing the installation: 20% (Yes = 20%, No = 0).
Five product certificates confirming IEC 62040-1 (CB certified), IEC 62040-2, IEC 62040-3, RoHS EU 2011/65/EU and WEEE EU 2012/19/EU: 20%.
Company letterhead confirmation of ability to supply and install UPS and batteries at all laboratories: 10% (Yes = 10%, No = 0).
No minimum qualifying score is stated.
Technical Specifications
Source: C1 to C3 TSSC3 all parts - Draft V1.doc (unknown)
Scope: supply, deliver, install and commission complete UPS systems and batteries at Bloemfontein, Klerksdorp, Port Elizabeth and Witbank Oil Laboratories.
UPS specification:
3-phase / 400VAC input and output, 25 kVA, allowing approximately 5 kVA growth.
Double conversion, true on-line topology with power factor of 0.9 or greater.
Modular design with parallel capability for future expansion.
Battery specification:
4-hour battery with a 336–480VDC bus.
Sufficiently rated battery charger to recharge the 4-hour battery to the C/10 standard.
10-year design batteries rated to provide 4 hours autonomy at 20 kVA load.
Standards:
Safety: IEC 62040-1, CB certified.
Emc: iec 62040-2.
Performance: IEC 62040-3.
RoHS: EU directive 2011/65/EU.
WEEE: EU directive 2012/19/EU.
Site requirements:
Supplier to clean up after work is completed.
Contractor to comply with site OHS Act requirements.
Supplier to provide registered, experienced and competent technicians/installers.
Supplier to provide proof of Certificate of Compliance (CoC) after completion.
Commissioning and handover certificate to be provided on handover.
Quantities (Price List Part 1):
3-phase / 400VAC input and output 25 kVA UPS: 4 complete units/sets.
Installation charges/labour rate: 4 each.
Delivery charges: 1 each to Bloemfontein, Klerksdorp, Witbank and Port Elizabeth.
Accommodation: 4 each.
Financial Requirements
Source: C1 to C3 TSSC3 all parts - Draft V1.doc (unknown)
Pricing format: Price List in two parts. Part 1 covers work not requiring a Task Order; Part 2 covers task-by-task work instructed by Task Order. Rates and prices must include all work necessary to complete each item.
Price entries:
Fixed amount items: enter the amount in the Price column only; leave Unit, Expected quantity and Rate blank.
Rate-based items: enter a rate and multiply by the Expected quantity to produce the Price.
Time-based items: state a unit of time and the expected length of time as the quantity.
VAT: offered total exclusive of VAT, VAT at 15%, and total inclusive of VAT must be stated on the Form of Offer and Acceptance.
Contractor's Contract Data: overhead and profit percentages added to Defined Cost for people and for other Defined Cost must be entered.
Payment: tax invoice required in accordance with the Employer's procedures; the Employer's VAT number 4740101508 must appear on each invoice. Late payment interest is not applicable.
Insurance: the Contractor must provide the insurances in Insurance Table A from the starting date until the earlier of Completion and the termination certificate. The Employer provides the insurances in Insurance Table B.
Employer's liability for the Contractor's indirect or consequential loss is limited to R0.00.
Compliance Requirements
Source: C1 to C3 TSSC3 all parts - Draft V1.doc (unknown)
CIDB: the tenderer's CIDB registration number must be entered on the Form of Offer and Acceptance.
B-bbee:
The Contractor must notify the Employer within seven days of any change to its B-BBEE status.
An updated verification certificate and supporting documentation must be submitted within thirty days of that notification.
A decrease in B-BBEE status may lead to renegotiation or termination of the contract.
Failure to notify may constitute grounds for termination.
Health, safety and environment: compliance with the Construction Regulations, all applicable health and safety laws, and all environmental laws is required; the contract price must include sufficient allowance for this.
Ethics: coercive, collusive, corrupt, fraudulent or obstructive actions during procurement or execution may lead to termination.
Confidentiality: no disclosure of contract information; no images of the Employer's property without prior written consent.
Cession: no cession, delegation or assignment without the Employer's written consent.
Asbestos: the Employer manages asbestos and ACM according to its Asbestos Standard 32-303; the Contractor's personnel may stop work and leave a contaminated area until it is declared safe.
DocumentAcknowledgement Form for Eskom SHE Rules and other Requirements (1).docxReview complete
Description
Source: Acknowledgement Form for Eskom SHE Rules and other Requirements (1).docx
Annexure B is the acknowledgement form for Eskom's OHS legal and other requirements. The bidder confirms it has obtained and understands the OHS documents listed in the form and accepts the consequences of non-compliance.
Submission Guidelines
Source: Acknowledgement Form for Eskom SHE Rules and other Requirements (1).docx (unknown)
Returnable document:
Annexure B (Acknowledgement Form for Eskom OHS legal and other requirements): signed confirmation that the bidder has obtained and understands the listed OHS documents and accepts the consequences of non-compliance.
Submission method, address and closing time are not stated in the available text.
Technical Specifications
Source: Acknowledgement Form for Eskom SHE Rules and other Requirements (1).docx (unknown)
Scope: supply, delivery and installation of UPS units and batteries at four oil laboratories — Bloemfontein, Klerksdorp, Port Elizabeth and Witbank.
OHS framework applying to the work:
Eskom Contractor Health and Safety Requirements Standard 32-136.
OHS specification and requirements issued with the tender.
Occupational Health and Safety Act 85 of 1993.
Compensation for Occupational Diseases and Illnesses Act 130 of 1993.
After award the contractor must align its processes with Eskom's OHS policies, procedures and standards.
Compliance Requirements
Source: Acknowledgement Form for Eskom SHE Rules and other Requirements (1).docx (unknown)
OHS compliance:
The contractor must comply with Eskom Standard 32-136, the tender OHS specification, the Occupational Health and Safety Act 85 of 1993 and the Compensation for Occupational Diseases and Illnesses Act 130 of 1993.
All employees must complete both the Eskom induction and the contractor's own induction.
Penalties apply to the main supplier for OHS non-conformances, including those of its contractors and suppliers.
Management of contractors and suppliers:
The main supplier must show Eskom the selection criteria and process used to appoint contractors and suppliers.
Eskom must be notified before any contractor or supplier is appointed to start work.
The main supplier must confirm that contractors and suppliers have adequate resources and competencies.
The main supplier is accountable for its contractors' and suppliers' compliance with applicable legal and Eskom requirements.
The main supplier must audit and assess contractors and suppliers for OHS compliance during the work.
The main supplier must set out the grounds on which a contractor's or supplier's work may be terminated.
Non-conformances by contractors or suppliers at any tier are handled directly with the main supplier under the performance and penalty processes.
Eskom may verify compliance and may require testimonials, references and client contact details, including Eskom contacts, for similar previous work.
Returnable form:
Annexure B (Acknowledgement Form for Eskom OHS legal and other requirements): signed acknowledgement that the bidder holds and understands the listed OHS documents.
DocumentE3511CXMWPR_Invitation to Tender (ITT)_06 November 2026.pdfReview complete
Description
Source: E3511CXMWPR_Invitation to Tender (ITT)_06 November 2026.pdf
Eskom invites tenders for the supply, delivery and installation of UPS units and batteries at its Oil Laboratories in Bloemfontein, Klerksdorp, Port Elizabeth and Witbank. The tender documents are issued free of charge, and submitting a tender is taken as acceptance of Eskom's Standard Conditions of Tender, available at www.eskom.co.za. The Eskom Representative manages the process, and all queries must be put to that person in writing. The full scope of work is attached as a separate document.
Important Dates
Source: E3511CXMWPR_Invitation to Tender (ITT)_06 November 2026.pdf (TENDER)
Clarification meeting (non-compulsory)
Date: 10 November 2026
Time: 09:00 SAST
Venue: Microsoft Teams
Attendance: confirm intention with the Eskom Representative, giving the name, position and contact details of each attendee; request the meeting link by email from [email protected].
Closing
Date: 20 November 2026
Time: 10:00 SAST
Clarification queries
Deadline: 5 working days before the tender closing deadline.
Tender validity
180 days from the closing date and time.
Contact Information
Source: E3511CXMWPR_Invitation to Tender (ITT)_06 November 2026.pdf (TENDER)
Source: E3511CXMWPR_Invitation to Tender (ITT)_06 November 2026.pdf (TENDER)
Submission method
Electronic submission only, via the Eskom Tender Bulletin e-tendering portal.
No hard-copy tenders will be accepted.
Upload documents into the folders Technical, Commercial, Financial and Other.
All documents in PDF; the pricing schedule in PDF plus an Excel copy.
Upload limits: 500 MB per document; 4 GB total per submission.
Zip or compressed files are not permitted.
The portal submission status must show as complete.
If a tender is resubmitted, only the latest version is accepted and earlier versions are void.
Late tenders will not be accepted.
Returnable forms and documents
Disqualifiable if not submitted by closing:
Annexure A (Authorisation Form): authorises the named signatory to bind the bidder; attach the certified resolution or power of attorney.
Annexure B (Acknowledgement Form): confirms receipt and completeness of the tender pack and records the cataloguing position.
Annexure C (Tenderer's Particulars): records the bidder's details.
Annexure D (Integrity Declaration Form): commits the bidder to the Eskom Supplier Integrity Pact.
Annexure G1 to G4 (SBD 6.2 and local content schedules): declares local production and content where designated materials apply.
Annexure H (SBD 1, Invitation to Bid): the signed offer and bidder details.
Annexure J (SBD 4, Bidder's Disclosure): discloses state employment and conflicts of interest.
NEC or other Contract, completed.
Pricing schedule, completed.
E-tendering Help Manual acknowledgement form.
Non-disqualifiable at closing (may be requested within 5 working days):
Annexure I (SBD 6.1, Preference Points Claim): claims B-BBEE preference points under the PPPFA 2022 regulations.
Specific Goals evidence: failure to submit scores zero points but does not disqualify.
Required before contract award:
CSD registration number and CSD report.
Tax compliance: SARS PIN or CSD profile for local bidders; certified tax clearance for foreign bidders without a CSD footprint.
COIDA letter of good standing or proof of application.
Employment Equity Act compliance proof, including the report submitted to the Department of Labour (South African bidders that are designated employers).
Quality, OHS and environmental documents listed under compliance requirements.
Latest approved annual financial statements of the tendering company.
Joint ventures
Letter of intent or a valid JV agreement setting out each partner's rights, obligations and profit share.
Written confirmation that the JV will operate as a single incorporated entity for the contract, or this obligation included in the JV agreement.
Confirmation of a single designated JV bank account, independent of the individual partners.
Disqualification risks
Any disqualifiable returnable not completed, signed or uploaded by the closing time.
Tender uploaded after the closing time.
Tender not submitted through the e-tendering portal.
Non-compliance with eligibility criteria.
Evaluation Criteria
Source: E3511CXMWPR_Invitation to Tender (ITT)_06 November 2026.pdf (TENDER)
Evaluation stages
Eligibility and basic compliance screening: bidders failing eligibility or basic compliance are disqualified.
Technical functionality: minimum qualifying score 75%; bidders below 75% are disqualified and are not evaluated further. Criteria are set out in Appendix B / Annexure K.
Price and specific goals scoring under the 80/20 preference point system.
Contractual requirements assessed after evaluation and ranking; they are not scored but must be met before award.
Scoring
Price: 80 points.
Specific goals (B-BBEE): 20 points under the PPPFA.
Ranking: price and specific goal scores are added and bidders ranked from highest to lowest.
Price evaluation adjustments
Prices are evaluated inclusive of VAT.
Arithmetic errors are corrected.
Contingencies in any bill of quantities or activity schedule are excluded.
Acceptable variations, deviations and alternative tenders are adjusted for.
Net present value comparison may be applied, including price adjustment factors and exchange rate movements where applicable.
Unconditional discounts are taken into account; conditional discounts are not scored but are applied at payment.
Specific goals
A bidder that does not submit evidence of its specific goals claim is not disqualified but scores zero for that goal.
Other
Objective criteria: not applicable, but Eskom may award to a bidder other than the highest scorer where objective criteria justify it.
Reverse e-auction: not applicable.
Alternative tenders: allowed.
Quality Management
Source: E3511CXMWPR_Invitation to Tender (ITT)_06 November 2026.pdf
Bidders must meet Eskom's Category 4 quality requirements and submit:
A QMS manual defining the system and its scope.
A quality policy and quality objectives approved by top management.
Documented information for document and record control (ISO 9001:2015 clause 7.5).
Documented information for control of nonconforming outputs (clause 8.7).
Documented information for nonconformity and corrective action (clause 10.2).
Documented information for internal audit (clause 9.2).
An organisation chart and responsibility matrix covering the quality management function (clause 5.3).
Documented criteria for evaluating, selecting, monitoring and re-evaluating external providers (clause 8.4).
Form A completed and signed, and a training plan.
Pricing Schedule
Source: E3511CXMWPR_Invitation to Tender (ITT)_06 November 2026.pdf
A completed pricing schedule must be submitted, unless it is already included in the NEC or other contract. It must be uploaded in PDF and as an Excel copy. The upload limit is 500 MB per document and 4 GB in total. Where cataloguing is required, the pricing schedule must include a line item for cataloguing, which Eskom pays for. Prices are evaluated inclusive of VAT, with arithmetic corrections, contingencies excluded, and unconditional discounts taken into account. Alternative tenders are allowed. The pricing schedule is a disqualifiable returnable if not submitted by the closing time.
Financial Requirements
Source: E3511CXMWPR_Invitation to Tender (ITT)_06 November 2026.pdf (TENDER)
Pricing
Complete the pricing schedule; submit it in PDF and as an Excel copy.
Prices are evaluated inclusive of VAT.
Alternative tenders are allowed.
Payment terms
Contracts below R50 000 000 including VAT: payment within 30 days of receipt of undisputed invoices.
Contracts above R50 000 000 including VAT: payment within 60 days of receipt of undisputed invoices.
Security
Provision of security for performance: not applicable.
Financial due diligence (required before award)
Latest approved annual financial statements of the tendering company itself, not the parent or holding company; draft statements or management accounts are not accepted.
Statements must include the company background, a signed director's report, a signed auditor's, reviewer's, compiler's or accounting officer's report, the statement of financial position, statement of comprehensive income, statement of changes in equity, statement of cash flows and the notes.
South African entities that are not audited must also submit a signed public interest score showing the actual score, whether the company is owner-managed and whether the statements were externally prepared, plus ITA34C copies for the current and previous years of assessment.
Each partner in an unincorporated JV or SPV must submit its own annual financial statements with all the above items.
Price negotiation
Eskom reserves the right to negotiate with preferred bidders where tendered prices are not market-related.
Compliance Requirements
Source: E3511CXMWPR_Invitation to Tender (ITT)_06 November 2026.pdf (TENDER)
Eligibility
Open tender; the bidder, or any of its principals, must not be restricted from doing business with Eskom or any state-owned company.
Must not have the nationality of a country on an international sanctions list; this applies to proposed subcontractors and suppliers too.
May not submit more than one tender, individually or as a JV partner.
JV or consortium agreements must state that the parties are jointly and severally liable.
No conflict of interest, including common controlling partners or majority shareholders, or relationships giving access to another bidder's information or influence over Eskom's decision.
Tender must be signed by an authorised person.
Must not be restricted by National Treasury, on the Tender Defaulters list, or restricted by Eskom.
May not subcontract 100% of the scope.
Registration and tax
CSD registration number and CSD report required before award.
Local bidders: SARS e-filing PIN or CSD profile for verification; otherwise a certified tax clearance certificate.
Foreign bidders with a South African footprint but no CSD registration or SARS PIN: certified tax clearance certificate.
Foreign suppliers with no South African footprint: complete SBD 1; no tax compliance proof required.
B-bbee
Specific goals carry 20 points under the 80/20 system.
Proof of B-BBEE status means a certificate from an authorised body, a sworn affidavit under the B-BBEE Codes of Good Practice, or another document prescribed under the B-BBEE Act.
No B-BBEE evidence means zero specific goal points, not disqualification.
CIDB
Not applicable.
Labour and safety
COIDA letter of good standing, or proof of application, from the Compensation Fund or a licensed insurer (South African bidders).
Employment Equity Act compliance proof, including the report submitted to the Department of Labour, for designated employers (South African bidders).
Quality (Category 4)
QMS manual defining the quality management system and its scope.
Quality policy and quality objectives approved by top management.
Documented information for document and record control (ISO 9001:2015 clause 7.5).
Documented information for control of nonconforming outputs (clause 8.7).
Documented information for nonconformity and corrective action (clause 10.2).
Documented information for internal audit (clause 9.2).
Organisation chart and responsibility matrix covering the quality management role (clause 5.3).
Documented criteria for evaluation, selection, monitoring and re-evaluation of external providers (clause 8.4).
Form A completed and signed; training plan.
OHS
Signed acknowledgement of Eskom's OHS legal and other requirements (Annexure B).
OHS plan addressing the project's OHS risks and aligned with the health and safety specification.
Baseline OHS risk assessment with the methodology used.
Valid letter of good standing (COIDA or equivalent).
OHS policy signed by the CEO, complying with section 7 of the OHS Act.
Section 37(2) Eskom agreement.
Signed acknowledgement of the Life-saving Rules.
Environment
Signed environmental policy with top management commitment.
Aspects and impacts register for the scope of work, with the assessment methodology and control measures.
Environmental method statement including a waste management procedure for hazardous and general waste.
Functionality
Technical criteria assessed against Appendix B; minimum qualifying score 75%.
Health & Safety
Source: E3511CXMWPR_Invitation to Tender (ITT)_06 November 2026.pdf
OHS documents required before award:
Signed acknowledgement of Eskom's OHS legal and other requirements (Annexure B).
OHS plan addressing the project's OHS risks and aligned with the health and safety specification.
Baseline OHS risk assessment, including the methodology used.
Valid letter of good standing (COIDA or equivalent).
OHS policy signed by the CEO and compliant with section 7 of the OHS Act.
Section 37(2) Eskom agreement.
Signed acknowledgement of the Life-saving Rules.
Technical functionality is assessed separately against Appendix B, with a 75% minimum qualifying score.
Environmental
Source: E3511CXMWPR_Invitation to Tender (ITT)_06 November 2026.pdf
Environmental documents required before award:
Signed environmental policy showing top management commitment.
Aspects and impacts register for the scope of work, identifying activities with an environmental impact, the assessment methodology and the control measures.
Environmental method statement covering the measures and procedures for managing environmental aspects and impacts, including a waste management procedure for hazardous and general waste.
Contractual Terms
Source: E3511CXMWPR_Invitation to Tender (ITT)_06 November 2026.pdf
The contract is governed by Eskom's General Conditions of Purchase. The tender covers the whole contract, and alternative tenders are allowed. The tender remains valid for 180 days from closing. Payment is within 30 days of undisputed invoices for contracts below R50 000 000 including VAT, and within 60 days for contracts above that amount. Eskom may negotiate with preferred bidders where prices are not market-related. Subcontracting the entire scope is prohibited, and subcontracting to a subsidiary must be declared. Bidders must not be subject to international sanctions, may submit only one tender, and must disclose any conflict of interest.
Section
Source: E3511CXMWPR_Invitation to Tender (ITT)_06 November 2026.pdf
Functionality is assessed first against the technical criteria in Appendix B / Annexure K, with a minimum qualifying score of 75%; bidders below that threshold are disqualified. Qualifying bidders are then scored on the 80/20 preference point system: price carries 80 points and specific goals carry 20 points. Price scoring is inclusive of VAT, corrected for arithmetic errors, excludes contingencies, allows for acceptable variations and alternative tenders, may apply a net present value comparison, and counts unconditional but not conditional discounts. A bidder that submits no evidence for a specific goal scores zero for that goal without being disqualified. Contractual requirements, including quality, OHS and environmental documents, are checked after ranking and are not scored; failure to meet them by the stated deadline can make the bid non-responsive. Objective criteria and reverse e-auction do not apply.
DocumentTender Evaluations Environmental Requirements -UPS and Batteries -27 Aug 2026.pdfReview complete
Submission Guidelines
Source: Tender Evaluations Environmental Requirements -UPS and Batteries -27 Aug 2026.pdf (unknown)
Returnable environmental documents — all three must be submitted with the bid:
Signed Environmental Policy: demonstrates top management commitment to environmental management.
Aspects and Impacts Register: identifies, assesses and controls activities in the scope of work that have or may have an environmental impact, with the methodology used and the control measures stated.
Environmental Method Statement: sets out the measures and procedures for managing the environmental aspects and impacts of the activity, including a waste management procedure covering hazardous materials and general waste.
Each returnable is marked Y (submitted) or N (not submitted) on the environmental tender returnable schedule.
Evaluation Criteria
Source: Tender Evaluations Environmental Requirements -UPS and Batteries -27 Aug 2026.pdf (unknown)
Environmental returnables are evaluated on a Recommended / Not recommended basis.
Recommended: all three environmental returnables are submitted and acceptable.
Not recommended: any returnable is missing or inadequate.
No points, weighting or minimum score is stated for the environmental evaluation.
Technical Specifications
Source: Tender Evaluations Environmental Requirements -UPS and Batteries -27 Aug 2026.pdf (unknown)
Scope: supply, delivery and installation of UPS units and batteries at the Bloemfontein, Klerksdorp, Port Elizabeth and Witbank oil laboratories.
Environmental submission requirements:
Environmental Policy signed by top management, evidencing commitment to environmental management.
Aspects and Impacts Register built on the scope of work, covering identification, assessment and control of activities with an actual or potential environmental impact.
The methodology applied to identify and assess those activities, submitted together with the register and the control measures.
Environmental Method Statement describing the measures and procedures to manage the environmental aspects and impacts of the installation activity.
Waste management procedure within the method statement, covering hazardous material management and general waste.
Methodology
Source: Tender Evaluations Environmental Requirements -UPS and Batteries -27 Aug 2026.pdf
Aspects and Impacts Register requirements:
Identify, assess and control activities in the scope of work that have or may have an environmental impact.
State the methodology used to identify and assess those activities.
List the identified activities and the control measures applied to each.
Compliance Requirements
Source: Tender Evaluations Environmental Requirements -UPS and Batteries -27 Aug 2026.pdf (unknown)
Environmental compliance returnables:
Signed Environmental Policy.
Aspects and Impacts Register aligned to the scope of work, with methodology and control measures.
Environmental Method Statement including a waste management procedure for hazardous and general waste.
No CSD, tax, B-BBEE, CIDB or professional registration thresholds are stated in this document.
Environmental
Source: Tender Evaluations Environmental Requirements -UPS and Batteries -27 Aug 2026.pdf
Environmental Method Statement requirements:
Describe the measures and procedures that will be implemented to manage the environmental aspects and impacts of the activity.
Include a waste management procedure covering hazardous material management and general waste.
The method statement must cover at least these items; additional content is permitted.
Section
Source: Tender Evaluations Environmental Requirements -UPS and Batteries -27 Aug 2026.pdf
Environmental returnables are assessed as Recommended or Not recommended.
Recommended: the signed Environmental Policy, the Aspects and Impacts Register and the Environmental Method Statement are all submitted and acceptable.
Not recommended: any of the three is missing or inadequate.
No scoring, weighting or minimum threshold is stated.
The document is a Contract Quality Plan (CQP) template that the bidder must complete to show how it will identify and plan for meeting Eskom's quality management expectations and requirements for the contract.
The template is aligned with SANS 466:2005 Edition 1 and ISO 10005:2005 Edition 2.
The completed CQP forms part of the bid submission.
Submission Guidelines
Source: 240-109253698 CQP Template.docx (unknown)
Returnable document: a completed Contract Quality Plan (CQP) based on the supplied template, submitted with the bid and revised to Revision 1 after contract award.
The CQP must cover all 20 sections of the template, including scope of work, communication channels, organogram with QA/QC roles, interfacing documents, supplier and sub-supplier lists, monitoring arrangements, QCP/ITP requirements, special controls, records control, concession and non-conformance management, databook management, tool and equipment calibration, customer property, product preservation, identification and traceability, and commissioning and post-delivery activities.
The CQP must be compiled by a representative of the bidder and approved by the owner of the organisation.
Eskom review and acceptance sections are completed only after contract award.
Technical Specifications
Source: 240-109253698 CQP Template.docx (unknown)
Scope: supply, delivery and installation of uninterruptible power supplies (UPS) and batteries at the Bloemfontein, Klerksdorp, Port Elizabeth and Witbank oil laboratories.
The quality plan must address, as a minimum:
Scope of work and the applicable works information.
Communication channels between the supplier and Eskom for all quality-related matters, including document control, supplier representative details, minutes of meetings, fixed contract meetings and weekly progress reporting.
An organogram showing designations, roles, responsibilities and outputs, including QA and QC functions and the personnel responsible for work verification.
An index of interfacing documents: work instructions, processes, policies, procedures, industry standards, specifications and drawings.
A list of suppliers and sub-suppliers for scope-specific raw materials, components and outsourced services, with selection and performance-monitoring arrangements.
A description of how sub-suppliers interface with the supplier's quality management system.
An index of items to be manufactured, refurbished or purchased, with full descriptions, production schedule and whether produced in-house or outsourced.
Identification of items and activities requiring a quality control plan or inspection and test plan (QCP/ITP), both offsite and onsite.
Identification of processes requiring special controls under manufacturing or fabrication codes (for example welding and NDT/NDE), with the quality control activities to be applied to each deliverable.
An index of documented information to be submitted to Eskom during the project, including method statements, inspection reports, signed-off QCPs, technical assurance reports, warranty certificates, material certificates, dimension reports and test reports.
How records will be identified, completed, retained and disposed of, using an indexed and cross-referenced filing system.
Concession management, non-conformance (defects, repair and rework) management and inspection management processes.
Databook management, including databook index and operating and maintenance manual, where applicable.
A list of tools and equipment to be used, with calibration, maintenance or test status for each.
The process for dealing with customer property in line with the latest ISO 9001 requirements.
Product preservation: identification, handling, contamination control, packaging, storage, transmission or transportation, and protection.
Identification and traceability methods for scope activities affected by statutory and regulatory requirements.
Post-delivery activities and support during commissioning and after delivery, including warranty period and conditions, customer satisfaction measurement, technical support and defect correction period or retention funds.
Reference standards: SANS 466:2005 Edition 1 and ISO 10005:2005 Edition 2 (guidelines for quality plans).
Compliance Requirements
Source: 240-109253698 CQP Template.docx (unknown)
The bid must include a Contract Quality Plan prepared in accordance with SANS 466:2005 Edition 1 and ISO 10005:2005 Edition 2.
The plan must be compiled by a representative of the bidder and approved by the owner of the organisation.
No other compliance requirements are stated in the document.
Role: Eskom representative for the quality requirements schedule
Email: not stated
Telephone: not stated
Document issue date: 1 September 2026
Submission Guidelines
Source: 240-12248652_UPS Batteries.pdf (TENDER)
Returnable quality documents — all must be completed, signed and submitted with the bid:
Section A: QMS manual or equivalent document defining the QMS and its scope; approved quality policy; approved quality objectives; documented information for control of documented information (ISO 9001:2015 clause 7.5), control of nonconforming outputs (clause 8.7), nonconformity and corrective action (clause 10.2), and internal audit (clause 9.2).
Section B: organisation chart and responsibility matrix showing defined roles, responsibilities and authorities, including the quality management function (clause 5.3); documented criteria for evaluation, selection, monitoring of performance and re-evaluation of external providers (clause 8.4).
Section C: draft contract quality plan specific to the scope of work, prepared with reference to ISO 10005.
Section D: draft or example inspection and test plan (ITP) or quality control plan (QCP) for similar or previous work, prepared with reference to ISO 10005.
Section E: Form A completed and signed; training plan.
Submission method, submission address and closing time are not stated in the available text.
Evaluation Criteria
Source: 240-12248652_UPS Batteries.pdf (TENDER)
Quality evaluation only — the available text sets out no price or preference point scoring.
Scoring structure
Section A (Quality Management System requirements): 7 points.
Section B (evidence of QMS in operation): 2 points.
Section C (contract quality plan): 1 point.
Section D (quality control plan / ITP): 1 point.
Section E (user-defined additional requirements): 2 points.
Total available: 13 points.
Each listed deliverable is scored 1 where it is provided.
Minimum qualifying score: not stated.
Technical Specifications
Source: 240-12248652_UPS Batteries.pdf (TENDER)
Scope
Supply, delivery and installation of uninterruptible power supplies (UPS) and batteries.
Sites
Bloemfontein Oil Laboratories
Klerksdorp Oil Laboratories
Port Elizabeth Oil Laboratories
Witbank Oil Laboratories
Quality deliverables tied to the scope
Draft contract quality plan specific to this scope of work (ISO 10005).
Inspection and test plan (ITP) or quality control plan (QCP) for the works.
Training plan.
Quantities, UPS ratings, battery specifications and installation standards are not stated in the available text.
Compliance Requirements
Source: 240-12248652_UPS Batteries.pdf (TENDER)
Quality management system
A documented QMS that complies with ISO 9001 is required; certification is not a precondition, but objective evidence of a compliant system must be submitted.
Evidence must cover document and record control, control of nonconforming outputs, nonconformity and corrective action, and internal audit.
Roles, responsibilities and authorities must be documented, including the quality management function.
External providers must be evaluated, selected, monitored and re-evaluated against documented criteria.
Returnable forms
Form A: completed and signed as part of the quality returnables.
Training plan: submitted with the quality returnables.
CSD registration, tax compliance, B-BBEE level and CIDB grading are not stated in the available text.
Section
Source: 240-12248652_UPS Batteries.pdf
Quality is assessed against five sections, each deliverable scoring 1 point where provided.
Section A — Quality Management System requirements (ISO 9001): 7 points. Covers the QMS manual or equivalent, approved quality policy, approved quality objectives, and documented information for document and record control (clause 7.5), control of nonconforming outputs (clause 8.7), nonconformity and corrective action (clause 10.2), and internal audit (clause 9.2).
Section B — Evidence of QMS in operation: 2 points. Covers the organisation chart and responsibility matrix including the quality management role (clause 5.3), and documented criteria for evaluation, selection, performance monitoring and re-evaluation of external providers (clause 8.4).
Section C — Contract quality plan: 1 point. A draft plan specific to the scope of work, prepared with reference to ISO 10005.
Section D — Quality control plan: 1 point. A draft or example ITP or QCP for similar or previous work, prepared with reference to ISO 10005.
Section E — User-defined additional requirements: 2 points. Form A completed and signed, and a training plan.
No minimum qualifying score is stated.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.