Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Corner Querera Drive and Bonza Bay Road - Beacon Bay - east london - 5205
Organization Type
GOVERNMENT
Published
12 Nov 2026
OCDS Reference
ocds-9t57fa-177923
ESKOM distribution division requires the design, manufacture, and ex-works testing of various pole-top and ground-mounted transformers on an "as and when" required basis over a 12-month period. Approximately 5,957 transformers are required, including coastal, swer, and cubicle-box types, complying with ESKOM specification 240-45395762 rev 4. Tenders are submitted electronically only via the ESKOM etendering portal by 4 december 2026 at 10h00 (sast). The most consequential consideration is passing the mandatory and functional technical evaluation, which requires an 80% minimum score and successful factory accreditation, before any price evaluation.
Closing: 4 December 2026 at 10:00 SAST; electronic submission only via https://eTendering.eskom.co.za — no hard copies, no zip files; upload per folder (Technical, Commercial, Financial), max 50MB per file, 900MB total; finalise submission before deadline.
Mandatory returnables at closing: E-Tendering Training Acknowledgement Form, Annexure A Authorisation Form, SBD 1, SBD 4, SBD 6.1, Integrity Declaration Form, CPA Requirements for Local Goods/Services (Annexure E), and completed tender returnables including signed NEC 3 Offer and Acceptance and signed Contract Data.
Technical compliance: transformers must meet Eskom specification 240-45395762 Rev 4; mandatory technical criteria must pass all items per SAP number — any gap, TBA, or blank renders that submission non-responsive and disqualified.
Functional evaluation: minimum threshold of 80% on the 100-point technical scoring (criteria per 240-128700801); failures on any scored item (e.g., insulation levels, tapping ranges, inter-layer stress <5kV/mm, type test reports with no failed tests) reduce the chance of reaching the minimum.
Factory assessment: after passing functional threshold, each manufacturing facility undergoes a factory assessment (CIGRE TB 530 / ISO 9001 principles); accredited factories only proceed — risks must be corrected within 30 days of notification; prior valid accreditation within last 12 months may waive the assessment.
B-BBEE: proof of level via CSD report or valid certificate/affidavit must be provided at closing if pre-qualification; failing to provide results in zero preference points (not disqualification) but fraudulent or expired documents disqualify.
Clarification meeting on 20 November 2026 at 10:00–12:00 via MS Teams (link and passcode in the ITT) is non-compulsory; but all written clarifications must be sent only to the Eskom Representative (Lonwabo Mavukwana) at [email protected] — any query to other officials is disallowed.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Date & Time
Friday, 04 December 2026 - 10:00
Venue
MS Teams
Categories
Request for Bid(Open-Tender)
Corner Querera Drive and Bonza Bay Road - Beacon Bay - east london - 5205
Recommended Certifications
Having these can improve your winning chances: SABS Product Certification, NRCS Certification
AI Document Analysis Stages
Description
Source: Commercial.zip12 Nov
2026
Tender Published
Tender was published
04 Dec
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Quality Requirements.zip
Eskom Distribution Division requires the design, manufacture and testing ex-works of various pole top and ground mounted transformers, supplied on an 'as and when' required basis over a 12-month period. The tender is governed by Eskom's Supplier Quality Management specification (240-105658000 / QM 58), which mandates a quality management system conforming to ISO 9001 and includes pre- and post-contract quality requirements.
Technical.zip
Eskom's Distribution Division requires the design, manufacture, and ex-works testing of various pole top and ground mounted transformers, supplied on an 'as and when' required basis over a 12-month period. The scope covers a range of three-phase transformers (25 kVA to 1000 kVA) at 11 kV, 22 kV, and 33 kV primary voltages, with ester oil as the specified insulating fluid. Bidders must offer transformers that meet SANS 780:2019 loss limits and Eskom's specific technical requirements.
Commercial.zip
Eskom Distribution Division requires the design, manufacture and testing ex-works of various pole top and ground mounted transformers, supplied on an 'as and when' required basis over a 12-month period. The tender is advertised in the Eastern Cape and closes on 4 December 2026.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
EskomWin Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 132 791
Range
Based on 24 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
This is an open tender for the design, manufacture, and testing (ex-works) of various pole-top and ground-mounted transformers, called off on an 'as and when' basis over 12 months for Eskom's Distribution Division. Tenderers must use the eTendering portal for submission; registration with a CSD number is required. The procurement is governed by Eskom's Standard Conditions of Tender and the Supplier Integrity Pact, requiring ethical conduct and declaration of any interest with Eskom employees.
Important Dates
Source: Commercial.zip (TENDER)Closing: 4 December 2026 at 08:00 (SAST).
Briefing meeting: 20 November 2026 at 10:00 (venue not clearly stated; likely virtual via MS Teams; attendance is non-compulsory).
Contact Information
Source: Commercial.zip (TENDER)Primary enquiry contact: The Eskom Representative (only official allowed for written clarifications).
Ethics/Forensic reporting (for integrity concerns, not tender enquiries):
Eskom Tender Bulletin: https://tenderbulletin.eskom.co.za
eTendering portal: https://eTendering.eskom.co.za
Submission Guidelines
Source: Commercial.zip (TENDER)Submission method: electronic only via Eskom eTendering portal (https://eTendering.eskom.co.za).
Closing time: 4 December 2026 at 08:00 (SAST). Late or un-finalised submissions are rejected; the system blocks changes after the deadline.
Upload files into the correct folders (Technical, Commercial, Financial). Individual files max 50MB; total upload max 900MB. Finalise the submission within the system to complete it.
Mandatory returnable before closing:
Other mandatory returnables (must be completed and submitted):
Documents which if not returned at closing will disqualify: the Acknowledgement Form and all mandatory returnables; failure to submit mandatory documents leads to disqualification.
Original and one hard copy required in paper tenders; for eTendering, electronic submission is the only accepted channel.
Ensure all documents are in English, completed in permanent ink (if written), unaltered except initialled corrections.
Evaluation Criteria
Source: Commercial.zip (TENDER)Evaluation stages:
Preference points: 80/20 or 90/10 system applies, determined by the tender value; pricing and Specific Goals (B-BBEE) scores are added and rank tenderers.
B-BBEE: if no certificate/affidavit submitted at closing, bidder scores zero for preference points but is not disqualified (if otherwise responsive). Fraudulent or expired B-BBEE documents disqualify.
Specific Goals: failing to submit supporting documentation results in zero points, not disqualification.
Correction of arithmetical errors: errors are corrected per Eskom's rules; amounts in words prevail over figures; rejection if tenderer does not accept corrections.
Technical Specifications
Source: Commercial.zip (TENDER)Scope: Design, manufacture, and testing ex-works of various pole-top and ground-mounted transformers for Eskom's Distribution Division, on an 'as and when' required basis over a 12-month period.
Quantity: approximately 5,957 transformers across types listed in the pricing schedule.
Key technical reference: transformers must comply with Eskom specification 240-45395762 Rev 4.
Technical evaluation criteria reference: document 240-128700801.
Product list (SAP descriptions) includes coastal, SWER, and cubicle-box types: e.g., 16kVA 11kV/240V coastal (600 units), 32kVA 22kV/240V (800), 64kVA 22kV/240V (1010), 100kVA 11kV/415V (300), 500kVA 22kV/415V (65), 1000kVA 11kV/415V with cable box (5), and various 33kV, 19kV SWER and cubicle-box variants.
Financial Requirements
Source: Commercial.zip (TENDER)Prices must be fixed for the contract duration unless otherwise provided in the ITT; state rates/prices in South African Rand, inclusive of all duties, taxes (including VAT) and levies applicable 14 days before closing.
Payment terms: as stipulated in the ITT (specific terms not extracted).
Financial statements required for evaluation: latest approved (not draft) audited annual financial statements of the tendering company (not parent/holding), including: signed director's report, auditor's/reviewer's/compiler's report, statement of financial position, income statement, changes in equity, cash flows, and notes; for unincorporated JV/SPV, each partner must submit its statements.
For South African entities not audited: signed public interest score, copies of ITA34C for current and previous assessment years.
Bid security/performance security: not stated in the extracted text; the standard conditions require indication of two financial institutions if security is required (details in ITT).
Compliance Requirements
Source: Commercial.zip (TENDER)CSD registration: mandatory to access eTendering and to verify B-BBEE level.
No restriction to do business with Eskom or State-Owned Companies.
B-BBEE: proof of level via CSD report or valid certificate/affidavit; required at closing if it is a pre-qualification criterion. Fake or expired documents disqualify.
COIDA: original certificate of good standing or proof of application from the Compensation Fund (South African tenderers).
SHEQ: proof that safety, health, environment and quality systems are in place; compliance with OHS Act and Eskom SHEQ requirements.
CIDB: if stipulated, registration required at closing or within 21 working days from closing.
No 100% sub-contracting allowed.
All mandatory returnables must be submitted at closing; documents required for award (e.g., SDL&I Undertaking, designated local content info) must be submitted before award.
Section
Source: Commercial.zipAdditional evaluation criteria:
Description
Source: Quality Requirements.zipThe document is Eskom's Supplier Quality Management specification (QM 58, document 240-105658000, revision 4). It applies to all existing and potential Eskom suppliers and sub-suppliers, and becomes part of all RFIs, RFQs, RFPs and contracts. It sets the quality criteria for evaluation, selection, assessment, performance monitoring and auditing of suppliers. Eskom expects partners to demonstrate commitment to a QMS conforming to ISO 9001.
Important Dates
Source: Quality Requirements.zip (unknown)Closing date: 4 December 2026 at 08:00 (as per tender record). No other dates are stated in the document.
Contact Information
Source: Quality Requirements.zip (unknown)No contact details are provided in the document. The document is the Supplier Quality Management specification (QM 58). Enquiries would typically be directed to Eskom's Supply Chain Management, but no email or phone is listed.
Submission Guidelines
Source: Quality Requirements.zip (unknown)Returnable documents (per the List of Tender Returnables 240-12248652):
Disqualification risks:
Evaluation Criteria
Source: Quality Requirements.zip (unknown)Evaluation is based on quality requirements as per QM 58 (Supplier Quality Management specification). The specific quality categories (1–4) and evaluation criteria are selected using the Guideline for QM 58 Selection Criteria (240-125473040) and the Tender Evaluation Scorecard (240-168873697).
Bidders must:
The document does not specify an 80/20 or 90/10 preference point split or a minimum qualifying score.
Technical Specifications
Source: Quality Requirements.zip (unknown)The document is Eskom's Supplier Quality Management specification (QM 58, document 240-105658000, revision 4). It sets out the minimum quality requirements for all suppliers and sub-suppliers providing products, services or processes to Eskom, and applies to all Eskom RFIs, RFQs, RFPs and contracts. Key requirements:
Compliance Requirements
Source: Quality Requirements.zip (unknown)Mandatory compliance requirements:
The document does not specify CSD registration, tax clearance (SARS TCS), B-BBEE level, or CIDB grading as eligibility criteria for this specification (though they may appear in the general tender).
Section
Source: Quality Requirements.zipEvaluation will use the Tender Evaluation Scorecard 240-168873697 and the Guideline for QM 58 Selection Criteria 240-125473040 to select the appropriate quality category and assess compliance with the quality requirements. Bidders must meet the quality requirements for the selected category to be considered.
Description
Source: Technical.zipThe tender is for the design, manufacture and testing ex-works of various types of pole top and ground mounted transformers, on an "as and when" required basis over a 12-month period, for Eskom Distribution Division. The technical evaluation criteria document (240-128700801) defines how bidders will be assessed, based on tender returns and factory assessment.
Important Dates
Source: Technical.zip (unknown)Closing date: 4 December 2026 at 08:00 (per tender record).
No other dates (briefings, site visits, clarification deadlines) are stated in the document.
Contact Information
Source: Technical.zip (unknown)Technical contact:
No SCM contact or submission address is stated in the document.
Submission Guidelines
Source: Technical.zip (unknown)Returnable documents (all must be completed, signed and submitted with the bid):
Disqualification risks:
Evaluation Criteria
Source: Technical.zip (unknown)Evaluation stages:
Minimum qualifying score: 80 (technical).
Loss capitalisation: total cost = A + (NLLF × PNL) + (LLF × PLL), where A is the purchase price, PNL is no-load loss (kW), PLL is load loss (kW), NLLF is the no-load loss factor (R/kW) and LLF is the load loss factor (R/kW). The economic life of a transformer is 25 years.
Technical Specifications
Source: Technical.zip (unknown)Scope: Design, manufacture and testing ex-works of various types of pole top and ground mounted transformers, on an "as and when" required basis over a 12-month period, for Eskom Distribution Division.
Transformer types (coastal, ester oil only, three-phase):
Key technical requirements:
Financial Requirements
Source: Technical.zip (unknown)Pricing format: ex-works, per transformer type, on an "as and when" required basis.
Loss capitalisation: the total evaluated cost includes the purchase price plus capitalised no-load and load losses using the loss factors (NLLF and LLF) provided in the document. For 2024, NLLF = R80 500/kW and LLF = R17 500/kW; for 2025, NLLF = R85 400/kW and LLF = R18 600/kW.
No bid security, bonds, guarantees, retention, or payment terms are stated in the document.
Compliance Requirements
Source: Technical.zip (unknown)Mandatory:
Section
Source: Technical.zipAdditional evaluation criteria:
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 46 of 2000
Relevant where professional engineering services or regulated engineering work may be required.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Address
Corner Querera Drive and Bonza Bay Road - Beacon Bay - east london - 5205
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
3
Last checked
13 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Get deep intelligence on Manufacture of electrical equipment. Unlock full pricing strategies, bid frequency, and historical win rates.
Learn how to submit a winning bid with these related articles
💡 Want more tendering tips and strategies?
Explore Our Blog