Issuing Organization
Development Bank of Southern Africa (DBSA)Location
Gauteng
Closing Date
12 Aug 2026
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
1258 Lever Road - Headwayhill - Midrand - 1619
Organization Type
GOVERNMENT
Published
28 Jul 2026
OCDS Reference
ocds-9t57fa-163761
The development bank of southern africa seeks service providers to design, supply, install, commission, and maintain solar-powered backup systems for 20 hospital facilities equipped with psa oxygen generating plants across cluster 1 and cluster 2. This tender ensures uninterrupted power supply for critical healthcare infrastructure.
Design, supply, installation, commissioning, and maintenance of solar-powered backup systems; Deployment at 20 hospital facilities with PSA oxygen plants; Compliance with technical specifications for solar and backup power systems; Adherence to DBSA SHEQ (Safety, Health, Environment, Quality) policies; Submission of bids by the closing date of 12 August 2026; Open-tender process under Request for Bid (RFB) guidelines; Service providers must meet financial and compliance requirements as stipulated.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Wednesday, 12 August 2026 - 00:00
Venue
https://teams.microsoft.com/meet/366182954212521?p=kTV3WtJ6WlbX9L7GzM
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Please visit the DBSA website to receive further information on bid.
Categories
Request for Bid(Open-Tender)
1258 Lever Road - Headwayhill - Midrand - 1619
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: Annexure C - DBSA SHEQ Policy.pdf. You don’t need to refresh — this page will pick up the updated review automatically.
28 Jul
2026
Tender Published
Tender was published
12 Aug
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
RFP069-070.2026_Volume 1 of 3_Tender Procedure.pdf
The Development Bank of Southern Africa (DBSA) invites tenders (RFP069-070/2026) for the appointment of service providers to design, supply, install, commission, and maintain solar-powered backup systems at 20 hospital facilities with PSA oxygen generating plants in Gauteng. The tender closes on August 12, 2026, and requires compliance with South African procurement regulations, including B-BBEE, CIDB grading (7 EB or higher), and tax compliance. Submissions must be made online via Microsoft OneDrive, with strict adherence to formatting and documentation requirements.
Annexure C - DBSA SHEQ Policy.pdf
Annexure B_DBSA Baseline Specification_RFP070.2026.pdf
The Development Bank of Southern Africa seeks service providers to design, supply, install, commission and maintain solar‑powered backup systems at 20 hospital facilities receiving PSA oxygen generating plants (Clusters 1 and 2) in Gauteng, with a 38‑month contract (2 months per site for works plus 36 months post‑installation maintenance) on an accelerated, multi‑site rollout.
Annexure A_Health and Safety Specification_RFP069.2026.pdf
The tender is for the appointment of service providers to design, supply, install, commission, and maintain solar-powered backup systems (including Solar PV, BESS, PCS, EMS, and associated equipment) for 20 hospital facilities with PSA oxygen plants in South Africa. The project aims to ensure energy resilience for critical oxygen generation infrastructure. The Development Bank of Southern Africa (DBSA) is the client, and the tender includes strict health, safety, environmental, and quality (HSEQ) compliance requirements under the Occupational Health and Safety Act (OHSA) and Construction Regulations 2014.
RFP069-070.2026_Volume 2 of 3_Tender Returnable.pdf
The tender (RFP069-070/2026) is for the appointment of service providers to design, supply, install, commission, and maintain solar-powered backup systems at 20 hospital facilities with PSA oxygen plants in Gauteng. Issued by the Development Bank of Southern Africa (DBSA), it requires comprehensive compliance with legal, technical, and administrative requirements, including B-BBEE, tax compliance, and CIDB/CSD registration. The closing date is August 12, 2026.
Annexure A_Health and Safety Specification_RFP070.2026.pdf
The tender is for the appointment of service providers to design, supply, install, commission, and maintain solar-powered backup systems at 20 hospital facilities in South Africa. The project is part of the DBSA-NDoH-GF PSA Oxygen Plants Programme, ensuring uninterrupted oxygen supply through reliable backup power. The scope includes civil, structural, PV, BESS, electrical works, testing, commissioning, and a 36-month maintenance period. The project is governed by strict OHS, statutory, and technical compliance requirements, with an accelerated timeline and multi-site coordination.
RFP069-0702026 Activity Schedule.xlsx
The tender is for the appointment of service providers to design, supply, install, commission, and maintain solar-powered backup systems for 20 hospital facilities equipped with Pressure Swing Adsorption (PSA) oxygen-generating plants. The project is divided into two clusters (Cluster 1 and Cluster 2) across multiple provinces in South Africa, including KwaZulu-Natal, Free State, Mpumalanga, Limpopo, and Gauteng. The systems are intended to ensure uninterrupted power supply for critical PSA operations, with preliminary planning classes ranging from 90 kWp to 120 kWp per hospital. The tender includes detailed Bill of Quantities (BoQ) for each hospital, covering components like solar PV modules, inverters, battery energy storage systems (BESS), mounting structures, cabling, protection systems, and maintenance services over 36 months under NEC3 TSC terms.
Annexure B _DBSA Baseline Specification_RFP069.2026.pdf
The tender involves the appointment of service providers for the design, supply, installation, commissioning, and maintenance of solar-powered backup systems (including Solar PV, BESS, PCS, EMS, and balance-of-plant equipment) for 20 hospital facilities with PSA oxygen plants in South Africa. The goal is to ensure energy resilience and operational continuity during grid interruptions. The project is managed by the Development Bank of Southern Africa (DBSA) and requires strict adherence to health, safety, and environmental regulations, including the Occupational Health and Safety Act (2014) and Construction Regulations.
RFP069-070.2026_Volume 3 of 3_The Contract.pdf
To download these documents and access AI-powered analysis, visit the main tender page.
Secure DBSA tenders with AI Matching Engine, development finance intelligence, compliance analysis, and bid support for infrastructure and consulting.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 920 000
Range
Based on SITA benchmarks. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
💡 Want more tendering tips and strategies?
Explore Our BlogWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Contact Information
Source: RFP069-070.2026_Volume 3 of 3_The Contract.pdf (TENDER){"name":null,"email":null,"phone":null,"department":null,"address":"he Conditions"}
Submission Guidelines
Source: RFP069-070.2026_Volume 3 of 3_The Contract.pdf (TENDER)Returnable Documents: C1.1 FORM OF OFFER AND ACCEPTANCE 4, C1.3 : PERFORMANCE GUARANTEE 44, C2.4 : AMENDMENTS, QUALIFICATIONS & ALTERNATIVES 92
Technical Specifications
Source: RFP069-070.2026_Volume 3 of 3_The Contract.pdf (TENDER)Appointment of service providers for the design,
NEC3 ECC and TSC SUPPLY, INSTALLATION, COMMISSIONING AND
Option a maintenance
Quality Management
Source: RFP069-070.2026_Volume 3 of 3_The Contract.pdfThe works comprise the provision of integrated solar photovoltaic (PV), Battery
Energy Storage System (BESS), grid-forming Power Conversion System (PCS),
Energy Management System (EMS), associated balance-of-plant equipment,
electrical integration, monitoring, testing, commissioning, training and
maintenance services to provide resilient backup power to PSA oxygen
generation facilities.
Activity Schedule of April 2013 (including amendments).
authorised/accredited OEMs, for the design, manufacture, supply, installation, testing, commissioning and
maintenance of solar power backup systems at twenty (20) hospital facilities receiving Pressure Swing
Adsorption (PSA) oxygen generating plants within the Republic of South Africa.
Signature(s)
Name(s)
e-mail: To be indicated at contracting
11.2(13) The activity is The design, manufacture, supply, delivery, installation, testing,
commissioning, training, operation and maintenance of
integrated solar photovoltaic (PV), Battery Energy Storage
System (BESS), grid-forming Power Conversion System (PCS),
Energy Management System (EMS) and associated balance-of-
plant infrastructure to provide resilient backup power to
Pressure Swing Adsorption (PSA) oxygen generation facilities
located at healthcare institutions within the Republic of South
Contractor’s contractors or consortia, supported by authorised/accredited OEMs,
main for the design, manufacture, supply, delivery, installation, testing,
responsibilities commissioning, training and maintenance of solar power backup
systems at twenty (20) hospital facilities receiving Pressure Swing
Adsorption (PSA) oxygen generating plants within the Republic of
manufacture, procurement, transportation, installation, testing,
commissioning and maintenance of the solar power backup
systems.
The scope shall include, but not be limited to, solar photovoltaic (PV)
generation systems, Battery Energy Storage Systems (BESS), grid-
forming Power Conversion Systems (PCS), Energy Management
Systems (EMS), monitoring platforms, protection systems, electrical
balance-of-plant equipment, civil and structural works, earthing and
bonding systems, AC and DC cabling, standby generator
integration, utility grid integration, operator training, documentation
and maintenance support.
acceptance testing for those components of the system that can be
tested off site prior to site installation
Pricing Schedule
Source: RFP069-070.2026_Volume 3 of 3_The Contract.pdfC1 : agreement and contract data
C2 : pricing data
C3 : scope of work
C4 : site information
of 114
Part C1: Agreements and Contract Data, (which includes this Form of Offer and Acceptance)
Part C2: Pricing data
Part C3: Scope of work.
Part C4: Site information
and the schedules, forms, drawing and documents or parts thereof, which may be incorporated by reference into
Parts 1 to 4 above.
Financial Requirements
Source: RFP069-070.2026_Volume 3 of 3_The Contract.pdf (TENDER)Bid Bond: PERFORMANCE GUARANTEE 44
C1.4 Advance payment guarantee 49
C1.5 Contract 2 52
C1.5 Part one – data provided by the employer 52
C1.6 Part two – data provided by contractor 81
C2 : pricing data 85
C2.1 : Pricing assumptions – option a 87
C2.2 : Pricing instructions 90
C2.3 : Activity schedule 91
C2.4 : Amendments, quali
Compliance Requirements
Source: RFP069-070.2026_Volume 3 of 3_The Contract.pdf (TENDER)appointment letter
C1.1 Form of offer and acceptance 4
C1.3 : Performance guarantee 44
C2.4 : Amendments, qualifications & alternatives 92
Health & Safety
Source: RFP069-070.2026_Volume 3 of 3_The Contract.pdffrom either party.
W1.4(2) The tribunal is: Arbitration, arbitrator to be appointed as required.
W1.4(5) The arbitration the latest edition of Rules for the Conduct of Arbitrations published
procedure is by The Association of Arbitrators Southern Africa or its successor
body.
Add the following new definition as clause 11.2(34):
“Baseline Risk Assessment means the baseline risk assessment contemplated in
11.2 regulation 5(1)(a) of the Construction Regulations.”
Add the following new definition as clause 11.2(35):
"Construction Agent means an “agent” as per the Construction Regulations which
means a competent person who acts as a representative for a client (“client” in this
regard being the Employer); the agent contemplated herein: (i) manages the health and
safety on a construction project for the client; (ii) is registered with a statutory body
(being the South African Council for Project and Construction Management Professions
or any other statutory body approved by the chief inspector); and (iii) is qualified to
perform the functions required by the Construction Regulations 2014”;
Add the following new definition as clause 11.2(36):
“Construction Health and Safety Officer means the Construction Health and Safety
Officer as defined in the Construction Regulations.”
Add the following new definition as clause 11.2(37):
“Construction Regulations means the Construction Regulations as defined in clause
27.4.2 below”
Add the following new definition as clause 11.2(38):
“A Contractor Insolvency Event means and is considered to occur if:
constitute an act of insolvency within the meaning of Sections 8 or 9(3)(a)(v) of
the Insolvency Act , as amended, or any equivalent legislation in any
jurisdiction to which it is subject;
generally deferring, re-scheduling or otherwise re-adjusting all or a material part
of its indebtedness or proposes or makes a general scheme, arrangement,
assignment, or composition with or for the benefit of its creditors or a
moratorium is proposed or agreed in respect of or affecting all or a material part
of its indebtedness;
for its winding-up (whether provisionally or finally);
of 114
Add the following clauses after clause 12.4:
“Any extension, concession, waiver or relaxation of any action stated in this contract by
12.5 the Parties, the Project Manager, the Supervisor, or the Adjudicator does not constitute
a waiver of rights and does not give rise to an estoppel unless the Parties agree
otherwise and confirm such agreement in writing.”
Important Dates
Source: RFP069-070.2026_Volume 1 of 3_Tender Procedure.pdf (RFP){"briefingSession":"{"date":null,"time":"11h00","venue":"e: Online: 8/4/2026 Physical: N/A","is_compulsory":false}"}
Evaluation Criteria
Source: RFP069-070.2026_Volume 1 of 3_Tender Procedure.pdf (RFP)General
B-BBEE
Professional
Technical Specifications
Source: RFP069-070.2026_Volume 1 of 3_Tender Procedure.pdf (RFP)Appointment of service providers for
The design, supply, installation, commissioning and
Volume
Maintenance
Section
Source: RFP069-070.2026_Volume 1 of 3_Tender Procedure.pdfRFP069-070/2026 appointment of service providers for
Cluster 1 (069) and cluster 2 (070)
Tender NO. RFP0069-070/2026
Important Dates
Source: Annexure B_DBSA Baseline Specification_RFP070.2026.pdf (unknown){"closingDate":"17 June 2026"}
Contact Information
Source: Annexure B_DBSA Baseline Specification_RFP070.2026.pdf (unknown){"name":null,"email":null,"phone":null,"department":"of Health (NDoH), as Principal Recipient of the Global Fund (GF)","address":null}
Evaluation Criteria
Source: Annexure B_DBSA Baseline Specification_RFP070.2026.pdf (unknown)Tenderers must demonstrate proven experience in multi‑site solar PV and BESS installations, possess qualified personnel (registered electricians, structural engineers, OEM‑approved technicians), hold necessary registrations (e.g., CIDB grading, ECSA or equivalent), and have the financial and logistical capacity to mobilise resources for concurrent work across up to 20 sites. Compliance with occupational health and safety requirements (OHS Act, Construction Regulations 2014) and environmental legislation (NEMA) is mandatory. Evidence of OEM endorsement, TRP reports, BMS redundancy, FAT/SAT compliance, and a robust maintenance/spare‑parts strategy must be submitted with the tender.
Technical Specifications
Source: Annexure B_DBSA Baseline Specification_RFP070.2026.pdf (unknown)Supply, delivery, offloading, storage, installation, testing, commissioning and handover of PV
arrays, BESS installations, LV distribution and protection, civil works (foundations, trenches,
cable ducts), temporary works (scaffolding, formwork, shoring), and all associated works at
Clusture 2hospitals while maintaining uninterrupted clinical services and protecting PSA
oxygen plant operations.
Scope includes the 36-month post-installation maintenance period and programme-level
controls (central monitoring, spare parts logistics and standardised FAT/SAT protocols
and reinstatement.
penetrations.
lightning protection interfaces.
battery module handling, thermal management, battery monitoring and
commissioning.
coordination, temporary supplies and final connections to hospital systems.
temporary services.
documentation.
access and hospital logistics.
5 | P a g e
6.1. Primary legislation and standards to be applied
Occupational Health and Safety Act and associated regulations.
Construction Regulations 2014 (CR) — duties of Client, Principal Contractor and
contractors; PHSP and H&S File requirements.
regulations.
SANS 10142-1, iec 62446, iec 62109, iec 62619).
Local municipal bylaws and hospital site rules.
Contract documents and Section 37(2) Health & Safety Agreement where applicable.
7.1. Risk Classification Methodology and Matrix
Aligned with ISO 31010 and ISO 45001. Risks are assessed using Severity (S) and
Likelihood (L).
The Principal Contractor is responsible for applying this matrix, implementing control
measures, and managing residual risks.
Severity (S):
Severity (S) Description Example
1 Minor Superficial burn, first aid only
2 Moderate Medical treatment, equipment damage < $10k
3 Major Lost-time injury, fire contained on-site
4 Severe Multiple injuries or partial structural loss
5 Catastrophic Fatality, explosion, total facility loss
6 | P a g e
Definitions
Severity Scale
1 – Minor Injury: First aid only, no lost time.
2 – Moderate Injury: Medical treatment, short-term lost time.
3 – Serious Injury: Hospitalization, long-term lost time.
4 – Major Injury: Permanent disability, life-changing injury.
5 – Fatality: Single or multiple deaths
Likelihood (L):
Severity (S) Description Example
1 Rare Highly unlikely
2 Possible Could occur occasionally
3 Likely Occurs periodically
4 Frequent Monthly events
5 Continuous Weekly/Daily occurrence
Definitions
Likelihood Scale
1 – Rare: May occur only in exceptional circumstances.
2 – Unlikely: Could happen but not expected during project.
3 – Possible: Might occur at some time during works.
4 – Likely: Will probably occur in most circumstances.
5 – Almost Certain: Expected to occur frequently or regularly.
Risk Rating = Severity × Likelihood
7 | P a g e
Range Category Action
1 – 5 Low Acceptable – monitor
6 – 10 Medium Review controls
11 – 15 High Immediate supervision
16 – 25 Critical Stop work – rectify immediately
Risk Matrix Table (S × L):
Severity \ Likelihood 1 - Rare 2 - Possible 3 - Likely 4 - Frequent 5 - Continuous
1 - Minor 1 2 3 4 5
2 - Moderate 2 4 6 8 10
3 - Major 3 6 9 12 15
4 - Severe 4 8 12 16 20
5 - Catastrophic 5 10 15 20 25
Definitions
Risk Rating
Low (Green): Acceptable with routine controls.
Medium (Amber): Requires management attention and monitoring.
High (Red): Significant risk; must be reduced before work proceeds.
Critical (Red): Unacceptable; work must not proceed until risk is controlled.
How to use this table:
Raw Risk Score = Likelihood × Severity before controls.
Residual Risk Score = Likelihood × Severity after controls.
8 | P a g e
Critical/High risks (≥11) must have strict controls and continuous monitoring.
Update Review Date regularly (monthly or after incidents).
Application
▪ Score each activity (raw risk).
▪ Apply controls (aligned with ISO/HSE hierarchy).
▪ Re-score residual risk.
▪ Document monitoring frequency and review dates in the Risk Register.
This ensures compliance with CDM Regulations, ISO 31000 risk management cycle,
and the International HSE “Plan-Do-Check-Act” framework.
8.1. Purpose
Provide a client-side baseline HIRA (BRA) that identifies project hazards, assigns raw risk
scores, prescribes minimum controls required from the Principal Contractor, and sets
expected residual risk targets and evidence required for tender evaluation and PHSP
acceptance.
Covers all activities in the project scope: civil, structural, PV, BESS, electrical, temporary
works, testing and commissioning, hospital interfaces and environmental hazards specific to
the provinces where Cluster 2 hospitals are located.
H&S File.
evidence; implement controls; maintain H&S File.
witness critical tests.
9 | P a g e
of Event client (1–5) (1–5) (L×S) L S Risk type) Measures Risk Trigger
(1–5) (1–5) Hazard Description Scenario Unwanted L S Raw Control (minimum requirement) Residual Residual Residual (Lr×Sr) PTW (Yes/No; Responsible Person Evidence Required
OEM TRP report;
BMS redundancy;
Yes; Battery
thermal sensors and PC Project OEM TRP; BMS
Cell/module handling /
BESS alarms; ventilation; Manager; BESS test logs; BTRRP;
propagation Thermal
Thermal 3 5 15 OEM-endorsed 2 4 8 OEM Rep; FAT/SAT witness
causing fire, toxic runaway permit;
Runaway BTRRP integrated CHSM(if statement;
gas, facility loss Energisation
with ERP; FAT/SAT applicable/CHSO) energisation PTW
Ptw
witness; energisation
Ptw
PSA Oxygen Yes; Works Works or Written hospital
PC; Hospital Written approvals;Plant 2 5 10 1 4 4 affecting critical energisation approvals; isolation
Engineering; isolationInterruption services permit interrupt or SOPs; redundant
10 | P a g e
of Event client (1–5) (1–5) (L×S) L S Risk type) Measures Risk Trigger
(1–5) (1–5) Hazard Description Scenario Unwanted L S Raw Control (minimum requirement) Residual Residual Residual (Lr×Sr) PTW (Yes/No; Responsible Person Evidence Required
contaminate PSA supply checks; DBSA appointed certificates; DBSA
supply causing schedule works Engineer sign-off
patient harm outside clinical
windows; DBSA
Engineer sign-off
Sans/iec
compliance;
PV DC Contact or arc registered electricians; Yes; Electrical Arc-flash study;
Registered
Electrical during stringing LOTO; isolation isolation / electrician LOAs;
3 4 12 2 3 6 Electrician;
Shock Arc testing certificates; arc-flash Energisation LOTO certificates;
Chso
Flash commissioning study; PPE; PTW test records
energisation PTW;
OEM witness
11 | P a g e
of Event client (1–5) (1–5) (L×S) L S Risk type) Measures Risk Trigger
(1–5) (1–5) Hazard Description Scenario Unwanted L S Raw Control (minimum requirement) Residual Residual Residual (Lr×Sr) PTW (Yes/No; Responsible Person Evidence Required
Detailed lift plans;
ground bearing tests; Lifting Supervisor;
Lifting Crane Dropped load or Lift plan; crane test
exclusion zones; Yes; Lifting / Crane Operator;
Operations crane failure cert; ground test
3 5 15 banksman; TMP; 2 4 8 Crane operation DBSA appointed
near Hospital impacting patients report; banksman
DBSA Structural permit Structural
Access ambulances LOA
sign-off; Permit to Engineer
Work
Utility wayleave
Strike of power Utility verification; as-builtExcavation Excavation
oxygen reticulation Yes; Excavation confirmations; records; CAT/GPRStrike to Supervisor; TWD;
or services 4 4 16 2 3 6 / Trenching CAT/GPR reports; scanning;Underground Registered
causing outage permit shoring design; hand-digging nearServices Electrician
release collapse excavation permit services; TWD shoring
design; excavation
12 | P a g e
of Event client (1–5) (1–5) (L×S) L S Risk type) Measures Risk Trigger
(1–5) (1–5) Hazard Description Scenario Unwanted L S Raw Control (minimum requirement) Residual Residual Residual (Lr×Sr) PTW (Yes/No; Responsible Person Evidence Required
permit; daily
inspections
Hot works ignite Hot works permit; fire
fuel or watch; exclusion
Hot Works Fire Safety Hot works permit;
combustibles zones; fuel bunding; Yes; Hot works
Ignition near 3 4 12 2 3 6 Officer; Hot fire watch log; fuel
causing fire fire extinguishers; permit
BESS Fuel Works Authoriser storage cert
spread to BESS BTRRP linkage;
PSA scheduling
Battery Dropped module Handling SOP; Mechanical lifting Yes; Lifting
Module or strain injury Lifting Supervisor; training records; aids; OEM handling 3 3 9 2 2 4 permit for
Manual during handling BESS OEM Rep lifting equipment SOPs; certified lifting modules
Handling installation certs fixtures; SWMS;
13 | P a g e
of Event client (1–5) (1–5) (L×S) L S Risk type) Measures Risk Trigger
(1–5) (1–5) Hazard Description Scenario Unwanted L S Raw Control (minimum requirement) Residual Residual Residual (Lr×Sr) PTW (Yes/No; Responsible Person Evidence Required
trained handlers;
medical surveillance
Working at Heights
Anchor certs;
Working at Fall from roof Plan; certified
Construction rescue plan;
Height on carport scaffold anchors; fall arrest Yes; Working at
4 4 16 2 3 6 Supervisor; scaffold inspection
Carports causing serious PPE; rescue plan; Height permit
CHSO tags; medical
Roofs injury fatality scaffold tagging;
fitness
medical fitness
Vehicle collision or
Mobile Yes; Traffic Site TMP; segregated rollover near Fleet Manager; TMP; operator
Equipment management routes; ROPS and hospital access 3 4 12 2 3 6 Site Traffic certificates; pre-op
Collision permit for major seat belts; operator blocking access Coordinator check logs
Rollover movements competence LOAs; injuring persons
14 | P a g e
of Event client (1–5) (1–5) (L×S) L S Risk type) Measures Risk Trigger
(1–5) (1–5) Hazard Description Scenario Unwanted L S Raw Control (minimum requirement) Residual Residual Residual (Lr×Sr) PTW (Yes/No; Responsible Person Evidence Required
pre-op checks; speed
limits
Dust suppression
water sprays; covered
Dust Dust contaminates loads; wheel wash; No; PTW Dust monitoring
Migration clinical zones dust monitoring; recommended Environmental logs; wheel wash
4 3 12 2 2 4
into Clinical affecting patients coordination with for high-dust Officer; CHSO records; infection
Areas sterile areas hospital infection activities control sign-off
control; temporary
screens
SDS on site; bunded Yes; Hazardous SDS; spill drill
EnvironmentalChemical Spill vapour storage; spill kits and 3 4 12 2 3 6 chemical records; waste
Officer; CHSOExposure exposure causing trained responders; handling permit disposal receipts
PPE; chain-of-custody
15 | P a g e
of Event client (1–5) (1–5) (L×S) L S Risk type) Measures Risk Trigger
(1–5) (1–5) Hazard Description Scenario Unwanted L S Raw Control (minimum requirement) Residual Residual Residual (Lr×Sr) PTW (Yes/No; Responsible Person Evidence Required
Electrolyte burns respiratory for battery waste;
Fuels harm EMP
Public barriers
Public falls into hoarding ≥1 m and 1
Public
excavation or kN impact; night PC Site Security; Barrier photos;
Pedestrian No; site security
exposed hazard 4 5 20 illumination; signage; 1 3 3 Community lighting plan;
Interface plan required
causing severe secure perimeter; Liaison liaison minutes
Excavations
injury community liaison;
public notices
Schedule noisy works High noise during No; works
Noise Noise mitigation outside critical critical clinical scheduling Site Manager;
Impact on 4 2 8 2 1 2 plan; notification windows; acoustic windows affecting approval CHSO
Patients records screens; temporary patient care required
enclosures; notify
16 | P a g e
of Event client (1–5) (1–5) (L×S) L S Risk type) Measures Risk Trigger
(1–5) (1–5) Hazard Description Scenario Unwanted L S Raw Control (minimum requirement) Residual Residual Residual (Lr×Sr) PTW (Yes/No; Responsible Person Evidence Required
hospital; PPE for
workers
WBGT monitoring;
Heat illness during
work-rest schedules; WBGT logs;
outdoor works No; medical CHSM (if
Heat Stress hydration stations; work-rest
causing 3 3 9 2 2 4 surveillance applicable)/CHSO
for Workers acclimatisation schedules; medical
exhaustion heat required ; Site Medic
records; shaded rest records
stroke
areas; first aid
Tool tethering;
Tool Dropped tool No; included in
exclusion zones under Construction
Equipment strikes personnel WAH permit Tool tether register;
3 3 9 work at height; PPE; 2 2 4 Supervisor;
Dropped below causing where inspection records
tool inspection CHSO
from Height injury applicable
register; toolbox talks
17 | P a g e
of Event client (1–5) (1–5) (L×S) L S Risk type) Measures Risk Trigger
(1–5) (1–5) Hazard Description Scenario Unwanted L S Raw Control (minimum requirement) Residual Residual Residual (Lr×Sr) PTW (Yes/No; Responsible Person Evidence Required
Pre-op checks;
preventative
Mechanical Equipment failure No; PTW for Maintenance Maintenance logs;
maintenance program;
Failure of causing injury or 3 4 12 2 3 6 major plant Supervisor; Fleet acceptance
acceptance process
Plant service loss movements Manager certificates
for new plant;
inspection certificates
Source damage Authorised operator
Radiation
leak during only; radiation permit Yes; Radiation Geotechnical Radiation permit;
Troxler
geotechnical 1 4 4 and signage; secure 1 2 2 permit where Supervisor; operator LOA;
Gauge
testing causing transport and storage; used CHSO transport records
Misuse
exposure emergency procedure
18 | P a g e
of Event client (1–5) (1–5) (L×S) L S Risk type) Measures Risk Trigger
(1–5) (1–5) Hazard Description Scenario Unwanted L S Raw Control (minimum requirement) Residual Residual Residual (Lr×Sr) PTW (Yes/No; Responsible Person Evidence Required
Prestart area checks;
snake awareness
Worker bitten
training; first aid and
Venomous during clearing Training records;
medevac plan; No; biohazard
Snake Bite excavation in Site Supervisor; medevac plan;
3 3 9 antivenom readiness 2 2 4 controls
Provincial snake-prone areas CHSO antivenom
or rapid transfer mandatory
Risk causing availability note
arrangements; no lone
envenomation
work; gaiters for
clearing
Heavy rains flood Stormwater No; weather
Flooding works trenches or Environmental Stormwater plan; management plan; contingency
Stormwater BESS areas 3 4 12 2 3 6 Officer; Site weather logs; temporary drainage; PTW for critical
Ingress causing damage Manager drainage records stop-work criteria works
safety risk during heavy rain;
19 | P a g e
of Event client (1–5) (1–5) (L×S) L S Risk type) Measures Risk Trigger
(1–5) (1–5) Hazard Description Scenario Unwanted L S Raw Control (minimum requirement) Residual Residual Residual (Lr×Sr) PTW (Yes/No; Responsible Person Evidence Required
secure storage; daily
weather monitoring
Secure compound;
Theft Theft vandalism of
CCTV; night security; Security logs;
Vandalism equipment No; security plan
3 3 9 asset tagging; 2 2 4 PC Site Security CCTV footage;
Security causing delays required
controlled access; asset register
Breach hazards
visitor register
Infection control
Construction coordination withInfectious No; hospital Environmental Infection control
activity increases hospital; dustContaminatio 3 4 12 2 3 6 infection control Officer; Hospital sign-off; waste
infection risk to suppression;n Risk sign-off required Infection Control records
patients restricted access near
clinical areas; PPE
20 | P a g e
of Event client (1–5) (1–5) (L×S) L S Risk type) Measures Risk Trigger
(1–5) (1–5) Hazard Description Scenario Unwanted L S Raw Control (minimum requirement) Residual Residual Residual (Lr×Sr) PTW (Yes/No; Responsible Person Evidence Required
and hygiene stations;
waste segregation
Mechanical aids;
Musculoskeletal
Manual manual handling No; SWMS Construction Training records;
injury from lifting
Handling 3 3 9 training; task-based 2 2 4 required for Supervisor; mechanical aid
modules cables
General RA; team lifts; SWMS heavy lifts CHSO certificates
materials
for heavy lifts
Confined spaceConfined Asphyxiation toxic Gas test records;
Confined Space permit; atmosphericSpace Entry exposure in Yes; Confined rescue team LOAs;
2 5 10 1 4 4 Supervisor; testing continuousBattery confined battery space permit confined space
CHSO monitoring; standbyRooms Pits rooms pits permit
rescue team and
21 | P a g e
of Event client (1–5) (1–5) (L×S) L S Risk type) Measures Risk Trigger
(1–5) (1–5) Hazard Description Scenario Unwanted L S Raw Control (minimum requirement) Residual Residual Residual (Lr×Sr) PTW (Yes/No; Responsible Person Evidence Required
equipment; trained
entrants; rescue drills
Mechanical isolation
procedures; DBSA
Mechanical works PC; DBSA
Working Engineer sign-off; Written approvals;
damage PSA Yes; Works appointed
Near PSA written hospital isolation
piping controls 2 5 10 1 4 4 affecting critical Engineer;
Mechanical approvals; mechanical certificates; DBSA
causing PSA services permit Hospital
Interfaces SWMS; PTW for sign-off
failure Engineering
works affecting critical
services
Temporary Temporary works
Yes; Temporary Temporary WorksWorks Collapse of design by TWD; TWD design; 3 5 15 2 3 6
works permit Designer; PCFailure temporary works temporary works inspection records;
Scaffolding register; inspections
22 | P a g e
of Event client (1–5) (1–5) (L×S) L S Risk type) Measures Risk Trigger
(1–5) (1–5) Hazard Description Scenario Unwanted L S Raw Control (minimum requirement) Residual Residual Residual (Lr×Sr) PTW (Yes/No; Responsible Person Evidence Required
Formwork causing injury before use; temporary temporary works
Shoring structural damage works permit; permit
competent erectors
supervisors
Centralised LOTO
system; written
LOTO Incomplete
isolation certificates; Isolation
Failure isolation leading to Yes; Electrical Registered
unique lock/tag certificates; LOTO
during unexpected 2 5 10 1 4 4 isolation / LOTO Electrician;
identifiers; verification register; electrician
Electrical energisation permit CHSO
by registered verification
Work during work
electrician; LOTO
register
23 | P a g e
of Event client (1–5) (1–5) (L×S) L S Risk type) Measures Risk Trigger
(1–5) (1–5) Hazard Description Scenario Unwanted L S Raw Control (minimum requirement) Residual Residual Residual (Lr×Sr) PTW (Yes/No; Responsible Person Evidence Required
Firebreaks; liaison
Fire spreads from with neighbours; fire Fire plan;
Fire Spread No; hot works
neighbouring site watch; BTRRP Fire Safety neighbour liaison
from 2 5 10 1 4 4 permit and fire
to hospital linkage; emergency Officer; CHSO records; fuel
Adjacent Site plan required
systems BESS contact list; fuel storage cert
storage controls
Fatigue management
Fatigue substance
Contractor plan; shift rostering; HR Manager; Fatigue plan;
impairment No; HR controls
Fatigue 3 4 12 drug and alcohol 2 3 6 CHSM (if testing records;
causing errors mandatory
Impairment testing policy; pre-shift applicable/CHSO) rosters
incidents
fitness checks
24 | P a g e
of Event client (1–5) (1–5) (L×S) L S Risk type) Measures Risk Trigger
(1–5) (1–5) Hazard Description Scenario Unwanted L S Raw Control (minimum requirement) Residual Residual Residual (Lr×Sr) PTW (Yes/No; Responsible Person Evidence Required
Wildfire contingency
Bushfire
plan; stop-work
Environment encroachment Environmental
criteria; liaison with No; emergency Wildfire plan;
al Wildfire during dry season 2 5 10 1 4 4 Officer; Fire
local fire services; plan required liaison records
Risk threatening site Safety Officer
vegetation clearance
hospital
around perimeter
TMP; crane
Traffic
movement scheduling;
Management Delivery crane Yes; Traffic
emergency access TMP; movement
Failure traffic disrupts management Site Traffic
3 5 15 protection; banksmen 2 4 8 permits; traffic
Deliveries emergency access permit for major Coordinator; PC
traffic marshals; marshal LOAs
Crane causes collisions movements
temporary signage
Movements
lighting
25 | P a g e
This programme-level risk block identifies high-level risks that arise from the accelerated, multi-site rollout and the 36-month post-installation
maintenance period. Tenderers must address each programme risk in their submission by providing a concise mitigation plan (owner, actions,
resources, timeline, KPIs and evidence). The table below lists the required programme risks (P01–P05) and the minimum content the tenderer
must include in their mitigation plan.
L s
Risk Raw Risk Tenderer must submit (minimum
Risk Title One-line Description Potential Impact (1– (1–
ID (L×S) Category mitigation plan content)
Failure to mobilise sufficient Resource and mobilisation plan;
Multi-site contractors, equipment or Programme delay; cost resourcing Gantt for concurrent
Programme /
P01 Delivery resources to meet the escalation; delayed 4 4 16 sites; contingency suppliers;
Commercial
Failure accelerated multi-site patient benefit. escalation protocol; KPIs and
schedule. recovery actions.
36-month maintenance plan; spare
Inadequate maintenance
parts inventory and distribution
capacity, spare-parts System downtime; PSA
Maintenance Operational / strategy; SLA metrics
P02 logistics or SLA risk; patient safety 3 5 15
Service Failure Service (response/repair times); staffing
performance during the impact.
and training plan; escalation and
36-month support period.
reporting.
26 | P a g e
L s
Risk Raw Risk Tenderer must submit (minimum
Risk Title One-line Description Potential Impact (1– (1–
ID (L×S) Category mitigation plan content)
Missing or delayed OEM OEM data register per site; TRP
OEM Data and technical data, TRP reports Commissioning delays; evidence; FAT/SAT schedule;
Technical /
P03 TRP or commissioning safety non-compliance; 3 4 12 contractual OEM commitments and
Methodology
Source: Annexure B_DBSA Baseline Specification_RFP070.2026.pdf7.1. Risk Classification Methodology and Matrix
Aligned with ISO 31010 and ISO 45001. Risks are assessed using Severity (S) and
Likelihood (L).
Widespread outages;
multiple sites (e.g., extreme plan; mutual aid agreements; surge
Concurrent inability to respond; Resilience /
P05 weather, flood, wildfire) that 2 5 10 resourcing plan; prioritisation
13.1. Methodology
Raw Risk is calculated as L × S before controls.
Residual Risk is calculated as Lr × Sr after the minimum client controls are applied.
The Principal Contractor must complete the HIRA by: (a) confirming acceptance of
the minimum controls, (b) adding any additional controls they will implement, (c)
scoring PC Residual L and PC Residual S, and (d) uploading evidence files
referenced in the Evidence Required column.
immediate supervision or stop-work until controls are verified.
28 | P a g e
Compliance Requirements
Source: Annexure B_DBSA Baseline Specification_RFP070.2026.pdf (unknown)Availability procedures across multiple withheld energisation. delivery milestones; acceptance sites. criteria. Failure of remote telemetry, Undetected faults; Central monitoring architecture; Centralised central monitoring or alarm delayed response to Technical / redundancy and failover plan; alarm P04 Monitoring 3 5 15 aggregation for BESS/PV thermal or electrical Safety escalation matrix; monitoring SLA; Failure across sites. events. test plan and acceptance criteria. Simultaneous incidents at Multi-site emergency response Widespread outages; multiple sites (e.g., extreme plan; mutual aid agreements; surge Concurrent inability to respond; Resilience / P05 weather, flood, wildfire) that 2 5 10 resourcing plan; prioritisation Critical Events reputational and clinical Emergency overwhelm response matrix; insurance and contingency risk. capacity. funding arrangements. 27 | P a g e
Risk Register 13.1. Methodology
Raw Risk is calculated as L × S before controls.
Residual Risk is calculated as Lr × Sr after the minimum client controls are applied.
The Principal Contractor must complete the HIRA by: (a) confirming acceptance of the minimum controls, (b) adding any additional controls they will implement, (c) scoring PC Residual L and PC Residual S, and (d) uploading evidence files referenced in the Evidence Required column.
Action thresholds: Raw or Residual scores ≥11 are High or Critical and require immediate supervision or stop-work until controls are verified. 28 | P a g e
Risk Register Impact Action Controls level)ID Title (L×S) Category (1–5) (1–5)Risk Risk Description Potential L S Raw Risk Existing (High Required (Client expectation) Owner Review Frequency Works, damage or Mandatory written commissioning approvals for any Patient harm; Hospital Hospital error causes PSA work; Weekly during clinical approvals; Engineering / PSA Oxygen partial/complete Clinical / pre-works works; R01 escalation; 2 5 10 isolation SOPs; DBSA Supply Interruption loss or Operational verification; immediate legal DBSA Engineer appointed contamination of redundant supply pre-works exposure oversight Engineer hospital PSA checks; emergency oxygen response drill OEM TRP, PC Project Prior to first Battery cell/module Require OEM TRP Evacuation; BESS Thermal Safety / BMS, ventilation Manager; charge; monthly thermal event evidence; BTRRPR02 facility loss; 3 5 15 Runaway Technical requirements BESS OEM during propagates integrated with patient risk (baseline) Rep commissioning causing fire, toxic ERP; FAT/SAT 29 | P a g e Impact Action Controls level)ID Title (L×S) Category (1–5) (1–5)Risk Risk Description Potential L S Raw Risk Existing (High Required (Client expectation) Owner Review Frequency gas and facility witness; damage energisation PTW DC string faults, Registered Enforce SANS/IEC arc flash or Severe electricians; compliance; Registered PV / DC Electrical incorrect isolation burns; fire; Safety / Daily during R03 3 4 12 LOTO baseline; arc-flash study; Electrician; Incident during equipment Electrical electrical works electrical LOTO verification; CHSO installation/commis damage standards energisation PTW sioning Service Mandatory utility Wayleave Striking outages; Excavation Daily for verification; Excavation / checks; undergroundR04 explosion; 4 4 16 Civil / Safety Supervisor; excavation hand-digging near Service Strike CAT/GPR services (power, structural TWD activities services; recommended oxygen damage excavation permit; 30 | P a g e
Health & Safety
Source: Annexure B_DBSA Baseline Specification_RFP070.2026.pdfRisk assessment (hira)/baseline
Risk assessment (bra)—
Project Information ........................................................................................ 4
Context and Background ............................................................................... 4
Contract Duration and Programme Timelines ............................................... 4
Scope of Work ................................................................................................ 5
Key activities included: .................................................................................. 5
Legal Framework ............................................................................................ 6
6.1. Primary legislation and standards to be applied ................................... 6
7.1. Risk Classification Methodology and Matrix .......................................... 6
8.1. Purpose ................................................................................................... 9
13.1. Methodology ...................................................................................... 28
Risk Register ............................................................................................ 29
Monitoring and Review Procedures ......................................................... 38
15.1. Monitoring frequency ........................................................................ 38
15.2. Review triggers .................................................................................. 38
15.3. Programme Monitoring and Maintenance Reporting ....................... 38
Recordkeeping .......................................................................................... 38
Responsibilities ........................................................................................ 38
Control Measures (Hierarchy of Controls) ............................................... 39
18.1. Hierarchy applied in order of preference: ......................................... 39
2 | P a g e
20.1. Annexure A: Programme Risk Mitigation Template .......................... 39
Final Notes and Tender Instructions ........................................................ 40
Principal Contractor Acknowledgement and Acceptance ....................... 40
Principal Contractor Declaration .............................................................. 41
For Client Use Only .................................................................................. 42
3 | P a g e
Project: DBSA-NDoH-GF PSA OXYGEN PLANTS — Cluster 2Hospital Projects
Project Sites (Cluster 2): Bela-Bela Hospital; Jubilee Hospital; Seshego Hospital;
Mecklenburg Hospital; Lydenburg (Mashishing) Hospital; Sabie Hospital; Tintswalo Hospital;
Document: Project Health and Safety Risk Assessment (Baseline Risk Assessment)
(Project HIRA / BRA) — DBSA-NDoH-GF PSA OXYGEN PLANTS Cluster 2 Hospital
6.1. Primary legislation and standards to be applied
Occupational Health and Safety Act and associated regulations.
Construction Regulations 2014 (CR) — duties of Client, Principal Contractor and
contractors; PHSP and H&S File requirements.
regulations.
SANS 10142-1, iec 62446, iec 62109, iec 62619).
Local municipal bylaws and hospital site rules.
Contract documents and Section 37(2) Health & Safety Agreement where applicable.
1 – Rare: May occur only in exceptional circumstances.
2 – Unlikely: Could happen but not expected during project.
3 – Possible: Might occur at some time during works.
4 – Likely: Will probably occur in most circumstances.
5 – Almost Certain: Expected to occur frequently or regularly.
Risk Rating = Severity × Likelihood
7 | P a g e
8.1. Purpose
Provide a client-side baseline HIRA (BRA) that identifies project hazards, assigns raw risk
scores, prescribes minimum controls required from the Principal Contractor, and sets
expected residual risk targets and evidence required for tender evaluation and PHSP
acceptance.
of Event client (1–5) (1–5) (L×S) L S Risk type) Measures Risk Trigger
(1–5) (1–5) Hazard Description Scenario Unwanted L S Raw Control (minimum requirement) Residual Residual Residual (Lr×Sr) PTW (Yes/No; Responsible Person Evidence Required
OEM TRP report;
BMS redundancy;
Yes; Battery
thermal sensors and PC Project OEM TRP; BMS
BESS alarms; ventilation; Manager; BESS test logs; BTRRP;
propagation Thermal
Thermal 3 5 15 OEM-endorsed 2 4 8 OEM Rep; FAT/SAT witness
causing fire, toxic runaway permit;
Runaway BTRRP integrated CHSM(if statement;
gas, facility loss Energisation
with ERP; FAT/SAT applicable/CHSO) energisation PTW
Ptw
witness; energisation
Ptw
PSA Oxygen Yes; Works Works or Written hospital
PC; Hospital Written approvals;Plant 2 5 10 1 4 4 affecting critical energisation approvals; isolation
Engineering; isolationInterruption services permit interrupt or SOPs; redundant
10 | P a g e
of Event client (1–5) (1–5) (L×S) L S Risk type) Measures Risk Trigger
(1–5) (1–5) Hazard Description Scenario Unwanted L S Raw Control (minimum requirement) Residual Residual Residual (Lr×Sr) PTW (Yes/No; Responsible Person Evidence Required
contaminate PSA supply checks; DBSA appointed certificates; DBSA
supply causing schedule works Engineer sign-off
patient harm outside clinical
windows; DBSA
11 | P a g e
of Event client (1–5) (1–5) (L×S) L S Risk type) Measures Risk Trigger
(1–5) (1–5) Hazard Description Scenario Unwanted L S Raw Control (minimum requirement) Residual Residual Residual (Lr×Sr) PTW (Yes/No; Responsible Person Evidence Required
Detailed lift plans;
ground bearing tests; Lifting Supervisor;
Lifting Crane Dropped load or Lift plan; crane test
exclusion zones; Yes; Lifting / Crane Operator;
Operations crane failure cert; ground test
3 5 15 banksman; TMP; 2 4 8 Crane operation DBSA appointed
near Hospital impacting patients report; banksman
Strike of power Utility verification; as-builtExcavation Excavation
oxygen reticulation Yes; Excavation confirmations; records; CAT/GPRStrike to Supervisor; TWD;
or services 4 4 16 2 3 6 / Trenching CAT/GPR reports; scanning;Underground Registered
causing outage permit shoring design; hand-digging nearServices Electrician
release collapse excavation permit services; TWD shoring
design; excavation
12 | P a g e
of Event client (1–5) (1–5) (L×S) L S Risk type) Measures Risk Trigger
(1–5) (1–5) Hazard Description Scenario Unwanted L S Raw Control (minimum requirement) Residual Residual Residual (Lr×Sr) PTW (Yes/No; Responsible Person Evidence Required
permit; daily
inspections
Hot works ignite Hot works permit; fire
fuel or watch; exclusion
Hot Works Fire Safety Hot works permit;
combustibles zones; fuel bunding; Yes; Hot works
Ignition near 3 4 12 2 3 6 Officer; Hot fire watch log; fuel
causing fire fire extinguishers; permit
Battery Dropped module Handling SOP; Mechanical lifting Yes; Lifting
Module or strain injury Lifting Supervisor; training records; aids; OEM handling 3 3 9 2 2 4 permit for
Manual during handling BESS OEM Rep lifting equipment SOPs; certified lifting modules
Handling installation certs fixtures; SWMS;
13 | P a g e
of Event client (1–5) (1–5) (L×S) L S Risk type) Measures Risk Trigger
(1–5) (1–5) Hazard Description Scenario Unwanted L S Raw Control (minimum requirement) Residual Residual Residual (Lr×Sr) PTW (Yes/No; Responsible Person Evidence Required
trained handlers;
medical surveillance
Mobile Yes; Traffic Site TMP; segregated rollover near Fleet Manager; TMP; operator
Equipment management routes; ROPS and hospital access 3 4 12 2 3 6 Site Traffic certificates; pre-op
Collision permit for major seat belts; operator blocking access Coordinator check logs
Rollover movements competence LOAs; injuring persons
14 | P a g e
of Event client (1–5) (1–5) (L×S) L S Risk type) Measures Risk Trigger
(1–5) (1–5) Hazard Description Scenario Unwanted L S Raw Control (minimum requirement) Residual Residual Residual (Lr×Sr) PTW (Yes/No; Responsible Person Evidence Required
pre-op checks; speed
limits
control; temporary
screens
SDS on site; bunded Yes; Hazardous SDS; spill drill
EnvironmentalChemical Spill vapour storage; spill kits and 3 4 12 2 3 6 chemical records; waste
Officer; CHSOExposure exposure causing trained responders; handling permit disposal receipts
PPE; chain-of-custody
15 | P a g e
of Event client (1–5) (1–5) (L×S) L S Risk type) Measures Risk Trigger
(1–5) (1–5) Hazard Description Scenario Unwanted L S Raw Control (minimum requirement) Residual Residual Residual (Lr×Sr) PTW (Yes/No; Responsible Person Evidence Required
Electrolyte burns respiratory for battery waste;
excavation or kN impact; night PC Site Security; Barrier photos;
Pedestrian No; site security
exposed hazard 4 5 20 illumination; signage; 1 3 3 Community lighting plan;
injury community liaison;
public notices
Schedule noisy works High noise during No; works
Noise Noise mitigation outside critical critical clinical scheduling Site Manager;
Impact on 4 2 8 2 1 2 plan; notification windows; acoustic windows affecting approval CHSO
Patients records screens; temporary patient care required
enclosures; notify
16 | P a g e
of Event client (1–5) (1–5) (L×S) L S Risk type) Measures Risk Trigger
(1–5) (1–5) Hazard Description Scenario Unwanted L S Raw Control (minimum requirement) Residual Residual Residual (Lr×Sr) PTW (Yes/No; Responsible Person Evidence Required
hospital; PPE for
workers
WBGT monitoring;
work-rest schedules; WBGT logs;
outdoor works No; medical CHSM (if
Heat Stress hydration stations; work-rest
causing 3 3 9 2 2 4 surveillance applicable)/CHSO
for Workers acclimatisation schedules; medical
exhaustion heat required ; Site Medic
records; shaded rest records
stroke
areas; first aid
Tool tethering;
Tool Dropped tool No; included in
exclusion zones under Construction
Equipment strikes personnel WAH permit Tool tether register;
3 3 9 work at height; PPE; 2 2 4 Supervisor;
exposure emergency procedure
18 | P a g e
of Event client (1–5) (1–5) (L×S) L S Risk type) Measures Risk Trigger
(1–5) (1–5) Hazard Description Scenario Unwanted L S Raw Control (minimum requirement) Residual Residual Residual (Lr×Sr) PTW (Yes/No; Responsible Person Evidence Required
Prestart area checks;
snake awareness
training; first aid and
Venomous during clearing Training records;
medevac plan; No; biohazard
Snake Bite excavation in Site Supervisor; medevac plan;
3 3 9 antivenom readiness 2 2 4 controls
safety risk during heavy rain;
19 | P a g e
of Event client (1–5) (1–5) (L×S) L S Risk type) Measures Risk Trigger
(1–5) (1–5) Hazard Description Scenario Unwanted L S Raw Control (minimum requirement) Residual Residual Residual (Lr×Sr) PTW (Yes/No; Responsible Person Evidence Required
secure storage; daily
weather monitoring
Secure compound;
Construction coordination withInfectious No; hospital Environmental Infection control
activity increases hospital; dustContaminatio 3 4 12 2 3 6 infection control Officer; Hospital sign-off; waste
infection risk to suppression;n Risk sign-off required Infection Control records
patients restricted access near
clinical areas; PPE
20 | P a g e
of Event client (1–5) (1–5) (L×S) L S Risk type) Measures Risk Trigger
(1–5) (1–5) Hazard Description Scenario Unwanted L S Raw Control (minimum requirement) Residual Residual Residual (Lr×Sr) PTW (Yes/No; Responsible Person Evidence Required
and hygiene stations;
waste segregation
Mechanical aids;
electrician; LOTO
register
23 | P a g e
of Event client (1–5) (1–5) (L×S) L S Risk type) Measures Risk Trigger
(1–5) (1–5) Hazard Description Scenario Unwanted L S Raw Control (minimum requirement) Residual Residual Residual (Lr×Sr) PTW (Yes/No; Responsible Person Evidence Required
Firebreaks; liaison
Fire spreads from with neighbours; fire Fire plan;
Fire Spread No; hot works
neighbouring site watch; BTRRP Fire Safety neighbour liaison
from 2 5 10 1 4 4 permit and fire
to hospital linkage; emergency Officer; CHSO records; fuel
criteria; liaison with No; emergency Wildfire plan;
al Wildfire during dry season 2 5 10 1 4 4 Officer; Fire
local fire services; plan required liaison records
movement scheduling;
Management Delivery crane Yes; Traffic
emergency access TMP; movement
3 5 15 protection; banksmen 2 4 8 permits; traffic
Deliveries emergency access permit for major Coordinator; PC
traffic marshals; marshal LOAs
parts inventory and distribution
capacity, spare-parts System downtime; PSA
Maintenance Operational / strategy; SLA metrics
P02 logistics or SLA risk; patient safety 3 5 15
Service Failure Service (response/repair times); staffing
performance during the impact.
and training plan; escalation and
36-month support period.
reporting.
26 | P a g e
L s
Risk Raw Risk Tenderer must submit (minimum
Risk Title One-line Description Potential Impact (1– (1–
ID (L×S) Category mitigation plan content)
Missing or delayed OEM OEM data register per site; TRP
OEM Data and technical data, TRP reports Commissioning delays; evidence; FAT/SAT schedule;
P03 TRP or commissioning safety non-compliance; 3 4 12 contractual OEM commitments and
Compliance
Availability procedures across multiple withheld energisation. delivery milestones; acceptance
sites. criteria.
Failure of remote telemetry, Undetected faults; Central monitoring architecture;
central monitoring or alarm delayed response to Technical / redundancy and failover plan; alarm
P04 Monitoring 3 5 15
aggregation for BESS/PV thermal or electrical Safety escalation matrix; monitoring SLA;
commissioning approvals for any
Patient harm; Hospital Hospital
error causes PSA work; Weekly during
clinical approvals; Engineering /
PSA Oxygen partial/complete Clinical / pre-works works;
R01 escalation; 2 5 10 isolation SOPs; DBSA
Supply Interruption loss or Operational verification; immediate
legal DBSA Engineer appointed
contamination of redundant supply pre-works
exposure oversight Engineer
hospital PSA checks; emergency
oxygen response drill
OEM TRP, PC Project Prior to first Battery cell/module Require OEM TRP Evacuation;
BESS Thermal Safety / BMS, ventilation Manager; charge; monthly thermal event evidence; BTRRPR02 facility loss; 3 5 15
arc flash or Severe
electricians; compliance; Registered
PV / DC Electrical incorrect isolation burns; fire; Safety / Daily during
R03 3 4 12 LOTO baseline; arc-flash study; Electrician;
electrical LOTO verification; CHSO
installation/commis damage
standards energisation PTW
sioning
Service Mandatory utility Wayleave Striking outages; Excavation Daily for verification; Excavation / checks; undergroundR04 explosion; 4 4 16 Civil / Safety Supervisor; excavation hand-digging near Service Strike CAT/GPR services (power, structural TWD activities services; recommended oxygen damage excavation permit;
30 | P a g e
Section
Source: Annexure B_DBSA Baseline Specification_RFP070.2026.pdf▪ Re-score residual risk.
scores, prescribes minimum controls required from the Principal Contractor, and sets
expected residual risk targets and evidence required for tender evaluation and PHSP
Contact Information
Source: RFP069-070.2026_Volume 2 of 3_Tender Returnable.pdf (RFP){"name":"MS Teams","email":null,"phone":null,"department":null,"address":"....................."}
Submission Guidelines
Source: RFP069-070.2026_Volume 2 of 3_Tender Returnable.pdf (RFP)Returnable Documents: ____________________________ ______________________________ (Signature) (Date) of 33 Volume Part T2 Tender Returnable Version 1.0 Tender No. RFP069-070/2026 VOLUME APPOINTMENT OF SERVICE PROVIDERS FOR THE DESIGN, SUPPLY, INSTALLATION, COMMISSIONING AND MAINTENANCE TENDER RETURNABLES OF SOLAR-POWERED BACKUP SYSTEMS AT TWENTY (20) HOSPITAL FACILITIES RECEIVING PRESSURE SWING ADSORPTION (PSA) OXYGEN GENERATING PLANTS CLUSTER 1 (069) AND CLUSTER 2 (070) PART T2.1.9: PROOF OF REGISTRATION WITH CSD & CIDB IT IS A CONDITION OF THIS TENDER THAT THE TENDERER MUST BE REGISTERED WITH CSD AND VALID/COMPLIANT WITH CIDB (IF APPLICABLE) AT TENDER CLOSURE AND FURTHER; THE SUCCESSFUL TENDERER MUST BE IN COMPLIANT STANDING WITH CIDB (IF APPLICABLE) AND CSD PRIOR TO CONDITIONAL APPOINTMENT. The Tenderer shall attach hereto its, Registration of the National Treasury Central Supplier Database (CSD). ii. Valid Registration Certificate of the Construction Industry Development Board (CIDB). iii. In the case of Consortium/Joint Venture Tenders, each partner shall provide their own valid CIDB registration certificate and CSD registration, including for the Consortium/Joint Venture. Failure to submit the above will result in the invalidation/ disqualification of the tender submission as per stipulated criteria in the Responsiveness Evaluation. Registration on the Central Supplier Database (CSD) site of the National Treasury is a compulsory requirement for a tenderer to conduct business with the DBSA. The onus is on each tenderer to register on the CSD site and provide proof of registration on the CSD site in the form of a report as prescribed in this returnable. I, ______________________________________ of ______________________________________, (Authorised Signatory) (Company Name) Hereby acknowledge having read, understood, and agree to the terms and conditions set out in this Returnable and warrant that the documents submitted are true and accurate copies of the originals. ____________________________ ______________________________ (Signature) (Date) of 33 Volume Part T2 Tender Returnable Version 1.0 Tender No. RFP069-070/2026 VOLUME APPOINTMENT OF SERVICE PROVIDERS FOR THE DESIGN, SUPPLY, INSTALLATION, COMMISSIONING AND MAINTENANCE TENDER RETURNABLES OF SOLAR-POWERED BACKUP SYSTEMS AT TWENTY (20) HOSPITAL FACILITIES RECEIVING PRESSURE SWING ADSORPTION (PSA) OXYGEN GENERATING PLANTS CLUSTER 1 (069) AND CLUSTER 2 (070) PART T2.1.10: TAX REQUIREMENT IT IS A CONDITION OF THIS TENDER THAT THE TAXES OF THE SUCCESSFUL TENDERER MUST BE IN ORDER PRIOR TO CONDITIONAL APPOINTMENT., The Tax Pin issued by the South African Revenue Services must be submitted together with this tender and appended to this page. Failure to submit the Tax Pin will result in the invalidation/ disqualification of the tender submission as per stipulated criteria in the Risk Analysis and Other Objective Criteria. ii. Valid Tax Compliance is a mandatory requirement for the successful bidder prior to appointment, to be awarded a contract in terms of this tender. iii. Where Joint Ventures/ Consortia/ Associations, etc. are involved, the Tax Compliance status will be based on all the Joint Venture Partners status. The Tax Compliance status documentation of all the Joint Venture Partners is to be appended to this page. Any tax non- compliance of any party will require a bidder to provide fully compliant tax status for any award to be made. iv. Bidders are expected to have their tax affairs in order, to be able to do business with the DBSA. I, ______________________________________ of ______________________________________, (Authorised Signatory) (Company Name) Hereby acknowledge having read, understood, and agree to the terms and conditions set out in this Returnable and warrant that the documents submitted are true and accurate copies of the originals. ____________________________ ______________________________ (Signature) (Date) of 33 Volume Part T2 Tender Returnable Version 1.0 Tender No. RFP069-070/2026 VOLUME APPOINTMENT OF SERVICE PROVIDERS FOR THE DESIGN, SUPPLY, INSTALLATION, COMMISSIONING AND MAINTENANCE TENDER RETURNABLES OF SOLAR-POWERED BACKUP SYSTEMS AT TWENTY (20) HOSPITAL FACILITIES RECEIVING PRESSURE SWING ADSORPTION (PSA) OXYGEN GENERATING PLANTS CLUSTER 1 (069) AND CLUSTER 2 (070) PART T2.1.11: REGISTRATION CERTIFICATES/ AGREEMENTS/ IDENTITY DOCUMENTS The DBSA reserves the right to request the following documents, and shall be retained as per the POPIA Act, Certified copies of Identity Documents for Partnerships, Sole proprietors etc.; ii. Signed Agreements and Powers of Attorney for Joint Venture / Consortium/ Partnership if applicable. iii. Complete disclosure of Shareholding of the tenderer. iv. Any other relevant information to risk mitigation. If the above documentation is not included in the tender submission, the tenderer will not be disqualified. Utilisation thereof forms part of the Risk Analysis and Other Objective Criteria. Therefore applicable bidders will be required to provide such within 48 hours of request. Non-submission hereof will deem your tender non-responsive at Risk Analysis and Other Objective Criteria. I, ______________________________________ of ______________________________________, (Authorised Signatory) (Company Name) Hereby acknowledge having read, understood, and agree to the terms and conditions set out in this Returnable and warrant that the documents submitted are true and accurate copies of the originals. ____________________________ ______________________________ (Signature) (Date) of 33 Volume Part T2 Tender Returnable Version 1.0 Tender No. RFP069-070/2026 VOLUME APPOINTMENT OF SERVICE PROVIDERS FOR THE DESIGN, SUPPLY, INSTALLATION, COMMISSIONING AND MAINTENANCE TENDER RETURNABLES OF SOLAR-POWERED BACKUP SYSTEMS AT TWENTY (20) HOSPITAL FACILITIES RECEIVING PRESSURE SWING ADSORPTION (PSA) OXYGEN GENERATING PLANTS CLUSTER 1 (069) AND CLUSTER 2 (070) PART T2.1.12: WORKMEN’S COMPENSATION REGISTRATION (COIDA) IT IS A CONDITION OF THIS TENDER THAT THE SUCCESSFUL TENDERER MUST HAVE A VALID AND COMPLIANT COIDA PRIOR TO CONDITIONAL APPOINTMENT. Attach hereto copy of, Proof of Workmen’s Compensation Registration; ii. Note that proof of payment of contributions in terms of the Compensation of Occupational Injuries and Diseases Act, No. ) is not an acceptable form of proof for COIDA registration. If the above documentation is not included in the tender submission, the tenderer will not be disqualified. Utilisation thereof forms part of the Risk Analysis and Other Objective Criteria (if applicable). Therefore applicable bidders will be required to provide such within 48 hours of request. Non-submission hereof will deem your tender non-responsive at Risk Analysis and Other Objective Criteria I, ______________________________________ of ______________________________________, (Authorised Signatory) (Company Name) Hereby acknowledge having read, understood, and agree to the terms and conditions set out in this Returnable and warrant that the documents submitted are true and accurate copies of the originals. ____________________________ ______________________________ (Signature) (Date) of 33 Volume Part T2 Tender Returnable Version 1.0 Tender No. RFP069-070/2026 VOLUME APPOINTMENT OF SERVICE PROVIDERS FOR THE DESIGN, SUPPLY, INSTALLATION, COMMISSIONING AND MAINTENANCE TENDER RETURNABLES OF SOLAR-POWERED BACKUP SYSTEMS AT TWENTY (20) HOSPITAL FACILITIES RECEIVING PRESSURE SWING ADSORPTION (PSA) OXYGEN GENERATING PLANTS CLUSTER 1 (069) AND CLUSTER 2 (070) PART T2.1.13: UNEMPLOYMENT INSURANCE FUND (UIF) – REGISTRATION CERTIFICATE (ACT ) IT IS A CONDITION OF THIS TENDER THAT THE SUCCESSFUL TENDERER MUST HAVE A VALID UIF REGISTRATION CERTIFICATE PRIOR TO CONDITIONAL APPOINTMENT. Attach hereto copy of, Proof of Tenderer’s Unemployment Insurance Fund (UIF) Registration Certificate; or If the above documentation is not included in the tender submission, the tenderer will not be disqualified. Utilisation thereof forms part of the Risk Analysis and Other Objective Criteria (if applicable). Therefore applicable bidders will be required to provide such within 48 hours of request. Non-submission hereof will deem your tender non-responsive at Risk Analysis and Other Objective Criteria I, ______________________________________ of ______________________________________, (Authorised Signatory) (Company Name) Hereby acknowledge having read, understood, and agree to the terms and conditions set out in this Returnable and warrant that the documents submitted are true and accurate copies of the originals. ____________________________ ______________________________ (Signature) (Date) of 33 Volume Part T2 Tender Returnable Version 1.0 Tender No. RFP069-070/2026 VOLUME APPOINTMENT OF SERVICE PROVIDERS FOR THE DESIGN, SUPPLY, INSTALLATION, COMMISSIONING AND MAINTENANCE TENDER RETURNABLES OF SOLAR-POWERED BACKUP SYSTEMS AT TWENTY (20) HOSPITAL FACILITIES RECEIVING PRESSURE SWING ADSORPTION (PSA) OXYGEN GENERATING PLANTS CLUSTER 1 (069) AND CLUSTER 2 (070) PART T2.1.14: SBD6.1: BROAD BASED BLACK EMPOWERMENT STATUS LEVEL CERTIFICATE PREFERENCE POINTS CLAIM FORM IN TERMS OF THE PREFERENTIAL PROCUREMENT REGULATIONS 2022 This preference form must form part of all tenders invited. It contains general information and serves as a claim form for preference points for specific goals. NB: BEFORE COMPLETING THIS FORM, TENDERERS MUST STUDY THE GENERAL CONDITIONS, DEFINITIONS AND DIRECTIVES APPLICABLE IN RESPECT OF THE TENDER AND PREFERENTIAL PROCUREMENT REGULATIONS, 2022, GENERAL CONDITIONS 1.1 The following preference point systems are applicable to invitations to tender: Either the 90/10 or 80/20 preference point system will be applicable in this tender. The lowest/ highest acceptable tender will be used to determine the accurate system once tenders are received 1.2 To be completed by the organ of state (Tick applicable Threshold), The applicable preference point system for this tender is the 90/10 preference point system, The applicable preference point system for this tender is the 80/20 preference point system, Either the 90/10 or 80/20 preference point system will be applicable in this tender. The lowest/ highest acceptable tender will be used to determine the accurate system once tenders are received: 1.3 Points for this tender (even in the case of a tender for income-generating contracts) shall be awarded for: (a) Price; and (b) Specific Goals (namely, BBBEE status level of contributor). 1.4 To be completed by the organ of state: The maximum points for this tender are allocated as selected: Tick applicable Threshold: POINTS POINTS PRICE 80 90 SPECIFIC GOALS 20 10 Total points for Price and SPECIFIC GOALS 100 100 Applicable RFP of 33 Volume Part T2 Tender Returnable Version 1.0 Tender No. RFP069-070/2026 VOLUME APPOINTMENT OF SERVICE PROVIDERS FOR THE DESIGN, SUPPLY, INSTALLATION, COMMISSIONING AND MAINTENANCE TENDER RETURNABLES OF SOLAR-POWERED BACKUP SYSTEMS AT TWENTY (20) HOSPITAL FACILITIES RECEIVING PRESSURE SWING ADSORPTION (PSA) OXYGEN GENERATING PLANTS CLUSTER 1 (069) AND CLUSTER 2 (070) 1.5 Failure on the part of a tenderer to submit proof or documentation required in terms of this tender to claim points for specific goals with the tender, will be interpreted to mean that preference points for specific goals are not claimed. 1.6 The organ of state reserves the right to require of a tenderer, either before a tender is adjudicated or at any time subsequently, to substantiate any claim in regard to preferences, in any manner required by the organ of state., DEFINITIONS (a) “tender” means a written offer in the form determined by an organ of state in response to an invitation to provide goods or services through price quotations, competitive tendering process or any other method envisaged in legislation; (b) “price” means an amount of money tendered for goods or services, and includes all applicable taxes less all unconditional discounts; (c) “rand value” means the total estimated value of a contract in Rand, calculated at the time of bid invitation, and includes all applicable taxes; (d) “tender for income-generating contracts” means a written offer in the form determined by an organ of state in response to an invitation for the origination of income-generating contracts through any method envisaged in legislation that will result in a legal agreement between the organ of state and a third party that produces revenue for the organ of state, and includes, but is not limited to, leasing and disposal of assets and concession contracts, excluding direct sales and disposal of assets through public auctions; and (e) “the Act” means the Preferential Procurement Policy Framework Act, 2000 (Act No. )., FORMULAE FOR PROCUREMENT OF GOODS AND SERVICES 3.1. POINTS AWARDED FOR PRICE 3.1.1 THE 80/20 OR 90/10 PREFERENCE POINT SYSTEMS A maximum of 80 or 90 points is allocated for price on the following basis: 80/20 or 90/10 Pt−Pmin Pt−Pmin Ps= 80(1− ) or Ps= 90(1− ) Pmin Pmin Where Ps = Points scored for price of tender under consideration Pt = Price of tender under consideration Pmin = Price of lowest acceptable tender of 33 Volume Part T2 Tender Returnable Version 1.0 Tender No. RFP069-070/2026 VOLUME APPOINTMENT OF SERVICE PROVIDERS FOR THE DESIGN, SUPPLY, INSTALLATION, COMMISSIONING AND MAINTENANCE TENDER RETURNABLES OF SOLAR-POWERED BACKUP SYSTEMS AT TWENTY (20) HOSPITAL FACILITIES RECEIVING PRESSURE SWING ADSORPTION (PSA) OXYGEN GENERATING PLANTS CLUSTER 1 (069) AND CLUSTER 2 (070) 3.2. FORMULAE FOR DISPOSAL OR LEASING OF STATE ASSETS AND INCOME GENERATING PROCUREMENT 3.2.1. POINTS AWARDED FOR PRICE A maximum of 80 or 90 points is allocated for price on the following basis: 80/20 or 90/10 Pt−Pmax Pt−Pmax Ps= 80(1+ ) or Ps= 90(1+ ) Pmax Pmax Where Ps = Points scored for price of tender under consideration Pt = Price of tender under consideration Pmax = Price of highest acceptable tender, POINTS AWARDED FOR SPECIFIC GOALS 4.1. In terms of Regulation 4(2); 5(2); 6(2) and 7(2) of the Preferential Procurement Regulations, preference points must be awarded for specific goals stated in the tender. For the purposes of this tender the tenderer will be allocated points based on the goals stated in table 1 below as may be supported by proof/ documentation stated in the conditions of this tender: 4.2. In cases where organs of state intend to use Regulation 3(2) of the Regulations, which states that, if it is unclear whether the 80/20 or 90/10 preference point system applies, an organ of state must, in the tender documents, stipulate in the case of— (a) an invitation for tender for income-generating contracts, that either the 80/20 or 90/10 preference point system will apply and that the highest acceptable tender will be used to determine the applicable preference point system; or (b) any other invitation for tender, that either the 80/20 or 90/10 preference point system will apply and that the lowest acceptable tender will be used to determine the applicable preference point system, then the organ of state must indicate the points allocated for specific goals for both the 90/10 and 80/20 preference point system. Table 1: Specific goals for the tender and points claimed are indicated per the table below. (Note to organs of state: Where either the 90/10 or 80/20 preference point system is applicable, corresponding points must also be indicated as such. of 33 Volume Part T2 Tender Returnable Version 1.0 Tender No. RFP069-070/2026 VOLUME APPOINTMENT OF SERVICE PROVIDERS FOR THE DESIGN, SUPPLY, INSTALLATION, COMMISSIONING AND MAINTENANCE TENDER RETURNABLES OF SOLAR-POWERED BACKUP SYSTEMS AT TWENTY (20) HOSPITAL FACILITIES RECEIVING PRESSURE SWING ADSORPTION (PSA) OXYGEN GENERATING PLANTS CLUSTER 1 (069) AND CLUSTER 2 (070) Note to tenderers: The tenderer must indicate how they claim points for each preference point system.) Number of Number of Number of Number of The specific points points claimed points points claimed goals (80/20 system) (90/10 system) allocated allocated allocated (To be (To be points in terms (80/20 system) (90/10 system) completed by the completed by the of this tender tenderer) tenderer) 1 20 10 2 18 9 3 14 6 4 12 5 5 8 4 6 6 3 7 4 2 8 2 1 Non-compliant 0 0 contributor (Note: Bidders are required to submit their Valid B-BBEE certificate issued by a SANAS accredited verification agency / sworn affidavit / CIPC affidavit (in the case of EMEs/QSEs) to prove ownership percentage, in order to be eligible to claim points) DECLARATION WITH REGARD TO COMPANY/FIRM 4.3. Name of company/firm............................................................................... 4.4. Company registration number: ..................................................................... 4.5. TYPE OF COMPANY/ FIRM [TICK APPLICABLE BOX] Partnership/Joint Close Personal Liability Non-Profit Venture / Consortium corporation Company Company One-person Public Company (Pty) Limited State Owned business/sole propriety Company 4.6. I, the undersigned, who is duly authorised to do so on behalf of the company/firm, certify that the points claimed, based on the specific goals as advised in the tender, qualifies the company/ firm for the preference(s) shown and I acknowledge that, The information furnished is true and correct; of 33 Volume Part T2 Tender Returnable Version 1.0
Evaluation Criteria
Source: RFP069-070.2026_Volume 2 of 3_Tender Returnable.pdf (RFP)Mandatory
Conditional
Technical Specifications
Source: RFP069-070.2026_Volume 2 of 3_Tender Returnable.pdf (RFP)of the work and explanations given at the
Experience & Qualifications
Source: RFP069-070.2026_Volume 2 of 3_Tender Returnable.pdf“competitor” shall include any individual or organisation, other than the Tenderer, whether
affiliated with the Tenderer, who:
a) has been requested to submit a Tender in response to this Tender invitation;
b) could potentially submit a Tender in response to this Tender invitation, based on their
qualifications, abilities, or experience; and
c) provides the same Services as the Tenderer and/or is in the same line of business as the
Pricing Schedule
Source: RFP069-070.2026_Volume 2 of 3_Tender Returnable.pdfthe work and all aspects that could influence either the cost or the construction of the services prior to
determining our rates and prices.
Compliance Requirements
Source: RFP069-070.2026_Volume 2 of 3_Tender Returnable.pdf (RFP)CIDB grading/category: 22 T
CIDB 22 t
Tax Compliance is a mandatory requirement for the successful bidder prior to
Tax Compliance status
CSD registration, including for the Consortium/Joint Venture
Central Supplier Database (CSD)
Central Supplier Database (CSD) site of the National Treasury is a compulsory requirement
power of attorney signed by legally authorized
Certificates / Agreements / Identity Documents 24
T2.1.12 Workmen’s Compensation Registration (COIDA) 25
T2.1.9 Proof of Registration with CSD & CIDB 22
T2.1.11 Registration Certificates / Agreements / Identity Documents 24
invalidation/ disqualification of the tender submission as per stipulated criteria in the Risk
ii. Valid Tax Compliance is a mandatory requirement for the successful bidder prior to
iii. Where Joint Ventures/ Consortia/ Associations, etc. are involved, the Tax Compliance status
will be based on all the Joint Venture Partners status. The Tax Compliance status
Points Allocation: 90 points
B-BBEE Details: must be done in an open and fair manner that supports and drives a competitive economy.
Underpinning our process are several acts and policies that any service provider dealing with DBSA
must understand and support. These are:
Procurement and Supply Chain Management: fair, equitable, transparent, competitive, and cost
effective;
management, storage, and protection of personal information in order to protect an individual's
right to privacy. Please refer to the DBSA website for the Privacy Statement (Contractors,
Consultants and Service Providers).
The Privacy Statement sets out:
The DBSA takes your privacy and the protection of your personal information very seriously, and
we will only use your personal information in accordance with the Privacy Statement and applicable
laws. We have implemented reasonable technical and operational measures to keep your personal
information secure. It is important that you read the Privacy Statement carefully before submitting
any personal information to the DBSA.
By s
Health & Safety
Source: RFP069-070.2026_Volume 2 of 3_Tender Returnable.pdfi. Access published link (Microsoft Teams).
ii. Stipulate Company Name, Email, Contact Number and Attendee Name in chat box, as
proof of attendance. (Failure to comply may result in bidders attendance not being recorded
and subsequently disqualified from further evaluation).
I CERTIFY THAT THE INFORMATION FURNISHED IN PARAGRAPHS 1, 2 and 3
A conflict of interest arises when personal interests or activities influence (or appear to influence) the
ability to act in the best interests of DBSA.
Doing business with family members or close associates.
Having a financial or beneficial interest in another company in our industry or environment
Adsorption (psa) oxygen generating plants cluster 1
(069) and cluster 2 (070)
i) authorizes the Employer to obtain a tax clearance certificate from the South African Revenue
Services that my / our tax matters are in order;
ii) confirms that the neither the name of the enterprise or the name of any partner, manager, director,
or other person, who wholly or partly exercises, or may exercise, control over the enterprise
appears on the Register of Tender Defaulters established in terms of the Prevention and Combating
of Corrupt Activities Act, No ;
iii) confirms that no partner, member, director, or other person, who wholly or partly exercises, or may
exercise, control over the enterprise appears, has within the last five years been convicted of fraud
or corruption;
iv) confirms that I / we are not associated, linked, or involved with any other tendering entities
submitting tender offers and have no other relationship with any of the tenderers or those
responsible for compiling the scope of work that could cause or be interpreted as a conflict of
interest; and
v) confirms that the contents of this questionnaire are within my personal knowledge and are to the
best of my belief both true and correct.
I, ______________________________________ of ______________________________________,
(Authorised Signatory) (Company Name)
i. The Tax Pin issued by the South African Revenue Services must be submitted together with
this tender and appended to this page. Failure to submit the Tax Pin will result in the
invalidation/ disqualification of the tender submission as per stipulated criteria in the Risk
ii. Valid Tax Compliance is a mandatory requirement for the successful bidder prior to
appointment, to be awarded a contract in terms of this tender.
iii. Where Joint Ventures/ Consortia/ Associations, etc. are involved, the Tax Compliance status
will be based on all the Joint Venture Partners status. The Tax Compliance status
documentation of all the Joint Venture Partners is to be appended to this page. Any tax non-
compliance of any party will require a bidder to provide fully compliant tax status for any award
to be made.
iv. Bidders are expected to have their tax affairs in order, to be able to do business with the DBSA.
I, ______________________________________ of ______________________________________,
(Authorised Signatory) (Company Name)
One-person Public Company (Pty) Limited State Owned
business/sole propriety Company
4.6. I, the undersigned, who is duly authorised to do so on behalf of the company/firm, certify that
the points claimed, based on the specific goals as advised in the tender, qualifies the company/
firm for the preference(s) shown and I acknowledge that:
i) The information furnished is true and correct;
of 33
Volume Part T2
Contractual Terms
Source: RFP069-070.2026_Volume 2 of 3_Tender Returnable.pdfAdsorption (psa) oxygen generating plants cluster 1
(069) and cluster 2 (070)
Volume 2
Section part t2: returnable documents page
T2.1.1 Tender Brief Attendance 3
T2.1.2 Certificate of Authority for Signatory 4
T2.1.3 Record of Addenda to Tender document 8
T2.1.4 Bidder's Disclosure (SBD4) 9
T2.1.5 Service Provider Code of Conduct 12
T2.1.6 RFP Declaration Form 15
T2.1.7 Enterprise Questionnaire 17
T2.1.8 Certificate of Acquaintance with Tender Document 20
T2.1.9 Proof of Registration with CSD & CIDB 22
T2.1.10 Tax Requirement 23
T2.1.11 Registration Certificates / Agreements / Identity Documents 24
T2.1.12 Workmen’s Compensation Registration (COIDA) 25
T2.1.13 Unemployment Insurance Fund (UIF) – Registration Certificate (Act ) 26
T2.1.14 SBD6.1: Broad Based Black Empowerment Status Level Certificate 27
activities. These include, but are not limited to:
rights, etc.);
Collusion in whatever form that is intended to influence procurement decisions;
Failure to disclose accurate information required during the sourcing activity (ownership,
financial situation, BBBEE status, etc.);
Corrupt activities listed above; and
Harassment, intimidation, or other aggressive actions towards DBSA employees.
or services are purchased from them. A rigorous due diligence is conducted, and the service
provider is expected to participate in an honest and straight forward manner.
records must be accurate in all material respects.
extent such terms are not included in contractual obligations and any of the above code is breached,
then DBSA reserves its right to review doing business with these service providers.
I, ______________________________________ of ______________________________________,
(Authorised Signatory) (Company Name)
hereby acknowledge having read, understood, and agree to the terms and conditions set out in the
“DBSA Service Provider Code of Conduct.”
(Signature) (Date)
of 33
Volume Part T2
Adsorption (psa) oxygen generating plants cluster 1
(069) and cluster 2 (070)
Part t2.1.13: Unemployment insurance fund (uif) – registration certificate
(Act )
i. Proof of Tenderer’s Unemployment Insurance Fund (UIF) Registration Certificate; or
4.3. Name of company/firm...............................................................................
4.4. Company registration number: .....................................................................
4.5. Type of company/ firm [tick applicable box]
Partnership/Joint Close Personal Liability Non-Profit
Section
Source: RFP069-070.2026_Volume 2 of 3_Tender Returnable.pdfT2.1.15 Supporting Documents - Stage 1, Responsiveness Evaluation ☒ 32
Tender No. RFP069-070/2026
(069) and cluster 2 (070)
and subsequently disqualified from further evaluation).
This preference form must form part of all tenders invited. It contains general information and serves
as a claim form for preference points for specific goals.
1.1 The following preference point systems are applicable to invitations to tender
Either the 90/10 or 80/20 preference point system will be applicable in this tender. The lowest/
a) The applicable preference point system for this tender is the 90/10 preference point
b) The applicable preference point system for this tender is the 80/20 preference point
c) Either the 90/10 or 80/20 preference point system will be applicable in this tender.
1.3 Points for this tender (even in the case of a tender for income-generating contracts)
(b) Specific Goals (namely, BBBEE status level of contributor).
The maximum points for this tender are allocated as selected
Points points
Specific goals 20 10
Total points for Price and SPECIFIC GOALS 100 100
tender to claim points for specific goals with the tender, will be interpreted to mean that
preference points for specific goals are not claimed.
adjudicated or at any time subsequently, to substantiate any claim in regard to preferences, in
arrangements with any competitor regarding the quality, quantity, specifications,
Preference points claim form in terms of the preferential procurement
Contact Information
Source: Annexure A_Health and Safety Specification_RFP070.2026.pdf (RFP){"name":null,"email":null,"phone":null,"department":"of Health NDoH as Principal Recipient of the Global Fund grant","address":".......................................................................... 12"}
Evaluation Criteria
Source: Annexure A_Health and Safety Specification_RFP070.2026.pdf (RFP)General
Experience
Compliance
Technical Specifications
Source: Annexure A_Health and Safety Specification_RFP070.2026.pdf (RFP)The works comprise the supply, delivery, offloading, storage, installation, testing,
commissioning and handover of the DBSA PSA Solar Backup Programme at Bela-Bela
Hospital, including but not limited to:
and reinstatement.
10 | P a g e
penetrations.
lightning protection interfaces.
battery module handling, thermal management, battery monitoring and
commissioning.
protection coordination, temporary supplies and final connections to hospital
systems.
temporary services.
documentation.
emergency power, patient access and hospital logistics.
All activities must be performed without compromising hospital clinical services and patient
safety.
The programme scope includes site preparation, supply and installation of PV arrays and
mounting structures, delivery and offloading of Solar-Powered Backup Systems, integration
with PSA oxygen generation plants, commissioning, end-user and maintenance training,
handover, and a 36-month post-installation maintenance and support period. Multiple service
providers will be appointed to meet accelerated delivery timelines.
The project is located across the Cluster A Hospitals and forms part of the DBSA PSA
Solar Backup Programme. Installations include PV arrays on carports and roofs, BESS
installations for backup power, LV distribution and protection, and civil works for foundations
and cable routes. The hospitals remain operational throughout construction; the PC must
ensure patient safety, maintain access and protect the PSA oxygen plant and other critical
services.
framework
This project is construction work as defined in the CR. The Client shall provide the PC with
this Specification and any site information in the Client’s possession that may affect H&S
(known underground services, PSA plant details, access restrictions). The PC must accept
11 | P a g e
written appointment prior to any construction activity and must prepare, implement and
maintain a site-specific PHSP in accordance with CR 7. The PC must open and maintain the
site H&S File on site and ensure it is available for inspection by the Client and statutory
inspectors. The Section 37(2) Health & Safety Agreement will be executed pre-mobilisation
and incorporated into the contract; this allocation does not relieve any party of non-delegable
statutory duties.
Contractual documents will reflect DBSA’s role as Implementing Agent for a national rollout
and include obligations for 36-month maintenance and multi-site delivery coordination.
Where the project meets the thresholds in CR 3, the Client’s Agent shall apply to the
Department of Employment and Labour for a Construction Work Permit prior to
commencement. A copy of the permit and the permit number must be displayed at the site
entrance and retained in the H&S File. No construction activity may commence without the
permit (where applicable) and without PHSP acceptance.
The PC shall implement a centralised, auditable PTW system controlled by the CHSO.
Permit types shall include, at minimum:
written isolation certificates and verification by a registered electrician; isolation
certificates retained in the H&S File.
zones.
rescue team and rescue equipment.
plan.
inspections.
appointment.
PTW for first charge.
and suppression readiness.
12 | P a g e
Each permit must record the authoriser, permit holder, start and end times, conditions,
required PPE, rescue arrangements and handback sign-off. Permits must be retained in the
H&S File and be auditable.
PTW controls must explicitly cover first-charge energisation and recurring maintenance
activities during the 36-month support period; PTW records must be retained for the full
maintenance term
The PC shall maintain continuous liaison with the Client Representative, hospital
engineering team and DBSA appointed PrCHSA. A weekly H&S coordination meeting shall
be held during mobilisation and critical phases; minutes and action logs must be recorded
and retained. Any planned interruption to hospital services (including PSA oxygen,
emergency power or medical gas) requires written approval from the hospital engineering
team and the DBSA appointed Engineer and must be scheduled outside critical clinical
windows. The PC shall provide a single H&S point of contact (name, mobile, email) and
display contact details at site. All communications affecting patient safety must be escalated
immediately to the Client Representative and DBSA appointed PrCHSA.
Programme coordination: DBSA, NDoH and hospital engineering will maintain a centralised
programme coordination forum to schedule works across the 20-hospital rollout. Weekly
programme coordination meetings are mandatory during mobilisation and critical phases.
Maintenance handover procedures and escalation contacts must be included in the
handover pack for each hospital.
12.1. Mandatory RFP returnables (to be submitted with tender)
Tenderers must submit the following with their RFP response. Failure to provide any
mandatory returnable will render the tender non-compliant:
Draft PHSP tailored to this Specification.
Consolidated HIRA for all major activities (5×5 matrix).
SWMS/RAMS / RAMS for all high-risk activities (PV mounting, carport works, BESS
delivery/installation, battery handling, electrical works, LOTO, working at heights,
lifting, excavation, hot works, confined space, generator installation and
commissioning).
applicable) CHSO, Construction Manager (CM), Registered Electrician(s), Lifting
Supervisor, Fire Safety Officer, First Aiders, Environmental Officer, Traffic Marshals,
13 | P a g e
Confined Space Supervisor, Battery OEM Representative. CHSM and CHSO must
provide SACPCMP registration evidence where required.
liability and employer’s liability insurance.
thermal runaway procedures (SDS and OEM manuals).
(certificates and inspection records).
temporary facilities and emergency access.
Proposed ERP summary and battery fire response outline.
Proposed programme showing the seven-day electrical load monitoring campaign
and coordination with hospital operations.
similar scope) with references.
concurrently.
logistics.
multiple concurrent site deliveries.
12.2. Mandatory written appointments (pre-mobilisation)
The following appointments are mandatory and must be made in writing prior to mobilisation.
Each appointment must include scope, contact details and competency evidence:
Client Representative / Client H&S Custodian.
Principal Contractor (PC).
Construction Manager.
Construction Health & Safety Manager – If applicable (CHSM) — project level
(SACPCMP registration where applicable).
registration where applicable).
Construction Supervisors (civil, structural, electrical, BESS/PV).
Registered Electrician(s) (SANS 10142-1 compliance).
14 | P a g e
Lifting Supervisor / Appointed Person.
Crane Operators and Riggers (certified).
Fire Safety Officer.
First Aiders and Emergency Response Team.
Environmental Officer / Waste Officer.
Traffic Marshals.
Confined Space Entry Supervisor.
Battery OEM Representative / BESS Commissioning Engineer.
DBSA appointed Engineer / Client Technical Representative.
Temporary Works Designer.
Professional Construction Health & Safety Agent (PrCHSA) — appointed by
DBSA/Client.
appointments)
DBSA will appoint or require appointment of the following professional team members. Each
role is mandatory for the project and must be integrated into the PHSP, HIRA and PTW
arrangements. The PC must cooperate fully with these appointees.
DBSA will act as Implementing Agent for the nationwide rollout and will coordinate
multi-supplier procurement, programme oversight and verification of maintenance obligations
during the 36-month support period.
13.1. Electrical Lead Engineer (DBSA appointed)
Responsibilities: review and accept electrical design interfaces; verify earthing and bonding
designs; approve temporary and permanent LV distribution arrangements; witness and
accept electrical test regimes (continuity, insulation resistance, earth fault loop, RCD testing,
PV string testing); review arc flash study and PPE requirements; approve energisation
sequences and coordinate with OEM for inverter/BESS interfaces. Deliverables: signed
electrical design drawings, test schedules, commissioning checklists, Certificates of
Compliance where applicable, and witness statements for FAT/SAT. Competence:
registered professional engineer (Pr Eng) or equivalent with demonstrable PV/BESS
experience.
13.2. Structural Engineer (DBSA appointed)
Responsibilities: review and approve structural designs for carports, PV mounting systems
and BESS foundations; verify load calculations, anchorages and crane base bearing
15 | P a g e
capacities; approve temporary works and lifting support arrangements; provide inspection
and sign-off for structural elements prior to lifting or loading. Deliverables: structural design
drawings, calculations, temporary works approvals, inspection certificates and sign-off for
lifting operations affecting structures. Competence: registered professional structural
engineer with relevant experience.
13.3. Mechanical Engineer (DBSA appointed)
Responsibilities: review mechanical interfaces for BESS thermal management, ventilation,
HVAC modifications, generator interfaces and mechanical handling equipment; approve
mechanical installation sequences and commissioning tests; verify mechanical lifting and
handling procedures for battery modules. Deliverables: mechanical design drawings,
ventilation calculations for battery rooms, commissioning checklists and mechanical
FAT/SAT witness statements. Competence: registered mechanical engineer or suitably
qualified mechanical specialist.
13.4. Professional Construction Health & Safety Agent (PrCHSA) (DBSA
appointed)
Responsibilities: independent review and acceptance of the PC’s PHSP and HIRA;
periodic audits and verification of PHSP implementation; witness FAT/SAT and critical
energisation events from an H&S perspective; provide technical H&S advice to Client and
DBSA; review incident investigations and corrective actions. Deliverables: PHSP
acceptance certificate, audit reports, witness statements for critical tests, H&S
recommendations and final H&S close-out acceptance. Competence: registered PrCHSA
with SACPCMP or equivalent registration and demonstrable experience in PV/BESS hospital
projects.
13.5. Environmental Specialist (DBSA appointed)
Responsibilities: review and accept the Environmental Management Plan (EMP); verify
hazardous waste handling and battery waste chain of custody; monitor environmental
controls (dust, stormwater, noise) and advise on mitigation; witness environmental
compliance during critical activities (fuel storage, bunding, battery disposal). Deliverables:
EMP acceptance, environmental monitoring reports, waste disposal records and
environmental non-conformance reports. Competence: qualified environmental practitioner
with experience in hazardous waste and battery disposal regulations.
Integration and authority: DBSA-appointed professionals have the right to require
corrective actions, witness critical tests and escalate H&S or environmental concerns to the
Client. Their instructions on matters within their professional scope are binding on the PC for
the purposes of PHSP acceptance and safe execution.
The PC shall:
16 | P a g e
and enforcement.
Open and maintain the site H&S File and ensure availability for inspection.
Appoint CHSM (if applicable) and CHSO in writing and ensure competency and
presence on site.
registration and required insurances, and comply with the PHSP.
approved and followed for all high-risk activities.
maintain records and close out corrective actions within agreed timeframes.
cooperate with statutory investigations.
without prior written approval from the hospital engineering team and the DBSA
appointed Engineer.
rescue equipment and trained personnel.
instructions relating to safety, structural integrity, electrical safety, mechanical
systems and environmental protection.
OHS Act)
Where two or more H&S representatives are designated, the PC shall establish an OHS
Committee comprising all designated H&S representatives and management representatives
(management members must not exceed the number of H&S representatives). The Client
Representative shall attend as chairperson (non-voting). The committee shall meet monthly
and consider at least: incident reports, audit findings, training needs, corrective actions and
H&S performance. Minutes and attendance registers must be retained in the H&S File.
The PC shall maintain a site H&S File containing, as a minimum:
Construction work permit / notification (CR 3/4).
Emergency contact numbers (verified).
17 | P a g e
Contractor appointment letters and organogram.
Health & Safety policy signed by CEO or authorised representative.
PHSP and underpinning HIRAs and SWMS/RAMS/RAMS.
Fall Protection Plan.
Waste Management Plan and EMP.
List of subcontractors and agreements; proof of Compensation Fund registration.
Appointment letters and competency evidence for mandatory roles.
Medical fitness certificates for safety-critical roles.
Inspection and test certificates (lifting gear, electrical tests, scaffolding).
PTW register and LOTO isolation certificates.
Incident register (GAR 9) and investigation reports.
Training records and toolbox talk registers.
Audit reports and corrective action tracker.
Environmental monitoring records and SDS for hazardous substances.
FAT/SAT and commissioning records, as-built drawings and O&M manuals.
H&S File Index (standardised).
The Client will periodically evaluate the H&S File and may withhold mobilisation approval
until the H&S File meets acceptance criteria.
Project-specific hazards include (not exhaustive):
thermal runaway, damaged cell containment.
breaches, crane failure.
ingress.
failure.
18 | P a g e
Temporary works failure: scaffolding, formwork collapse, propping failure.
Fire and smoke affecting clinical areas and PSA plant: patient evacuation risk,
oxygen enrichment hazards.
Noise and dust affecting patients and staff: clinical interference, infection control.
Traffic interface with hospital visitors and emergency vehicles: collisions, access
obstruction.
Each hazard must be addressed in the HIRA and SWMS/RAMS with hierarchy of controls
and verification.
The PC shall prepare SWMS/RAMS/RAMS for all high-risk activities. Each
SWMS/RAMS/RAMS must include:
Activity title and scope.
Sequence of operations and stepwise tasks.
Identified hazards and risk ratings (pre- and post-controls).
Controls using the hierarchy (elimination, substitution, engineering, administrative,
PPE).
Required competencies and training.
Required permits and PTW references.
PPE requirements and inspection criteria.
Emergency and rescue procedures (including battery thermal runaway response).
Verification checklist and sign-off by supervisor and CHSO.
Review frequency and trigger events (e.g., design change, weather, incident).
SWMS/RAMS must be available at the workface and be reviewed and re-issued when
conditions change.
controls)
The PC shall ensure physical segregation of works from hospital pedestrian routes and
clinical areas using robust fencing, covered walkways where required, signage, lighting and
traffic control. Visitors must be inducted and recorded in a visitor register. The site perimeter
19 | P a g e
must be secured (minimum 1.6 m galvanised diamond mesh or equivalent) with controlled
access gates. Noise, dust and vibration controls must be implemented to protect patients;
any activity that could affect patient care must be coordinated and scheduled with the
hospital. Patient transfer routes and emergency access must be maintained at all times.
The PC shall maintain and make available the following registers and checklists:
Daily pre-start checklists and toolbox talk records.
Incident register (GAR 9) and WCL accident/incident forms.
PTW register and LOTO isolation certificates.
Lifting equipment and crane inspection logs.
Scaffolding inspection register.
Temporary electrical installation inspection records.
Portable tool inspection register.
Fire equipment inspection and maintenance records.
First aid box contents and treatment records.
Training and medical surveillance records.
Audit reports and corrective action tracker.
Environmental and waste chain of custody records.
All records must be legible, dated and retained for the contract period and as required by
law.
21.1. Purpose
Provide a standard, client-level Bill of Quantities for health, safety and emergency items that
Principal Contractors (PCs) must price and supply per site. The OHS BOQ ensures
minimum, auditable provision of PPE, emergency response equipment, monitoring devices,
temporary works safety items and BESS/PV-specific controls during construction,
commissioning and the 36-month maintenance period.
21.2. Scope
The OHS BOQ applies to all Cluster 2sites and must be completed by tenderers for each
hospital. Quantities may be site-adjusted where justified; any deviation must be itemised,
explained and approved by the Client at tender evaluation.
20 | P a g e
21.3. How to use
the commercial submission.
supply (delivery notes, certificates, calibration records) must be provided at
mobilisation and retained for the maintenance period where applicable.
21.4. Minimum OHS BOQ structure
(To be copied into tender returnables and H&S File)
Table columns (required): Item Code; Description; Specification / Standard; Unit; Qty (per site);
Unit Rate (ZAR); Total (ZAR); Notes / Evidence required
Sample BOQ rows (tenderers must expand as site conditions require):
Qty Unit Notes /
Specification Total
Item Code Description Unit (per Rate Evidence
/ Standard (ZAR)
site) (ZAR) required
Hard hats SANS Delivery note;
OHS-PPE-001 Each
(safety helmets) compliant certificate
High-visibility SANS
OHS-PPE-002 Each Delivery note
vests (Class 2/3) compliant
Safety boots SANS Supplier invoice;
OHS-PPE-003 Pair
(steel toe) compliant size list
Arc rating per Certificates;
Arc-flash PPE kit
OHS-PPE-004 arc-flash Kit arc-flash study
(for electricians)
study ref
21 | P a g e
Qty Unit Notes /
Specification Total
Item Code Description Unit (per Rate Evidence
/ Standard (ZAR)
site) (ZAR) required
Hearing
OHS-PPE-005 protection SANS Each Delivery note
(earmuffs/plugs)
Reflective;
Warning signage bilingual Photos of
OHS-SIG-001 Set
(standardised) where installation
required
Pedestrian
barriers / Linear Photos; barrier
OHS-BARR-001 As per BRA
hoarding (1 m, 1 m spec
kN impact)
SANS;
Portable fire
quantity per Test certs;
OHS-FIRE-001 extinguishers Each
BESS/PSA location plan
(Abc / co2)
risk
Fire blankets
OHS-FIRE-002 SANS Each Delivery note
and fire hoses
Spill kits
Chemical
(battery SDS; drill
OHS-SPILL-001 absorbents; Kit
electrolyte / records
Methodology
Source: Annexure A_Health and Safety Specification_RFP070.2026.pdfSWMS/RAMS Safe Work Method Statement activities; mandatory RFP returnable
(Sections 15 & 33).
concurrently.
logistics.
Quality Management
Source: Annexure A_Health and Safety Specification_RFP070.2026.pdfelectrical/mechanical work (Sections 8 &
25).
Construction Health & Safety Senior H&S manager; leads audits and
Chsm
Manager investigations (Sections 10 & 20).
Construction Health & Safety Site H&S officer; maintains PTW register
Chso
Officer and daily inspections (Sections 10 & 18).
QA / QC acceptance (FAT/SAT, test certificates)
and reinstatement.
10 | P a g e
penetrations.
lightning protection interfaces.
battery module handling, thermal management, battery monitoring and
commissioning.
protection coordination, temporary supplies and final connections to hospital
systems.
temporary services.
documentation.
emergency power, patient access and hospital logistics.
this Specification and any site information in the Client’s possession that may affect H&S
(known underground services, PSA plant details, access restrictions). The PC must accept
11 | P a g e
written appointment prior to any construction activity and must prepare, implement and
maintain a site-specific PHSP in accordance with CR 7. The PC must open and maintain the
site H&S File on site and ensure it is available for inspection by the Client and statutory
inspectors. The Section 37(2) Health & Safety Agreement will be executed pre-mobilisation
and incorporated into the contract; this allocation does not relieve any party of non-delegable
statutory duties.
Contractual documents will reflect DBSA’s role as Implementing Agent for a national rollout
and include obligations for 36-month maintenance and multi-site delivery coordination.
written isolation certificates and verification by a registered electrician; isolation
certificates retained in the H&S File.
zones.
rescue team and rescue equipment.
plan.
inspections.
appointment.
(certificates and inspection records).
multi-supplier procurement, programme oversight and verification of maintenance obligations
during the 36-month support period.
13.1. Electrical Lead Engineer (DBSA appointed)
Responsibilities: review and accept electrical design interfaces; verify earthing and bonding
designs; approve temporary and permanent LV distribution arrangements; witness and
accept electrical test regimes (continuity, insulation resistance, earth fault loop, RCD testing,
PV string testing); review arc flash study and PPE requirements; approve energisation
sequences and coordinate with OEM for inverter/BESS interfaces. Deliverables: signed
electrical design drawings, test schedules, commissioning checklists, Certificates of
environmental non-conformance reports. Competence: qualified environmental practitioner
with experience in hazardous waste and battery disposal regulations.
Integration and authority: DBSA-appointed professionals have the right to require
corrective actions, witness critical tests and escalate H&S or environmental concerns to the
(management members must not exceed the number of H&S representatives). The Client
Representative shall attend as chairperson (non-voting). The committee shall meet monthly
and consider at least: incident reports, audit findings, training needs, corrective actions and
Daily pre-start checklists and toolbox talk records.
Incident register (GAR 9) and WCL accident/incident forms.
PTW register and LOTO isolation certificates.
Lifting equipment and crane inspection logs.
Scaffolding inspection register.
Temporary electrical installation inspection records.
Portable tool inspection register.
Fire equipment inspection and maintenance records.
First aid box contents and treatment records.
Training and medical surveillance records.
Audit reports and corrective action tracker.
Environmental and waste chain of custody records.
Inspection tags;
OHS-RESCUE-001 rescue kit (for rescue Kit
rescue plan
WAH) equipment
22 | P a g e
Daily: pre-start checks and toolbox talks recorded by supervisors and CHSO.
Weekly: formal site inspections by CHSO with written reports and immediate
corrective actions.
submitted to the Client and DBSA appointed PrCHSA. Audit reports must include
non-conformances, root causes and corrective action plans with closure dates.
energisation.
compliance rate, audit closure rate. Targets and thresholds to be agreed
pre-mobilisation.
dashboard to Client and DBSA appointed PrCHSA; immediate notification of critical
incidents to DBSA and statutory authorities.
minimisation, erosion control, dust suppression, noise mitigation and prevention of
water/soil contamination.
cleaning agents) must be accompanied by SDS and stored in bunded areas with
secondary containment; SDS must be available at point of use.
storage in designated, secure, labelled containers; disposal in accordance with
NEMA and local regulations; DBSA appointed Environmental Specialist to approve
disposal route.
located adjacent to storage and personnel trained in spill response.
and records retained.
25 | P a g e
applicable.
and Labour in accordance with statutory timeframes.
cause analysis and corrective action plan within 48 hours. Investigations documented
26 | P a g e
and corrective actions tracked to closure. Lessons learned to be communicated to
site personnel and DBSA appointed PrCHSA.
(Sans/iec)
retained.
inspected and certified by a registered electrician.
commissioning standards (IEC 62446 for PV); registered electricians to sign test
certificates (continuity, insulation resistance, earth fault loop, RCD testing).
only authorised persons to isolate and re-energise equipment.
approach distances defined.
transport trolleys; OEM handling procedures mandatory.
Collective protection: guardrails, edge protection and scaffolding preferred.
Personal fall arrest: where used, harnesses, lanyards and certified anchor points;
rescue plan for suspended workers.
recorded.
procedures.
training documented.
excavation.
monitoring for water ingress.
27 | P a g e
temporary works register and inspected/certified prior to use and after any event
affecting stability. Unknown services discovered trigger immediate stop-work and
verification.
supervisor and TWD.
affect hospital operations; include load calculations, crane selection, ground bearing
assessments, exclusion zones, banksman and contingency measures.
certificates and daily inspection logs.
appointed in writing.
movement; DBSA Structural Engineer to approve crane bases where required.
breakers with noise suppression, low-noise generators).
acoustic screens between works and clinical areas. Locate noisy plant away from
patient wards where practicable.
implement time limits and rotation to reduce individual exposure; provide advance
notice to hospital wards and coordinate with hospital staff.
action levels; ensure fit testing and training. PPE must not be the primary control for
patient-facing areas where communication is critical.
cutting.
29 | P a g e
grinding, enclosed cutting booths, dust extraction on power tools, wheel wash and
sealed loading points.
sealed barriers and negative-pressure enclosures where works abut clinical areas;
implement vehicle speed limits and designated haul routes.
reduce exposures below action levels; ensure fit testing and training.
dusty waste. Maintain records of dust monitoring and corrective actions.
32.3. Manual Handling
Compliance Requirements
Source: Annexure A_Health and Safety Specification_RFP070.2026.pdf (RFP)appointment letters and CVs for: Principal Contractor (PC), CHSM (if
appointment letters and organogram
Appointment letters and competency evidence for mandatory roles
Health & Safety
Source: Annexure A_Health and Safety Specification_RFP070.2026.pdffuel)
Stipulated
First aid kits
OHS-FIRST-001 contents per Each First aid register
(site & remote)
site size
Fall-arrest Certified
Inspection tags;
OHS-RESCUE-001 rescue kit (for rescue Kit
rescue plan
WAH) equipment
22 | P a g e
Qty Unit Notes /
Specification Total
Item Code Description Unit (per Rate Evidence
/ Standard (ZAR)
site) (ZAR) required
WBGT meter
Calibrated
OHS-MON-001 (heat Each Calibration cert
instrument
monitoring)
Dust monitor Portable; Calibration cert;
OHS-MON-002 Each
(PM2.5/PM10) calibrated logs
Thermal sensors OEM spec;
OHS-MON-003 OEM spec Each
for BESS (spare) calibration
Battery room
OEM / design
OHS-VENT-001 ventilation fans Each Installation cert
spec
(spare)
LOTO locks, tags Unique ID
OHS-LOTO-001 Set LOTO register
and hasps (set) system
PTW boards, Hardcopy Sample
OHS-PTW-001 permit books and digital Set completed
and registers templates permit
Intrinsically
Two-way radios
OHS-COMM-001 safe where Each Inventory list
(site comms)
required
Crane exclusion As per lift Photos; lift plan
OHS-CRANE-001 Set
zone barricading plan ref
Btrrp
equipment pack Per Annexure BTRRP; training
OHS-BESS-001 Set
(smoke hoods, H records
gas monitors)
Spare parts list; Critical spareOHS-SPARE-001 Per OEM list Kit
storage plan parts kit
23 | P a g e
Qty Unit Notes /
Specification Total
Item Code Description Unit (per Rate Evidence
/ Standard (ZAR)
site) (ZAR) required
(inverter/BMS
fuses,
contactors)
Induction,
Training & Training records;
SWMS, Lump
OHS-TRAIN-001 induction (per attendance
emergency sum
site) sheets
drills
FAT/SAT witness
Lump Witness
OHS-AUDIT-001 allowance Per site
sum schedule
(DBSA/PrCHSA)
36-month
maintenance SLA;
Lump
OHS-MAINT-001 contingency SLA provision maintenance
sum
(spares & plan
labour)
content must include site rules, PTW, LOTO, emergency procedures, battery hazards
and hospital interface controls.
confined space entrants, working at height personnel and rescue teams; certificates
and refresher schedules must be maintained.
include SACPCMP registration evidence for CHSM (if applicable)/CHSO where
applicable.
entrants, working at height rescue teams); records to be confidentially retained.
24 | P a g e
Toolbox talks: daily or weekly as appropriate; records retained.
OEM training: battery OEM must provide training for battery handling,
commissioning and thermal runaway response; OEM attendance mandatory for first
charge.
Daily: pre-start checks and toolbox talks recorded by supervisors and CHSO.
Weekly: formal site inspections by CHSO with written reports and immediate
corrective actions.
submitted to the Client and DBSA appointed PrCHSA. Audit reports must include
non-conformances, root causes and corrective action plans with closure dates.
energisation.
compliance rate, audit closure rate. Targets and thresholds to be agreed
pre-mobilisation.
dashboard to Client and DBSA appointed PrCHSA; immediate notification of critical
incidents to DBSA and statutory authorities.
minimisation, erosion control, dust suppression, noise mitigation and prevention of
water/soil contamination.
cleaning agents) must be accompanied by SDS and stored in bunded areas with
secondary containment; SDS must be available at point of use.
storage in designated, secure, labelled containers; disposal in accordance with
NEMA and local regulations; DBSA appointed Environmental Specialist to approve
disposal route.
located adjacent to storage and personnel trained in spill response.
and records retained.
25 | P a g e
procedures
supervision and battery fire preparedness.
Officer; must define detection thresholds, automatic isolation actions, suppression
strategy (compatible extinguishing agents), evacuation distances, OEM escalation
procedures, coordination with local fire services and post-incident remediation and
disposal.
detection where applicable and suppression systems compatible with lithium battery
incidents; design to OEM and SANS/IEC guidance.
and at regular intervals thereafter; DBSA appointed PrCHSA to witness at least one
full-scale drill prior to energisation.
emergency services; ensure patient protection measures and continuity of critical
services.
to support response across multiple sites during the maintenance period.
all times; first aid equipment maintained and inspected.
equipped; rescue plans documented and rehearsed.
services maintained; PC to ensure unobstructed routes for patient transfer if required.
applicable.
and Labour in accordance with statutory timeframes.
cause analysis and corrective action plan within 48 hours. Investigations documented
26 | P a g e
and corrective actions tracked to closure. Lessons learned to be communicated to
site personnel and DBSA appointed PrCHSA.
(Sans/iec)
retained.
inspected and certified by a registered electrician.
commissioning standards (IEC 62446 for PV); registered electricians to sign test
certificates (continuity, insulation resistance, earth fault loop, RCD testing).
only authorised persons to isolate and re-energise equipment.
approach distances defined.
transport trolleys; OEM handling procedures mandatory.
Collective protection: guardrails, edge protection and scaffolding preferred.
Personal fall arrest: where used, harnesses, lanyards and certified anchor points;
rescue plan for suspended workers.
recorded.
procedures.
training documented.
excavation.
monitoring for water ingress.
27 | P a g e
temporary works register and inspected/certified prior to use and after any event
affecting stability. Unknown services discovered trigger immediate stop-work and
verification.
supervisor and TWD.
affect hospital operations; include load calculations, crane selection, ground bearing
assessments, exclusion zones, banksman and contingency measures.
certificates and daily inspection logs.
appointed in writing.
movement; DBSA Structural Engineer to approve crane bases where required.
This section is mandatory, detailed and prescriptive. Controls must protect workers, patients
and hospital operations and be auditable in the PHSP and H&S File.
32.1. Noise
Risk identification and assessment
façade, patient wards adjacent to works, temporary welfare areas) before noisy
activities commence.
operation, heavy plant movements, cutting and grinding). Include cumulative
exposure from multiple sources.
Monitoring and measurement
dose where applicable. Frequency of monitoring: baseline, weekly during noisy
phases, and after any change in plant or process.
mitigation in place.
28 | P a g e
Hierarchy of controls
breakers with noise suppression, low-noise generators).
acoustic screens between works and clinical areas. Locate noisy plant away from
patient wards where practicable.
implement time limits and rotation to reduce individual exposure; provide advance
notice to hospital wards and coordinate with hospital staff.
action levels; ensure fit testing and training. PPE must not be the primary control for
patient-facing areas where communication is critical.
Patient protection and communication
advance; provide contact details for immediate escalation.
where necessary for critical procedures.
Records and training
Provide hearing conservation training to affected workers and supervisors.
32.2. Dust
Risk identification and assessment
demolition, material handling and vehicle movements. Assess potential for airborne
particulate migration into clinical areas and PSA plant.
Monitoring and measurement
adjacent clinical façades during high-risk activities. Frequency: baseline, daily during
dusty operations, and after mitigation changes. Record meteorological conditions.
Hierarchy of controls
cutting.
29 | P a g e
grinding, enclosed cutting booths, dust extraction on power tools, wheel wash and
sealed loading points.
sealed barriers and negative-pressure enclosures where works abut clinical areas;
implement vehicle speed limits and designated haul routes.
reduce exposures below action levels; ensure fit testing and training.
Hospital protection and infection control
areas; provide temporary HEPA filtration or positive-pressure barriers where works
are adjacent to critical clinical zones.
Waste and housekeeping
dusty waste. Maintain records of dust monitoring and corrective actions.
32.3. Manual Handling
Risk identification and assessment
material stacking, formwork handling and repetitive tasks. Use task-specific risk
assessments to quantify load, frequency and posture.
Controls
lifting frames) for heavy or awkward loads.
ergonomic tools.
provide task rotation and training in safe lifting techniques. Document manual
handling procedures in SWMS/RAMS.
back support where required.
Battery handling specific controls
handling procedures; ensure slings and spreader beams are certified and inspected.
Prohibit manual lifting of battery modules above safe manual handling limits.
30 | P a g e
Project & Document Information ................................................................................ 5
Context and Background ............................................................................................ 5
Applications and Interpretation .................................................................................. 5
Abbreviations and Acronyms ..................................................................................... 6
Definitions.................................................................................................................... 9
Scope of Work ........................................................................................................... 10
Project Description ................................................................................................... 11
Application of the Construction Regulations 2014 and statutory framework ....... 11
Construction Work Permit ........................................................................................ 12
Permit to Work (PTW) system and Lock Out Tag Out (LOTO) ............................ 12
Communication, Liaison and Hospital Interface (PSA coordination) ................ 13
Legal Documentation and Mandatory Appointments (RFP returnables) ........... 13
12.1. Mandatory RFP returnables (to be submitted with tender) ......................... 13
12.2. Mandatory written appointments (pre-mobilisation) ................................... 14
appointments) ................................................................................................................... 15
13.1. Electrical Lead Engineer (DBSA appointed) ................................................ 15
13.2. Structural Engineer (DBSA appointed) ........................................................ 15
13.3. Mechanical Engineer (DBSA appointed) ...................................................... 16
13.4. Professional Construction Health & Safety Agent (PrCHSA) (DBSA
appointed) ...................................................................................................................... 16
13.5. Environmental Specialist (DBSA appointed) ............................................... 16
General Duties of the Principal Contractor (PC) ................................................. 16
Appointment of Occupational Health & Safety Committee (Section 19 OHS Act)
Administrative controls and the Site Health & Safety File (CR 7(1)(b)) ............. 17
Potential Sources of Risk ..................................................................................... 18
Safe Work Procedures (SWMS/RAMS / RAMS) and task verification ................ 19
Safety of Pedestrians, Patients and the Public (hospital interface controls) .... 19
2 | P a g e
Checklists, Registers and Recordkeeping (minimum registers) ........................ 20
OHS Bill of Quantities (OHS BOQ) ....................................................................... 20
21.1. Purpose .......................................................................................................... 20
21.2. Scope .............................................................................................................. 20
21.3. How to use ..................................................................................................... 21
21.4. Minimum OHS BOQ structure ....................................................................... 21
Training, Competence and Medical Surveillance (competence matrix) ............. 24
Health & Safety Audits, Inspections, KPIs and reporting regime ....................... 25
Environmental controls and hazardous chemical agents (SDS) ........................ 25
procedures ........................................................................................................................ 26
First aid, rescue and emergency response teams (rescue capability) .............. 26
Accident / Incident reporting, investigation and statutory notification ............. 26
Plant, tools, electrical safety and high-risk equipment controls (SANS/IEC) .... 27
Working at Height, Fall Protection, Scaffolding and Ladders (CR 10/11) .......... 27
Excavations, Temporary Works, Formwork and Shoring (CR 13 & TWD) ......... 27
Lifting, Crane Operations and Lifting Plans (CR 22) ........................................... 28
Noise, Dust, Manual Handling and Occupational Hygiene Controls .................. 28
32.1. Noise ............................................................................................................... 28
32.2. Dust ................................................................................................................ 29
32.3. Manual Handling ............................................................................................ 30
32.4. Occupational Hygiene ................................................................................... 31
Working under Thermal Conditions (heat and cold) ........................................... 31
Testing, Commissioning, FAT/SAT and Handover Requirements (OEM witness)
Contractor Health & Safety Management System and H&S close-out pack ...... 34
Annexure and RFP templates (mandatory returnables) ..................................... 34
36.1. Annexure A — PHSP Minimum Content Checklist ...................................... 34
36.2. Annexure B — HIRA Template (5×5 Matrix) .................................................. 35
36.3. Annexure C — SWMS/RAMS / RAM Template (Task-Level) ........................ 36
36.4. Annexure D — Permit to Work (PTW) Templates (Summary Table) ........... 37
3 | P a g e
36.5. Annexure E — LOTO Isolation Certificate Template and Isolation Diagram
Guidance........................................................................................................................ 38
36.6. Annexure F — Lifting Plan Template and Crane Exclusion Zone Diagram 39
36.7. Annexure G — FAT / SAT Witness Checklist (PV & BESS) ......................... 39
36.8. Annexure H — Battery Thermal Runaway Response Plan (BTRRP) .......... 40
36.9. Annexure I — Site H&S File Index and Handover Checklist ....................... 41
36.10. Annexure J — H&S Tender Returnables Checklist and Pre-mobilisation
Verification ..................................................................................................................... 42
36.11. Annexure K — Audit Checklist and Corrective Action Tracker .................. 43
36.12. Annexure L — Visitor Induction Form and Visitor Register Template ....... 44
36.13. Annexure X-1 — Thermal Risk Assessment Template ................................ 44
36.14. Annexure X-2 — WBGT Monitoring Log ....................................................... 45
36.15. Annexure X-3 — Work-Rest Schedule Template .......................................... 45
36.16. Annexure X-4 — Acclimatisation Record and Checklist ............................. 45
36.17. Annexure X-5 — Heat-Illness Incident Report and Medical Follow-up Form
36.18. Annexure X-6 — Battery Room Thermal Monitoring and Ventilation
Acceptance Checklist ................................................................................................... 46
36.19. Annexure M — Programme Delivery and Maintenance Plan Template ...... 47
36.20. Annexure N — Multi-site Logistics and Spare Parts Strategy Template .... 47
Principal Contractor Acknowledgement and Acceptance .................................. 47
Principal Contractor Declaration .......................................................................... 48
For Client Use Only ............................................................................................... 48
4 | P a g e
Project Sites (Cluster 2): Jubilee, Bela-Bela; Seshego; Mecklenburg; Lydenburg
(Mashishing); Sabie; Tintswalo; Kwa-Mhlanga
Document: Project Specific Health & Safety Specification
Prepared by: Tebogo Mabudusha, PrCHSA
This Project Specific Health & Safety Specification (the Specification) is the Client’s
mandatory health and safety requirement for the DBSA-NDoH-GF PSA OXYGEN PLANTS
Cluster 2Hospital Projects. It must be read and implemented in conjunction with the
Occupational Health and Safety Act , the Construction Regulations 2014, the
National Environmental Management Act (NEMA), applicable SANS and IEC standards,
local municipal bylaws and the contract documents. Where this Specification imposes a
higher standard than statutory minimums, the higher standard applies. The words must,
5 | P a g e
shall and required are mandatory. The Principal Contractor (PC) and all subcontractors
are contractually bound to implement, verify and maintain compliance with this Specification.
H&S File Site Health & Safety File handed over at completion (Sections 12 &
31).
Consolidated risk register using a 5×5
NEMA hazardous waste and disposal (Section
PPE Personal Protective Equipment requirements; must meet SANS standards
(Sections 17 & 24).
statutory definition applies.
Agent — any competent person who acts as a representative for the Client.
Client — the person or entity for whom construction work is being performed
(DBSA/Client Representative for Bela-Bela Hospital).
under the OHS Act.
renovation, repair, demolition or dismantling of a building or similar structure; civil
engineering works; moving of earth; piling; excavations; or any similar work as
defined in the CR.
Construction work permit — a document issued in terms of CR 3 where applicable.
Contractor — an employer who performs construction work.
Danger — anything that may cause injury or damage to persons or property.
Employee — any person who is employed by or works for any employer and who
receives or is entitled to receive any remuneration or who works under the direction
or supervision of an employer.
9 | P a g e
remunerates that person.
plan that addresses hazards identified and includes safe working procedures to
mitigate, reduce or control the hazards identified.
document prepared by the Client pertaining to all health and safety requirements
related to construction work.
the Construction Regulations to be kept on site.
hazards to the health and safety of persons associated with the construction work.
qualifications specific to the work or task being performed.
connected and used for converting energy to performing work, or used for
developing, receiving, storing, containing, confining, transforming, transmitting,
transferring or controlling any form of energy.
employees by an occupational health practitioner where required.
Risk — the probability that injury or damage will occur.
Safe — free from any hazard.
SDS — Safety Data Sheet — supplier-provided document describing hazards,
handling, storage and emergency measures for hazardous substances.
and crane bases required for construction.
care (PSA oxygen plant, emergency power, medical gas, critical HVAC).
installations for backup power, LV distribution and protection, and civil works for foundations
and cable routes. The hospitals remain operational throughout construction; the PC must
ensure patient safety, maintain access and protect the PSA oxygen plant and other critical
services.
framework
required PPE, rescue arrangements and handback sign-off. Permits must be retained in the
engineering team and DBSA appointed PrCHSA. A weekly H&S coordination meeting shall
be held during mobilisation and critical phases; minutes and action logs must be recorded
and retained. Any planned interruption to hospital services (including PSA oxygen,
emergency power or medical gas) requires written approval from the hospital engineering
team and the DBSA appointed Engineer and must be scheduled outside critical clinical
windows. The PC shall provide a single H&S point of contact (name, mobile, email) and
display contact details at site. All communications affecting patient safety must be escalated
immediately to the Client Representative and DBSA appointed PrCHSA.
Programme coordination: DBSA, NDoH and hospital engineering will maintain a centralised
programme coordination forum to schedule works across the 20-hospital rollout. Weekly
programme coordination meetings are mandatory during mobilisation and critical phases.
temporary facilities and emergency access.
Client Representative / Client H&S Custodian.
Principal Contractor (PC).
Construction Manager.
Construction Health & Safety Manager – If applicable (CHSM) — project level
(SACPCMP registration where applicable).
registration where applicable).
Construction Supervisors (civil, structural, electrical, BESS/PV).
Registered Electrician(s) (SANS 10142-1 compliance).
14 | P a g e
Lifting Supervisor / Appointed Person.
Crane Operators and Riggers (certified).
Fire Safety Officer.
First Aiders and Emergency Response Team.
Environmental Officer / Waste Officer.
Traffic Marshals.
Confined Space Entry Supervisor.
Battery OEM Representative / BESS Commissioning Engineer.
DBSA appointed Engineer / Client Technical Representative.
Temporary Works Designer.
Professional Construction Health & Safety Agent (PrCHSA) — appointed by
16 | P a g e
and enforcement.
Open and maintain the site H&S File and ensure availability for inspection.
Appoint CHSM (if applicable) and CHSO in writing and ensure competency and
presence on site.
registration and required insurances, and comply with the PHSP.
approved and followed for all high-risk activities.
maintain records and close out corrective actions within agreed timeframes.
cooperate with statutory investigations.
without prior written approval from the hospital engineering team and the DBSA
appointed Engineer.
rescue equipment and trained personnel.
instructions relating to safety, structural integrity, electrical safety, mechanical
systems and environmental protection.
OHS Act)
Construction work permit / notification (CR 3/4).
Emergency contact numbers (verified).
17 | P a g e
Contractor appointment letters and organogram.
Health & Safety policy signed by CEO or authorised representative.
PHSP and underpinning HIRAs and SWMS/RAMS/RAMS.
Fall Protection Plan.
Waste Management Plan and EMP.
List of subcontractors and agreements; proof of Compensation Fund registration.
Appointment letters and competency evidence for mandatory roles.
Medical fitness certificates for safety-critical roles.
Inspection and test certificates (lifting gear, electrical tests, scaffolding).
PTW register and LOTO isolation certificates.
Incident register (GAR 9) and investigation reports.
Training records and toolbox talk registers.
Audit reports and corrective action tracker.
Environmental monitoring records and SDS for hazardous substances.
FAT/SAT and commissioning records, as-built drawings and O&M manuals.
H&S File Index (standardised).
Project-specific hazards include (not exhaustive):
thermal runaway, damaged cell containment.
breaches, crane failure.
ingress.
failure.
18 | P a g e
Temporary works failure: scaffolding, formwork collapse, propping failure.
Fire and smoke affecting clinical areas and PSA plant: patient evacuation risk,
oxygen enrichment hazards.
Noise and dust affecting patients and staff: clinical interference, infection control.
Traffic interface with hospital visitors and emergency vehicles: collisions, access
obstruction.
Interruption to PSA oxygen plant or emergency power: life-threatening patient risk.
Activity title and scope.
Sequence of operations and stepwise tasks.
Identified hazards and risk ratings (pre- and post-controls).
Controls using the hierarchy (elimination, substitution, engineering, administrative,
PPE).
Required competencies and training.
Required permits and PTW references.
PPE requirements and inspection criteria.
Emergency and rescue procedures (including battery thermal runaway response).
Verification checklist and sign-off by supervisor and CHSO.
Review frequency and trigger events (e.g., design change, weather, incident).
conditions change.
controls)
clinical areas using robust fencing, covered walkways where required, signage, lighting and
traffic control. Visitors must be inducted and recorded in a visitor register. The site perimeter
19 | P a g e
must be secured (minimum 1.6 m galvanised diamond mesh or equivalent) with controlled
access gates. Noise, dust and vibration controls must be implemented to protect patients;
any activity that could affect patient care must be coordinated and scheduled with the
hospital. Patient transfer routes and emergency access must be maintained at all times.
Principal Contractors (PCs) must price and supply per site. The OHS BOQ ensures
minimum, auditable provision of PPE, emergency response equipment, monitoring devices,
temporary works safety items and BESS/PV-specific controls during construction,
commissioning and the 36-month maintenance period.
21.2. Scope
The OHS BOQ applies to all Cluster 2sites and must be completed by tenderers for each
hospital. Quantities may be site-adjusted where justified; any deviation must be itemised,
explained and approved by the Client at tender evaluation.
20 | P a g e
21.3. How to use
the commercial submission.
supply (delivery notes, certificates, calibration records) must be provided at
mobilisation and retained for the maintenance period where applicable.
21.4. Minimum OHS BOQ structure
(To be copied into tender returnables and H&S File)
Table columns (required): Item Code; Description; Specification / Standard; Unit; Qty (per site);
Unit Rate (ZAR); Total (ZAR); Notes / Evidence required
Sample BOQ rows (tenderers must expand as site conditions require):
Item Code Description Unit (per Rate Evidence
/ Standard (ZAR)
site) (ZAR) required
Hard hats SANS Delivery note;
OHS-PPE-001 Each
(safety helmets) compliant certificate
OHS-PPE-002 Each Delivery note
vests (Class 2/3) compliant
Safety boots SANS Supplier invoice;
OHS-PPE-003 Pair
(steel toe) compliant size list
Arc rating per Certificates;
OHS-PPE-004 arc-flash Kit arc-flash study
(for electricians)
study ref
21 | P a g e
OHS-PPE-005 protection SANS Each Delivery note
(earmuffs/plugs)
Reflective;
quantity per Test certs;
OHS-FIRE-001 extinguishers Each
(battery SDS; drill
OHS-SPILL-001 absorbents; Kit
electrolyte / records
PPE
fuel)
OHS-TRAIN-001 induction (per attendance
emergency sum
site) sheets
drills
OHS-AUDIT-001 allowance Per site
sum schedule
(DBSA/PrCHSA)
36-month
maintenance SLA;
Lump
OHS-MAINT-001 contingency SLA provision maintenance
sum
(spares & plan
labour)
content must include site rules, PTW, LOTO, emergency procedures, battery hazards
and hospital interface controls.
confined space entrants, working at height personnel and rescue teams; certificates
and refresher schedules must be maintained.
include SACPCMP registration evidence for CHSM (if applicable)/CHSO where
applicable.
entrants, working at height rescue teams); records to be confidentially retained.
24 | P a g e
Toolbox talks: daily or weekly as appropriate; records retained.
OEM training: battery OEM must provide training for battery handling,
commissioning and thermal runaway response; OEM attendance mandatory for first
charge.
procedures
supervision and battery fire preparedness.
Officer; must define detection thresholds, automatic isolation actions, suppression
strategy (compatible extinguishing agents), evacuation distances, OEM escalation
procedures, coordination with local fire services and post-incident remediation and
disposal.
detection where applicable and suppression systems compatible with lithium battery
incidents; design to OEM and SANS/IEC guidance.
and at regular intervals thereafter; DBSA appointed PrCHSA to witness at least one
full-scale drill prior to energisation.
emergency services; ensure patient protection measures and continuity of critical
services.
to support response across multiple sites during the maintenance period.
all times; first aid equipment maintained and inspected.
equipped; rescue plans documented and rehearsed.
services maintained; PC to ensure unobstructed routes for patient transfer if required.
lifting frames) for heavy or awkward loads.
ergonomic tools.
provide task rotation and training in safe lifting techniques. Document manual
handling procedures in SWMS/RAMS.
back support where required.
Environmental
Source: Annexure A_Health and Safety Specification_RFP070.2026.pdfregistered professional engineer (Pr Eng) or equivalent with demonstrable PV/BESS
experience.
13.2. Structural Engineer (DBSA appointed)
Responsibilities: review and approve structural designs for carports, PV mounting systems
and BESS foundations; verify load calculations, anchorages and crane base bearing
15 | P a g e
capacities; approve temporary works and lifting support arrangements; provide inspection
and sign-off for structural elements prior to lifting or loading. Deliverables: structural design
drawings, calculations, temporary works approvals, inspection certificates and sign-off for
lifting operations affecting structures. Competence: registered professional structural
engineer with relevant experience.
13.3. Mechanical Engineer (DBSA appointed)
Responsibilities: review mechanical interfaces for BESS thermal management, ventilation,
HVAC modifications, generator interfaces and mechanical handling equipment; approve
mechanical installation sequences and commissioning tests; verify mechanical lifting and
handling procedures for battery modules. Deliverables: mechanical design drawings,
ventilation calculations for battery rooms, commissioning checklists and mechanical
FAT/SAT witness statements. Competence: registered mechanical engineer or suitably
qualified mechanical specialist.
13.4. Professional Construction Health & Safety Agent (PrCHSA) (DBSA
appointed)
Responsibilities: independent review and acceptance of the PC’s PHSP and HIRA;
periodic audits and verification of PHSP implementation; witness FAT/SAT and critical
energisation events from an H&S perspective; provide technical H&S advice to Client and
DBSA; review incident investigations and corrective actions. Deliverables: PHSP
acceptance certificate, audit reports, witness statements for critical tests, H&S
recommendations and final H&S close-out acceptance. Competence: registered PrCHSA
with SACPCMP or equivalent registration and demonstrable experience in PV/BESS hospital
projects.
13.5. Environmental Specialist (DBSA appointed)
Responsibilities: review and accept the Environmental Management Plan (EMP); verify
hazardous waste handling and battery waste chain of custody; monitor environmental
controls (dust, stormwater, noise) and advise on mitigation; witness environmental
compliance during critical activities (fuel storage, bunding, battery disposal). Deliverables:
dose where applicable. Frequency of monitoring: baseline, weekly during noisy
phases, and after any change in plant or process.
mitigation in place.
28 | P a g e
adjacent clinical façades during high-risk activities. Frequency: baseline, daily during
dusty operations, and after mitigation changes. Record meteorological conditions.
Section
Source: Annexure A_Health and Safety Specification_RFP070.2026.pdf(Sections 15 & 16).
Task-level method statements for high-risk
SWMS/RAMS Safe Work Method Statement activities; mandatory RFP returnable
(Sections 15 & 33).
Risk Assessment and Method Alternative term for SWMS/RAMS for
Rams
Statement complex tasks (Sections 15 & 33).
Formal permit system for high-risk
PTW Permit to Work
activities (Sections 8 & 16).
6 | P a g e
Acronym Full term Relevance / Where used (Part / Section)
Isolation procedure and written isolation
certificate process for
LOTO Lock Out Tag Out
electrical/mechanical work (Sections 8 &
25).
Construction Health & Safety Senior H&S manager; leads audits and
Chsm
Manager investigations (Sections 10 & 20).
Construction Health & Safety Site H&S officer; maintains PTW register
Chso
Officer and daily inspections (Sections 10 & 18).
DBSA/Client appointed independent H&S
Professional Construction
PrCHSA professional for PHSP acceptance and
Health & Safety Agent
oversight (Section 11).
South African Council for the
Registration body for CHSM/CHSO where
SACPCMP Project and Construction
applicable (Section 10).
Management Professions
Funder/technical oversight; appoints
Development Bank of Southern
DBSA Engineer, PrCHSA and specialists (Section
Africa
11).
Pressure Swing Adsorption Critical hospital plant; works affecting PSA
Psa
(oxygen plant) require written approval (Sections 4 & 9).
Battery storage system subject to OEM
BESS Battery Energy Storage System procedures and thermal runaway controls
(Sections 4, 22 & 31).
Solar array systems and associated works
PV Photovoltaic
(Sections 4 & 25).
Supplier of BESS/PV equipment; provides
Original Equipment
OEM commissioning and safety procedures
Manufacturer
(Sections 11 & 31).
Off-site equipment acceptance test to be
FAT Factory Acceptance Test
witnessed where required (Section 31).
7 | P a g e
Acronym Full term Relevance / Where used (Part / Section)
On-site acceptance test and
SAT Site Acceptance Test commissioning witnessed by Client/DBSA
(Section 31).
Site emergency procedures including
ERP Emergency Response Plan battery incident response and hospital
coordination (Sections 22 & 23).
Supplier-provided hazard information for
SDS Safety Data Sheet chemicals, fuels and battery electrolytes
(Section 21).
Environmental legislation governing
National Environmental
NEMA hazardous waste and disposal (Section
Management Act
21).
National standards (e.g., SANS 10142-1,
South African National
SANS SANS 1200) applicable to works (Sections
Standards
24 & 25).
International standards for PV/BESS (e.g.,
International Electrotechnical
Iec iec 62446, iec 62109, iec 62619)
Commission
(Sections 24 & 31).
H&S KPI to be reported monthly (Section
TRIR Total Recordable Injury Rate
20).
Lost Time Injury Frequency H&S KPI to be reported monthly (Section
Ltifr
Rate 20).
Minimum and task-specific PPE
PPE Personal Protective Equipment requirements; must meet SANS standards
(Sections 17 & 24).
Plan for deliveries, crane movements and
TMP Traffic Management Plan hospital interface traffic control (Section
29).
Competent person responsible for
TWD Temporary Works Designer temporary works design and certification
(Sections 26 & 27).
8 | P a g e
Acronym Full term Relevance / Where used (Part / Section)
Written appointment required for
LOA Letter of Appointment mandatory roles (must be submitted
pre-mobilisation) (Section 10).
H&S File Standardised index for the site H&S file
Health & Safety File Index
Index contents and handover pack (Section 12).
Statutory inspectorate for incident
Department of Employment and
DoEL / DEL reporting and enforcement (Sections 6 &
Labour
24).
Processes for design, testing and
Quality Assurance / Quality
QA / QC acceptance (FAT/SAT, test certificates)
Control
(Section 31).
The following definitions are adopted from the Mahikeng template and tailored to the
Bela-Bela project. Where the OHS Act or Construction Regulations provide a definition, that
statutory definition applies.
Agent — any competent person who acts as a representative for the Client.
Client — the person or entity for whom construction work is being performed
(DBSA/Client Representative for Bela-Bela Hospital).
under the OHS Act.
renovation, repair, demolition or dismantling of a building or similar structure; civil
engineering works; moving of earth; piling; excavations; or any similar work as
defined in the CR.
Construction work permit — a document issued in terms of CR 3 where applicable.
Contractor — an employer who performs construction work.
Danger — anything that may cause injury or damage to persons or property.
Employee — any person who is employed by or works for any employer and who
receives or is entitled to receive any remuneration or who works under the direction
or supervision of an employer.
9 | P a g e
remunerates that person.
plan that addresses hazards identified and includes safe working procedures to
mitigate, reduce or control the hazards identified.
document prepared by the Client pertaining to all health and safety requirements
related to construction work.
the Construction Regulations to be kept on site.
hazards to the health and safety of persons associated with the construction work.
qualifications specific to the work or task being performed.
connected and used for converting energy to performing work, or used for
developing, receiving, storing, containing, confining, transforming, transmitting,
transferring or controlling any form of energy.
employees by an occupational health practitioner where required.
Risk — the probability that injury or damage will occur.
Safe — free from any hazard.
SDS — Safety Data Sheet — supplier-provided document describing hazards,
handling, storage and emergency measures for hazardous substances.
and crane bases required for construction.
care (PSA oxygen plant, emergency power, medical gas, critical HVAC).
Contact Information
Source: Annexure B _DBSA Baseline Specification_RFP069.2026.pdf (unknown){"name":null,"email":"[email protected]","phone":"061 023 1439","department":"manager Date","address":"re institutions throughout"}
Evaluation Criteria
Source: Annexure B _DBSA Baseline Specification_RFP069.2026.pdf (unknown)General
Technical
Safety
Technical Specifications
Source: Annexure B _DBSA Baseline Specification_RFP069.2026.pdf (unknown)DSTI Daily Safe Task Instruction
BESS Battery Energy Storage System
HME Heavy Mobile Equipment
PV Photovoltaic
MDS Material Data Sheet
EMS Energy Management System
PPE Personal Protective Equipment
PSA Pressure Swing Adsorption
SWP Safe Work Procedure
DBSA Development Bank of Southern Africa
PCS Power Conversion System
1.1 Project Background
The Health and Safety Specifications pertaining to the design, manufacture, supply,
installation, testing, commissioning, operation, maintenance and performance
monitoring of integrated Solar Photovoltaic (PV), Battery Energy Storage System
(BESS), Grid-Forming Power Conversion System (PCS), Energy Management System
(EMS) and associated balance-of-plant equipment to provide resilient backup power to
containerized Pressure Swing Adsorption (PSA) oxygen generation facilities located at
healthcare institutions throughout the Republic of South Africa, it cover the subjects
contained in the index and is intended to outline the normal as well as any special
requirements of DBSA pertaining to the health and safety matters (including the
environment) applicable to the abovementioned project. These Specifications should
be read in
Quality Management
Source: Annexure B _DBSA Baseline Specification_RFP069.2026.pdfinstallation, testing, commissioning, operation, maintenance and performance
monitoring of integrated Solar Photovoltaic (PV), Battery Energy Storage System
(BESS), Grid-Forming Power Conversion System (PCS), Energy Management System
(EMS) and associated balance-of-plant equipment to provide resilient backup power to
containerized Pressure Swing Adsorption (PSA) oxygen generation facilities located at
healthcare institutions throughout the Republic of South Africa, it cover the subjects
contained in the index and is intended to outline the normal as well as any special
requirements of DBSA pertaining to the health and safety matters (including the
environment) applicable to the abovementioned project. These Specifications should
be read in conjunction with the Act, the Construction Regulations and all other
equipment not safe outriggers to be verified and
and serviceable, ensured,
no inspections and Load test certificates and
of 35
load test certificates Inspections by competent
available, persons to be in place prior,
security theft including
5 1 5 l
or unauthorised site access control,
person entering site, Mandatory alcohol testing,
structures (i,e, no structures and Competent and certified
access ladders, no material falling, temporary works personnel to
toe boards, be appointed,
insufficient bracing), inspections of temporary work
(i,e, HME - TLB, plant, incompetent injuries/fatalities, Development Bank of
graders, excavators, operator, Property damage Southern Africa inductions to
tipper trucks, water open/uneven be conducted before work to
trucks, cranes) surfaces, commence,
collision with Hospital Pre-use and daily inspections
equipment, of Plant,
intoxicated operator, Plant to be checked and
medically unfit approved for site before plant
operator, lack of mobilisation on site, plant
plant inspection and service history to be available,
service history, Competence verification of 5 6 30 EH
man/machine operators including valid
interface, congested medical assessments,
areas, speeding of Solid barricading of potential
operators, collision of hazards,
operators with daily alcohol testing of all
Trenching (i,e, (poor visibility Injuries resulting in specification,
foundation) conditions i,e, fog, permanent disabilities, Ensure competent trained
Mechanical failure of rain, blind spots), Property damage, personnel are used,
machines (brakes, Poor soil conditions, Collapsing of Dedicated pedestrian walk
steering, park brake, Lack of inspections excavation ways where practical,
leaks, etc,), resulting in to injuries Adequate barricading of
and serviceable Safe access and warnings,
5 3 15 m
condition, Inspections of excavations by
5 6 30 eh
weighted equipment equipment inspection, DSTI
Electrical Tools (e,g, Fires and explosions, equipment/tools
reportable Environmental inspection by a competent
Compliance Requirements
Source: Annexure B _DBSA Baseline Specification_RFP069.2026.pdf (unknown)No specific requirements found
Health & Safety
Source: Annexure B _DBSA Baseline Specification_RFP069.2026.pdfperformance
Time constraints Client has not Serious injury/Fatal. It is important to ensure that
allowed for adequate Property damage time for the construction is
time to complete Financial loss realistic and takes all possible
project to standard Environmental aspects that can cause delays
5 3 15 m
and on time impact into account
Prosecution
Damage to
companies’ image
Site Establishment
Fencing of laydown Access to laydown Muscular skeletal Planning of material deliveries to
area are accessible by injurie. prevent this situation.
unauthorised Back injuries
persons Cuts, bruises, and Prior arrangement and planning 5 2 10 M
Laydown area too fractures Injury to with Development Bank of
small for volume of employees Southern Africa terminal
construction material Damage to property management
of 35
BaselineRiskAssessment
Preparing laydown Preparing bases for Cuts, bruises, and Pre-planning of site lay-out and
area for office, store containers Exposure fractures Injury to activities
to traffic employees Ensure that crane and lifting
Lifting/sling of Damage to property operations are planned
containers in position equipment certified, operators
on bases with a competent, risk assessment
5 2 10 m
crane completed, and work permit is in
Connecting to place
electric connection Certified electrician and plumber
provided by to connect services and COC
Development Bank of issued
Southern Africa
Transportation of Sub-standard/un- Road accidents with Use of Vehicles to comply with
personnel to site roadworthy vehicles, potential for injuries the National Road Traffic Act
Driver under the and fatalities, (No, ),
influence, of Property damage
intoxicants,
incompetent/
unlicensed drivers,
5 6 30 eh
speeding by driver,
overcrowding of
vehicles, loading
equipment and tools
with employees,
vehicle not fitted with
seat belts,
of 35
BaselineRiskAssessment
Use of equipment and Improper use of tools Pinch points, cuts, Compliance to Project Health
tools and equipment laceration, incidents, and Safety Specification,
Incompetent/untraine (caught by, in Correct tools for the job and,
d operators/users’ between) resulting correct use of the tools,
Substandard tools in LTI’s, medical All tools and equipment to be
and equipment treatment cases or numbered and placed on
No safeguards where first registers and inspected when
required aid cases, required by competent persons, 5 1 5 L
Homemade tools, no Damage to property, Operators/users to have
SWP, competency/training and
experience,
All machine guarding to be in
place before equipment is used,
PPE (use of suitable gloves
mandatory, eye protection),
Lifting Operation- Incompetent crane Objects falling onto Compliance to Project Health
Placement of drivers/operators, people (employees) and Safety Specification,
containers/offices Heavier loads and/or property Crane operator and rigger
exceeding lifting Fatalities, Injuries competency to be verified
capacity of cranes, Property Damage before activities take place,
no rigging studies Rigging studies to be done 5 6 30 EH
done, where required, Ground stability,
Mobile cranes/lifting weights and placement of
equipment not safe outriggers to be verified and
and serviceable, ensured,
no inspections and Load test certificates and
of 35
BaselineRiskAssessment
load test certificates Inspections by competent
available, persons to be in place prior,
Sub-standard lifting Ensure registration and
tackle equipment, verification of LMI’s and LME’s,
Incorrect use of Wind monitoring tools to be
Lifting tackle, available,
Use of mobile cranes Employees to undergo formal
in high wind height work training,
conditions,
Employees falling
from top of
containers while
tying/untying rope,
Uneven/unsuitable
surfaces on which
crane will stand,
Underground services Failure to detect or Electrocution by live Permit system must be followed,
undetected existing electrical wires, Survey and detection results to
underground Damage to cables be made known,
services, and services results Additional use of detection
1 3 3 l
in disruption to equipment where required,
operations and Updated drawings indicating
services, services,
Fires, explosions Manual proof trenching,
of 35
BaselineRiskAssessment
Employees facilities Failure to provide Health, hygiene and Compliance to Project Health
employees facilities environmental and Safety Specification,
on site (i,e, eating damage/ Awareness Training on health
1 1 1 l
and sicknesses, (i,e, and hygiene requirements,
ablution facilities) food poisoning) Comply to Facilities
Regulations,
Temporary electrical Incompetent Fatality, Compliance to Project Health
Installations Installers, Unsafe Injuries resulting in and Safety Specification,
installations due to permanent Ensure competency of electrical
faulty wiring, disabilities installers and use of certified
Lack of insulation, (electrocution, burns equipment,
Substandard etc,) and property Inspections of installations and
electrical tools (e,g, damage fire safety equipment by
portable electrical competent inspectors, 5 3 15 M
grinders, drills) being Task Risk assessment with
used, SWP and work permits,
Contact with live Issuing of COC upon
electrical conductors completion,
Failure to adhere to
isolation and lockout
procedures
Stacking and Storage Incorrect control of Medical treatment Compliance to Project Health
stacked materials, injury,Lost time and Safety Specification, PPE
incorrect method injury,Damage to compliance, Appointment of 1 1 1 L
ofstacking property, stacking and storage personnel,
materials/articles
of 35
BaselineRiskAssessment
may cause injury to
Employees and
property damage
Site Access Failure to obtain site Injuries, Compliance to Project Health
access certificate, Property and Safety Specification,
Failure to provide damage/loss and Security management plan
security theft including
5 1 5 l
or unauthorised site access control,
person entering site, Mandatory alcohol testing,
Failure to test for
intoxication
Occupational Health & Hygiene
Noise - Working close Ergonomics – Over exposure to Occupational hygiene
or adjacent to the including Manual noise levels - short monitoring and medical
moving of handling and long term may surveillance,
construction plant result in potentially Hearing conservation
5 2 10 m
(equipment and permanent health programme,
machinery and impact (noise PPE (Ear protection-ear muffs),
public/Hospital induced hearing Compliance to Project Health
vehicles) loss) and Safety Specification
of 35
BaselineRiskAssessment
Working in extreme Exposure to extreme Overexposure may Occupational hygiene
temperatures/adverse ambient result in health monitoring and medical
weather conditions temperatures during conditions such as surveillance,
winter and summer heat exhaustion and Specialised PPE (e.g., lined
days, UV exposure, hypothermia, gloves, balaclavas, eye
5 2 10 m
windy/rainy Lung/chest/eye protection, dust
conditions infections from masks/specialised FFP1/FFP2),
particles being Compliance to Project Health
blown into eyes and and Safety Specification,
inhaled, Drinking sufficient potable water,
Ergonomics – Working on awkward Musculoskeletal Compliance to Project Health
including Manual work positions (i,e, injuries due to and Safety Specification (i,e,,
handling restricted space), manual handling, lifting techniques), Task based
Use of self-improved bending, twisting, risk assessment, DSTI and
/improper tools and prolonged, muscle Toolbox Talks, 5 1 5 L
machinery, strains, fatigue Correct lifting and handling
Heavy load manual practices and ergonomic
handling, repetitive awareness,
work
Dust Particles – i,e, Excessive exposure Inhalation exposure Compliance to Project Health
demolition and drilling to solid dust airborne to solid dust results and Safety Specification,
particles from in Respiratory Occupational health
construction infection (potentially assessment, 5 2 10 M
activities, permanent health Hygiene monitoring,
impact), Medical surveillance,
Lung Dust suppression,
of 35
BaselineRiskAssessment
Irritation/damage to FFP2 dust masks and safety
eyes/red eyes, goggles,
Operational activities Exposure to Inhalation exposure Inductions to be arranged with
resulting in Asbestos Asbestos dust during can result in DBSA before any work
dust exposure loading operations respiratory infection commences in/near such areas
and from stockpile (potentially so that PPE and safe work
areas which is in permanent health requirements can be
close proximity to the impact), communicated, Client to obtain
Hospital Lung a schedule of when such
5 3 15 m
Irritation/damage to operations will be taking place
eyes/ red eyes, i,e, loading of manganese and
lung disease, inform Contractor so that extra
Cancers, precautions can be taken during
these periods,
PPE requirements to be
adhered to,
of 35
BaselineRiskAssessment
Vibration and fumes – Exposure to Vibrations from Compliance to Project Health
HCS related activities vibrations as well as various and Safety Specification,
fumes emitting from plant/equipment can Occupational health
various construction result in carpal assessment,
activities such as tunnel syndrome Hygiene monitoring,
drilling, demolition vibration as well as Medical surveillance,
and associated have an effect on FFP2 masks and safety goggles
plant/equipment, employees kidneys and all other required PPE
6 2 10 m
Fumes from various Inhalation exposure
HCS to fumes results in
used, Respiratory infection
(potentially
permanent health
impact),
Irritation/damage to
eyes/ red eyes,
Communicable and Contact with an Fatalities and Training on communicable and
other infectious infected person or diseases infectious diseases during DSTI
diseases (e,g, area, Sneezing or and Toolbox talks,
COVID-19, HIV/AIDS, coughing without Practice social distancing,
etc,) closing the mouth, Washing of hands regularly,
5 6 30 eh
Unhygienic practices, use of face masks,
unprotected sexual Employees reporting to
practices management when sick,
Drink plenty of water and keep
hydrated,
of 35
BaselineRiskAssessment
Practice protected sex e.g., use
protection,
Project Construction Activities
Clear and grub - bush Incompetent person Exposure to Compliance to Project Health
clearing by means of operating Heavy venomous, snakes, and Safety Specification and
HME (Heavy Mobile Mobile Equipment insects, poisonous Client inductions,
Equipment) (HME), Operators spiders and Contractor emergency
not medically fit, scorpions, resulting in management plan including
Operators under the to fatalities, injuries, employee awareness training,
influence of alcohol Property damage, Verification of competent
while operating HME, operators training and
HME operators appointments as well as 5 6 30 EH
expose to high levels medical assessments,
of noise and Dedicated pedestrian walk
vibration, ways to prevent man/machine
HME not in safe and interface,
serviceable Flagmen/spotters to be
condition, collision appointed to regulate
between operators
and site personnel,
Use of Temporary Incompetent erectors Incidents resulting in Compliance to Project Health
Works (scaffolding, and inspectors when fatalities, injuries such and Safety Specification,
false work, formwork building as cuts, lacerations, Temporary works to comply 5 6 30 EH
and support work) support structures, Property damage from with SANS 10085 (scaffolding)
Incomplete support and Construction Regulations,
of 35
BaselineRiskAssessment
structures (i,e, no structures and Competent and certified
access ladders, no material falling, temporary works personnel to
toe boards, be appointed,
insufficient bracing), inspections of temporary work
Overloading support as required,
structures, Temporary work design and
Support structures drawings to be signed off by
not erected as per competent CR 12 appointee
drawings, and constructed accordingly,
No CR 12 (temp Permits to be obtained where
work designer) legally required,
appointee or Rebar to be closely monitored
incompetent CR 12, with regards to exposed and
sharp edges and to be capped
with rebar caps,
of 35
BaselineRiskAssessment
Use of mobile Plant Defective mobile Multiple Policies and procedures,
(i,e, HME - TLB, plant, incompetent injuries/fatalities, Development Bank of
graders, excavators, operator, Property damage Southern Africa inductions to
tipper trucks, water open/uneven be conducted before work to
trucks, cranes) surfaces, commence,
collision with Hospital Pre-use and daily inspections
equipment, of Plant,
intoxicated operator, Plant to be checked and
medically unfit approved for site before plant
operator, lack of mobilisation on site, plant
plant inspection and service history to be available,
service history, Competence verification of 5 6 30 EH
man/machine operators including valid
interface, congested medical assessments,
areas, speeding of Solid barricading of potential
operators, collision of hazards,
operators with daily alcohol testing of all
Hospital users, personnel,
property damage Required PPE to be worn and
caused by operators especially reflector vests for
high visibility,
Appointment of
spotters/flagmen,
of 35
BaselineRiskAssessment
Bricklaying Working at height, Cuts and lacerations, Compliance to Project Health
Manual handling, Back strains, and Safety Specification,
repetitive motions Dermatitis, Regular change of work
Exposure to Occupational activities and positions,
5 2 10 m
hazardous diseases Compliance to PPE
substances requirements,
Procedure to handle
hazardous substances,
Excavation and Inclement weather fatality, Project health and safety
Trenching (i,e, (poor visibility Injuries resulting in specification,
foundation) conditions i,e, fog, permanent disabilities, Ensure competent trained
Mechanical failure of rain, blind spots), Property damage, personnel are used,
machines (brakes, Poor soil conditions, Collapsing of Dedicated pedestrian walk
steering, park brake, Lack of inspections excavation ways where practical,
leaks, etc,), resulting in to injuries Adequate barricading of
Machines not in safe and fatalities, excavations,
and serviceable Safe access and warnings,
5 3 15 m
condition, Inspections of excavations by
Unprotected competent and appointed
excavations, Unsafe persons to ensure compliance
access and egress including checks pertaining to
into and from inclement weather,
excavations, Excavators/TLB used for deep
Unstable excavation excavations,
walls (even after Competent and certified
inclement weather), operators,
of 35
BaselineRiskAssessment
Loose objects on the Inspections according to
side walls of Construction regulations
excavations, section 13,
Underground services
being
struck/damaged,
Backfilling Movement of Injuries/fatalities, Dust suppression, methods to
machinery (TLB), Property damage, be
Dust emissions, Lung infections and to implemented,
Noise, be placed on registers Trained flagmen/spotters to be 5 6 30 EH
Improper use of appointed,
tools, All tools to be inspected before
use
Concrete Improper handling or Skin and or eye Project health and safety
Work,(Pouring, working with irritation, Back pain, specification, Medical
levelling, floating) concrete,(i,e, contact Fatalities, Surveillance (Fitness for Duty
with eyes or skin), Certificate), Employee
Holding of concrete Dossier, Concrete mix
5 6 30 eh
weighted equipment equipment inspection, DSTI
Incompetent and Toolbox Talk, Use of
concrete mix correct PPE (i,e, long sleeve
operator, Spillages overall, footwear, eye and
of concrete, hand protection etc), Spotter
of 35
BaselineRiskAssessment
for concrete truck mixer,
Supervision, Communication
of the MDS relating to
concrete/cement,
Working at elevated Working on Injuries, Project health and safety
position unprotected edges, Fatalities, specification,
Poor housekeeping Property loss due to Fall protection plan to be
leading to tools/equipment falling developed and employees to
accumulation of and being damaged be trained on it, Use fall
waste and loose protection and prevention
materials, Incorrect equipment (i,e, guardrails,
methods of getting solid barricade, harnesses),
materials, equipment Formal working at heights
5 6 30 eh
or tools from and to training, valid medicals to
ground (i,e, include working at height
throwing), assessments,
Working during Weather conditions to be
inclement weather monitored and documented,
conditions, Medically
unfit and untrained
employees working
at heights,
of 35
BaselineRiskAssessment
Construction plant Man/machine Injuries/fatalities/prop Procedures to be
interface within erty damage due to communicated with regards to
restricted areas, close proximity of working
plant/ equipment to conditions/environment and a
employees, sequence of events to be
implemented which minimises 5 6 30 EH
man/machine interface,
Competent flagmen to be
appointed to regulate the
man/machine interface
process,
Additional Exposure to Vibrations from Continuous monitoring and
deterioration and vibrations emitting various assessment of existing
further collapse of from various plant/equipment can structures during operations,
hospital/ all construction activities result in carpal tunnel Identification of minimum
Installations such as earthworks, syndrome/ white impact of vibrating tools and
drilling and finger vibration as well equipment,
associated plant/ as have an effect on Appointed Feasibility Service
equipment, employees’ kidneys provider to implement 5 6 30 EH
Inhalation exposure to methods to ensure hospital/ all
fumes results in Installations stabilisation
Respiratory infection before commencement of
(potentially permanent activities,
health impact),
damage to eyes/red
eyes,
of 35
BaselineRiskAssessment
Fatalities, injuries,
property damage,
Construction within Congested work Fatalities, Construction methodology to
operational areas areas, Injuries, identify procedures of
man/machine Property damage, staggered
interface, operational/construction areas,
Signages to be placed
informing affected people of
5 6 30 eh
the construction activities and
the hazards, Communications
to be sent out informing the
tenants/affected people about
the construction activities
taking place,
Use of Ladders Person falling from Injury requiring Project health and safety
the ladder, medical treatment, specification, 1 3 3 L
Carrying tools while Fatality, Inspection of Ladders before
of 35
BaselineRiskAssessment
ascending/descendin use,
g Three point contact when
ladder, climbing ladders,
Defective ladder
used
Hot Works – Incompetent Injury requiring Project health and safety
Welding, Grinding, Operators, medical treatment, specification,
Cutting Substandard Fatality, Daily electrical
Electrical Tools (e,g, Fires and explosions, equipment/tools
reportable Environmental inspection by a competent
Electrical Grinders, damage, person, Verified competency
Drills, Welding training for any person
Machines, operating electrically driven
Generators) being tools and equipment,
used, All electrical equipment run
Performing hot work from reportable generators to 5 3 15 M
activities in wet be double insulated,
weather conditions, Generators to be inspected
Oil/Fuel leaking daily,
generators Proper earthing processes to
Not adequate fire be followed for all activities,
prevention All tools to be inspected and
measures, checked before use including
use of correct cutting disk and
backing plates,
Grinders may only be used on
of 35
BaselineRiskAssessment
solid surface,
All electrically driven tools
must be double insulated and
must have a dead man switch
fitted,
Fire extinguisher and fire
fighter to be available during
execution,
Hot work permit must be
applied for before execution,
Plastering Defective/handmade Cuts, lacerations, All tools/equipment to be
tools bruises, Fractures, placed on a register and
In-adequate or Eye injuries, inspected before use and at
incorrect PPE, Dermatitis, regular intervals,
Incompetent No handmade tools,
personnel, Mandatory PPE to be worn at 5 2 10 M
Working at height, all times,
Only competent person to do
the job,
Safe work platforms to be
provided,
of 35
REGULATION 5(1)(b), 2014 OCCUPATIONAL HEALTH AND SAFETY ACT, NO.
(Latest Edition)
REGULATION 5(1)(b), 2014 OCCUPATIONAL HEALTH AND SAFETY ACT, NO.
(Latest Edition)
REGULATION 5(1)(b), 2014 OCCUPATIONAL HEALTH AND SAFETY ACT, NO.
(Latest Edition)
1.1 Project Background .........................................................................................................................................4
Project Scope..............................................................................................................................................................5
Risk Assessment .......................................................................................................................................................7
Risk Hazard Matrix ..................................................................................................................................................35
of 35
Document No S-HSBR-001-00
Revision 00
REGULATION 5(1)(b), 2014 OCCUPATIONAL HEALTH AND SAFETY ACT, NO.
(Latest Edition)
REGULATION 5(1)(b), 2014 OCCUPATIONAL HEALTH AND SAFETY ACT, NO.
(Latest Edition)
REGULATION 5(1)(b), 2014 OCCUPATIONAL HEALTH AND SAFETY ACT, NO.
(Latest Edition)
taking into consideration all construction methods.
Geographical location: Within various locations of KwaZulu Natal
Legal requirements pertaining to the specific task step’s control measures are assumed to be implemented and will not be
repeated in the baseline risk assessment. Proposed Risk Controls focus on unique risks anticipated, and/or specific client
requirements.
y M, Hazards lityActivities/Task injury to person control Rating Rating, L, Probabi Severit
include safety Damage to
aspects for safety companies image
during
constructability, 5 3 15 M
operability and
maintainability
used by designers in their
designs and information that
could affect health and safety in
of 35
and safety completed safe, on time and to
information in tender the quality expected by the
document
of 35
contractor based on
cost and not on
competence and
health and safety
performance
containers in position equipment certified, operators
on bases with a competent, risk assessment
5 2 10 m
crane completed, and work permit is in
tools and equipment laceration, incidents, and Safety Specification,
Incompetent/untraine (caught by, in Correct tools for the job and,
d operators/users’ between) resulting correct use of the tools,
Substandard tools in LTI’s, medical All tools and equipment to be
and equipment treatment cases or numbered and placed on
place before equipment is used,
PPE (use of suitable gloves
mandatory, eye protection),
Placement of drivers/operators, people (employees) and Safety Specification,
containers/offices Heavier loads and/or property Crane operator and rigger
exceeding lifting Fatalities, Injuries competency to be verified
capacity of cranes, Property Damage before activities take place,
no rigging studies Rigging studies to be done 5 6 30 EH
done, where required, Ground stability,
employees facilities environmental and Safety Specification,
on site (i,e, eating damage/ Awareness Training on health
1 1 1 l
and sicknesses, (i,e, and hygiene requirements,
ablution facilities) food poisoning) Comply to Facilities
installations due to permanent Ensure competency of electrical
faulty wiring, disabilities installers and use of certified
Lack of insulation, (electrocution, burns equipment,
Substandard etc,) and property Inspections of installations and
electrical tools (e,g, damage fire safety equipment by
portable electrical competent inspectors, 5 3 15 M
grinders, drills) being Task Risk assessment with
used, SWP and work permits,
stacked materials, injury,Lost time and Safety Specification, PPE
incorrect method injury,Damage to compliance, Appointment of 1 1 1 L
ofstacking property, stacking and storage personnel,
materials/articles
of 35
access certificate, Property and Safety Specification,
Noise - Working close Ergonomics – Over exposure to Occupational hygiene
or adjacent to the including Manual noise levels - short monitoring and medical
moving of handling and long term may surveillance,
construction plant result in potentially Hearing conservation
5 2 10 m
(equipment and permanent health programme,
machinery and impact (noise PPE (Ear protection-ear muffs),
public/Hospital induced hearing Compliance to Project Health
vehicles) loss) and Safety Specification
of 35
temperatures/adverse ambient result in health monitoring and medical
weather conditions temperatures during conditions such as surveillance,
winter and summer heat exhaustion and Specialised PPE (e.g., lined
days, UV exposure, hypothermia, gloves, balaclavas, eye
5 2 10 m
windy/rainy Lung/chest/eye protection, dust
conditions infections from masks/specialised FFP1/FFP2),
particles being Compliance to Project Health
blown into eyes and and Safety Specification,
inhaled, Drinking sufficient potable water,
Ergonomics – Working on awkward Musculoskeletal Compliance to Project Health
including Manual work positions (i,e, injuries due to and Safety Specification (i,e,,
handling restricted space), manual handling, lifting techniques), Task based
handling, repetitive awareness,
work
Dust Particles – i,e, Excessive exposure Inhalation exposure Compliance to Project Health
demolition and drilling to solid dust airborne to solid dust results and Safety Specification,
particles from in Respiratory Occupational health
construction infection (potentially assessment, 5 2 10 M
activities, permanent health Hygiene monitoring,
impact), Medical surveillance,
Irritation/damage to FFP2 dust masks and safety
eyes/red eyes, goggles,
resulting in Asbestos Asbestos dust during can result in DBSA before any work
dust exposure loading operations respiratory infection commences in/near such areas
and from stockpile (potentially so that PPE and safe work
areas which is in permanent health requirements can be
close proximity to the impact), communicated, Client to obtain
fumes emitting from plant/equipment can Occupational health
various construction result in carpal assessment,
activities such as tunnel syndrome Hygiene monitoring,
drilling, demolition vibration as well as Medical surveillance,
and associated have an effect on FFP2 masks and safety goggles
plant/equipment, employees kidneys and all other required PPE
6 2 10 m
clearing by means of operating Heavy venomous, snakes, and Safety Specification and
HME (Heavy Mobile Mobile Equipment insects, poisonous Client inductions,
Equipment) (HME), Operators spiders and Contractor emergency
not medically fit, scorpions, resulting in management plan including
Works (scaffolding, and inspectors when fatalities, injuries such and Safety Specification,
false work, formwork building as cuts, lacerations, Temporary works to comply 5 6 30 EH
and support work) support structures, Property damage from with SANS 10085 (scaffolding)
not erected as per competent CR 12 appointee
drawings, and constructed accordingly,
No CR 12 (temp Permits to be obtained where
work designer) legally required,
appointee or Rebar to be closely monitored
incompetent CR 12, with regards to exposed and
sharp edges and to be capped
with rebar caps,
of 35
property damage Required PPE to be worn and
caused by operators especially reflector vests for
high visibility,
5 2 10 m
hazardous diseases Compliance to PPE
substances requirements,
hazardous substances,
concrete mix correct PPE (i,e, long sleeve
operator, Spillages overall, footwear, eye and
of concrete, hand protection etc), Spotter
of 35
informing affected people of
5 6 30 eh
the construction activities and
the hazards, Communications
to be sent out informing the
tenants/affected people about
the construction activities
taking place,
used
Hot Works – Incompetent Injury requiring Project health and safety
incorrect PPE, Dermatitis, regular intervals,
personnel, Mandatory PPE to be worn at 5 2 10 M
Environmental
Source: Annexure B _DBSA Baseline Specification_RFP069.2026.pdfForming PCS, Battery Energy Storage System (BESS), Energy Management System
(EMS), associated electrical infrastructure and integration with new and/or existing
standby generator systems. Final plant capacities and equipment ratings shall be
confirmed during detailed design based on site-specific load profiles, operational
requirements and environmental conditions.
regulation into Financial loss specifically the requirements of
account during Environmental section 6 of the 2014
stages 2,3 and 4 impact construction regulations.
surveys not adhered Environmental geotech, Archaeological,
to in planning and impact heritage, Asbestos, ground
designs Prosecution water, environmental impact,
5 3 15 m
management complete project Property damage Africa project cost management
safe, expected Financial loss must ensure that the project
quality and on time Environmental budget includes all costs
allowed for adequate Property damage time for the construction is
time to complete Financial loss realistic and takes all possible
project to standard Environmental aspects that can cause delays
5 3 15 m
and on time impact into account
leading to tools/equipment falling developed and employees to
accumulation of and being damaged be trained on it, Use fall
waste and loose protection and prevention
materials, Incorrect equipment (i,e, guardrails,
methods of getting solid barricade, harnesses),
materials, equipment Formal working at heights
5 6 30 eh
or tools from and to training, valid medicals to
ground (i,e, include working at height
throwing), assessments,
Contractual Terms
Source: Annexure B _DBSA Baseline Specification_RFP069.2026.pdfof critical oxygen generation infrastructure through the deployment of standardized
solar hybrid microgrid systems capable of supporting PSA oxygen plants during utility
supply interruptions and periods of poor grid reliability.
Section
Source: Annexure B _DBSA Baseline Specification_RFP069.2026.pdfThe Contractor shall install temporary power quality and energy monitoring
client grid so as to prevent wastage of harvested energy and offset some client grid
Contact Information
Source: Annexure A_Health and Safety Specification_RFP069.2026.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":".......................................................................................... 56"}
Evaluation Criteria
Source: Annexure A_Health and Safety Specification_RFP069.2026.pdf (unknown)General
Compliance
Health And Safety
Methodology
Source: Annexure A_Health and Safety Specification_RFP069.2026.pdfdesign and where particular code/standard is not appropriate, to
eliminate these risks, the systematic risk based approach should be
used to determine the right solution and reduce the risk as low as
reasonably practicable while ensuring that the client is aware of the
residual risks.
Compliance Requirements
Source: Annexure A_Health and Safety Specification_RFP069.2026.pdf (unknown)completion certificate to the client and a copy thereof to the
B-BBEE Minimum Level: 6
Health & Safety
Source: Annexure A_Health and Safety Specification_RFP069.2026.pdfREGULATION 5(1)(b), 2014 OCCUPATIONAL HEALTH AND SAFETY ACT, NO. (Latest Edition)
safety of persons. This document is prepared in line with the Baseline Risk
(Tba)
Health and Safety specification Rev 0 of 97
REGULATION 5(1)(b), 2014 OCCUPATIONAL HEALTH AND SAFETY ACT, NO. (Latest Edition)
2.1. Introduction to the Health and Safety Specification ....................................... 6
2.1.1. Scope of health and safety specification ............................... 9
2.1.2. Scope of works covered in this Health and Safety specification includes: ...... 10
2.1.3. Implementation of the Occupational Health and Safety Specification ............. 12
3.1. Application for work permits (CR 3) ............................................................. 13
3.2. Duties of client/DBSA (CR 5) ........................................................................ 15
3.3. DBSA Rules of Conduct ............................................................................... 19
3.4. Designs for Safety Requirements ................................................................. 21
3.5. Principal Contractor/Contractors Duties (CR 7) ............................................ 28
3.6. Subcontractors ............................................................................................ 31
4.1. Compensation of Occupational Injuries and Diseases Act (COID Act)
............................................................................................................................... 33
4.2. Notification of Intention to Commence Construction Work (CR 4) ..................... 33
4.3. Principal Contractor/Contractors H&S Plan (CR 7).................................................. 34
4.4. Appointments, Management and Supervision of Construction Work (CR 8) .............. 35
4.5. Health and Safety File .......................................................................................... 37
4.6. Risk Assessments (CR 9) PROJECT SITE SPECIFIC RISK ASSESSMENT ................ 47
4.7 Project / Site specific requirements ....................................................................... 48
4.8. Induction Training ......................................................................................... 51
4.9. Health and Safety Training.............................................................................. 51
4.10. Arrangements for Monitoring and Reporting .................................................. 52
4.11. DBSA Audits ................................................................................................ 52
4.12. First Aid ....................................................................................................... 52
4.13. First Aid Box and Equipment ....................................................................... 53
Health and Safety specification Rev 0 of 97
REGULATION 5(1)(b), 2014 OCCUPATIONAL HEALTH AND SAFETY ACT, NO. (Latest Edition)
4.14. Hazard Notices ............................................................................................. 54
4.15. Reporting of incidents and/or injuries ............................................................ 54
4.16. Emergency preparedness and response Emergency response plan ............ 55
4.17. Fire Precautions........................................................................................... 56
4.18. Personal Protective Equipment (Clothing) .................................................... 58
4.19. Signage and Notices ..................................................................................... 59
4.20. Permit to Work ............................................................................................. 60
5.1. Barricading and Demarcation ...................................................................... 61
5.2. Fall protection (CR 10) ................................................................................. 61
5.3. Structure (CR 11) ......................................................................................... 63
5.4. Temporary works (CR 12) ............................................................................ 64
5.5. Excavation (CR 13) ...................................................................................... 67
5.6. Demolition Work (CR 14) ............................................................................. 69
5.7. Tunnelling (CR 15) ....................................................................................... 72
5.8. Scaffolding (CR 16) ...................................................................................... 72
5.9. Ladders ....................................................................................................... 72
5.10. Suspended Platforms (CR 17) ...................................................................... 73
5.11. Rope Access Work (CR 18) .......................................................................... 79
5.12. Material Hoist (CR 19) .................................................................................. 80
5.13. Piling ........................................................................................................... 82
5.14. Electrical installations and machinery (CR 24).............................................. 82
5.15. Use and temporary storage of flammable liquids.......................................... 83
5.16. Housekeeping and general safeguarding (CR 27) ......................................... 83
5.17. Stacking and Storage (CR 28)....................................................................... 84
5.18. Fire precautions (CR 29) .............................................................................. 85
5.19. Hazardous Chemical Substance (HCSR) ...................................................... 86
5.20. Asbestos (when applicable) (AR) ................................................................. 87
5.21. Confined space (GSR) .................................................................................. 87
Health and Safety specification Rev 0 of 97
REGULATION 5(1)(b), 2014 OCCUPATIONAL HEALTH AND SAFETY ACT, NO. (Latest Edition)
6.1. Construction vehicles and mobile plant (CR 23) ........................................... 88
6.2. Cranes (CR 22) ............................................................................................. 91
6.3. Vessels under pressure and gas bottles ...................................................... 92
6.4. Welding, Flame- Cutting, Soldering and similar operations........................... 92
6.5. Public safety and Security measures ........................................................... 93
7.1. Occupational Health ..................................................................................... 94
7.2. Occupational Hygiene .................................................................................. 95
7.3. Employee Facilities ...................................................................................... 95
7.4. Alcohol and Drugs ....................................................................................... 96
Health and Safety specification Rev 0 of 97
REGULATION 5(1)(b), 2014 OCCUPATIONAL HEALTH AND SAFETY ACT, NO. (Latest Edition)
definitions given hereunder shall apply:
CR Refers to the Construction regulations 2014
HSS Refers to this document (the Health and Safety
Specification) including any project - specific annexures that
the engineers could attach.
OHSA refers to the Occupational Health &Safety Act of 1993
Directorate in terms of Regulation 5 (6) of the Regulations.
Client means the Development Bank of Southern Africa. (DBSA)
Regulations means, specifically, the Construction Regulations, 2014 as
issued on 07 February 2014, under the Occupational Health
& Safety Act of 1993, but not excluding the other applicable
regulations existing under the Act.
and Contractor
Health and Safety specification Rev 0 of 97
REGULATION 5(1)(b), 2014 OCCUPATIONAL HEALTH AND SAFETY ACT, NO. (Latest Edition)
2.1. Introduction to the Health and Safety Specification
In terms of Construction Regulation 5(1) (b) of the Occupational Health and
Safety Act, 1993 (Act ), DBSA, as the Client, shall be responsible
to prepare Health & Safety Specifications for any intended construction project
and provide any Principal Contractor who is making a bid or appointed to
perform construction work for the Client and/or its Agent on its behalf with the
same.
there-under. The Principal Contractor shall be responsible for the Health &
Safety Policy for the site in terms of Section 7 of the Act and in line with
Construction Regulation 7 as well as the Health and Safety Plan for the
project.
This “Health and Safety Specifications document is governed by the
occupational Health and safety Act 1993 (Act No. ), hereafter
referred to as “The Act”. Notwithstanding this cognizance should be taken of
the fact that no single Act or its set of Regulations can be read in isolation.
stipulates á documented specification of all Health and safety requirements
pertaining to associated works on a construction site, so as to ensure the
health and Safety of persons, it is required that the entire scope oof the labour
regulations including the Basic conditions of Employment Act be considered
Health and Safety specification Rev 0 of 97
REGULATION 5(1)(b), 2014 OCCUPATIONAL HEALTH AND SAFETY ACT, NO. (Latest Edition)
as part of the legal compliance system. With reference to this specification the
requirement is limited to health, safety and environmental issues pertaining to
the site of the project as referred to here-in. Despite the foregoing it is
reiterated that environmental management shall receive due attention.
and in consideration of the information contained here-in, the contractor shall
develop a Risk Assessment Program to identify and determine the scope and
Shall include documented “Method Statements” detailing the key activities to
be performed in order to provide details of any risk associated with any hazard
at the construction site, in order to identify the steps needed to be taken to
remove, reduce or control such hazard. This Risk Assessment and the steps
identified will be the basis or point of departure for the Health and Safety Plan.
The Health and Safety Plan reduce as far as practicable; the hazards identified
in the Risk Assessment.
the project to which this specification document pertains. Any such
Health and Safety specification Rev 0 of 97
REGULATION 5(1)(b), 2014 OCCUPATIONAL HEALTH AND SAFETY ACT, NO. (Latest Edition)
inaccuracies, inconsistencies and/or inadequacies must immediately be
brought to the attention of the Agent and/or Client.
all people and properties affected under its custodianship or contractual
commitments, and is further obligated to monitor that these measures are
structured and applied according to the requirements of the Health and Safety
to construction sites which might affect the health and safety of persons at
work and the health and safety of persons in connection with the use of plant
and machinery; and to protect persons other than persons at work against
hazards to health and safety arising out of or in connection with the activities
of persons at work during the carrying out of construction work for DBSA. The
aspects of the project and to be provided with information and requirements
on inter alia:
a) Safety considerations affecting the site of the project and its
environment;
b) Health and safety aspects of the associated structures and equipment;
c) Submissions on health and safety matters required from the Principal
Contractor; and
d) The Principal Contractor’s (and his / her Contractor) Health and Safety
Health and Safety specification Rev 0 of 97
REGULATION 5(1)(b), 2014 OCCUPATIONAL HEALTH AND SAFETY ACT, NO. (Latest Edition)
expected with regard to the Occupational Health and Safety Act, 1993 (Act
No. ) and the Regulations made there-under including the
applicable safety standards, and in particular in terms of Section 8 of the Act.
incorporated into the Act.
2.1.1. Scope of health and safety specification
REGULATION 5(1)(b), 2014 OCCUPATIONAL HEALTH AND SAFETY ACT, NO. (Latest Edition)
of DBSA pertaining to the health and safety matters (including the
environment) applicable to the abovementioned project. These Specifications
should be read in conjunction with the Act, the Construction Regulations and
all other Regulations and Safety Standards which were or will be promulgated
under the Act or incorporated into the Act and be in force or come into force
during the effective duration of the project. The stipulations
2.1.2. Scope of works covered in this Health and Safety specification includes:
Forming PCS, Battery Energy Storage System (BESS), Energy Management
System (EMS), associated electrical infrastructure and integration with new
Health and Safety specification Rev 0 of 97
REGULATION 5(1)(b), 2014 OCCUPATIONAL HEALTH AND SAFETY ACT, NO. (Latest Edition)
and/or existing standby generator systems. Final plant capacities and
equipment ratings shall be confirmed during detailed design based on site-
specific load profiles, operational requirements and environmental conditions.
Phase-to-phase and phase-to-neutral voltages (V)
Phase currents (A)
Active power (kW)
Apparent power (kVA)
Power factor (pf)
Health and Safety specification Rev 0 of 97
REGULATION 5(1)(b), 2014 OCCUPATIONAL HEALTH AND SAFETY ACT, NO. (Latest Edition)
Active energy consumption (kWh)
Maximum demand (kW)
Load profiles and operating cycles
by making use of the inverter settings in conjunction with CT’s (current
transformers). Excess energy shall not be clipped after full BESS charge and
shall feed into the client grid so as to prevent wastage of harvested energy
and offset some client grid use.
(BESS), shall have an energy availability equivalent to the runtime needs of
the PSA – 98% available and penalties equivalent to PSA downtime shall
apply.
2.1.3. Implementation of the Occupational Health and Safety Specification
required to make it an integral part of their contracts with subcontractors and
Health and Safety specification Rev 0 of 97
REGULATION 5(1)(b), 2014 OCCUPATIONAL HEALTH AND SAFETY ACT, NO. (Latest Edition)
suppliers. The prospective Principal Contractors shall allow in their tenders for
the cost of complying with the requirements of the health and safety
specification as well as other regulations and standards applicable.
Health and Safety specification Rev 0 of 97
REGULATION 5(1)(b), 2014 OCCUPATIONAL HEALTH AND SAFETY ACT, NO. (Latest Edition)
thirteen million rand or is for the Construction Industry Development
Board grading level 6.
only if -
baseline risk assessment and (b) a suitable, sufficiently
documented and coherent site specific health and safety
specification for the intended construction work based on the
baseline risk assessment contemplated in paragraph (a); have been
submitted; and
regulation 5(5) with regard to the registration and good standing of
the Principal Contractor as contemplated in regulation 5(1)(j); and
that regulation 5(1)(c), (d), (e), (f), (g) and (h) has been complied
with.
Health and Safety specification Rev 0 of 97
REGULATION 5(1)(b), 2014 OCCUPATIONAL HEALTH AND SAFETY ACT, NO. (Latest Edition)
construction work permit contemplated in sub regulation (1) in the occupational
health and safety file for inspection by an inspector, the Client, the Client's
authorised agent, or an employee.
No construction work contemplated in sub regulation (1) may be commenced
or carried out before the construction work permit and number contemplated
in sub regulation (3) have been issued and assigned.
A site-specific number contemplated in sub regulation (3) is not transferrable.
3.2. Duties of client/DBSA (CR 5)
work project.
specific health and safety specification for the intended construction
work based on the baseline risk assessment contemplated in
paragraph (1).
contemplated in paragraph (2).
specification into consideration during the design stage.
in regulation 6.
Health and Safety specification Rev 0 of 97
REGULATION 5(1)(b), 2014 OCCUPATIONAL HEALTH AND SAFETY ACT, NO. (Latest Edition)
made adequate provision for the cost of health and safety
measures.
necessary competencies and resources to carry out the
construction work safely.
contemplated in the Compensation for Occupational Injuries and
Diseases Act, 1993 (Act No. ).
thereof on the construction site.
the Principal Contractor's Health and Safety plan contemplated in
regulation 7(1), and must thereafter finally approve that plan for
implementation.
plan is available on request to an employee, inspector or Contractor.
Safety plan contemplated in regulation 7(1)(a) is implemented and
maintained.
Health and Safety specification Rev 0 of 97
REGULATION 5(1)(b), 2014 OCCUPATIONAL HEALTH AND SAFETY ACT, NO. (Latest Edition)
verification are conducted at intervals mutually agreed upon
between the Principal Contractor and any Contractor, but at least
once every 30 days.
contemplated in paragraph (15) is provided to the Principal
poses a threat to the health and safety of persons which is not in
accordance with DBSA’s Health and Safety specifications and the
work, make sufficient health and safety information and appropriate
resources available to the Principal Contractor to execute the work
safely; and
7(1)(b) is kept and maintained by the Principal Contractor.
of a design change or an error in construction due to the actions of
DBSA; DBSA must ensure that sufficient safety information and
appropriate additional resources are available to execute the
required work safely.
construction site, DBSA must ensure that the Contractor provides the
Provincial Director with a report contemplated in Section 24 of the
Act, in accordance with regulations 8 and 9 of the General
Administrative Regulations, 2013, and that the report includes the
Health and Safety specification Rev 0 of 97
REGULATION 5(1)(b), 2014 OCCUPATIONAL HEALTH AND SAFETY ACT, NO. (Latest Edition)
measures that the Contractor intends to implement to ensure a safe
construction site as far as is reasonably practicable.
contemplated in sub regulation (1)(k), the client must take reasonable
steps to ensure co-operation between all Principal Contactors and
regulation 3(1), DBSA must, without derogating from his or her Health
and Safety responsibilities or liabilities, appoint a competent person
in writing as an Agent to act as his or her representative, and where
such an appointment is made the duties that are imposed by these
person in writing as an Agent to act as his or her representative, and
where such an appointment is made the duties that are imposed by
these Regulations upon DBSA, apply as far as reasonably
practicable to the Agent so appointed: Provided that, where the
question arises as to whether an Agent is necessary, the decision of
an inspector is decisive.
manage the health and safety on a construction project for
DBSA; and
e registered with a statutory body (SACPCMP) approved by the
Health and Safety specification Rev 0 of 97
REGULATION 5(1)(b), 2014 OCCUPATIONAL HEALTH AND SAFETY ACT, NO. (Latest Edition)
Chief Inspector as qualified to perform the required functions;
3.3. DBSA Rules of Conduct
employee or visitor whose action and demeanour show symptoms of
possible narcosis or drunkenness shall be removed from site.
unnecessarily discharge fire extinguishers.
training and authorization.
respect to carrying out of properly issued instructions or orders for health
and Safety reasons.
the person in charge.
Health and Safety specification Rev 0 of 97
REGULATION 5(1)(b), 2014 OCCUPATIONAL HEALTH AND SAFETY ACT, NO. (Latest Edition)
investigations.
Rule 1 Do not come to work in possession or consumption of banned
substances or being under the influence of alcohol.
Rule 2 Do not violate traffic rules and do not exceed the prescribed
speed limit 40 km p/h within DBSA premises and 20km p/h on the
quay side.
Rule 3 Do not work in the hazardous areas without proper procedure
being followed.
Rule 4 Do not work at height where there is a risk of falling without fall
protection equipment.
Rule 5 Do not clean or repair any equipment without following isolation
or locking out procedure.
Rule 6 Do not stand or work within the demarcated line of the edge of the
quay without the life vest/jacket.
Rule 7 Adhere to all railway rules, signs and stay out of the close
clearance areas.
Rule 8 Do not enter or work in the confined space alone and without a
proper procedure being followed throughout the duration of the
task.
Rule 9 Do not stand under the suspended load.
Rule 10 Adhered to all the health and safety basic rules, standards and
signals and always wear the required PPE.
Rule 11 Do not tamper with or disable safety devices.
Health and Safety specification Rev 0 of 97
REGULATION 5(1)(b), 2014 OCCUPATIONAL HEALTH AND SAFETY ACT, NO. (Latest Edition)
3.4. Designs for Safety Requirements
and health during the construction stage and during subsequent use and
maintenance. They are therefore a key contributor to construction health
and safety.
Health and Safety specification Rev 0 of 97
REGULATION 5(1)(b), 2014 OCCUPATIONAL HEALTH AND SAFETY ACT, NO. (Latest Edition)
and design of the structures to avoid or minimise risks from known site
hazards, including:
units
Health and Safety specification Rev 0 of 97
REGULATION 5(1)(b), 2014 OCCUPATIONAL HEALTH AND SAFETY ACT, NO. (Latest Edition)
can be dealt with in the safety and health plan.
eliminate risk or where this is not possible reduce risk as low as reasonably
practicable through the implementation of control measure. Typical
requirements and example of safe design for different stages are shown in
table 1 below.
Table 1. Safety in design requirements
Concept design (This may Identification of critical health - Site geology e.g.
include feasibility or option and safety related risks that soft soil
studies) may affect the viability of the Contaminated land
project - Emissions from
development
Health and Safety specification Rev 0 of 97
REGULATION 5(1)(b), 2014 OCCUPATIONAL HEALTH AND SAFETY ACT, NO. (Latest Edition)
Functional design (This Identification of reasonably - Specification of
may include preliminary foreseeable safety risks with a materials with high
design) design project associated with durability and low
the construction/manufacture, maintenance
installation, commissioning, requirements
maintenance/repair, demolition - Hazardous area
and disposal (Hazard An classification
operability studies may be - Redundancy-
used to identify risks (Hazop)) introduction of
duplicates to allow
safe continued
operation in the event
of failure
safe access to roofs,
plants rooms and
windows for
maintenance and
repair purposes such
as stairs or
walkaways with
guardrails.
considerations
Health and Safety specification Rev 0 of 97
REGULATION 5(1)(b), 2014 OCCUPATIONAL HEALTH AND SAFETY ACT, NO. (Latest Edition)
ergonomic principles
eg avoid designing
construction activities
that require work with
restricted spaces or
designs that require
repetitive or
prolonged
movements to
complete task.
Detailed design (This Focusing on ways in which a - Eliminating the need
includes full documentation design can be modified to for installing
to commence and should eliminate or reduce issues that temporary barriers,
include consideration of the may affect the ongoing safety by integrated
procurement, construction, of persons involved in guardrail system
start up and ongoing constructing, using, along roof edges.
operation and maintenance maintaining or demolishing the - Inclusion of
of project) design product. construction access
into building fabric
e.g. removable
panels
to facilitate the
movement of heavy
items
Health and Safety specification Rev 0 of 97
REGULATION 5(1)(b), 2014 OCCUPATIONAL HEALTH AND SAFETY ACT, NO. (Latest Edition)
need to be undertaken:
The current construction regulation 2014 (CR 6) requires that the designer of
a structure must: -
design and other legal requirements (e.g. Driving Machinery regulation)
Consider the DBSA’s Health and Safety specifications requirement.
Prepare a report which sets out: all relevant Health and safety information
about the design which may affect pricing, the geo-technical aspects and
the loading that the structure can withstand.
relating to the construction work and make available all relevant
information required for the safe execution of the work upon being
designed or when the design is subsequently altered.
the use of dangerous procedures or materials hazardous to the Health and
substituting materials.
Health and Safety specification Rev 0 of 97
REGULATION 5(1)(b), 2014 OCCUPATIONAL HEALTH AND SAFETY ACT, NO. (Latest Edition)
design.
agent must do these.
at appropriate stages to verify that the construction of the relevant structure
is carried out in accordance with his design: Provided that if the designer
is not so mandated, the client's appointed agent in this regard is
responsible to carry out such inspections;
from executing any construction work which is not in accordance with the
relevant design's health and safety aspects: Provided that if the designer
is not so mandated, the client's appointed agent in that regard must stop
that contractor from executing that construction work;
inspection of the completed structure in accordance with the National
supporting all anticipated vertical and lateral loads that may be applied.
Health and Safety specification Rev 0 of 97
REGULATION 5(1)(b), 2014 OCCUPATIONAL HEALTH AND SAFETY ACT, NO. (Latest Edition)
structural design drawings issued by the Contractor, and in the event of
any uncertainty consult the Contractor.
are kept at the office of the temporary works designer and are made
available on request by an inspector.
clearly indicated in the design.
3.5. Principal Contractor/Contractors Duties (CR 7)
a) Provide and demonstrate to the client a suitable, sufficiently
documented and coherent site-specific Health and Safety plan, based
on DBSA’s documented Health and Safety Specifications
contemplated in regulation 5(1)(b), which plan must be applied from
the date of commencement of and for the duration of the
construction work and which must be reviewed and updated by the
b) Open and keep on site a Health and Safety file, which must include
all documentation required in terms of the Act and these
inspector, DBSA; DBSA’s agent or a Contractor; and
c) On appointing any other Contractor, in order to ensure compliance
with the provisions of the Act-
i) Provide Contractors who are tendering to perform
construction work for the Principal Contractor, with the
Health and Safety specification Rev 0 of 97
REGULATION 5(1)(b), 2014 OCCUPATIONAL HEALTH AND SAFETY ACT, NO. (Latest Edition)
relevant sections of the Health and Safety specifications
contemplated in regulation 5(1)(b) pertaining to the
construction work which has to be performed;
ii) Ensure that potential Contractors submitting tenders have
made sufficient provision for Health and Safety measures
during the construction process;
iii) Ensure that no Contractor is appointed to perform
construction work unless the Principal Contractor is
reasonably satisfied that the Contractor that he or she
intends to appoint, has the necessary competencies and
resources to perform the construction work safely;
iv) Ensure prior to work commencing on the site that every
as contemplated in the Compensation for Occupational
Injuries and Diseases Act, 1993;
v) Appoint each Contractor in writing for the part of the project
on the construction site;
vi) Take reasonable steps to ensure that each Contractor's
health and safety plan contemplated in sub regulation (2)(a)
is implemented and maintained on the construction site;
vii) Ensure that the periodic site audits and document verification
are conducted at intervals mutually agreed upon between the
every 30 days;
viii) Stop any Contractor from executing construction work which
Health and Safety specification Rev 0 of 97
REGULATION 5(1)(b), 2014 OCCUPATIONAL HEALTH AND SAFETY ACT, NO. (Latest Edition)
is not in accordance with the DBSA’s health and safety
specifications and the Principal Contractor's Health and
and safety of persons;
ix) Where changes are brought about to the design and
construction, make available sufficient health and safety
information and appropriate resources to the Contractor to
execute the work safely; and
x) Discuss and negotiate with the Contractor the contents of the
health and safety plan contemplated in sub regulation (2)(a),
and must thereafter finally approve that plan for
implementation;
d) Ensure that a copy of his or her Health and Safety plan
contemplated in paragraph (a), as well as the Contractor's Health
and Safety plan contemplated in sub regulation (2)(a), is available
on request to an employee, an inspector, a Contractor, DBSA or
DBSA’s agent;
e) Hand over a consolidated health and safety file to DBSA upon
completion of the construction work and must, in addition to the
documentation referred to in sub regulation (2)(b), include a record
of all drawings, designs, materials used and other similar
information concerning the completed structure;
that no critical information is lost due to any organizational changes,
Health and Safety specification Rev 0 of 97
Description
Source: RFP069-0702026 Activity Schedule.xlsxCell A1: The table below identifies the Preliminary and General (P&G) items together with their corresponding Occupational Health and Safety (OHS) activity descriptions. Tenderers shall make full provision for these requirements in the rates and prices submitted as part of their bid offer, per site. No additional payment will be made for compliance with these requirements unless specifically provided for elsewhere in the Bill of Quantities.
Evaluation Criteria
Source: RFP069-0702026 Activity Schedule.xlsx (unknown)General
Specific
Technical Specifications
Source: RFP069-0702026 Activity Schedule.xlsx (unknown)Cell A1: The table below identifies the Preliminary and General (P&G) items together with their corresponding Occupational Health and Safety (OHS) activity descriptions. Tenderers shall make full provision for these requirements in the rates and prices submitted as part of their bid offer, per site. No additional payment will be made for compliance with these requirements unless specifically provided for elsewhere in the Bill of Quantities.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 46 of 2000
Relevant where professional engineering services or regulated engineering work may be required.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Address
1258 Lever Rd, Headway Hill, Midrand, 1685, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
9
Last checked
28 Jul 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Contact
+27 11 313 3500[email protected]www.dbsa.org1258 Lever Rd, Headway Hill, Midrand, 1685, South Africa