Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Issuing Organization
Eskom National Transmission Company of South AfricaLocation
Western Cape
Closing Date
17 Dec 2026
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
Muldersvlie Substation - Klapmuts - Cape Town - 7400
Organization Type
GOVERNMENT
Published
20 Nov 2026
OCDS Reference
ocds-9t57fa-179199
ESKOM national transmission company of south africa requires the supply of screened separable connectors and associated accessories for 11kv and 22kv cable systems, as specified in ESKOM drawing D-DT-8017. the scope covers non-extensible and extensible connectors, connectors with surge arresters, blank inserts, intermediate bushings, end plugs, and tri-furcating kits, all to nrs 053 and ESKOM specification 34-1622. the contract runs for 6 months. Bidders must ensure all items comply with the mandatory technical standards and pass inspection and ESKOM release note requirements.
Closing date: 17 December 2026 at 08:00 (UTC).
Compliance: All connectors must comply with NRS 053 and Eskom specification 34-1622; test and certification to NRS 053 is required.
Inspection and release: Items are subject to inspection and must have an Eskom release note; all items must bear an indelible manufacturer's trademark and part number.
Technical specification: Connectors must meet EN50180/1 630A Type C interface with M16 x 2mm thread, be screened, polymeric, and supplied complete with fixing stems, lugs, earthing kits, instruction sheet and bill of materials.
Surge arresters: 11kV units require minimum MCOV 10kV, maximum residual voltage 40kV, discharge current 10kA; 22kV units require minimum MCOV 19.2kV, maximum residual voltage 80kV, discharge current 10kA; both IEC line discharge class 1 with 500mm earth lead and M12 lug.
Accessories: Tri-furcating kits for 22kV 3-core cable (25-50 mm² and 70-185 mm²) with 800mm tail length must be supplied as specified.
No other eligibility or evaluation criteria (e.g. B-BBEE, CIDB, financial thresholds) are stated in the document.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Check the registered grade against the tender conditions, or estimate a possible grade. Check CIDB registration · Estimate a CIDB grade.
Date & Time
Thursday, 17 December 2026 - 10:00
Venue
MS Team
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Quotation
Muldersvlie Substation - Klapmuts - Cape Town - 7400
AI Document Analysis Stages
Description
Source: Supplier Quality Management Specification (QM 58).pdf20 Nov
2026
Tender Published
Tender was published
17 Dec
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Appendix A - June 2026.docx
Supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei for Eskom National Transmission Company of South Africa, with a contract period of six months.
Muldersvlei 11kV Control Room BoQ_ November 2026_QK Comments.xlsx
Eskom National Transmission Company of South Africa requires the supply, installation, termination, commissioning and handover of 11kV switchgear at the Muldersvlei substation control room in the Western Cape, over a 6-month period. The work is priced through a bill of quantities covering preliminary and general items, health, safety and environmental provisions, civil works, and primary and secondary plant electrical works.
559-66~1.DOC
Annex-c_Local content Declaration-Summary Schedule.pdf
ITT Re-Issue For Muldersvlei 11kV Switchgear Supply Install Termination.pdf
Supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei Substation, Western Cape, for a 6-month period, under an NEC3 Engineering and Construction Contract (ECC3).
240-77~1.DOC
Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf
Eskom National Transmission Company of South Africa is re-issuing a tender for the supply, installation, termination, commissioning, and handover of 11kV switchgear at Muldersvlei in the Western Cape, with a contract period of six months. The tender is governed by Eskom's Standard Conditions of Tender (Rev. 12), which set out the procedural and compliance obligations for bidders.
202411~1.PDF
NTCSA requires the supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei in the Western Cape over a 6-month period. The work covers surge arrestors, connectors, arc sensors, panel testing, 11kV cable jointing and termination on farmers feeders, and operator training. The contract is governed by a project-specific Health and Safety specification that the principal contractor must answer with an approved H&S plan before site access.
Clarification Meeting Link for the re-issued.msg
Supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei for Eskom National Transmission Company of South Africa, for a period of six months.
Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf
Supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei in the Western Cape, for Eskom National Transmission Company of South Africa, over a contract period of 6 months.
Tx Environmental Managemement Tender Returnable .pdf
Eskom National Transmission Company of South Africa is re-issuing a tender for the supply, installation, termination, commissioning, and handover of 11kV switchgear at Muldersvlei in the Western Cape, with a contract period of six months. Bidders must submit comprehensive environmental documentation covering their environmental management system, project-specific environmental management programme, waste management plan, and aspect and impact register, and must achieve a weighted average score of 80% or above in the environmental evaluation to be considered.
Annex-d_Imports Declaration-Supporting schedule to Annex C.pdf
Supplier Quality Management Specification (QM 58).pdf
Eskom National Transmission Company of South Africa requires the supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei, Western Cape, over a 6-month period. The tender is a re-issue and closes on 17 December 2026 at 10:00.
Annex-d_Imports Declaration-Supporting schedule to Annex C.pdf
240-56065202_ Switcgear Training Standard Requirements.pdf
Eskom National Transmission Company of South Africa is re-issuing a tender for the supply, installation, termination, commissioning, and handover of 11kV switchgear at Muldersvlei substation in the Western Cape, with a contract period of six months. The tender references a standard that mandates OEM-provided, four-level switchgear training (Levels 1 to 4) for Eskom staff, covering orientation, operation, maintenance, and overhaul, with training costs to be included in the contract.
Clarification Meeting Re-Issue Virtual MS Teams.docx
Eskom National Transmission Company of South Africa requires the supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei Substation in Klapmuts, Western Cape, over a six-month period. The procurement includes a compulsory site visit and an optional virtual clarification meeting.
Annex-e_Local Content Declaration-Supporting Schedule to Annex C.pdf
SDLI Strategy -Strategy Setting Template For Bidders For Muldersvlei 11kV.pdf
Supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei for Eskom National Transmission Company of South Africa, over a 6-month period.
Annex-e_Local Content Declaration-Supporting Schedule to Annex C.pdf
Annexures C D E.xlsx
Supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei for Eskom National Transmission Company of South Africa, with a contract period of six months.
E-tendering Help Manual for supplier -.pdf
Eskom National Transmission Company of South Africa requires the supply, installation, termination, commissioning, and handover of 11kV switchgear at Muldersvlei in the Western Cape, with a contract period of six months. The tender is a re-issue, and bids must be submitted electronically via the Eskom eTendering system.
240-56030619-ACCESSORIES FOR MEDIUM VOLTAGE POWE.pdf
Eskom National Transmission Company of South Africa requires the supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei, Western Cape, over a six-month period. The tender references the Eskom standard for medium-voltage cable accessories (240-56030619), which specifies technical requirements for terminations, joints, surge arresters and separable connectors.
8006.pdf
Supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei for Eskom National Transmission Company of South Africa over a 6-month period. The technical scope covers single-core XLPE cable termination kits rated 11kV, 22kV and 33kV, in indoor and outdoor variants, for copper and aluminium conductors from 50 mm² to 630 mm².
240-56065202_ Switcgear Training Standard Requirements.pdf
The standard defines the switchgear training that suppliers and their original equipment manufacturers (OEMs) must deliver to Eskom personnel across the equipment's life cycle, structured into four accredited training levels. It applies to switchgear supplied, installed, terminated, commissioned and handed over under the Muldersvlei 11kV contract, and sets out how training is scoped, costed, assessed and re-assessed.
Annexures C D E.xlsx
Supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei for Eskom National Transmission Company of South Africa, with a contract period of six months. The tender is a re-issue and includes local content and imported content declaration requirements.
8010.pdf
Supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei for Eskom National Transmission Company of South Africa, over a 6-month period. The scope includes polymer indoor surge arresters for 11kV and 22kV systems, with specific technical specifications and Eskom drawing references.
QM.pdf
Supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei Substation for the National Transmission Company of South Africa (Eskom), over a six-month period. The tender is a re-issue and includes quality management and quality control requirements.
240-78305014 Environmental Aspects and Management Plans Requirements Rev 5.pdf
Eskom National Transmission Company of South Africa requires the supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei in the Western Cape, with the work running over a period of 6 months. The installation sits within the Transmission division's environmental management framework, so the appointed contractor must plan and execute the works under an approved environmental management programme.
SDLI Strategy -Strategy Setting Template For Bidders For Muldersvlei 11kV.pdf
Eskom National Transmission Company of South Africa requires the supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei substation in the Western Cape, over a 6-month period. The tender is a re-issue and includes mandatory local content requirements for cable (90%) and SDL&I obligations covering transformation, local procurement, jobs, and skills development.
202411~1.PDF
Supply, installation, termination, testing, commissioning and handover of 11kV switchgear at Muldersvlei, including surge arrestors, connectors, arc sensors, cable works, and training, for Eskom National Transmission Company South Africa, over a 6-month period.
Authorisation Form - 08 November 2024 (1).pdf
Eskom National Transmission Company of South Africa requires the supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei in the Western Cape, with a contract period of six months. The tender is a re-issue and requires bidders to complete an authorisation form appropriate to their organisation type.
240-56030619-ACCESSORIES FOR MEDIUM VOLTAGE POWE.pdf
Eskom National Transmission Company of South Africa requires the supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei in the Western Cape, over a six-month period. The tender is a re-issue and is governed by Eskom's technical standard for medium-voltage cable accessories (240-56030619), which specifies requirements for terminations, joints, surge arresters and separable connectors.
240-12248652 Category 2- List of Tender Returnables Documents_Rev 6.pdf
Eskom National Transmission Company of South Africa requires the supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei Substation in the Western Cape, with a contract period of six months. The tender is a re-issue and includes detailed quality management and quality control requirements that bidders must address in their submissions.
559-66~1.DOC
240-77~1.DOC
20250206_Muldersvlei 11kV_BRA.pdf
Supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei substation for Eskom National Transmission Company of South Africa, over a 6-month period. The work includes civil works, earthworks, excavation, foundation construction, electrical works, and associated site establishment and yardworks.
Clarification Meeting Re-Issue Virtual MS Teams.docx
Eskom National Transmission Company of South Africa requires the supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei Substation in the Western Cape, with a contract period of six months. The procurement includes a compulsory site visit and an optional virtual clarification meeting.
240-185000522 - Rev 2 Technical Specification Evaluation.pdf
Eskom National Transmission Company South Africa requires the supply, installation, termination, commissioning and handover of 11 kV cable systems to a newly installed 11 kV fixed pattern indoor switchgear at Muldersvlei substation in the Western Cape. The scope includes terminating six 11 kV feeders, installing surge arrestors and arc sensors, and commissioning the switchgear and cable systems over a six-month period.
Annex-c_Local content Declaration-Summary Schedule.pdf
240-68099512 Form A_Cat 2_ Rev 9.pdf
Eskom National Transmission Company of South Africa requires the supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei Substation, with a contract period of six months. The tender is a re-issue and includes mandatory compliance with Eskom's Supplier Quality Requirements and ISO 9001 standards.
Eskom Holdings Safety, Health, Environment and Quality (SHEQ) Policy.pdf
Eskom National Transmission Company of South Africa requires the supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei substation in the Western Cape, with a contract period of six months. The tender is a re-issue, and bidders must comply with Eskom's Safety, Health, Environment and Quality (SHEQ) Policy, including adherence to ISO 9001, ISO 14001 and ISO 45001 standards.
8021.pdf
Eskom National Transmission Company of South Africa requires the supply, installation, termination, commissioning, and handover of 11kV switchgear at Muldersvlei in the Western Cape, over a 6-month period. The tender includes a range of transition joint kits for connecting XLPE to paper-insulated cables at 11kV and 22kV, as well as trifurcating kits for PILC to XLPE transitions.
20250206_Muldersvlei 11kV_BRA.pdf
Supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei over a six-month period. The associated OHS baseline risk assessment identifies construction, earthworks, electrical and site-establishment hazards and the controls required for routine and non-routine activities.
Authorisation Form - 08 November 2024 (1).pdf
Eskom National Transmission Company of South Africa requires the supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei in the Western Cape, with a contract period of six months. The tender is a re-issue, and bidders must complete the relevant authorisation certificate based on their organisation type.
Eskom General Conditions of Purchase - 31 May 2024.pdf
Eskom National Transmission Company of South Africa requires the supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei in the Western Cape, with a contract period of six months. The tender is a re-issue, and the closing date is 17 December 2026 at 10:00.
8021.pdf
Eskom National Transmission Company of South Africa requires the supply, installation, termination, commissioning, and handover of 11kV switchgear at Muldersvlei in the Western Cape, with the contract running for six months. The tender is a re-issue and includes the provision of various transition joint kits for 11kV and 22kV cables, as detailed in the specification sheets.
20240226_Tx. CONTRACTOR ENVIRONMENTAL REQUIREMENTS PROFORMA.docx
Supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei for Eskom National Transmission Company of South Africa, over a 6-month period.
QM.pdf
Supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei substation, part of the Muldersvlei Substation Refurbishment Project, for Eskom National Transmission Company of South Africa in the Western Cape. The contract period is six months.
E-tendering Help Manual for supplier -.pdf
Eskom National Transmission Company of South Africa is re-issuing a tender for the supply, installation, termination, commissioning, and handover of 11kV switchgear at Muldersvlei in the Western Cape, with a contract period of six months.
20240226_Transmission Industry Waste Management Plan_2023-2028.pdf
Supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei for a six-month period, re-issued by Eskom National Transmission Company of South Africa in the Western Cape.
Eskom Holdings Safety, Health, Environment and Quality (SHEQ) Policy.pdf
Eskom National Transmission Company of South Africa requires the supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei substation in the Western Cape, with a contract period of six months. The work is governed by Eskom's Safety, Health, Environment and Quality (SHEQ) Policy, which mandates compliance with ISO 9001, ISO 14001 and ISO 45001 standards, and adherence to Eskom's Life-saving Rules.
ECC3 Muldersvlei 11kV Switchgear Supply Install .pdf
Eskom National Transmission Company of South Africa requires the supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei Substation in the Western Cape, under an NEC3 Engineering and Construction Contract (Option B, priced contract with bill of quantities). The contract runs for approximately six months, with a completion date of 30 January 2027 and access from 01 July 2026.
8017.pdf
Eskom National Transmission Company of South Africa is re-issuing a tender for the supply, installation, termination, commissioning, and handover of 11kV switchgear at Muldersvlei in the Western Cape, with a contract period of six months. The scope includes separable connectors for 11kV and 22kV systems, with options for extensible and non-extensible types, surge arresters, and associated accessories.
20240226_Tx. CONTRACTOR ENVIRONMENTAL REQUIREMENTS PROFORMA.docx
Eskom National Transmission Company of South Africa requires the supply, installation, termination, commissioning, and handover of 11kV switchgear at Muldersvlei in the Western Cape, with a contract period of six months. The work is a re-issue of a previous tender and includes strict environmental management obligations.
240-68099512 Form A_Cat 2_ Rev 9.pdf
Eskom National Transmission Company of South Africa requires the supply, installation, termination, commissioning and handover of 11kV switchgear at the Muldersvlei substation in the Western Cape, as part of a refurbishment project. The contract period is six months.
ECC3 Muldersvlei 11kV Switchgear Supply Install .pdf
Supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei Substation for Eskom National Transmission Company of South Africa, under an NEC3 Engineering and Construction Contract (Option B, priced contract with bill of quantities). The contract runs from 1 July 2026 with completion by 30 January 2027, and includes a 52-week defects date.
E-Tenderers E-Tendering Training Acknowledgement.pdf
Supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei for Eskom National Transmission Company of South Africa, over a 6-month period.
SBD 6.2 Declaration Certificate.pdf
Eskom National Transmission Company of South Africa requires the supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei in the Western Cape, under a re-issued tender for a period of six months. The tender includes a local production and content requirement for cables, with a minimum threshold of 90%.
8017.pdf
Eskom National Transmission Company of South Africa requires the supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei, Western Cape, over a 6-month period. The tender also covers the supply of separable connectors (11kV and 22kV), extensible connectors, surge arrester combinations, and trifurcating kits, all to Eskom specification 34-1622 and NRS 053.
Muldersvlei 11kV Control Room BoQ_ November 2026_QK Comments.xlsx
Eskom National Transmission Company of South Africa requires the supply, installation, termination, commissioning and handover of 11kV switchgear at the Muldersvlei substation control room in the Western Cape, over a 6-month period. The scope also includes associated civil works, dismantling and erection of primary and secondary plant, and environmental and health and safety obligations, all priced through a bill of quantities.
20240226_Transmission Industry Waste Management Plan_2023-2028.pdf
Eskom Transmission requires the supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei substation in the Western Cape, with a six-month contract period. The tender is a re-issue, and the closing date is 17 December 2026 at 10:00.
240-185000522 - Rev 2 Technical Specification Evaluation.pdf
Eskom National Transmission Company of South Africa requires the supply, installation, termination, commissioning and handover of 11 kV cable systems to a newly installed 11 kV fixed pattern indoor switchgear at Muldersvlei substation in the Western Cape. The scope covers terminating existing XLPE and PILC cables, installing surge arrestors and arc sensors, and commissioning the switchgear and cable systems over a 6-month period.
Appendix A - June 2026.docx
Supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei for Eskom National Transmission Company of South Africa, with a contract period of six months.
Clarification Meeting Link for the re-issued.msg
Eskom National Transmission Company of South Africa requires the supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei in the Western Cape, for a period of six months.
ITT Re-Issue For Muldersvlei 11kV Switchgear Supply Install Termination.pdf
Supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei Substation for the National Transmission Company South Africa (NTCSA), with a contract period of six months. The work includes cable accessories, terminations, and associated testing, and requires attendance at a compulsory site visit.
8010.pdf
Eskom National Transmission Company of South Africa is re-issuing a tender for the supply, installation, termination, commissioning, and handover of 11kV switchgear at Muldersvlei in the Western Cape, with a contract period of six months. The scope includes surge arresters for 11kV and 22kV systems, as detailed in Eskom drawing D-DT-8010.
Supplier Quality Management Specification (QM 58).pdf
Eskom National Transmission Company of South Africa is re-issuing a tender for the supply, installation, termination, commissioning, and handover of 11kV switchgear at Muldersvlei in the Western Cape, with a contract period of six months. The tender includes comprehensive supplier quality management requirements based on ISO 9001, with bidders required to complete and submit Form A and other quality documentation depending on the applicable quality category.
8006.pdf
Eskom National Transmission Company of South Africa requires the supply, installation, termination, commissioning, and handover of 11kV switchgear at Muldersvlei in the Western Cape, over a six-month period. The tender includes a detailed specification for various cable termination kits (SAP materials) for 11kV, 22kV, and 33kV XLPE cables, with indoor and outdoor applications, and different conductor sizes.
E-Tenderers E-Tendering Training Acknowledgement.pdf
Supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei for Eskom National Transmission Company of South Africa, over a six-month period.
SBD 6.2 Declaration Certificate.pdf
Eskom National Transmission Company of South Africa requires the supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei in the Western Cape, for a contract period of six months. The tender is a re-issue and includes a local content requirement for cables of at least 90%.
240-78305014 Environmental Aspects and Management Plans Requirements Rev 5.pdf
Eskom National Transmission Company of South Africa requires the supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei substation in the Western Cape, with a contract period of six months. The tender is a re-issue, and bidders must comply with Eskom's environmental management requirements as detailed in the referenced work instruction.
240-12248652 Category 2- List of Tender Returnables Documents_Rev 6.pdf
Eskom National Transmission Company of South Africa requires the supply, installation, termination, commissioning and handover of 11kV switchgear at the Muldersvlei substation in the Western Cape, with a contract period of six months. The tender is a re-issue and includes mandatory quality management and quality control deliverables as part of the evaluation.
Eskom General Conditions of Purchase - 31 May 2024.pdf
Eskom National Transmission Company of South Africa requires the supply, installation, termination, commissioning, and handover of 11kV switchgear at Muldersvlei in the Western Cape, with a contract period of six months. The tender is a re-issue, and the closing date is 17 December 2026 at 10:00.
Tx Environmental Managemement Tender Returnable .pdf
Eskom National Transmission Company of South Africa requires the supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei in the Western Cape, with the contract running for six months. Bidders must submit comprehensive environmental documentation covering management systems, site-specific environmental programmes, waste management, and impact assessments, and must achieve a minimum weighted score of 80% in the environmental evaluation to be considered.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 2 062 500
Range
Based on CIDB grading. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
General description
Submission Guidelines
Source: Supplier Quality Management Specification (QM 58).pdf (unknown)Returnable quality documents
Evaluation Criteria
Source: Supplier Quality Management Specification (QM 58).pdf (unknown)Quality evaluation basis
Technical Specifications
Source: Supplier Quality Management Specification (QM 58).pdf (unknown)Quality management scope
Methodology
Source: Supplier Quality Management Specification (QM 58).pdfExecution methodology
Experience & Qualifications
Source: Supplier Quality Management Specification (QM 58).pdfPersonnel qualifications
Quality Management
Source: Supplier Quality Management Specification (QM 58).pdfQuality management requirements
Compliance Requirements
Source: Supplier Quality Management Specification (QM 58).pdf (unknown)Compliance requirements
Health & Safety
Source: Supplier Quality Management Specification (QM 58).pdfHealth, safety and environment
Contractual Terms
Source: Supplier Quality Management Specification (QM 58).pdfPreservation and contract quality obligations
Section
Source: Supplier Quality Management Specification (QM 58).pdfAdditional quality evaluation
Submission Guidelines
Source: 20240226_Tx. CONTRACTOR ENVIRONMENTAL REQUIREMENTS PROFORMA.docx (unknown)Returnable
Technical Specifications
Source: 20240226_Tx. CONTRACTOR ENVIRONMENTAL REQUIREMENTS PROFORMA.docx (unknown)Environmental obligations for the works
Financial Requirements
Source: 20240226_Tx. CONTRACTOR ENVIRONMENTAL REQUIREMENTS PROFORMA.docx (unknown)Environmental penalties
Compliance Requirements
Source: 20240226_Tx. CONTRACTOR ENVIRONMENTAL REQUIREMENTS PROFORMA.docx (unknown)Mandatory declaration
Environmental compliance undertakings
Description
Source: SBD 6.2 Declaration Certificate.pdfThe tender is for the supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei, for a period of 6 months. The document provided is the SBD 6.2 Declaration Certificate for Local Production and Content, which applies to designated sectors.
Important Dates
Source: SBD 6.2 Declaration Certificate.pdf (TENDER)Closing date: 21 February 2025 at 12:00 (per the document; note the tender record lists 17 December 2026 — the document date is used as the source of truth).
Contact Information
Source: SBD 6.2 Declaration Certificate.pdf (TENDER)Fraud and corruption reporting:
Submission Guidelines
Source: SBD 6.2 Declaration Certificate.pdf (TENDER)Returnable documents:
Disqualification risks:
Evaluation Criteria
Source: SBD 6.2 Declaration Certificate.pdf (TENDER)Local content is a designated sector requirement. The stipulated minimum threshold for local production and content for cables is 90%.
Local content must be calculated using the formula LC = [1 - x/y]
If imported content is used, the SARB exchange rates published at 12:00 on the date of advertisement must be used, and proof of these rates must be submitted.
The awarding of the bid depends on the accuracy of the local content information furnished.
Technical Specifications
Source: SBD 6.2 Declaration Certificate.pdf (TENDER)The tender is for the supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei, for a period of 6 months.
Local content requirement:
Pricing Schedule
Source: SBD 6.2 Declaration Certificate.pdfThe local content declaration must include the bid price excluding VAT (y) and imported content (x). The local content percentage is calculated using the formula in SATS 1286:2011. Declarations C, D and E must be kept for verification for at least 5 years, and the successful bidder must update them with actual values for the duration of the contract.
Financial Requirements
Source: SBD 6.2 Declaration Certificate.pdf (TENDER)Bid price excluding VAT (y) and imported content (x) must be stated in the local content declaration.
Exchange rates used must be the SARB rates published at 12:00 on the date of advertisement of the bid.
Compliance Requirements
Source: SBD 6.2 Declaration Certificate.pdf (TENDER)Local content compliance:
Contractual Terms
Source: SBD 6.2 Declaration Certificate.pdfLocal content must be calculated per SATS 1286:2011. The bid may be disqualified if the SBD 6.2 Declaration Certificate and Annex C are not submitted at the stipulated deadlines.
Section
Source: SBD 6.2 Declaration Certificate.pdfThe bid is subject to the Preferential Procurement Regulations, 2022, under the PPPFA. Incorrect or unverifiable local content data may result in remedies as provided for in Regulation 9.1.
Description
Source: Appendix A - June 2026.docxThe work involves the supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei, with a contract period of 6 months.
Submission Guidelines
Source: Appendix A - June 2026.docx (unknown)Returnable documents: none specified beyond the standard Eskom annexures (Annexure A to N). Bidders must complete and submit all applicable annexures as required by the tender pack.
Technical Specifications
Source: Appendix A - June 2026.docx (unknown)Scope: supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei. Contract period: 6 months.
Description
Source: Muldersvlei 11kV Control Room BoQ_ November 2026_QK Comments.xlsxSupply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei substation, including associated civil and electrical works. The contract period is 6 months.
Submission Guidelines
Source: Muldersvlei 11kV Control Room BoQ_ November 2026_QK Comments.xlsx (unknown)Closing date: 17 December 2026 at 08:00
Submission: completed Bill of Quantities with all rates and prices inserted. All items must be priced; blank rates are assumed zero.
Technical Specifications
Source: Muldersvlei 11kV Control Room BoQ_ November 2026_QK Comments.xlsx (unknown)Scope: Supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei substation.
Contract duration: 6 months.
Civil works include: demolition, earthworks, concrete foundations, formwork, reinforcement, structural steelwork, earthing mats, cable ducts, and four 24m masts.
Electrical works include: dismantling and erection of primary plant equipment (132kV isolators, circuit breakers, surge arresters, current transformers, earth switches, voltage transformers), busbars, earthing, and floodlighting.
The contractor must provide all necessary site establishment, facilities, tools, equipment, water, power, communications, and dewatering.
The contractor must comply with SABS 1200A and other referenced standards.
Financial Requirements
Source: Muldersvlei 11kV Control Room BoQ_ November 2026_QK Comments.xlsx (unknown)Pricing format: Bill of Quantities with rates and prices in ZAR, expressed to two decimal places.
All prices exclude VAT.
Retention is not calculated in the forecast rate of payment.
The employer may provide certain free issue materials; the contractor must price for taking delivery, protection, storage, and installation.
Rates and prices must cover all direct and indirect costs, overheads, profits, risks, liabilities, and obligations.
No bid security or guarantee is specified in the BoQ.
Compliance Requirements
Source: Muldersvlei 11kV Control Room BoQ_ November 2026_QK Comments.xlsx (unknown)The contractor must comply with the Occupational Health and Safety Act and Eskom's SHE specifications.
The contractor must appoint a full-time safety officer for the duration of the contract (minimum 2 months).
The contractor must provide all required personal protective equipment and safety equipment.
The contractor must comply with environmental management requirements, including waste management, pollution prevention, and rehabilitation.
The contractor must appoint an environmental officer where applicable.
Description
Source: Annexures C D E.xlsxThe tender is for the supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei, for a period of 6 months. The document provided contains only the local content declaration annexes (Annex C, D, E); no technical specifications are included.
Submission Guidelines
Source: Annexures C D E.xlsx (unknown)Returnable documents:
Evaluation Criteria
Source: Annexures C D E.xlsx (unknown)Bidders must declare local content and imported content in accordance with SATS 1286.2011. No specific local content percentage threshold is stated in the provided document.
Technical Specifications
Source: Annexures C D E.xlsx (unknown)The tender is for the supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei, for a period of 6 months. The document provided contains only the local content declaration annexes (Annex C, D, E); no technical specifications are included.
Financial Requirements
Source: Annexures C D E.xlsx (unknown)Pricing must be stated per tender item, excluding VAT. The tenderer must calculate and declare local content percentages per item and overall, using the prescribed formulas in Annex C.
Compliance Requirements
Source: Annexures C D E.xlsx (unknown)Bidders must comply with the local content and imported content declaration requirements of SATS 1286.2011. No specific compliance thresholds (e.g., B-BBEE, CIDB) are stated in the provided document.
Description
Source: Appendix A - June 2026.docxSupply, install, terminate, commission and handover of 11kV switchgear at Muldersvlei for a 6-month period.
Technical Specifications
Source: Appendix A - June 2026.docx (unknown)Scope: Supply, install, terminate, commission and handover of 11kV switchgear at Muldersvlei.
Contract period: 6 months.
Document hierarchy: Annexures A through N referenced in Appendix A.
Contact Information
Source: Clarification Meeting Link for the re-issued.msg (unknown)Technical Specifications
Source: Clarification Meeting Link for the re-issued.msg (unknown)Supply, install, terminate, commission, and hand over 11kV Switchgear at Muldersvlei for a duration of 6 months.
Description
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdfAddenda to an issued Invitation to Tender are published or issued in the same manner as the original invitation and form part of the tender documents.
Bidders must monitor the Eskom Tender Bulletin and NT e-Tender Portal for addenda and for changes to the closing date and time.
All communication between Eskom and a bidder must be in writing, in English, and directed to or from the Eskom Representative only.
Eskom takes no responsibility for non-receipt of communications.
Important Dates
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)Compulsory site visit or clarification meeting
Closing
Contact Information
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)Enquiries
Submission address
Submission Guidelines
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)Submission method
Packaging
Returnables
Disqualification risks
Evaluation Criteria
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)Evaluation stages
Preference points
Arithmetical errors
Technical Specifications
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)Scope
Other requirements
Quality Management
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdfEskom does not reimburse bidders for costs incurred in preparing and submitting a tender, including testing needed to show compliance with the evaluation criteria, or for contract negotiation.
The Acknowledgement Form must be completed and submitted with the tender and must state whether the bid covers the whole or part of the works, services or supply identified in the specification and works information.
Bidders must check the Invitation to Tender documents on receipt and notify the Eskom Representative of any discrepancy or omitted document.
Pricing Schedule
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdfPricing: rates, prices and the tendered total must include all duties, taxes (including VAT) and levies payable by the successful bidder, as applicable 14 days before the closing date and time; prices must be fixed for the contract duration and are not subject to adjustment except as provided in the Invitation to Tender; prices are in South African Rand unless the Invitation to Tender instructs otherwise, using the stipulated exchange rate and base date where part payment in another currency is allowed.
Insurance: insurance provided by Eskom may not cover the full requirement of the conditions of contract; bidders should obtain qualified advice.
Alterations: tender documents may not be altered except to comply with Eskom's instructions or to correct the bidder's own errors; alterations must be initialled by all signatories and no correction fluid or tape may be used.
Alternative tenders: permitted only if a main tender is also submitted and the Invitation to Tender allows alternatives, and only on the criteria stated in the Tender Data.
Clarification and correction of prices: bidders must provide clarification and documents required during evaluation, but mandatory returnables due at closing may not be submitted afterwards; a breakdown request may not change prices or the substance of the tender except to correct arithmetical errors, and the corrected total is binding.
Designated materials and thresholds: information must be submitted by contract award, failing which the tender is not considered for award.
Functionality: where applicable, bidders are scored against the functionality criteria and must meet the minimum threshold in the Tender Data.
Financial analysis: Eskom assesses the financial risk of contracting with the bidder; where mitigating factors are absent, insufficient, or the risk too high, the bidder is not considered for award.
Price evaluation: factors such as CPA, forex, commodity exposure, unconditional discounts, technical adjustment, present value and forecast invoicing rates are taken into account.
Arithmetical errors: where figures and words differ, the amount in words prevails; highest-ranked tenders are checked for misplaced decimal points, incomplete pricing schedules or bills of quantities, and multiplication or addition errors; a bidder that does not correct or accept the correction is rejected.
Ranking: price and specific goals scores are added and bidders ranked from highest to lowest.
Objective criteria: a contract may be awarded to a bidder that did not score the highest points only under section 2(1)(f) of the PPPFA, where objective criteria are stipulated in the Invitation to Tender; functionality and B-BBEE scorecard elements may not be used as objective criteria.
Financial Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)Pricing
Security and insurance
Costs
Compliance Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)Eligibility
CIDB
B-bbee
Sheq
Legislation
Other
Health & Safety
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdfSafety, health, environment and quality (SHEQ): bidders must provide proof to Eskom's satisfaction that SHEQ systems, policies and capability are in place at the closing date and time and/or contract award; all SHEQ costs and personnel must be reflected in the tender.
Legislation: compliance is required with National Treasury instruction notes, CIDB regulations for construction works, dtic designated local content and production requirements, PPPFA Regulations, the Amended B-BBEE Codes, COIDA, the OHS Act and Eskom's SHEQ requirements.
Agent: where an agent submits on behalf of a principal, an authenticated copy of the authority to act as agent must be submitted as a tender returnable.
CIDB: where CIDB grading is a qualification criterion, registration at that grading is required at closing, or proof of application at closing with the CIDB database printout by contract award; failure to submit as stipulated disqualifies the tender.
Contract Skills Development Goals: apply to contracts of 12 months or more and of R5 million or more (professional service or service contracts) or CIDB grade 7 or higher (engineering and construction works or design and build).
Contract Participation Goals: apply to General Building and Civil Engineering works contracts of at least 6 months where at least 25% of the main contract could reasonably be subcontracted in the CE, EB, GB or ME classes.
Clarifications and addenda: Eskom responds to clarification requests received before the closing date and publishes responses and addenda on the platform where the tender was advertised; bidders must monitor the Eskom Tender Bulletin and NT e-Tender Portal.
Tender opening: tenders are opened in the presence of bidders' representatives who attend, at the time and place in the Tender Data; for e-tendering there is no public opening and Eskom publishes the names of bidders received.
Non-disclosure: Eskom does not disclose evaluation, comparison or award recommendation information until after award, unless required by law.
Rejection: a tender is rejected where there is proof that the bidder influenced the processing or award, colluded or rigged bids, or engaged in fraudulent or illegal activity connected with the invitation.
Acceptance: Eskom notifies acceptance before the validity period expires, after approval by the Eskom Adjudication Authority; for open tenders the notification is published on the Eskom Tender Bulletin and NT e-Tender Portal.
Contract documents: the successful bidder signs the Form of Agreement, and the contract documents are revised to reflect addenda, returnables, negotiated changes and other agreed revisions.
Contractual Terms
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdfTender validity: the tender must remain valid for acceptance for the stated validity period and be extended for an additional period on Eskom's request; a bidder that agrees to extend may not modify its tender, and a bidder that refuses is excluded from further consideration. If validity expires before contracts are concluded, the procurement is deemed concluded without an award.
Confidentiality: all matters arising from the procurement are confidential, and Eskom's documents may be used and copied only to prepare and submit the tender.
Eskom's rights: Eskom may accept or reject any variation, deviation or alternative tender, accept the whole or part of a tender, cancel the tender before contract conclusion with written reasons on request, and enter into mandated negotiations with one or more selected bidders.
Liability: Eskom, its subsidiaries, shareholders, advisers, directors, employees and representatives are not liable for losses, claims or damages arising from a bidder's participation in the tender or from amendment, termination, suspension or exclusion from the process.
Accuracy: Eskom gives no representation or warranty on the accuracy or completeness of information in the tender documents and disclaims liability for it.
Site visit: bidders must attend a site visit or clarification meeting identified as compulsory; non-attendance results in disqualification.
Standardised specifications: bidders must obtain and apply the latest revisions of specifications and publications incorporated by reference.
B-BBEE: the B-BBEE level is scored from the CSD report or the certificate or affidavit; where it is a pre-qualification criterion, proof must be submitted at closing or the tender is disqualified; fraudulent or expired evidence disqualifies the tender.
Arithmetical corrections: bidders must confirm tendered prices or accept Eskom's corrections; the corrected total is binding, and a bidder that does not correct or accept the correction is rejected.
Section
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdfFunctionality: where it is a criterion, bidders are scored against the functionality criteria and must meet the minimum threshold stated in the Tender Data to proceed to further evaluation.
Price: evaluated on the criteria in the Tender Data, taking into account CPA, forex, commodity exposure, unconditional discounts, technical adjustment, present value and forecast invoicing rates.
B-BBEE: scored on the level shown on the CSD report or the certificate or affidavit provided; no certificate or affidavit means zero PPPFA points rather than disqualification.
Specific goals: scored against supporting documentation; failure to meet them or to submit proof scores zero points within the 80/20 or 90/10 allocation but does not disqualify.
Ranking: price and specific goals scores are added and bidders ranked from highest to lowest.
Objective criteria: a contract may be awarded to a bidder that did not score the highest points only under section 2(1)(f) of the PPPFA, where objective criteria are stipulated in the Invitation to Tender; functionality and B-BBEE scorecard elements may not be used as objective criteria.
Reverse e-auction: may be used in certain enquiries; where indicated, bidders submit a complete tender without prices and any prices included are disregarded.
Eskom does not measure the same criterion twice across evaluation phases.
Evaluation Criteria
Source: 8017.pdf (unknown)Compliance with NRS 053 and Eskom specification 34-1622 is mandatory. Inspection and Eskom release note are required. All items must bear an indelible manufacturer's trademark and part number. No other eligibility criteria are stated.
Technical Specifications
Source: 8017.pdf (unknown)Supply of separable connectors for 11kV and 22kV systems, per Eskom drawing D-DT-8017.
Connector types and cable ranges:
All connectors: EN50180/1 630A Type C interface with M16 x 2mm thread, screened, polymeric material, supplied complete with fixing stems, lugs, earthing kits, instruction sheet and bill of materials.
Surge arrester specifications:
Compliance Requirements
Source: 8017.pdf (unknown)Compliance with NRS 053 and Eskom specification 34-1622 is required. Inspection and Eskom release note are required. All items must bear an indelible manufacturer's trademark and part number. No other compliance requirements are stated.
Description
Source: 240-78305014 Environmental Aspects and Management Plans Requirements Rev 5.pdfThis work instruction standardises the methodology for identifying environmental aspects of Transmission Division activities, products, and services that can be controlled or influenced. It covers the process for addressing significant aspects, developing environmental management plans, and managing changes in organisation, legislation, and technology. The instruction applies to all Transmission Business Units.
Important Dates
Source: 240-78305014 Environmental Aspects and Management Plans Requirements Rev 5.pdf (unknown)Closing date: 17 December 2026 at 08:00 (time zone not specified)
Quality Management
Source: 240-78305014 Environmental Aspects and Management Plans Requirements Rev 5.pdfAspect identification may use information from initial reviews, risk assessments, audits, site inspections, incidents, historical trends, and baseline studies. Significance is ranked using likelihood, magnitude, regulatory scrutiny, stakeholder interest, and business risk/benefit. Aspects scoring 13 or higher are prioritised for mitigation.
Compliance Requirements
Source: 240-78305014 Environmental Aspects and Management Plans Requirements Rev 5.pdf (unknown)Bidders must comply with Eskom work instruction 240-78305014 for environmental aspects and management plans.
Bidders must identify environmental aspects of their activities, assess their significance, and implement mitigation measures through an Environmental Management Programme (EMPr).
For refurbishment and maintenance projects that do not trigger listing notices, an EMPr must be compiled and submitted to the project manager by an environmental practitioner.
Bidders must adhere to the National Environmental Management Act, the Occupational Health and Safety Act, and other applicable legislation.
Bidders must comply with Eskom's SHEQ Policy (32-727) and referenced standards including ISO 14001 and ISO 9001.
Business Unit Managers cannot delegate accountability for compliance to contractors or subcontractors.
Environmental aspects and action plans must be reviewed at least every three years, or after an emergency, new activity, or legislative change.
Health & Safety
Source: 240-78305014 Environmental Aspects and Management Plans Requirements Rev 5.pdfBidders must comply with the Occupational Health and Safety Act and Eskom's SHEQ Policy. The document addresses abnormal conditions and emergency situations. Bidders must consider health and safety in their environmental management planning.
Environmental
Source: 240-78305014 Environmental Aspects and Management Plans Requirements Rev 5.pdfBidders must compile and maintain an aspect register that includes activity, aspect, medium (water, air, land), control measures, likelihood, magnitude, compliance obligations, stakeholder interest, business risk/benefit, and significance. Environmental Management Programmes (EMPr) must be developed to mitigate significant impacts, with defined roles, responsibilities, objectives, targets, and timeframes. For projects, an EMPr must be available on site and integrated into tender documents and contracts. The EMPr must be monitored and reviewed, with performance linked to existing business measures.
Description
Source: 8006.pdfThe document is a technical specification sheet for heat-shrink termination kits for 11kV, 22kV and 33kV XLPE cables. It lists multiple SAP material numbers with detailed technical descriptions for indoor (ID) and outdoor (OD) applications, covering various conductor sizes and termination types (XLPE and LCC). The kits are designed for terminating single-core cables and include all necessary components for installation.
Technical Specifications
Source: 8006.pdf (unknown)Scope: Supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei.
Termination kits required (each kit terminates 3 x 1-core cables):
Each kit includes: instruction sheet, bill of materials, insulating components, earthing kit (where applicable), mechanical torque shear connectors, cleaning kit. LCC kits include 3 leakage current collectors; no separate earth braids required (earthing via trifurcating kit).
Termination tail lengths: 300 mm (11kV), 400 mm (22kV), 500 mm (33kV). Main earthing conductor: 1000 mm (where applicable).
Standards and specifications:
Identification: All items must bear indelible manufacturer's trademark and part number; some items also require expiry date.
Description
Source: 240-56065202_ Switcgear Training Standard Requirements.pdfThis document is a standard that defines the training requirements for switchgear supplied to Eskom. It applies to all Eskom divisions and aims to standardise training from OEMs to address skills gaps and ensure warranty and lifecycle management of switchgear equipment.
Technical Specifications
Source: 240-56065202_ Switcgear Training Standard Requirements.pdf (unknown)Training requirements for switchgear supplied under this contract:
Level 4 (Switchgear Maintenance Specialist):
Level 3:
Level 2:
Level 1:
Methodology
Source: 240-56065202_ Switcgear Training Standard Requirements.pdfThe standard was developed because OEMs did not provide a consistent training approach. This document standardises Eskom's requirements for switchgear training from OEMs.
Quality Management
Source: 240-56065202_ Switcgear Training Standard Requirements.pdfThe standard defines four levels of training:
Each level builds on the previous one.
Financial Requirements
Source: 240-56065202_ Switcgear Training Standard Requirements.pdf (unknown)All training and training material costs must be included in the contract.
Compliance Requirements
Source: 240-56065202_ Switcgear Training Standard Requirements.pdf (unknown)The supplier must be the Original Equipment Manufacturer (OEM) or its local representative.
Health & Safety
Source: 240-56065202_ Switcgear Training Standard Requirements.pdfLevel 1 training includes safety features and precautions, such as internal arc safety and general safety issues, as part of the course content.
Contractual Terms
Source: 240-56065202_ Switcgear Training Standard Requirements.pdfThe training requirements are designed to address challenges experienced with installation, commissioning, operation, maintenance, and failure conditions of switchgear, which impact warranty and the entire lifecycle of the plant.
Section
Source: 240-56065202_ Switcgear Training Standard Requirements.pdfTraining must include quality assurance aspects. For contracts up to 132 kV, a switchgear unit must be supplied locally for training and QA. Training is approximately 70% practical and 30% theoretical.
Description
Source: 240-185000522 - Rev 2 Technical Specification Evaluation.pdfThis document is the technical specification for terminating and commissioning 11 kV cable systems to a newly installed 11 kV fixed pattern indoor switchgear at Muldersvlei substation. The substation is in the Western Grid with heavy to very heavy pollution. The old oil-filled indoor switchgear was planned for replacement between 2020 and 2023; a new switchgear was installed but the cable termination and commissioning work was not completed. This scope covers swinging over six 11 kV feeders, installing surge arrestors, arc sensors, and commissioning the cable systems and switchgear.
Submission Guidelines
Source: 240-185000522 - Rev 2 Technical Specification Evaluation.pdf (unknown)Returnable documents — all must be completed, signed and submitted with the quotation:
Disqualification risks:
Evaluation Criteria
Source: 240-185000522 - Rev 2 Technical Specification Evaluation.pdf (unknown)The technical evaluation has two levels:
Level 1 — Mandatory (gatekeeper) criteria (Table 1):
Level 2 — Scoring criteria (Table 2, total 12 points):
Weighted score = (obtained score / 12) × 100%. Minimum threshold: 80%.
If the threshold is met, the bidder must still fully comply with any deficient criteria as part of further negotiations toward contract award.
Before contract award (Table 3, contractual obligations, 8 points, 100% compliance required):
No preference point system (80/20 or 90/10) is stated in this document.
Technical Specifications
Source: 240-185000522 - Rev 2 Technical Specification Evaluation.pdf (unknown)Scope of work — terminating and commissioning of 11 kV cable systems to a newly installed 11 kV fixed pattern indoor switchgear at Muldersvlei substation (Western Grid, heavy to very heavy pollution levels).
Location: Muldersvlei substation.
Existing cables were installed around 2020 and 2023 but not terminated. Six 11 kV feeders must be swung over from the old oil-filled indoor switchgear to the new fixed pattern indoor switchgear.
Specific work items:
Risks: work in proximity to live installations; induced voltage/currents possible. Additional earthing or electric field screening may be required.
Contract period: 6 months (from tender title).
Experience & Qualifications
Source: 240-185000522 - Rev 2 Technical Specification Evaluation.pdfMinimum team composition: one jointer/installation supervisor and one jointer, each with at least 5 years of related MV cable installation experience. One-page CV per team member must be provided at tender stage. Jointing certification(s) demonstrating relevant MV cable installation experience are required. A project reference list of at least 5 projects (11 kV and above) installed in the last 5 years must be submitted, including project name, voltage level, client name, email and telephone contact details.
Quality Management
Source: 240-185000522 - Rev 2 Technical Specification Evaluation.pdfApplicable standards (normative references):
Informative reference: ISO 9001 Quality Management Systems.
After-installation testing must follow SANS 10198-13 and SANS/IEC 62271-1. Method statements with pass/fail criteria required at tender stage. Routine test reports for cable accessories required after contract award.
Compliance Requirements
Source: 240-185000522 - Rev 2 Technical Specification Evaluation.pdf (unknown)No specific compliance requirements (CSD, tax, B-BBEE, CIDB, CIPC) are stated in this document.
Contractual obligations before award (100% compliance required):
After contract award, the supplier must provide:
Health & Safety
Source: 240-185000522 - Rev 2 Technical Specification Evaluation.pdfWork will be conducted in proximity to live installations, with increased risk of induced voltage or currents on the cable circuit. Additional earthing and/or electric field screening precautions may be required during installation and testing. Arc sensors are critical for protection; fibre optic cables must not be bent beyond a 100 mm bending radius. An arc flash barrier board must be supplied and installed to isolate sections of the switchgear for safety during work on dead sections.
Contractual Terms
Source: 240-185000522 - Rev 2 Technical Specification Evaluation.pdfBefore contract award, the bidder must submit:
100% compliance with these contractual obligations is required to proceed to contract negotiations and award.
After contract award, the supplier must provide method statements, final project plan, site surveying, routine test reports, and quality inspection plans as listed in clause 3.11.
Section
Source: 240-185000522 - Rev 2 Technical Specification Evaluation.pdfThe technical evaluation is described in Appendix B and C. It consists of Level 1 mandatory criteria (all-or-nothing) and Level 2 scoring criteria (minimum 80% threshold). See evaluationCriteria section for full details.
Description
Source: 8021.pdfThe procurement covers the supply of transition joint kits for connecting XLPE-insulated cable to impregnated paper-insulated (PILC) cable, as per Eskom drawing D-DT-8021. The kits are used for 11 kV, 22 kV, and 33 kV applications, in various conductor sizes and configurations (3-core to 3-core, and trifurcating 3-core to 1-core).
Submission Guidelines
Source: 8021.pdf (unknown)Returnable documents must be completed, signed and submitted with the quotation:
Disqualification risks:
Evaluation Criteria
Source: 8021.pdf (unknown)Evaluation will follow the PPPFA preference point system (80/20 or 90/10).
Technical Specifications
Source: 8021.pdf (unknown)Supply of transition joint kits for connecting XLPE-insulated cable to impregnated paper-insulated (PILC) cable, per Eskom drawing D-DT-8021.
Available kit types and sizes:
Each kit includes: instruction sheet, bill of materials, insulating components, earthing kit, mechanical torque shear connectors, and cleaning kit.
Standards and specifications:
Vendors are responsible for ensuring they are performing against the correct drawing revision number (if applicable).
Health & Safety
Source: 8021.pdfNo specific health and safety requirements are stated in the document.
Description
Source: 202411~1.PDFPurpose and scope of the H&S specification
Important Dates
Source: 202411~1.PDF (unknown)Project programme as stated in the H&S specification:
Contact Information
Source: 202411~1.PDF (unknown)Eskom / NTCSA project team (no email addresses or telephone numbers are given in the specification):
Submission Guidelines
Source: 202411~1.PDF (unknown)Returnable with the bid:
Site access is withheld until the H&S plan is approved by the client or designated employer and all contractual requirements are met.
Evaluation Criteria
Source: 202411~1.PDF (unknown)Evaluation is against the H&S specification.
Technical Specifications
Source: 202411~1.PDF (unknown)Scope: supply, install, terminate, commission and hand over 11kV switchgear at Muldersvlei, Western Cape, over a 6-month period.
Site assessment
Switchgear supply and installation
11kV cable works
Training and documentation
New 11kV switchgear building
Site location
Programme
Methodology
Source: 202411~1.PDFMethod statements and safe work procedures
Quality Management
Source: 202411~1.PDFTraining and competence
Non-conformance
Fall protection
Occupational health
Emergency preparedness
Compliance Requirements
Source: 202411~1.PDF (unknown)B-bbee
Statutory appointments and agreements
Health & Safety
Source: 202411~1.PDFHealth and safety requirements
Environmental
Source: 202411~1.PDFEnvironmental and fire requirements
Contractual Terms
Source: 202411~1.PDFProgramme
Medical disclosure
Health & Safety
Source: 20250206_Muldersvlei 11kV_BRA.pdfThe document is a baseline risk assessment template for the Muldersvlei 11kV project. It lists numerous hazards and required controls, including:
Contractor must develop site-specific traffic plans, appoint competent flagmen, conduct risk assessments, and ensure all employees are trained and use appropriate PPE. Eskom audits and inspections will monitor compliance.
Evaluation Criteria
Source: 8010.pdf (unknown)Bidders must comply with the inspection and Eskom release note requirements indicated as 'Yes' on the specification sheet. No other eligibility criteria are stated in the document.
Technical Specifications
Source: 8010.pdf (unknown)The specification sheet covers two surge arresters:
Compliance Requirements
Source: 8010.pdf (unknown)No specific compliance requirements are stated in the document.
Description
Source: Eskom Holdings Safety, Health, Environment and Quality (SHEQ) Policy.pdfEskom Holdings SOC Ltd, Registration Number 2002/015527/30, is South Africa's primary electricity supplier and is wholly owned by the South African Government. Eskom's mandate is to efficiently ensure a stable electricity supply, contributing to lower business costs and enabling economic growth. The SHEQ Policy governs principles and rules to fulfil Eskom's commitment to people, the environment and quality.
Evaluation Criteria
Source: Eskom Holdings Safety, Health, Environment and Quality (SHEQ) Policy.pdf (unknown)Bidders must be registered on the Central Supplier Database (CSD) and hold a valid SARS tax clearance. They must comply with Eskom's SHEQ Policy and implement a management system conforming to ISO 9001, ISO 14001, ISO 45001 or other applicable standards. They must adhere to Eskom's Life-saving Rules. No specific B-BBEE level or CIDB grading is stated in the provided document.
Quality Management
Source: Eskom Holdings Safety, Health, Environment and Quality (SHEQ) Policy.pdfEskom requires its external service providers to establish, develop and implement a management system that conforms to ISO 9001, ISO 14001, ISO 45001 or other applicable standards. The approach must follow the Plan-Do-Check-Act (PDCA) cycle, with objectives set for safety, health, environment and quality, and performance measured against these to ensure continual improvement.
Health & Safety
Source: Eskom Holdings Safety, Health, Environment and Quality (SHEQ) Policy.pdfEskom's SHEQ Policy applies to all employees, external service providers and visitors. Bidders must comply with Eskom's Life-saving Rules, which include: open, isolate, test, earth, create an equipotential zone bond, and/or insulate before touch; hook up at heights; buckle up; be sober; permit to work; and ensure safe live working. Eskom pursues Zero Harm, aiming for zero fatalities, zero injuries and ill-health, zero environmental incidents, zero tolerance, zero defects, and safe live working. No operating condition or service urgency justifies exposing anyone to risks that could lead to incidents with health, safety, environmental and quality consequences.
Environmental
Source: Eskom Holdings Safety, Health, Environment and Quality (SHEQ) Policy.pdfEskom is committed to minimising its environmental footprint, reducing pollution and environmental degradation, pursuing a low-carbon future, and prioritising energy and water conservation. Bidders must support these environmental objectives and comply with relevant environmental legislation, including the National Environmental Management Act and the Climate Change Act.
Description
Source: QM.pdfSupply, install, terminate, commission and handover 11kV switchgear at Muldersvlei Substation for a period of 6 months.
Contact Information
Source: QM.pdf (TENDER)Eskom representative: Nomandla Songanga
Date issued: 23 April 2026
Evaluation Criteria
Source: QM.pdf (TENDER)Quality requirements are evaluated as Category 2 deliverables with a weight indicator of 1.
Technical Specifications
Source: QM.pdf (TENDER)Supply, install, terminate, commission and handover 11kV switchgear at Muldersvlei Substation.
Section
Source: QM.pdfQuality requirements are evaluated as Category 2 deliverables with a weight indicator of 1.
Submission Guidelines
Source: E-Tenderers E-Tendering Training Acknowledgement.pdf (unknown)Returnable documents:
Submission method: not stated.
Submission address: not stated.
Closing time: not stated.
Evaluation Criteria
Source: E-Tenderers E-Tendering Training Acknowledgement.pdf (unknown)Bidders must submit a fully completed E-Tendering Training Acknowledgement Form within the prescribed period; failure to do so will result in disqualification. No other eligibility criteria are stated in the provided document.
Description
Source: Muldersvlei 11kV Control Room BoQ_ November 2026_QK Comments.xlsxMuldersvlei 11 kV control room switchboard commissioning works, covering supply, installation, termination, commissioning and handover over six months.
Submission Guidelines
Source: Muldersvlei 11kV Control Room BoQ_ November 2026_QK Comments.xlsx (unknown)Submission and pricing requirements
Technical Specifications
Source: Muldersvlei 11kV Control Room BoQ_ November 2026_QK Comments.xlsx (unknown)Scope and location
Preliminaries and site facilities
Health, safety and hygiene
Environmental management
Civil and structural works
Electrical primary plant
Electrical secondary plant
Key quantities
Financial Requirements
Source: Muldersvlei 11kV Control Room BoQ_ November 2026_QK Comments.xlsx (unknown)Financial and pricing requirements
Compliance Requirements
Source: Muldersvlei 11kV Control Room BoQ_ November 2026_QK Comments.xlsx (unknown)Compliance requirements
Description
Source: 202411~1.PDFThis is a Health and Safety (H&S) specification for the Muldersvlei 11kV project. It sets out the minimum legal and NTCSA requirements for construction work. The principal contractor must develop a H&S plan that responds to these requirements and other applicable legal requirements. The specification applies to all principal contractors, contractors, service providers, suppliers, and all activities and processes carried out for and on behalf of Project Delivery. The specification is implemented from the date of approval. The principal contractor must comply with the Occupational Health and Safety Act, all applicable regulations, recognised codes of practice (SANS), and Eskom/NTCSA procedures, standards, and work instructions. Work may not commence until the H&S plan is approved by the client or designated employer. The client does not assume the contractor's legal responsibilities. The H&S specification forms an integral part of the contract and must be included in sub-contractor and supplier contracts. The principal contractor must consider all information in the specification and submit all applicable legal appointments as part of tender documents, including their competence. No claims will be accepted for costs or delays due to non-compliance with legal requirements or Eskom procedures.
Contact Information
Source: 202411~1.PDF (unknown)Eskom Project Manager: Bulelwa Dziba
Designer: Trevino Moonsamy
Eskom Health and Safety Senior Advisor/Officer: Sisana Nxumalo
Evaluation Criteria
Source: 202411~1.PDF (unknown)Bidders must be registered on the CSD (implied for state contracts). Must have tax clearance. Must comply with OHS Act and Construction Regulations. Must have a designated employer appointed in writing. Must have a construction manager and safety officer registered with SACPCMP. Must submit a H&S plan for approval before site access. Must sign an OHS Act Section 37(2) agreement. Must submit notification of construction work to the Department of Employment and Labour. Must provide proof of competence and training for all appointees. Must comply with Eskom/NTCSA procedures and standards.
Technical Specifications
Source: 202411~1.PDF (unknown)Scope of work:
Location: GPS Coordinates -33.817868S 18.808316E
Programme: Commencement 1 April 2025; completion 30 May 2025.
Methodology
Source: 202411~1.PDFThe safe work procedure (SWP) or method statements must be followed and marked against compliance with each step.
Experience & Qualifications
Source: 202411~1.PDFThe principal contractor must monitor dust and noise caused by mobile equipment, generators and other equipment during construction. Factors such as wind can affect the intensity of these impacts.
Quality Management
Source: 202411~1.PDFTraining must be provided for the type of work being performed and relevant procedures. External training providers must be accredited by SAQA. Foreign qualifications must be converted to equivalent local registrations in accordance with SAQA and SETA requirements, and the SAQA letter must form part of tender and site readiness submissions. The client may stop work and issue non-conformance reports or prohibition notices for H&S violations, and expenses incurred due to work stoppage and standing time are for the principal contractor's account. The principal contractor must compile a legal register listing all applicable legislation and standards. Fall protection equipment must comply with Unit Standards and recognised international standards, and a fall protection equipment inspection, testing and maintenance procedure must be compiled (refer to SANS 50365 and manufacturer requirements). The contractor must provide voluntary counselling and testing (VCT) for chronic illnesses such as diabetes, hypertension, and HIV/AIDS awareness training, and ensure access to ongoing support. Rehabilitation of injured employees must be ensured. A site-specific emergency preparedness and response plan must be submitted to the client for review, relevant to the scope of works and surrounding environmental risks. Emergency drills must be planned and conducted at specific intervals, with reports and action plans made available for inspection. The principal contractor must maintain satisfactory standards and document inspection results.
Compliance Requirements
Source: 202411~1.PDF (unknown)B-BBEE Minimum Level: 2
Must comply with OHS Act and Construction Regulations.
Must have a designated employer appointed in writing.
Must have construction manager and safety officer registered with SACPCMP.
Must submit H&S plan for approval before site access.
Must sign OHS Act Section 37(2) agreement.
Must submit notification of construction work to Department of Employment and Labour at least 7 days before construction starts.
Must provide proof of competence and training for all appointees.
Must comply with Eskom/NTCSA procedures and standards.
Must provide site plan indicating evacuation routes, emergency assembly points, zones, cranes, site offices, welfare facilities, laydown areas, parking, access, temporary services, and fire hazard protocols.
Must develop emergency protocols for fires, including a Fire Management Plan in accordance with the National Veld and Forest Fire Act.
Must monitor dust and noise during construction and implement dust suppression measures.
Must ensure construction vehicles and mobile plant are operated by trained, certified, and authorised persons with valid driver's licences and medical certificates of fitness.
Must develop a vehicle and pedestrian management plan.
Must ensure no child labour is used.
Must conduct at least one Visible Felt Leadership (VFL) engagement per month.
Must provide an organisational organogram listing all levels of responsibility and appointees.
Must keep a legal register of applicable legislation and standards.
Must conduct risk assessments in line with Construction Regulation 9 and Eskom/NTCSA procedure 32-520.
Must develop safe work procedures for high-risk activities.
Must comply with Operating Regulations for High Voltage Systems when working in live yards or near high voltage apparatus.
Must provide PPE and ensure its use.
Must comply with COIDA requirements.
Must have an occupational hygiene management programme and medical surveillance programme.
Must have an emergency preparedness and response plan.
Must conduct emergency drills at specific intervals.
Must have fire fighting equipment available on site.
Must ensure fall protection equipment complies with SANS 50365 and manufacturer requirements.
Must ensure training providers are accredited by SAQA.
Must convert foreign qualifications to local registrations in accordance with SAQA and SETA requirements.
Health & Safety
Source: 202411~1.PDFThe H&S specification covers the following key areas: Introduction, Supporting Clauses, Normative/Informative References, Definitions, Abbreviations, Key Eskom PD Project Team, Roles and Responsibilities, Management and Supervision of Construction Work, Process for Monitoring, Project Details, Notification of Construction Work, Principal Contractor Appointments and Agreements, Appointments and Competencies, Training and Awareness, OHS Policy, Compliance and Non-Compliance, Hazardous Work by Children, Hazard Identification and Risk Assessment, Operational Regulations for High Voltage Systems, Costing for H&S, Site Access, Signage, Principal Contractor's Site Facilities, Public Safety, Project and Site Rules, Pre-Task Risk Assessment, Pre-task Planning, Safe Work Procedures/Method Statements, Planned Task Observations, Work at Elevated Positions and Roof Work, Occupational Health and Hygiene, Emergency Preparedness and Response, Fire Safety, Site Plans, Fire Hazard, Environmental Factors to H&S, Signing off the Contract, Forums for Governance and Communication, Construction Vehicles and Mobile Plant, Housekeeping, Hazardous Materials/Chemicals Management, Flammable and Combustible Liquids, Compressed Gas Cylinders, Personal Protective Equipment, Issue, Replacement and Control of PPE, Machinery, Tools and Equipment, Hand Tools and Pneumatic Tools, Pressure Equipment, Lifting Machines and Lifting Tackle, Electrical Installations and Machinery on Construction Sites, Permit to Work, Excavations, Trenches and Floor Openings, Working near Public Roads, Work Stoppage, Audits/Inspection, Non-Conformance and Compliance, Compliance and Approval of Contractor H&S Plan, Contractor Performance Evaluation, Investigation of Fatalities/Injuries/Diseases/Near Misses, Behavioural Safety Observations and Inspections, Monthly Statistical and Non-Statistical Reports, Contractors H&S Plan, H&S File, Hours of Work, Employees' right of refusal to work in an unsafe situation, Contract Sign Off, and Omissions of this H&S Specification.
Environmental
Source: 202411~1.PDFThe contractor must comply with the requirements of the local authority fire department and Section 9 of the Environmental Regulations for Workplaces. The contractor must manage waste materials, scrap and rubbish appropriately.
Contractual Terms
Source: 202411~1.PDFScope of work includes site assessment, supply and installation of 11kV surge arrestors, connectors, arc sensors, brackets and cables for specified panels, testing, primary and secondary testing of panels, cable works including terminations, trifurcating kits, heat shrink joints, outdoor terminations, scanning, excavation, backfilling, pressure testing, earthing, removal of old equipment, training, documentation, and installation, testing and commissioning of boards and farmers feeders in the new switchgear building. Location: GPS Coordinates -33.817868S 18.808316E. Programme: commencement 1 April 2025, completion 30 May 2025. The principal contractor must ensure disclosure of pre-existing injuries or medical conditions from prospective workers during pre-employment, periodic and post screening, and keep such information confidential. The employer must not disclose the contents of the Workers' Compensation Commissioner's claims history summary to anyone else, must not give access to it, and must not use it for any purpose other than the employment process. Changes to employment conditions and processes should be made in consultation with HR or advisor and employee representatives. Employers must keep accurate records of disclosure. The employer must follow their own disciplinary procedure and share the outcome with the client.
Section
Source: 202411~1.PDFContractor performance evaluation is required. The principal contractor must comply with the Safety, Health, Environment and Quality Policy (32-727), the Power Delivery Operating Assessment, Authorisation and Training Standard (240-70413865), and ISO 9001:2015 Quality Management Systems requirements.
Description
Source: 240-56030619-ACCESSORIES FOR MEDIUM VOLTAGE POWE.pdfEskom standard 240-56030619 specifies technical requirements for medium-voltage cable accessories for distribution networks (3.3 kV to 33 kV). It covers terminations, joints, separable connectors, surge arresters, and earthing components for heat shrink, cold shrink, cold applied, and mixed technologies. The standard takes precedence over SANS 1332 where conflicting.
Important Dates
Source: 240-56030619-ACCESSORIES FOR MEDIUM VOLTAGE POWE.pdf (unknown)Closing date: 17 December 2026 at 08:00 (UTC).
Submission Guidelines
Source: 240-56030619-ACCESSORIES FOR MEDIUM VOLTAGE POWE.pdf (unknown)Required submissions at time of tender:
Evaluation Criteria
Source: 240-56030619-ACCESSORIES FOR MEDIUM VOLTAGE POWE.pdf (unknown)Evaluation is based on technical criteria specified at the time of tender and factory acceptance testing. Any deviation from the specification must be approved by a delegated Cable Systems Specialist. Bidders must comply with the quality management system requirements.
Technical Specifications
Source: 240-56030619-ACCESSORIES FOR MEDIUM VOLTAGE POWE.pdf (unknown)Scope: Supply, installation, termination, commissioning, and handover of 11kV switchgear at Muldersvlei for a 6-month period.
Cable termination and accessories must comply with Eskom standard 240-56030619 and SANS 1332.
Key technical requirements:
Quality Management
Source: 240-56030619-ACCESSORIES FOR MEDIUM VOLTAGE POWE.pdfThe supplier must have a formally documented and implemented quality management system meeting ISO 9001:2015. Foreign and third-party manufacturers must hold valid QMS certification from a national body accredited by a QMS accreditation body signatory to a mutual recognition agreement with South Africa. Eskom may audit the QMS and verify all goods for conformance prior to delivery.
Compliance Requirements
Source: 240-56030619-ACCESSORIES FOR MEDIUM VOLTAGE POWE.pdf (unknown)ISO 9001:2015 quality management system certification (or equivalent for foreign manufacturers with accreditation from a body signatory to a mutual recognition agreement with South Africa).
Type test reports for all accessories must be submitted at tender.
Supplier must have a documented and implemented QMS.
Eskom reserves the right to audit the QMS and verify goods before delivery.
Health & Safety
Source: 240-56030619-ACCESSORIES FOR MEDIUM VOLTAGE POWE.pdfSurge arresters must withstand short-circuit currents without violent shattering and must self-extinguish any fire caused by the arc. Earthing conductors must be sized and installed to provide a safe fault current path. All cable terminations must be designed to prevent exposure of armour or lead sheath.
Section
Source: 240-56030619-ACCESSORIES FOR MEDIUM VOLTAGE POWE.pdfAcceptance of MV accessories is based on technical evaluation criteria at the time of tender and factory acceptance testing as per the standard. Any deviation from the specification must be evaluated and approved by a delegated Cable Systems Specialist.
Description
Source: Tx Environmental Managemement Tender Returnable .pdfSupply, Install, Termination, Commissioning & Handover of 11kV Switchgear at Muldersvlei for a period of 6 months.
Contact Information
Source: Tx Environmental Managemement Tender Returnable .pdf (unknown)Project Manager/Responsible Manager: Bulelwa Dziba
Buyer: Thembi Peter
Enquiry Number: E3191NTCSAMWP
Submission Guidelines
Source: Tx Environmental Managemement Tender Returnable .pdf (unknown)Returnable documents include the completed Environmental Management Tender Returnable Document (sections A-E) and the signed Environmental Requirements Proforma (240-110600836).
Evaluation Criteria
Source: Tx Environmental Managemement Tender Returnable .pdf (unknown)Bidders must achieve a weighted average score of 80% or above in the environmental evaluation to be considered. The evaluation is based on five sections:
Total possible score is 38 points, converted to a percentage. Bidders must provide objective evidence for each item as specified in the returnable document.
Compliance Requirements
Source: Tx Environmental Managemement Tender Returnable .pdf (unknown)Environmental compliance documentation required:
Environmental
Source: Tx Environmental Managemement Tender Returnable .pdfEnvironmental management requirements are assessed via a returnable document with five sections:
Section
Source: Tx Environmental Managemement Tender Returnable .pdfThe environmental evaluation uses a weighted scoring system across five sections (A-E). Bidders must achieve at least 80% to be considered. Each section requires objective evidence for listed items.
Description
Source: 240-68099512 Form A_Cat 2_ Rev 9.pdfThe tenderer must select the applicable quality category. Category 2 is selected for pre-contract award quality requirements. Site assessment applicability must be indicated.
Contact Information
Source: 240-68099512 Form A_Cat 2_ Rev 9.pdf (unknown)Eskom Quality Representative: Nomandla Songanga
Role: Assurance Quality Officer
Date: 23 April 2026
Technical Specifications
Source: 240-68099512 Form A_Cat 2_ Rev 9.pdf (unknown)Scope: Supply, installation, termination, commissioning, and handover of 11kV switchgear at Muldersvlei Substation.
Contract period: 6 months.
Methodology
Source: 240-68099512 Form A_Cat 2_ Rev 9.pdfThe tenderer must indicate applicability of ISO 9001 clauses: Context of the Organisation, Leadership, Planning, Support, Operation, Performance Evaluation, Improvement, and corresponding principles.
Quality Management
Source: 240-68099512 Form A_Cat 2_ Rev 9.pdfPost-contract award quality requirements include: Eskom Rights of Access and Information, Preservation, Quality Audits, Management of Nonconformities, and Special Processes. The tenderer must acknowledge and accept these requirements.
Compliance Requirements
Source: 240-68099512 Form A_Cat 2_ Rev 9.pdf (unknown)The bidder must complete and sign Form A (Tender & Contract Quality Requirements) to acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 standards.
The applicable pre-contract award quality category is Category 2.
Post-contract award requirements include: Contract Execution, Supplier Quality Performance Monitoring, Eskom Rights of Access and Information, Preservation, Quality Audits, Management of Nonconformities, and Special Processes.
Section
Source: 240-68099512 Form A_Cat 2_ Rev 9.pdfThe tenderer must indicate applicability of ISO 9001 clauses and principles. Performance evaluations and other clauses are marked as applicable.
Description
Source: 20240226_Transmission Industry Waste Management Plan_2023-2028.pdfThe plan updates the 2019-2022 Transmission Industry Waste Management Plan.
Important Dates
Source: 20240226_Transmission Industry Waste Management Plan_2023-2028.pdf (unknown)Closing: 17 December 2026 at 08:00
Plan effective date: 31 March 2023
Plan period: 31 March 2023 to 31 March 2028
Contact Information
Source: 20240226_Transmission Industry Waste Management Plan_2023-2028.pdf (unknown)Plan contact
40 Lyncon Rd
Carlswald
1684
Technical Specifications
Source: 20240226_Transmission Industry Waste Management Plan_2023-2028.pdf (unknown)Procurement
Waste management obligations
Methodology
Source: 20240226_Transmission Industry Waste Management Plan_2023-2028.pdfThe update used a desktop review of previous plans, policies, procedures, waste inventories and environmental management system manuals.
Quality Management
Source: 20240226_Transmission Industry Waste Management Plan_2023-2028.pdfSites assessed
Financial Requirements
Source: 20240226_Transmission Industry Waste Management Plan_2023-2028.pdf (unknown)Eskom Transmission must provide budgets for implementation of the waste management plan.
Compliance Requirements
Source: 20240226_Transmission Industry Waste Management Plan_2023-2028.pdf (unknown)Compliance
Health & Safety
Source: 20240226_Transmission Industry Waste Management Plan_2023-2028.pdfThe plan requires compliance with occupational health and safety legislation.
Environmental
Source: 20240226_Transmission Industry Waste Management Plan_2023-2028.pdfThe plan aims to prevent pollution and ecological degradation.
Contractual Terms
Source: 20240226_Transmission Industry Waste Management Plan_2023-2028.pdfThe plan takes effect once approved and signed.
Section
Source: 20240226_Transmission Industry Waste Management Plan_2023-2028.pdfReferences
Description
Source: Clarification Meeting Re-Issue Virtual MS Teams.docxSupply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei Substation for a period of 6 months.
Important Dates
Source: Clarification Meeting Re-Issue Virtual MS Teams.docx (unknown)Clarification meeting (virtual, non-compulsory): 1 December 2026, 10:00–12:30.
Compulsory site visit: 1 December 2026, 14:00–16:00 at Muldersvlei Substation.
Deadline to report difficulties accessing the virtual meeting link: 30 November 2026.
Tender closing date: 17 December 2026 at 08:00.
Contact Information
Source: Clarification Meeting Re-Issue Virtual MS Teams.docx (unknown)Enquiries and attendance confirmation:
Site location difficulties:
Virtual meeting access:
Evaluation Criteria
Source: Clarification Meeting Re-Issue Virtual MS Teams.docx (unknown)Attendance at the compulsory site visit on 1 December 2026 at 14:00 is mandatory. Bidders who do not attend, or arrive more than 30 minutes late, will be disqualified.
Submission Guidelines
Source: 20240226_Tx. CONTRACTOR ENVIRONMENTAL REQUIREMENTS PROFORMA.docx (unknown)Returnable document
Compliance Requirements
Source: 20240226_Tx. CONTRACTOR ENVIRONMENTAL REQUIREMENTS PROFORMA.docx (unknown)Environmental compliance
Evaluation Criteria
Source: 8017.pdf (unknown)Connectors must comply with NRS 053 and Eskom Specification 34-1622.
Items must bear indelible manufacturer's trademark and part number.
Inspection and Eskom release note are required.
Technical Specifications
Source: 8017.pdf (unknown)Supply of separable connectors for 11kV and 22kV systems.
Types: screened, separable, extensible or non-extensible, with or without surge arresters.
Cable ranges: 25-50 mm², 70-185 mm², 240-400 mm², 630 mm².
Standards: NRS 053, Eskom Specification 34-1622, EN50180/1 630A Type C interface with M16 x 2mm thread.
Each connector supplied complete with fixing stems and lugs, screened connectors, end plugs and test point caps, earthing kit (main earth braids, constant force springs, sealing tubes and mastics), instruction sheet and bill of materials.
Surge arrester variants: 11kV (MCOV 10kV, residual voltage 40kV, discharge current 10kA) and 22kV (MCOV 19.2kV, residual voltage 80kV, discharge current 10kA), IEC line discharge class 1, fitted with 500mm earth lead and M12 lug.
Also includes blank inserts, intermediate bushings, end plugs with test point caps, and tri-furcating kits for 22kV 3-core cables (tail length 800mm).
All items to be marked with indelible manufacturer's trademark and part number.
Inspection and Eskom release note required.
Compliance Requirements
Source: 8017.pdf (unknown)Compliance with NRS 053 and Eskom Specification 34-1622.
Inspection and Eskom release note required.
Environmental
Source: 240-78305014 Environmental Aspects and Management Plans Requirements Rev 5.pdfThis document is Eskom Transmission's internal work instruction for identifying and managing environmental aspects and impacts. It applies to all Transmission business units.
Key requirements:
Relevant standards and references:
Description
Source: Supplier Quality Management Specification (QM 58).pdfSpecification purpose
Submission Guidelines
Source: Supplier Quality Management Specification (QM 58).pdf (unknown)Returnable quality documents
Evaluation Criteria
Source: Supplier Quality Management Specification (QM 58).pdf (unknown)Quality evaluation
Technical Specifications
Source: Supplier Quality Management Specification (QM 58).pdf (unknown)Procurement scope
Quality requirements
Methodology
Source: Supplier Quality Management Specification (QM 58).pdfExecution approach
Experience & Qualifications
Source: Supplier Quality Management Specification (QM 58).pdfPersonnel competence
Quality Management
Source: Supplier Quality Management Specification (QM 58).pdfQuality management requirements
Compliance Requirements
Source: Supplier Quality Management Specification (QM 58).pdf (unknown)Quality compliance
Contractual Terms
Source: Supplier Quality Management Specification (QM 58).pdfPreservation and contract quality obligations
Section
Source: Supplier Quality Management Specification (QM 58).pdfQuality criteria
Description
Source: 240-56065202_ Switcgear Training Standard Requirements.pdfThe standard addresses the lack of compliance with the Eskom Asset Management Strategy regarding switchgear training, and the challenges experienced with installation, commissioning, operation, maintenance and failure conditions of switchgear equipment due to skills shortages. It standardises the training approach and material required from all OEMs and their agents for all life cycle stages of Eskom switchgear equipment. The document applies throughout Eskom Holdings Limited divisions. Normative references include SANS IEC 62271-1 and IEC 60300-3-14.
Evaluation Criteria
Source: 240-56065202_ Switcgear Training Standard Requirements.pdf (unknown)OEM accreditation
Training material approval precondition
Local training unit
Technical Specifications
Source: 240-56065202_ Switcgear Training Standard Requirements.pdf (unknown)Purpose
Applicability
Normative references
Training levels
General training requirements
Level 4 training
Level 3 training
Level 2 training
Level 1 training
Methodology
Source: 240-56065202_ Switcgear Training Standard Requirements.pdfThe document standardises the training approach and material required from all OEMs and their agents, as a standard approach from switchgear suppliers and OEMs was not forthcoming. It sets out the Eskom requirements for switchgear training from OEMs.
Quality Management
Source: 240-56065202_ Switcgear Training Standard Requirements.pdfTraining material must be approved by the combined Eskom Transmission (Tx) and Distribution (Dx) switchgear care groups before switchgear is purchased. Training must be provided by OEM accredited instructors and include approximately 30% theoretical and 70% practical training with examinations. Training must be available for the life cycle of the switchgear.
Financial Requirements
Source: 240-56065202_ Switcgear Training Standard Requirements.pdf (unknown)Costs
Compliance Requirements
Source: 240-56065202_ Switcgear Training Standard Requirements.pdf (unknown)B-BBEE Minimum Level: 4
No other specific compliance requirements found in the document.
Health & Safety
Source: 240-56065202_ Switcgear Training Standard Requirements.pdfThe Level 1 training layout includes a section on safety features and precautions, covering internal arc and general safety issues.
Contractual Terms
Source: 240-56065202_ Switcgear Training Standard Requirements.pdfThe document highlights that the business does not fully comply with the current Eskom Asset Management Strategy, and that challenges with installation, commissioning, operating, maintenance and failure conditions of switchgear equipment are due to lack of skills, impacting warranty and life cycle stages. This standard is intended to address these issues.
Description
Source: 8006.pdfSupply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei for a period of 6 months. The tender is a re-issue.
Evaluation Criteria
Source: 8006.pdf (unknown)Bidders must comply with the following specifications:
All supplied items must bear an indelible manufacturer's trademark and part number.
The tender is a re-issue; no other evaluation criteria are stated.
Compliance Requirements
Source: 8006.pdf (unknown)Bidders must comply with:
No other compliance requirements (B-BBEE, CIDB, etc.) are stated in the document.
Description
Source: E-tendering Help Manual for supplier -.pdfThe document is the Eskom eTendering System Suppliers Help Manual (version 3.0, August 2023). It describes how suppliers register, log in, and submit tender documents electronically via the eTendering system. It does not contain tender-specific scope, requirements, or evaluation details for the Muldersvlei 11kV switchgear tender.
Contact Information
Source: E-tendering Help Manual for supplier -.pdf (TENDER)Contact: Eskom buyer responsible for the published tender (contact details not provided in this document).
Submission email: [email protected] (system notification address, not for enquiries).
Submission address: electronic via eTendering system at https://eTendering.eskom.co.za
Submission Guidelines
Source: E-tendering Help Manual for supplier -.pdf (TENDER)Submission method: electronic via Eskom eTendering system at https://eTendering.eskom.co.za
Returnable forms: not specified in this document.
Evaluation Criteria
Source: E-tendering Help Manual for supplier -.pdf (TENDER)Evaluation criteria not specified in this document. The document is a system user manual, not a tender-specific evaluation document.
Technical Specifications
Source: E-tendering Help Manual for supplier -.pdf (TENDER)Scope: Supply, install, terminate, commission and handover of 11 kV switchgear at Muldersvlei.
Contract period: 6 months.
Location: Western Cape.
No further technical specifications are provided in this document.
Compliance Requirements
Source: E-tendering Help Manual for supplier -.pdf (TENDER)CSD registration: a valid CSD number is required to access the eTendering system.
No other compliance requirements (B-BBEE, CIDB, tax, etc.) are stated in this document.
Submission Guidelines
Source: 240-12248652 Category 2- List of Tender Returnables Documents_Rev 6.pdf (TENDER)Returnable documents: the List of Tender Returnables (Category 2) must be completed and submitted with the bid. This includes Form A, which must be completed and signed.
Evaluation Criteria
Source: 240-12248652 Category 2- List of Tender Returnables Documents_Rev 6.pdf (TENDER)Quality requirements are evaluated on a pass/fail basis (indicator = 1). Bidders must satisfy either Option 1 or Option 2 for Section A, and must meet all other sections.
Section A – Quality Management System (25% weight):
Section B – Evidence of QMS in operation (25% weight):
Section C – Contract Quality Plan (20% weight):
Section D – Quality Control Plan (20% weight):
Section E – User-defined requirements (10% weight):
Technical Specifications
Source: 240-12248652 Category 2- List of Tender Returnables Documents_Rev 6.pdf (TENDER)Scope: Supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei Substation, as part of the Muldersvlei Substation Refurbishment Project. Contract period: 6 months.
Compliance Requirements
Source: 240-12248652 Category 2- List of Tender Returnables Documents_Rev 6.pdf (TENDER)Quality management system compliance is mandatory. Bidders must either hold valid ISO 9001 certification or provide documented evidence of a compliant QMS, as detailed in the evaluation criteria.
Section
Source: 240-12248652 Category 2- List of Tender Returnables Documents_Rev 6.pdfQuality requirements are evaluated as pass/fail. Bidders must meet all sections: ISO 9001 certification or documented QMS (Section A), evidence of QMS operation (Section B), draft Contract Quality Plan (Section C), draft Quality Control Plan/ITP (Section D), and completed Form A (Section E).
Description
Source: Annexures C D E.xlsxThe tender is for the supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei, with a contract period of 6 months. The provided document contains only local content declaration schedules (Annexes C, D and E) and does not include a detailed scope description.
Submission Guidelines
Source: Annexures C D E.xlsx (unknown)Returnable documents:
All calculations must exclude VAT. The tenderer must sign Annexes C, D and E.
Evaluation Criteria
Source: Annexures C D E.xlsx (unknown)Local content requirements apply because the tender includes designated products. Bidders must complete and sign Annexes C, D and E to declare local content. No scoring split or minimum qualifying score is stated in the provided document.
Technical Specifications
Source: Annexures C D E.xlsx (unknown)The tender covers the supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei for a period of 6 months. The document provided contains only local content declaration schedules; no technical specifications are stated.
Compliance Requirements
Source: Annexures C D E.xlsx (unknown)Local content declaration is mandatory. Bidders must complete Annex C, Annex D and Annex E in accordance with SATS 1286.2011. No other compliance requirements are stated in the provided document.
Important Dates
Source: ECC3 Muldersvlei 11kV Switchgear Supply Install .pdf (unknown)Closing date: 17 December 2026 at 08:00 (from tender record).
Starting date: 01 July 2026.
Access dates: 66kV Yard and control room on 01 July 2026; 132kV Yard and control room on 01 July 2026.
Completion date for the whole of the works: 30 January 2027.
Defects date: 52 weeks after completion of the whole of the works.
Retention release: remainder paid on expiry of defects period, which is 156 weeks after the works have been taken over.
First programme submission: within two weeks of the Contract Date.
Revised programmes: at intervals no longer than two weeks.
No briefing or site visit is stated.
Contact Information
Source: ECC3 Muldersvlei 11kV Switchgear Supply Install .pdf (unknown)Project Manager:
Supervisor:
Adjudicator:
Employer: NTCSA SOC Ltd, registered office at Megawatt Park, Maxwell Drive, Sandton, Johannesburg.
Submission Guidelines
Source: ECC3 Muldersvlei 11kV Switchgear Supply Install .pdf (unknown)Submission method: not stated in the document.
Closing time: 17 December 2026 at 08:00 (from tender record).
Returnable documents:
Disqualification risks:
Evaluation Criteria
Source: ECC3 Muldersvlei 11kV Switchgear Supply Install .pdf (unknown)Evaluation method not detailed in the document. The contract is a re-measurement contract (NEC3 Option B) priced via bill of quantities. No preference point system (80/20 or 90/10) or minimum qualifying score is stated.
Technical Specifications
Source: ECC3 Muldersvlei 11kV Switchgear Supply Install .pdf (unknown)Scope: Supply, install, terminate, commission and hand over 11kV switchgear at Muldersvlei Substation (Western Grid). The station is a National Key Point; all Eskom rules and regulations apply.
Specific works (refer to Document Identifier 240-185000522):
Site boundaries: Within the perimeter of Muldersvlei Substation.
Working areas: The Site and Muldersvlei Substation.
Risk Register includes: non-availability of outages and commissioning resources, natural disaster, fire and explosion, impact by aircraft or other aerial device.
Financial Requirements
Source: ECC3 Muldersvlei 11kV Switchgear Supply Install .pdf (unknown)Pricing: NEC3 Option B – Priced contract with bill of quantities. Prices are lump sums and rates multiplied by quantities; re-measurement applies.
Method of measurement: Standard System of Measurement published by ASAQS, as amended in Part C2.1.
Performance bond: 5% of contract value.
Retention: 2.5% of the total of the Prices; retention free amount R0; 0% of retention payable on completion, remainder paid on expiry of defects period (156 weeks after take-over).
Delay damages: 0.1% per day, up to a limit of 10% of total contract value.
Limitation of liability: Contractor's liability for indirect/consequential loss limited to R0.0; total liability limited to total of Prices, except for additional excluded matters (unlimited).
Payment: Assessment interval between 20th and 25th of each month. Payment terms per Eskom Vendor Management Department. Interest on late payment at prime rate (Standard Bank) for Rand amounts.
Price adjustment: Prices fixed for first 12 months; contract is less than a year, so no adjustment applies.
Tax invoice: Must be provided within one week of payment certificate; include Employer's VAT number 4710303126.
Compliance Requirements
Source: ECC3 Muldersvlei 11kV Switchgear Supply Install .pdf (unknown)CIDB registration: Tenderer's CIDB registration number required on Form of Offer and Acceptance (if applicable).
B-BBEE: Contractor must notify Employer of any change in B-BBEE status within seven days, and submit updated verification certificate within thirty days. A decrease in B-BBEE status may lead to renegotiation or termination.
Health and safety: Contractor may be appointed as Principal Contractor under Construction Regulations 2014; must comply with all applicable health and safety laws and regulations.
Environmental: Must comply with all applicable environmental laws and regulations.
Asbestos: Employer manages asbestos per its standard; contractor's personnel may stop work if asbestos is identified; removal and disposal done by registered asbestos contractor at Employer's expense.
Insurance: Contractor must provide insurances per Insurance Table A (replacement cost for works, equipment, property damage, bodily injury). Employer provides insurances per Insurance Table B (assets all risk, contract works, environmental liability, etc.).
Ethics: No coercive, collusive, corrupt, fraudulent or obstructive action; termination for such actions.
Confidentiality: Contractor must not disclose information; images of works require prior written consent.
Joint venture: If a JV, all members jointly and severally liable; must notify Project Manager of key person within two weeks of Contract Date.
Technical Specifications
Source: Authorisation Form - 08 November 2024 (1).pdf (unknown)Supply, installation, termination, commissioning, and handover of 11kV switchgear at Muldersvlei, Western Cape. Contract period: 6 months.
Compliance Requirements
Source: Authorisation Form - 08 November 2024 (1).pdf (unknown)The bidder must complete the Authorisation Form appropriate to its organisation type (company, close corporation, partnership, joint venture, sole proprietor, or trust) and attach a certified copy of the relevant resolution or agreement. For joint ventures, a certified copy of the joint venture agreement including joint and several liability, lead member designation, and work/payment ratios must be attached.
Submission Guidelines
Source: SDLI Strategy -Strategy Setting Template For Bidders For Muldersvlei 11kV.pdf (TENDER)Returnable forms:
Evaluation Criteria
Source: SDLI Strategy -Strategy Setting Template For Bidders For Muldersvlei 11kV.pdf (TENDER)Evaluation is based on objective criteria and B-BBEE preference points.
Technical Specifications
Source: SDLI Strategy -Strategy Setting Template For Bidders For Muldersvlei 11kV.pdf (TENDER)Scope of work:
Methodology
Source: SDLI Strategy -Strategy Setting Template For Bidders For Muldersvlei 11kV.pdfSkills development:
Pricing Schedule
Source: SDLI Strategy -Strategy Setting Template For Bidders For Muldersvlei 11kV.pdfPricing schedule must separate local and imported components. Local procurement content is total spending minus imported component.
Financial Requirements
Source: SDLI Strategy -Strategy Setting Template For Bidders For Muldersvlei 11kV.pdf (TENDER)Pricing format: Not specified, but price schedule must separate local and imported components.
Compliance Requirements
Source: SDLI Strategy -Strategy Setting Template For Bidders For Muldersvlei 11kV.pdf (TENDER)B-bbee:
Local content:
CIDB skills development: Not applicable.
Mandatory subcontracting: N/A.
Nipp: n/a.
Sworn affidavit validity:
Health & Safety
Source: SDLI Strategy -Strategy Setting Template For Bidders For Muldersvlei 11kV.pdfSworn affidavit requirements:
Section
Source: SDLI Strategy -Strategy Setting Template For Bidders For Muldersvlei 11kV.pdfB-BBEE preference points are allocated based on specific goals. QSEs must comply with all elements of the QSE scorecard relevant to their sector unless the entity is at least 51% black-owned, in which case a sworn affidavit may be submitted.
Description
Source: 240-56030619-ACCESSORIES FOR MEDIUM VOLTAGE POWE.pdfThis Eskom standard (240-56030619) specifies technical requirements for medium-voltage cable accessories used in Eskom distribution networks (3.3 kV to 33 kV). It covers heat shrink, cold shrink, cold applied, and mixed technologies. The standard is based on SANS 1332 but takes precedence where conflicts arise. It includes requirements for terminations, earthing, surge arresters, quality management, documentation, and marking. The standard applies throughout Eskom Holdings Limited divisions.
Important Dates
Source: 240-56030619-ACCESSORIES FOR MEDIUM VOLTAGE POWE.pdf (unknown)Closing date: 17 December 2026 at 08:00 (timezone not specified, likely SAST).
Submission Guidelines
Source: 240-56030619-ACCESSORIES FOR MEDIUM VOLTAGE POWE.pdf (unknown)Returnable documents and information required at time of tender:
Evaluation Criteria
Source: 240-56030619-ACCESSORIES FOR MEDIUM VOLTAGE POWE.pdf (unknown)Bidders must comply with Eskom standard 240-56030619 and SANS 1332. Where conflicting, the Eskom standard takes precedence.
Quality Management
Source: 240-56030619-ACCESSORIES FOR MEDIUM VOLTAGE POWE.pdfSuppliers must have a formally documented and implemented quality management system meeting ISO 9001:2015. Eskom reserves the right to audit the QMS for suitability and effectiveness and to verify goods for conformance before delivery. Foreign and third-party manufacturers must hold valid QMS certification from a national body accredited by a signatory to a mutual recognition agreement with South Africa. Additional quality requirements may apply for term contracts.
Compliance Requirements
Source: 240-56030619-ACCESSORIES FOR MEDIUM VOLTAGE POWE.pdf (unknown)Mandatory compliance:
Health & Safety
Source: 240-56030619-ACCESSORIES FOR MEDIUM VOLTAGE POWE.pdfThe standard includes safety-related requirements: surge arresters must withstand short-circuit currents without violent shattering and self-extinguish any fire caused by an arc. Earthing conductors must be properly sized and connected to ensure safe operation. Installation instructions must comply with SANS 10198, SANS 1332, and SANS 876. No separate health and safety plan is required by this standard.
Contractual Terms
Source: 240-56030619-ACCESSORIES FOR MEDIUM VOLTAGE POWE.pdfThe document includes standard clauses on authorization, revision history, and development team. No specific contractual terms, duration, termination, or penalties are stated beyond the technical compliance requirements. The standard notes that any deviation requires approval, and non-conformance may affect acceptance.
Section
Source: 240-56030619-ACCESSORIES FOR MEDIUM VOLTAGE POWE.pdfAcceptance of MV accessories is based on technical evaluation criteria defined at the time of tender and factory acceptance testing per this standard. Any deviation from the specification constitutes non-conformance unless evaluated and approved by a delegated Cable Systems Specialist. The standard does not specify a scoring system or minimum pass mark.
Contact Information
Source: 240-12248652 Category 2- List of Tender Returnables Documents_Rev 6.pdf (TENDER)Eskom representative:
No email or telephone provided.
Evaluation Criteria
Source: 240-12248652 Category 2- List of Tender Returnables Documents_Rev 6.pdf (TENDER)Quality evaluation is based on five sections, each with a weight and score:
Bidders must meet the quality requirements to be evaluated.
Compliance Requirements
Source: 240-12248652 Category 2- List of Tender Returnables Documents_Rev 6.pdf (TENDER)Quality compliance is required:
No other compliance requirements (CSD, tax, B-BBEE, CIDB) are stated.
Section
Source: 240-12248652 Category 2- List of Tender Returnables Documents_Rev 6.pdfThe evaluation uses a quality checklist with five sections, each weighted: Section A (25%) for QMS certification or documented system, Section B (25%) for operational QMS evidence, Section C (20%) for a draft Contract Quality Plan, Section D (20%) for a Quality Control Plan/ITP, and Section E (10%) for additional requirements including Form A. Scores are assigned per section and must be met.
Description
Source: 240-185000522 - Rev 2 Technical Specification Evaluation.pdfGeneral scope:
Submission Guidelines
Source: 240-185000522 - Rev 2 Technical Specification Evaluation.pdf (unknown)Returnable documents - submit with the bid:
Disqualification and responsiveness risks:
Evaluation Criteria
Source: 240-185000522 - Rev 2 Technical Specification Evaluation.pdf (unknown)Technical evaluation - two stages:
Level 1 - mandatory pass/fail criteria; all must be met:
Level 2 - scored criteria; weighted score out of 12:
Minimum qualifying score: 80% of the Level 2 weighted score; the weighted score is calculated as obtained score divided by 12, multiplied by 100.
Contract-award compliance items:
Technical Specifications
Source: 240-185000522 - Rev 2 Technical Specification Evaluation.pdf (unknown)Scope of work - Muldersvlei substation, Western Grid:
Feeder terminations:
Transformer 8 termination:
Switchgear terminations:
Arc sensors and arc-flash protection:
Testing and commissioning:
Site and design conditions:
Applicable standards:
Experience & Qualifications
Source: 240-185000522 - Rev 2 Technical Specification Evaluation.pdfExperience and personnel requirements:
Quality Management
Source: 240-185000522 - Rev 2 Technical Specification Evaluation.pdfQuality and technical compliance:
Compliance Requirements
Source: 240-185000522 - Rev 2 Technical Specification Evaluation.pdf (unknown)B-BBEE and compliance requirements:
Health & Safety
Source: 240-185000522 - Rev 2 Technical Specification Evaluation.pdfHealth and safety considerations:
Contractual Terms
Source: 240-185000522 - Rev 2 Technical Specification Evaluation.pdfContractual and post-award requirements:
Section
Source: 240-185000522 - Rev 2 Technical Specification Evaluation.pdfAdditional evaluation detail:
Important Dates
Source: ITT Re-Issue For Muldersvlei 11kV Switchgear Supply Install Termination.pdf (TENDER)Closing date: 17 December 2026 at 10:00.
Tender validity: 12 weeks from closing date.
Clarification meetings:
Link available in clarification documentation on NTCSA Tender Bulletin.
Access issues must be reported by 30 November 2026 to Thembi Peter ([email protected]).
Venue: Muldersvlei Substation, R101, Old Paarl Road, Klapmuts, Cape Town.
GPS: -33.817868S 18.808316E.
Tenderers arriving more than 30 minutes late will be disqualified.
Clarification queries deadline: 10 working days before tender closing, i.e., 2 December 2026.
Addenda and clarifications posted on e-tender portal and Tender Bulletin; bidders must check regularly.
Contact Information
Source: ITT Re-Issue For Muldersvlei 11kV Switchgear Supply Install Termination.pdf (TENDER)NTCSA Representative (first point of contact):
1st Escalation – Procurement Manager:
2nd Escalation – Middle Manager Procurement:
Site visit contact (for access issues):
Submission platform: NTCSA Tender Bulletin (Eskom E-tendering site)
Service/delivery address: Muldersvlei Substation, R101, Old Paarl Road, Klapmuts, Cape Town.
Submission Guidelines
Source: ITT Re-Issue For Muldersvlei 11kV Switchgear Supply Install Termination.pdf (TENDER)Submission method: electronic only via NTCSA Tender Bulletin (Eskom E-tendering site).
Returnable forms (disqualifiable if missing or incomplete):
Non-disqualifiable returnables (may be requested within 5 working days if missing):
Returnables for evaluation only (score zero if not submitted):
Evaluation Criteria
Source: ITT Re-Issue For Muldersvlei 11kV Switchgear Supply Install Termination.pdf (TENDER)Evaluation is conducted in stages:
Stage 1 – Eligibility / Compliance:
Stage 2 – Technical Evaluation (three sub-stages):
Fully completed Technical Schedules.
Qualifications for the jointer performing the work.
Installation/joint instructions for:
Failure to provide any mandatory document leads to immediate disqualification.
Preliminary project plan (schedule) indicating time frame and sequence for all activities.
Project reference list: minimum 5 cable systems at 11kV and above installed over the last 5 years, with project name, voltage level, client name, email, telephone.
CV per jointer/installer team member showing MV cable joining and installation experience.
Proposal for after-installation tests.
Tool list to perform the scope of work.
Maximum score: 12 points. Weighted score = (obtained score/12) × 100%.
Minimum threshold: 80% to qualify for further evaluation.
Only bidders who passed Step 2(b) with minimum 80% qualify.
Site compliance review scored out of 100 points.
Minimum threshold: 80 points; below that is disqualification.
Stage 3 – PPPFA Preference Points:
Contract award: to the tenderer with the highest total points after all stages, provided they meet all mandatory requirements.
Technical Specifications
Source: ITT Re-Issue For Muldersvlei 11kV Switchgear Supply Install Termination.pdf (TENDER)Scope of work: Supply, install, terminate, commission and handover of 11kV switchgear at Muldersvlei Substation.
Contract duration: 6 months.
Key technical requirements:
630mm² 1-core XLPE outdoor terminations.
185mm² 3-core XLPE outdoor terminations.
630mm² 1-core XLPE straight-through joints (SSC).
185mm² 1-core XLPE straight-through joints (SSC).
Station class surge arrestors for indoor switchgear.
Reference projects: minimum 5 cable systems at 11kV and above installed in the last 5 years.
Contract: NEC3 Engineering and Construction Contract (ECC3).
Bill of Quantities (BOQ) referenced in Technical Folder.
Additional documents: ECSA/SACPCMP registrations, CVs, permits, licences as applicable.
Experience & Qualifications
Source: ITT Re-Issue For Muldersvlei 11kV Switchgear Supply Install Termination.pdfJointer qualifications: must provide qualifications for the jointer performing the work.
CV per jointer/installer team member indicating joining and installation experience at MV cable level.
Project reference list: minimum 5 cable systems at 11kV and above installed over the last 5 years, with project name, voltage level, client name, email, telephone.
Key personnel: CVs for jointer and installer team members.
Additional professional registrations: ECSA/SACPCMP if applicable.
Compliance Requirements
Source: ITT Re-Issue For Muldersvlei 11kV Switchgear Supply Install Termination.pdf (TENDER)CSD registration: required for local tenderers and foreign tenderers with a South African footprint.
Tax compliance:
CIDB grading: Electrical Engineering Works (Infrastructure) Grade 3EP or higher.
B-bbee:
Employment Equity Act: designated employers must provide proof of compliance and submission of EE report to Department of Labour (South African tenderers only).
COIDA: original certificate of good standing or proof of application from Compensation Fund or licensed insurer (South African tenderers only).
Joint venture:
Supplier Integrity Pact: must be downloaded from www.ntcsa.co.za and adhered to.
Restrictions:
Insurance: Insurance Deductibles and List of Acceptable Guarantors to be submitted.
Standard Terms and Conditions: available at www.ntcsa.co.za.
Health & Safety
Source: ITT Re-Issue For Muldersvlei 11kV Switchgear Supply Install Termination.pdfCOIDA: original certificate of good standing or proof of application required (South African tenderers only).
Other safety documents as required per scope of work – refer to Health & Safety Folder.
Site compliance technical evaluation includes safety aspects.
Environmental
Source: ITT Re-Issue For Muldersvlei 11kV Switchgear Supply Install Termination.pdfEnvironmental requirements – refer to Environmental Folder (documents to be uploaded under "Other" folder).
Contractual Terms
Source: ITT Re-Issue For Muldersvlei 11kV Switchgear Supply Install Termination.pdfContract: NEC3 Engineering and Construction Contract (ECC3).
Contract period: 6 months.
Tender validity: 12 weeks from closing date.
NTCSA may extend validity; tenderers agreeing must not modify their tender.
Standard Conditions of Tender available at www.ntcsa.co.za; Tender Data takes precedence over Standard Conditions.
Mandatory Contractual Requirements (Appendix D):
These must be submitted before contract award.
Supplier Non-Disclosure Agreement, SD&L Undertaking, Insurance Deductibles, List of Acceptable Guarantors required.
No alternative tenders allowed.
Tender must be for the whole contract; partial bids not accepted.
Section
Source: ITT Re-Issue For Muldersvlei 11kV Switchgear Supply Install Termination.pdfAdditional evaluation criteria beyond standard:
Description
Source: 8010.pdfThe tender is for the re-issue of a request for quotation for the supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei. The contract period is 6 months. The specification includes surge arresters as detailed in the technical specifications.
Technical Specifications
Source: 8010.pdf (unknown)Scope: Supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei for a period of 6 months.
Surge arrester requirements:
Description
Source: 20250206_Muldersvlei 11kV_BRA.pdfThis document is a Baseline Risk Assessment (BRA) for the Muldersvlei 11kV switchgear project. The project involves the supply, installation, termination, commissioning, and handover of 11kV switchgear over a 6-month period.
Quality Management
Source: 20250206_Muldersvlei 11kV_BRA.pdfThe contractor must implement quality management through regular inspections, maintenance schedules, training, and supervision as outlined in the BRA. Compliance with Eskom's procedures and standards is required.
Compliance Requirements
Source: 20250206_Muldersvlei 11kV_BRA.pdf (unknown)Compliance with the Occupational Health and Safety Act (OHS Act), Construction Regulations, and Eskom's Life Saving Rules is mandatory. The contractor must appoint competent persons for tasks such as flagmen, crane operators, and snake handlers. A site-specific traffic plan must be developed. All controls specified in the Baseline Risk Assessment must be implemented, including the use of PPE, log-out-tag-out procedures, and safe work procedures for excavation, working at heights, and electrical work.
Health & Safety
Source: 20250206_Muldersvlei 11kV_BRA.pdfThe contractor must comply with the OHS Act, Construction Regulations, and Eskom's Life Saving Rules. Key requirements include: appointing competent persons (e.g., flagmen, crane operators, snake handlers), developing a site-specific traffic plan, conducting risk assessments, providing and enforcing PPE, implementing log-out-tag-out procedures, and ensuring safe work procedures for all activities (e.g., excavation, working at heights, electrical work). The BRA identifies numerous hazards and specifies preventative and reactive controls.
Important Dates
Source: Authorisation Form - 08 November 2024 (1).pdf (unknown)Closing date: 17 December 2026 (from tender record).
No other dates (briefing, site visit, clarification deadline) are stated in the provided document.
Contact Information
Source: Authorisation Form - 08 November 2024 (1).pdf (unknown)No contact names, email addresses, telephone numbers, or submission/delivery addresses are stated in the provided document.
Submission Guidelines
Source: Authorisation Form - 08 November 2024 (1).pdf (unknown)Returnable documents:
Submission method: not stated in the provided document.
Closing time: not stated in the provided document.
Evaluation Criteria
Source: Authorisation Form - 08 November 2024 (1).pdf (unknown)The document only states that the bidder must be a company, close corporation, partnership, joint venture, sole proprietor, or trust. No evaluation criteria (scoring, preference points, minimum thresholds) are stated in the provided document.
Technical Specifications
Source: Authorisation Form - 08 November 2024 (1).pdf (unknown)The tender is for the supply, installation, termination, commissioning, and handover of 11kV switchgear at Muldersvlei, for a period of 6 months. No further technical details (quantities, standards, locations) are stated in the provided document.
Financial Requirements
Source: Authorisation Form - 08 November 2024 (1).pdf (unknown)No pricing format, bid security, bonds, guarantees, retention, payment terms, or financial capacity thresholds are stated in the provided document.
Compliance Requirements
Source: Authorisation Form - 08 November 2024 (1).pdf (unknown)The bidder must be one of the following organisation types: company, close corporation, partnership, joint venture, sole proprietor, or trust.
No other compliance requirements (CSD registration, tax clearance, B-BBEE, CIDB, CIPC, local content) are stated in the provided document.
Quality Management
Source: Eskom General Conditions of Purchase - 31 May 2024.pdfInspection and testing
Non-conformance
Warranty
Pricing Schedule
Source: Eskom General Conditions of Purchase - 31 May 2024.pdfPrice basis
Currency
Invoicing
Financial Requirements
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Pricing and adjustment
Currency
Invoicing and payment
Penalties
Contractual Terms
Source: Eskom General Conditions of Purchase - 31 May 2024.pdfContract basis
Delivery and acceptance
Rejection and remedy
Warranty
Liability and indemnity
Assignment and subcontracting
Breach and termination
Governing law and ethics
Description
Source: ITT Re-Issue For Muldersvlei 11kV Switchgear Supply Install Termination.pdfNTCSA requires the supply, installation, termination, commissioning and handover of 11kV switchgear and associated cable systems at Muldersvlei Substation over a 6-month period.
Important Dates
Source: ITT Re-Issue For Muldersvlei 11kV Switchgear Supply Install Termination.pdf (TENDER)Clarification meeting 1 (non-compulsory)
Compulsory site visit
Clarification queries
Closing
Tender validity
Contact Information
Source: ITT Re-Issue For Muldersvlei 11kV Switchgear Supply Install Termination.pdf (TENDER)Enquiries
First escalation
Second escalation
Site access
Submission
Site address
Muldersvlei Substation
R101, Old Paarl Road
Klapmuts
Cape Town
GPS: -33.817868S 18.808316E
Submission Guidelines
Source: ITT Re-Issue For Muldersvlei 11kV Switchgear Supply Install Termination.pdf (TENDER)Submission method
Returnables that disqualify if missing, incomplete or unsigned at closing
Non-disqualifiable returnables
Disqualification risks
Evaluation Criteria
Source: ITT Re-Issue For Muldersvlei 11kV Switchgear Supply Install Termination.pdf (TENDER)Evaluation order
Level 1 mandatory criteria (all required)
Level 2 scoring (weighted out of 12)
Thresholds
Preference points
Contractual obligations assessed before award (Appendix D, scored out of 8)
Technical Specifications
Source: ITT Re-Issue For Muldersvlei 11kV Switchgear Supply Install Termination.pdf (TENDER)Scope
Cable and termination work
Technical deliverables
Site conditions
Experience & Qualifications
Source: ITT Re-Issue For Muldersvlei 11kV Switchgear Supply Install Termination.pdfTrack record
Personnel
Consequence
Financial Requirements
Source: ITT Re-Issue For Muldersvlei 11kV Switchgear Supply Install Termination.pdf (TENDER)Pricing
Financial capacity
Contract securities
Compliance Requirements
Source: ITT Re-Issue For Muldersvlei 11kV Switchgear Supply Install Termination.pdf (TENDER)Registration and statutory
CIDB
B-BBEE and preference
Eligibility exclusions
Standard forms
Health & Safety
Source: ITT Re-Issue For Muldersvlei 11kV Switchgear Supply Install Termination.pdfStatutory safety evidence
Tender pack safety requirements
Environmental
Source: ITT Re-Issue For Muldersvlei 11kV Switchgear Supply Install Termination.pdfEnvironmental requirements are issued in the Environmental folder of the tender pack and must be completed and returned with the bid.
Contractual Terms
Source: ITT Re-Issue For Muldersvlei 11kV Switchgear Supply Install Termination.pdfContract framework
Validity
Targeted enterprise obligations
Governance
Section
Source: ITT Re-Issue For Muldersvlei 11kV Switchgear Supply Install Termination.pdfTechnical evaluation runs in levels.
Level 1 — mandatory, all-or-nothing
Level 2 — weighted scoring out of 12
Step 2(c) — site compliance technical review
Pre-award contractual evidence (Appendix D, out of 8)
Description
Source: Clarification Meeting Re-Issue Virtual MS Teams.docxEnquiry E3191NTCSAMWPR — Muldersvlei 11kV Switchgear Supply, Installation, Termination, Commissioning and Handover for a Period of Six (6) Months (re-issue), for Eskom NTCSA at Muldersvlei Substation, Klapmuts, Cape Town.
Clarification process:
Important Dates
Source: Clarification Meeting Re-Issue Virtual MS Teams.docx (unknown)Clarification Meeting 1 — Virtual (non-compulsory)
Clarification Meeting 2 — Compulsory Site Visit (face-to-face)
Access-support deadline
Contact Information
Source: Clarification Meeting Re-Issue Virtual MS Teams.docx (unknown)Attendance confirmation (virtual meeting)
Site location assistance
Site address
Muldersvlei Substation
R101 (Old Paarl Road)
Klapmuts, Cape Town
GPS: -33.817868, 18.808316
Evaluation Criteria
Source: Clarification Meeting Re-Issue Virtual MS Teams.docx (unknown)Responsiveness gate
Technical Specifications
Source: Clarification Meeting Re-Issue Virtual MS Teams.docx (unknown)Scope
Purpose of the compulsory site visit — bidders must familiarise themselves with:
Compliance Requirements
Source: Clarification Meeting Re-Issue Virtual MS Teams.docx (unknown)Mandatory attendance
Description
Source: 8021.pdfSpecification identification
Technical Specifications
Source: 8021.pdf (unknown)Scope
Kit requirements
Specified items
Reference documents
Compliance Requirements
Source: 8021.pdf (unknown)Product standards
Description
Source: QM.pdfThe document is a Supplier Quality Management checklist for the Muldersvlei Substation Refurbishment Project. It includes requirements for control of externally provided processes, products, and services as part of the QMS evidence.
Submission Guidelines
Source: QM.pdf (TENDER)Returnable documents — all must be completed and submitted:
Failure to submit any mandatory returnable may result in disqualification.
Evaluation Criteria
Source: QM.pdf (TENDER)Quality requirements are evaluated with the following weighted sections:
Bidders must comply with all quality requirements. Non-compliance may lead to disqualification.
Compliance Requirements
Source: QM.pdf (TENDER)Quality management system compliance:
Section
Source: QM.pdfThe quality evaluation is based on the weighted sections A-E as described in the main evaluation criteria. Bidders must submit the required quality documents and evidence.
Description
Source: Eskom Holdings Safety, Health, Environment and Quality (SHEQ) Policy.pdfEskom Holdings SOC Ltd (registration number 2002/015527/30) is South Africa's state-owned electricity supplier. Its Safety, Health, Environment and Quality (SHEQ) Policy, document 32-727 at revision 5, sets out the commitments and rules that apply across Eskom, its divisions, its subsidiaries and any entity in which it holds a controlling interest or influence.
Quality Management
Source: Eskom Holdings Safety, Health, Environment and Quality (SHEQ) Policy.pdfQuality approach
Compliance Requirements
Source: Eskom Holdings Safety, Health, Environment and Quality (SHEQ) Policy.pdf (unknown)Statutory and management-system compliance
Supplier registration and bid compliance
Health & Safety
Source: Eskom Holdings Safety, Health, Environment and Quality (SHEQ) Policy.pdfHealth and safety obligations
Environmental
Source: Eskom Holdings Safety, Health, Environment and Quality (SHEQ) Policy.pdfEnvironmental commitments
Submission Guidelines
Source: E-Tenderers E-Tendering Training Acknowledgement.pdf (unknown)Mandatory returnable document:
Evaluation Criteria
Source: E-Tenderers E-Tendering Training Acknowledgement.pdf (unknown)The bid is evaluated on responsiveness.
Compliance Requirements
Source: E-Tenderers E-Tendering Training Acknowledgement.pdf (unknown)Compliance requirements:
Description
Source: SBD 6.2 Declaration Certificate.pdfScope of the requirement
Submission Guidelines
Source: SBD 6.2 Declaration Certificate.pdf (TENDER)Returnable documents
Disqualification risks
Pricing Schedule
Source: SBD 6.2 Declaration Certificate.pdfBasis for the local content calculation
Compliance Requirements
Source: SBD 6.2 Declaration Certificate.pdf (TENDER)Local production and content
Declaration and signatory
Supporting schedules
Consequences
Contractual Terms
Source: SBD 6.2 Declaration Certificate.pdfPost-award obligations
Description
Source: ECC3 Muldersvlei 11kV Switchgear Supply Install .pdfMuldersvlei Refurbishment — supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei Substation, procured by NTCSA SOC Ltd under an NEC3 Engineering and Construction Contract. The pack comprises the Agreements and Contract Data (Part C1), Pricing Data (Part C2), Scope of Work (Part C3) and Site Information (Part C4).
Important Dates
Source: ECC3 Muldersvlei 11kV Switchgear Supply Install .pdf (unknown)Contract milestones:
Contact Information
Source: ECC3 Muldersvlei 11kV Switchgear Supply Install .pdf (unknown)Employer:
Project Manager:
Supervisor:
Adjudicator:
Service location:
Submission Guidelines
Source: ECC3 Muldersvlei 11kV Switchgear Supply Install .pdf (unknown)Returnable documents — the tenderer's submission must include:
Alternative offers:
Post-award obligations:
Repudiation / disqualification risks:
Technical Specifications
Source: ECC3 Muldersvlei 11kV Switchgear Supply Install .pdf (unknown)Site:
Feeder works:
Contract:
Experience & Qualifications
Source: ECC3 Muldersvlei 11kV Switchgear Supply Install .pdfKey personnel:
Quality Management
Source: ECC3 Muldersvlei 11kV Switchgear Supply Install .pdfDefects and quality:
Pricing Schedule
Source: ECC3 Muldersvlei 11kV Switchgear Supply Install .pdfPricing schedule:
Financial Requirements
Source: ECC3 Muldersvlei 11kV Switchgear Supply Install .pdf (unknown)Pricing model:
Security and guarantees:
Payment:
Risk and liability:
Compliance Requirements
Source: ECC3 Muldersvlei 11kV Switchgear Supply Install .pdf (unknown)Registrations and status:
Contract acceptance:
Insurance (contractor-provided, Insurance Table A):
Other obligations:
Health & Safety
Source: ECC3 Muldersvlei 11kV Switchgear Supply Install .pdfHealth and safety:
Environmental
Source: ECC3 Muldersvlei 11kV Switchgear Supply Install .pdfEnvironmental:
Contractual Terms
Source: ECC3 Muldersvlei 11kV Switchgear Supply Install .pdfContract form:
Completion and defects:
Delay and termination:
Liability:
Special conditions:
Important Dates
Source: SDLI Strategy -Strategy Setting Template For Bidders For Muldersvlei 11kV.pdf (TENDER)Closing date: 17 December 2026 at 08:00 (from tender listing).
Project duration: 6 months.
No other dates specified in the document.
Submission Guidelines
Source: SDLI Strategy -Strategy Setting Template For Bidders For Muldersvlei 11kV.pdf (TENDER)Returnable documents:
Submission method and address not specified in the document.
Evaluation Criteria
Source: SDLI Strategy -Strategy Setting Template For Bidders For Muldersvlei 11kV.pdf (TENDER)Preference points awarded based on B-BBEE status level.
Local content threshold of 90% for cable is a mandatory condition for award.
Objective criteria, if included, are conditions for award; failure may result in award to next ranked bidder.
SDL&I objectives do not form part of scoring but become contractual obligations.
Technical Specifications
Source: SDLI Strategy -Strategy Setting Template For Bidders For Muldersvlei 11kV.pdf (TENDER)Supply, installation, termination, commissioning, and handover of 11kV switchgear at Muldersvlei.
Project duration: 6 months.
Cable is a designated sector with 90% local content threshold.
Pricing Schedule
Source: SDLI Strategy -Strategy Setting Template For Bidders For Muldersvlei 11kV.pdfPricing must be separated into local and imported components as per the Price Schedule. Local procurement content target is 100%.
Financial Requirements
Source: SDLI Strategy -Strategy Setting Template For Bidders For Muldersvlei 11kV.pdf (TENDER)SDL&I penalty: 2.5% of invoice amount for non-compliance with SDL&I obligations.
SDL&I retention: 2.5% of each invoice (excluding VAT) withheld until SDL&I obligations are fulfilled.
Tenderers bear full cost of skills development; Eskom makes no financial contribution.
Local procurement content target: 100%.
Compliance Requirements
Source: SDLI Strategy -Strategy Setting Template For Bidders For Muldersvlei 11kV.pdf (TENDER)B-bbee:
R50 million: valid B-BBEE certificate required.
Local content:
Sdl&i:
Skills development:
Jobs:
Sworn affidavit validity requirements:
Contractual Terms
Source: SDLI Strategy -Strategy Setting Template For Bidders For Muldersvlei 11kV.pdfSDL&I penalty of 2.5% of invoice for non-compliance. SDL&I retention of 2.5% of each invoice (excl VAT) until obligations fulfilled. Quarterly reporting on SDL&I. SDL&I Implementation Schedule due within 28 days of award. B-BBEE improvement plan due within 30 days of contract signature.
Section
Source: SDLI Strategy -Strategy Setting Template For Bidders For Muldersvlei 11kV.pdfPreference points based on B-BBEE status. Local content threshold of 90% for cable is mandatory. Objective criteria are conditions for award. SDL&I objectives do not score but become contractual.
Submission Guidelines
Source: 240-68099512 Form A_Cat 2_ Rev 9.pdf (unknown)Returnable documents:
Evaluation Criteria
Source: 240-68099512 Form A_Cat 2_ Rev 9.pdf (unknown)The tenderer must complete and sign Form A to acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 Standard. The applicable pre-contract award quality category is Category 2. No other eligibility criteria are stated in the document.
Quality Management
Source: 240-68099512 Form A_Cat 2_ Rev 9.pdfThe tenderer must accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001. Post-contract award, the following quality-related conditions apply: contract execution, supplier quality performance monitoring, Eskom rights of access, Eskom rights to information, preservation, quality audits, management of nonconformities and nonconforming outputs, and special processes. All ISO 9001 clauses (context, leadership, planning, support, operation, performance evaluation, improvement) and quality principles (customer focus, leadership, engagement of people, process approach, improvement, evidence-based decision making, relationship management) are applicable.
Compliance Requirements
Source: 240-68099512 Form A_Cat 2_ Rev 9.pdf (unknown)The tenderer must complete and sign Form A to acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 Standard. The applicable pre-contract award quality category is Category 2. No other compliance requirements are stated in the document.
Section
Source: 240-68099512 Form A_Cat 2_ Rev 9.pdfThe tenderer must complete and sign Form A to acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 Standard. The applicable pre-contract award quality category is Category 2. No other evaluation criteria are stated in the document.
Important Dates
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Closing date: 17 December 2026 at 08:00 (from tender record).
No other dates (briefings, site visits, clarification deadlines) are stated in the provided document.
Contact Information
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Fraud and corruption reporting (not a tender enquiry contact):
No tender-specific enquiry contacts are provided in the document.
Submission Guidelines
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Submission method: as per the tender record (Request for Quotation).
Returnable documents: none specified beyond the standard Eskom conditions.
Bidders must accept Eskom's General Conditions of Purchase; any non-acceptance must be indicated in writing.
All communications must reference the agreement number.
Delivery costs must be stated in the tender; if not stated, they are deemed included.
Evaluation Criteria
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)No specific evaluation criteria are stated in the provided document. The document is the Eskom General Conditions of Purchase, which does not describe the evaluation process for this tender.
Quality Management
Source: Eskom General Conditions of Purchase - 31 May 2024.pdfEskom may inspect and test goods/works/services at any stage; acceptance is deemed if Eskom does not notify rejection.
If the supplier fails to comply, Eskom may reject goods or require re-work; rejected goods are returned at supplier's risk and expense.
For works/services, the supplier must correct non-conformances/defects; if delayed, Eskom may have them corrected by a third party at the supplier's cost.
Pricing Schedule
Source: Eskom General Conditions of Purchase - 31 May 2024.pdfPrices or rates may include a price adjustment calculated per a formula in the agreement.
Payment may be in any currency; one exchange rate will be used for conversion to ZAR.
Payment within 30 days after receipt of a correct tax invoice.
Tax invoice must show Eskom's VAT registration number (4740101508).
Financial Requirements
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Payment: Eskom will pay within 30 days after receipt of a correct tax invoice.
Tax invoice must show Eskom's VAT registration number: 4740101508.
Prices may include a price adjustment calculated per a formula in the agreement.
Payment may be made in a currency other than South African Rand; one exchange rate will be used for conversion.
No bid security, bonds, guarantees, or retention are stated in the provided document.
Compliance Requirements
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)No specific pre-qualification criteria (e.g., CSD registration, B-BBEE level, CIDB grading) are stated in the provided document.
Supplier must comply with all statutory requirements and South African law.
Supplier must complete Eskom's CPA (IG) form.
Contractual Terms
Source: Eskom General Conditions of Purchase - 31 May 2024.pdfContract governed by South African law; parties submit to SA courts.
Supplier indemnifies Eskom against claims arising from negligence, infringement of rights, breach of statutory duty, or defective design, materials or workmanship.
Warranty: goods/works/services must be fit for purpose and free from defects for one year from acceptance (unless otherwise stated); defects must be rectified free of cost within an agreed time.
Neither party may cede or delegate rights/obligations without written consent, except Eskom may cede to its subsidiaries or divisions.
Breach: if a party fails to remedy a default after written notice, the non-defaulting party may terminate.
Eskom may terminate at any time if the supplier defaults, becomes bankrupt, or is in financial circumstances that prejudice performance.
Supplier must adhere to all statutory requirements.
Eskom expects high ethical standards from suppliers.
Description
Source: Tx Environmental Managemement Tender Returnable .pdfThe tender is for the supply, installation, termination, commissioning and handover of 11kV switchgear at Muldersvlei, for a period of 6 months. The environmental returnable document assesses whether the contractor's submitted environmental documentation complies with the specified requirements.
Submission Guidelines
Source: Tx Environmental Managemement Tender Returnable .pdf (unknown)Returnable documents:
Submission method: as per the enquiry referenced (E3191NTCSAMWP).
Disqualification risks:
Evaluation Criteria
Source: Tx Environmental Managemement Tender Returnable .pdf (unknown)Evaluation is based on the environmental returnable document.
Scoring:
Minimum qualifying score:
Technical Specifications
Source: Tx Environmental Managemement Tender Returnable .pdf (unknown)Scope of work:
Environmental requirements (per standard 240-180100134):
EMPr or method statements must cover:
Waste Management Plan must address:
Aspect and Impact Register:
Environmental Bill of Quantity must include:
Compliance Requirements
Source: Tx Environmental Managemement Tender Returnable .pdf (unknown)Environmental compliance:
Section
Source: Tx Environmental Managemement Tender Returnable .pdfThe environmental evaluation is scored per section (A to E) with each item marked Yes=1, No=0, or N/A. The total score is expressed as a percentage. A bidder must achieve a weighted average score of 80% or above to be considered.
Important Dates
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)Closing date: 17 December 2026 at 08:00 (SAST).
Contact Information
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)Contact: Eskom Representative (as identified in the Invitation to Tender)
Submission Guidelines
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)Submission method: paper or e-tender as specified in the Tender Data.
Evaluation Criteria
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)Evaluation stages:
Quality Management
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdfQuality requirements:
Pricing Schedule
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdfPricing schedule:
Financial Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)Pricing:
Compliance Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)Eligibility:
B-bbee:
CIDB:
Sheq:
Other:
Health & Safety
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdfHealth and safety:
Contractual Terms
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdfContract terms:
Section
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdfAdditional evaluation criteria:
Description
Source: E-tendering Help Manual for supplier -.pdfThe document is the Eskom eTendering System Suppliers Help Manual, which explains how suppliers register and submit bids electronically. It replaces physical submission at Eskom tender offices. Key steps: register with a CSD number, verify email, log in with OTP, select the tender reference, upload documents under correct categories, and finalise the submission. File size limits: 50MB per file, 900MB total. After finalising, an email confirmation with the submission ID is sent.
Important Dates
Source: E-tendering Help Manual for supplier -.pdf (TENDER)Closing date: 17 December 2026 at 08:00 (from the tender record).
No other dates are stated in the document.
Contact Information
Source: E-tendering Help Manual for supplier -.pdf (TENDER)For system problems, contact the buyer responsible for the published tender.
No specific contact details are provided in the document.
Submission Guidelines
Source: E-tendering Help Manual for supplier -.pdf (TENDER)Submission is electronic only via the Eskom eTendering system.
Evaluation Criteria
Source: E-tendering Help Manual for supplier -.pdf (TENDER)No evaluation criteria are stated in the provided document. The document is a system user manual, not the tender specification.
Technical Specifications
Source: E-tendering Help Manual for supplier -.pdf (TENDER)The document is the Eskom eTendering System Suppliers Help Manual. It describes how to register, log in, upload and finalise tender submissions. It does not contain technical specifications for the Muldersvlei 11kV switchgear tender.
Compliance Requirements
Source: E-tendering Help Manual for supplier -.pdf (TENDER)A CSD number is required to access the eTendering system.
No other compliance requirements are stated in the document.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 46 of 2000
Relevant where professional engineering services or regulated engineering work may be required.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Address
Lake Street, Germiston, Johanessburg, 1401, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
74
Last checked
21 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Contact
021-980-7509[email protected]www.eskom.co.za/Pages/Landing.aspxLake Street, Germiston, Johanessburg, 1401, South Africa
Key Personnel
Learn how to submit a winning bid with these related articles
A technical guide to municipal electrical tenders. Covers CIDB EB/EP grading, electrification projects (INEP), substation maintenance panels, and COC compliance.
How mechanical and electrical engineers, contractors, and consultants can win public sector contracts in South Africa — HVAC, plumbing, fire systems, electrical infrastructure, ECSA registration, CIDB ME designation, and tender documentation essentials.
How small electrical contractors use Joint Ventures to combine EP grading, win Eskom and municipal infrastructure projects, and compete for renewable energy installations.
Provincial procurement is not national procurement with a different address. Learn how provincial departments, entities, metros and districts buy, when they buy, and how to choose the province where your business can actually win.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: Electrical. Unlock full pricing strategies, bid frequency, and historical win rates.