Issuing Organization
South African Heritage Resources AgencyLocation
Western Cape
Closing Date
28 Oct 2026
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
111 Harrington Street - Cape Town - Cape Town - 8000
Organization Type
GOVERNMENT
Published
08 Oct 2026
OCDS Reference
ocds-9t57fa-173307
The south african heritage resources agency requires the rehabilitation of the duncan village massacre memorial in the eastern cape. The contract is procured under an open tender using the 80/20 preference point system, with price weighted at 80 points and specific goals at 20 points. Bidders must complete and sign sbd 6.1 And provide supporting proof for any specific goal points claimed, as unsubstantiated or fraudulent claims can lead to disqualification and other penalties.
Date & Time
Wednesday, 28 October 2026 - 11:00
Venue
Duncan Village Township, Msimango Street, Buffalo City Metropolitan Municipality, Eastern Cape
Categories
Request for Bid(Open-Tender)
111 Harrington Street - Cape Town - Cape Town - 8000
08 Oct
2026
Tender Published
Tender was published
28 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
REVISED SBD 4 Form.docx
Rehabilitation of the Duncan Village Massacre Memorial for the South African Heritage Resources Agency in the Western Cape.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Median Estimate
RΒ 2Β 738Β 521
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically β no action required from you.
Description
Source: Duncan Village Tender Document.pdfThe works comprise the rehabilitation of the Duncan Village Massacre Memorial in Duncan Village Township, Eastern Cape. The scope includes demolition of existing structures, construction of new steps, platform and plinth, and installation of a heritage statue.
Important Dates
Source: Duncan Village Tender Document.pdf (TENDER)Compulsory Tender Briefing and Site Visit: 19 October 2026 at 10:00, assembling at East London Museum, then proceeding to the site at Duncan Village Township, Msimango Street, Buffalo City Metropolitan Municipality, Eastern Cape.
Closing date and time: 28 October 2026 at 11:00.
Tender validity period: 120 days from the submission date.
Briefing Session
Source: Duncan Village Tender Document.pdf (TENDER)Compulsory Tender Briefing and Site Visit: 19 October 2026 at 10:00, assembling at East London Museum, then proceeding to the site at Duncan Village Township, Msimango Street, Buffalo City Metropolitan Municipality, Eastern Cape. Attendance is mandatory; failure to attend disqualifies the bid. Tenderers must read the tender document before the briefing.
Contact Information
Source: Duncan Village Tender Document.pdf (TENDER)Submission address:
South African Heritage Resources Agency (SAHRA)
111 Harrington Street
Cape Town 8000
Tel: 021 462 4502
Attention: Supply Chain Management
Submission email: [email protected]
Employer (SAHRA) general email: [email protected]
Employer's agent: CBM Africa (Pty) Ltd
Employer's agent communication email: [email protected]
Employer's communication email: [email protected]
All queries must be made via email; no telephonic communication is accepted.
Submission Guidelines
Source: Duncan Village Tender Document.pdf (TENDER)Submission method: email to [email protected] or hand delivery into the Tender Box at SAHRA, 111 Harrington Street, Cape Town 8000, for the attention of Supply Chain Management.
Closing: 28 October 2026 at 11:00. Late tenders are not accepted.
The tender must be returned in its entirety, including all returnable pages, the fully priced Bill of Quantities, the Form of Tender, and all completed or altered pages.
Telegraphic and facsimile tenders are not considered.
Returnable forms (all must be completed, signed and submitted):
Failure to submit any original completed returnable form automatically disqualifies the tender.
A detailed and realistic preliminary programme in Microsoft Projects format, showing the critical path, must be submitted.
The tender must not be qualified by the bidder's own conditions.
Evaluation Criteria
Source: Duncan Village Tender Document.pdf (TENDER)Evaluation follows CIDB Method 2, in three stages. Bidders must pass each stage to proceed.
Stage 1 β Administrative Compliance and Responsiveness (mandatory):
Failure of any mandatory requirement disqualifies the bid.
Stage 2 β Functionality Evaluation (maximum 100 points, minimum qualifying score 70/100):
Stage 3 β Price and Specific Goals (80/20 preference point system):
Only bidders scoring at least 70/100 in functionality proceed to Stage 3.
Technical Specifications
Source: Duncan Village Tender Document.pdf (TENDER)The works comprise the rehabilitation of the Duncan Village Massacre Memorial in Duncan Village Township, Eastern Cape.
Scope includes demolition of existing structures (steps, platform, plinth), construction of new steps, platform and plinth, and installation of a heritage statue.
The contract is a re-measurement contract; quantities in the Bill of Quantities are approximate and for tender purposes only.
Drawings are issued electronically only; no paper drawings are provided.
The contractor must provide a full construction programme within five days of award.
The contractor must appoint a full-time competent Safety Agent registered as PrCHSA with SACPCMP, not affiliated with the contractor.
All safety files and documentation must be handed to the Employer on completion.
Site security costs are for the contractor's account.
Quality control: all materials and workmanship subject to testing; 7- and 28-day concrete cube results and compaction density results must be submitted to the Engineer.
Tolerances conform to SANS 1200 Degree of Accuracy II.
The installation must be guaranteed for at least one year from practical completion, and a 5-year warranty certificate must be provided on completion.
The contractor must remove all temporary works, equipment, waste and surplus materials, leaving the site neat and satisfactory.
Methodology
Source: Duncan Village Tender Document.pdf (TENDER)Bidders must submit a project-specific preliminary programme and methodology demonstrating understanding of the scope and required contract duration.
The programme must address principal activities, interfaces, sequencing and dependencies, including design, approval, fabrication, delivery and installation of the statue and associated construction works.
The programme must be in Microsoft Projects format and indicate the critical path(s).
Points are awarded for clearly stating the contract period, identifying key activities, integrating statue works into the programme, and identifying critical path and dependencies.
Experience & Qualifications
Source: Duncan Village Tender Document.pdfCompany experience: completed construction projects involving paving, granite or stonework, and fencing, each with a completed contract value of at least R1 500 000, completed in the last five years. Evidence: signed client reference letter or completion certificate identifying project name, scope, value, client, financial year and completion date. Appointment letters, purchase orders and subcontracting agreements are not accepted as proof.
Heritage statue experience: fabrication, supply and installation of life-size statues at a heritage site or comparable public setting. Evidence: signed reference letter or completion certificate, photographs, and description of scope. If using a specialist subcontractor, identify them, provide their profile and proposed role.
Key personnel:
Submit a project organogram with CVs and supporting qualifications or professional registration records.
Quality Management
Source: Duncan Village Tender Document.pdfQuality control: contractor must maintain quality records and checklists for all work and materials delivered to site.
Quality documents must be compiled and provided to the client on completion; no final payment certificate or completion certificate will be issued until all quality control and warranties are provided.
Testing: all materials and workmanship subject to the testing regime; contractor must record and submit test results to the Engineer, including 28-day concrete cube results and compaction density results.
Tolerances: conform to SANS 1200 Degree of Accuracy II unless otherwise stated.
Measurement: in accordance with SANS 1200 or as amended in the project specification.
Pricing Schedule
Source: Duncan Village Tender Document.pdfPricing: fully priced Bill of Quantities is mandatory; failure to submit it disqualifies the tender.
The Bill of Quantities includes a Preamble, Bill of Quantities, and Summary.
Rates and prices must include all labour, plant, tools, instruments, templates, materials, transport and other appliances required for the works, as well as establishment costs, legal contingencies, statutory and regulatory compliance, risks, losses, damages, royalties, overheads, permits and approvals.
The contract is a re-measurement contract; quantities are approximate and for tender purposes only.
Contract price adjustment is not applicable.
Advance on materials: 80% (subject to proof of ownership and cession); advance on plant: 0%.
Retention: 10% of amounts due, limited to 10% of the contract price; retention money guarantee permitted.
Performance guarantee: fixed performance guarantee of 10% of the contract sum, the only acceptable form of surety.
Financial Requirements
Source: Duncan Village Tender Document.pdf (TENDER)Pricing: fully priced Bill of Quantities is mandatory; failure to submit it disqualifies the tender.
Pricing strategy: re-measurement contract.
Contract price adjustment is NOT applicable; no price adjustments for variations in special materials.
Advance on materials not yet built into the works: 80%, subject to proof of ownership and cession to the client. Advance on plant not yet supplied: 0%.
Retention: 10% of amounts due, limited to 10% of the contract price. A retention money guarantee is permitted.
Performance guarantee: fixed performance guarantee of 10% of the contract sum; surety must be provided and this is the only acceptable form of surety.
Insurance: the contractor must arrange contract works insurance, including special risks and public liability. Limit of indemnity for liability insurance: R10,000,000.00.
Additional insurance cover required: Compensation for Occupational Injuries and Diseases Act compliance; common law liability for employees not covered by COIDA, minimum R1,000,000 per accident; motor vehicle liability; all-risks insurance on plant and equipment.
Penalty for late completion: R940.00 per calendar day, after 30 days of delay granted.
Payment certificates may be withheld until the contractor complies with reporting obligations.
Compliance Requirements
Source: Duncan Village Tender Document.pdf (TENDER)CIDB registration: contractor grading designation 2GB or higher, active and valid throughout evaluation and award. Documentary evidence must be submitted.
Tax Compliance Status PIN: valid original required; CSD registration report also required.
B-BBEE: valid B-BBEE certificate required to claim preference points; points awarded per status level and ownership (Black Owned 8, Women 4, Youth 5, Disability 3, Non-compliant 0).
Statue designer: minimum three similar projects with evidence.
Key personnel: Contracts Manager (10 years' experience, SACPCMP registration), Site Agent (5 years' experience, National Diploma), General Foreman (5 years' experience), OHS Agent (5 years' experience, NOSA and PrCHSA registration).
OHS: contractor must enter into an agreement under section 37(2) of the Occupational Health and Safety Act, and submit a letter of good standing from the Compensation Commissioner within 14 days of commencement (if not insured with a licensed compensation insurer).
All goods and services must comply with South African approved standards and the specifications.
B-BBEE Requirements
Source: Duncan Village Tender Document.pdf (TENDER)B-BBEE points (20 points in the 80/20 system) are awarded based on status level and ownership:
A valid B-BBEE certificate must be submitted to claim preference points.
Health & Safety
Source: Duncan Village Tender Document.pdfOHS: contractor must appoint a full-time competent Safety Agent registered as PrCHSA with SACPCMP, not affiliated with the contractor.
All safety files, documentation and reports must be handed to the Employer on completion.
Site security costs are for the contractor's account and deemed included in the contract amount.
Contractor must enter into an agreement under section 37(2) of the Occupational Health and Safety Act and submit a letter of good standing from the Compensation Commissioner within 14 days of commencement (if not insured with a licensed compensation insurer).
Documentation required before commencement includes an approved Health and Safety Plan.
Environmental
Source: Duncan Village Tender Document.pdfThe contractor must remove all temporary works, equipment, waste and surplus materials, leaving the site in a neat and satisfactory condition to the approval of the Employer.
Contractual Terms
Source: Duncan Village Tender Document.pdfContract: re-measurement, with the General Conditions of Contract for Construction Works (Fourth Edition) 2025 (SAICE) applying.
Defects liability period: 6 months.
Time for practical completion: 16 weeks (excluding gazetted public holidays and builder's shutdown).
Latent defect period: 5 years from the Final Approval Certificate.
Non-working days: Sundays, gazetted public holidays, and year-end breaks from 16 December to the first Monday of the subsequent year.
Documentation required before commencement: approved Health and Safety Plan, initial programme, security, insurance, and letter of good standing from the Compensation Commissioner (if applicable). Works must commence within 5 days of the commencement date.
Contract price adjustment is not applicable.
Retention: 10% of amounts due, limited to 10% of the contract price; retention money guarantee permitted.
Advance on materials: 80% (subject to proof of ownership and cession); advance on plant: 0%.
Payment certificates may be withheld until reporting obligations are met.
Insurance: contractor to arrange contract works insurance; liability limit R10,000,000; additional cover for COIDA, common law liability (min R1,000,000 per accident), motor vehicle liability, and all-risks on plant.
Dispute resolution: adjudication without legal representation, one adjudication board member; unresolved disputes to arbitration.
Penalty for late completion: R940.00 per calendar day after 30 days of delay.
Tender validity: 120 days.
Bidders must indicate a domicilium citandi et executandi in South Africa and accept the jurisdiction of the Magistrate's Court.
Withdrawal or failure to execute after acceptance may result in liability for additional expenses and the difference between the tender and a less favourable accepted tender.
Special Conditions
Source: Duncan Village Tender Document.pdf (TENDER)Special conditions of contract:
Requirements
Source: Duncan Village Tender Document.pdf (TENDER)Mandatory requirements (Stage 1):
Failure of any mandatory requirement disqualifies the bid.
Bidders must submit a valid Tax Compliance Status PIN and CSD registration report.
Bidders must not qualify their tender with their own conditions.
The tender must be valid for 120 days.
Section
Source: Duncan Village Tender Document.pdfEvaluation follows CIDB Method 2, in three stages:
Stage 1 β Administrative Compliance and Responsiveness: mandatory requirements (briefing attendance, CIDB 2GB or higher, statue designer with three similar projects).
Stage 2 β Functionality Evaluation (100 points, minimum 70 to proceed):
Stage 3 β Price and Specific Goals: 80/20 preference point system, price 80 points, B-BBEE 20 points.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
SBD 6.1 IN TERMS OF PPR222 Generic.pdf
The South African Heritage Resources Agency requires the rehabilitation of the Duncan Village Massacre Memorial in the Eastern Cape. The contract is subject to the 80/20 preferential procurement system, with 80 points for price and 20 points for specific goals.
3. SCM-Bid documents SBD 3.3.doc
The South African Heritage Resources Agency seeks professional services for the rehabilitation of the Duncan Village Massacre Memorial in the Eastern Cape. The closing date is 28 October 2026 at 11:00.
REVISED SBD1.docx
The South African Heritage Resources Agency invites bids for the rehabilitation of the Duncan Village Massacre Memorial in the Eastern Cape, with submissions due on 28 October 2026 at 11:00 UTC.
9. General Conditions of Contract.pdf
The South African Heritage Resources Agency requires the rehabilitation of the Duncan Village Massacre Memorial in the Eastern Cape. The work involves restoring the memorial site, with the contract governed by National Treasury's General Conditions of Contract.
Duncan Village Tender Document.pdf
Rehabilitation of the Duncan Village Massacre Memorial in Duncan Village Township, Eastern Cape, including demolition of existing structures, construction of new steps, platform and plinth, and fabrication and installation of a life-size heritage statue. Procured by the South African Heritage Resources Agency (SAHRA) under a re-measurement contract with a 16-week construction period.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
South African Heritage Resources AgencyContact Person
Paul Tiyago
Phone
082-619-5727
[email protected]
Website
www.sahra.org.za/
Address
111 Harrington St, District Six, Cape Town, 8001, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
6
Last checked
09 Oct 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Compliance Requirements
Source: REVISED SBD 4 Form.docx (unknown)Returnable form: SBD 4 (Bidder's Disclosure) β must be completed and signed. It requires disclosure of any employment by an organ of state, any relationship with persons employed by the procuring institution, and any interest in other enterprises. Failure to disclose all CSD-registered active companies linked to all directors will lead to disqualification. The form also certifies that the bid was arrived at independently and that no collusion or disclosure of bid terms to competitors occurred. False declarations may lead to rejection, referral to the Competition Commission, or restriction from doing business with the state for up to 10 years.
Submission Guidelines
Source: 9. General Conditions of Contract.pdf (TENDER)Returnable documents: none specified in this document.
Submission method: not specified in this document.
Closing time: 28 October 2026 at 11:00 (from tender record).
Evaluation Criteria
Source: 9. General Conditions of Contract.pdf (TENDER)No evaluation criteria are stated in this document.
The document is the National Treasury General Conditions of Contract (GCC), which applies to all bids and contracts.
Bidders must not engage in corrupt, fraudulent, or collusive practices; such practices may lead to disqualification, contract termination, and restriction from public sector business for up to 10 years.
Bidders must not be involved in restrictive practices as defined in the Competition Act.
Bidders must provide a performance security within 30 days of contract award, in the form and amount specified in the Special Conditions of Contract (SCC).
Bidders must comply with all requirements in the SCC, which supplement the GCC and prevail in case of conflict.
Financial Requirements
Source: 9. General Conditions of Contract.pdf (TENDER)Performance security: The successful bidder must furnish a performance security within 30 days of notification of contract award, in the amount and form specified in the SCC. Acceptable forms include a bank guarantee, irrevocable letter of credit, or cashier's/certified cheque.
Payment: Payments will be made within 30 days after submission of a valid invoice or claim, unless otherwise specified in the SCC.
Prices: Prices quoted in the bid are firm and may not vary, except for adjustments authorised in the SCC or bid validity extension.
Taxes: Local suppliers are responsible for all taxes, duties, and licence fees until delivery. Foreign suppliers are responsible for taxes imposed outside the purchaser's country.
No contract will be concluded with a bidder whose tax matters are not in order; a valid tax clearance certificate from SARS must be submitted prior to award.
Compliance Requirements
Source: 9. General Conditions of Contract.pdf (TENDER)Tax clearance: A valid tax clearance certificate from SARS is required prior to contract award.
No contract will be concluded with a bidder whose tax matters are not in order.
Bidders must not engage in corrupt, fraudulent, or collusive practices; such practices may lead to disqualification, contract termination, and restriction from public sector business for up to 10 years.
Bidders must not be involved in restrictive practices as defined in the Competition Act.
The National Industrial Participation Programme (NIPP) applies to all contracts subject to the NIP obligation.
Contractual Terms
Source: 9. General Conditions of Contract.pdfThe document is the National Treasury General Conditions of Contract (GCC), which applies to all bids, contracts and orders, excluding immovable property unless otherwise indicated.
Special Conditions of Contract (SCC) supplement the GCC and prevail in case of conflict.
Key contractual obligations:
Description
Source: 3. SCM-Bid documents SBD 3.3.docThe project is the rehabilitation of the Duncan Village Massacre Memorial. The tender is for professional services, with the bidder required to propose phases, costs, and man-days for completion.
Important Dates
Source: 3. SCM-Bid documents SBD 3.3.doc (unknown)Closing date: 28 October 2026 at 11:00.
Submission Guidelines
Source: 3. SCM-Bid documents SBD 3.3.doc (unknown)Returnable documents: SBD 3.3 (Pricing Schedule for Professional Services) must be completed and signed. The bid must be valid for a specified number of days from the closing date (to be stated by the bidder).
Submission method: Not specified in the document.
Closing time: 11:00.
Evaluation Criteria
Source: 3. SCM-Bid documents SBD 3.3.doc (unknown)No eligibility criteria specified. Evaluation criteria not stated in the document.
Technical Specifications
Source: 3. SCM-Bid documents SBD 3.3.doc (unknown)The project involves the rehabilitation of the Duncan Village Massacre Memorial. The scope includes professional services for the project, with phases, cost per phase, and man-days to be specified by the bidder.
Financial Requirements
Source: 3. SCM-Bid documents SBD 3.3.doc (unknown)Pricing must be submitted on SBD 3.3 (Pricing Schedule for Professional Services).
Bidders must indicate a ceiling price based on the total estimated time for completion of all phases, including all expenses and all applicable taxes.
Rates for personnel involved in the project must be provided (hourly and daily rates).
Travel expenses: only actual costs are recoverable; proof must accompany certified invoices.
Other expenses (e.g., accommodation, telephone, reproduction) must be specified; certified invoices will be checked for correctness.
Bidders must state whether rates are firm for the full contract period; if not, provide the basis for adjustments (e.g., CPI).
Bidders must state the period required for commencement after acceptance of the bid and estimated man-days for completion.
Compliance Requirements
Source: 3. SCM-Bid documents SBD 3.3.doc (unknown)No specific compliance requirements found.
Description
Source: REVISED SBD1.docxThe procurement is for the rehabilitation of the Duncan Village Massacre Memorial. The document provided is primarily the standard SBD 1 form; no further scope details are available.
Submission Guidelines
Source: REVISED SBD1.docx (unknown)Bids must be delivered by the stipulated time to the correct address. Late bids will not be accepted. All bids must be submitted on the official forms provided (not re-typed) or in the manner prescribed in the bid document. The successful bidder will be required to complete and sign a written contract form (SBD 7). Returnable documents include: SBD 1 (Invitation to Bid) with bidder and contact details, signed as the offer cover page; proof of authority (e.g. company resolution) for the signatory; SARS Tax Compliance Status (TCS) PIN or CSD number; for foreign suppliers, the completed questionnaire on RSA residency, branch, permanent establishment, income source, and tax liability.
Evaluation Criteria
Source: REVISED SBD1.docx (unknown)The bid is subject to the Preferential Procurement Policy Framework Act, 2000 and the Preferential Procurement Regulations. Evaluation will follow the applicable preference point system (80/20 or 90/10) as determined by the bid value. Mandatory tax compliance: submission of SARS Tax Compliance Status (TCS) PIN or Central Supplier Database (CSD) number. Bidders must not be persons in the service of the state, companies with state-employed directors, or close corporations with state-employed members.
Technical Specifications
Source: REVISED SBD1.docx (unknown)The scope is the rehabilitation of the Duncan Village Massacre Memorial. No further technical details are provided in the available document.
Compliance Requirements
Source: REVISED SBD1.docx (unknown)Tax compliance: bidders must submit their unique SARS Tax Compliance Status (TCS) PIN to enable verification of tax status, or a printed TCS certificate, or a CSD number if registered on the Central Supplier Database. For consortia, joint ventures, or sub-contractors, each party must submit a separate TCS certificate/PIN/CSD number. Bidders must not be persons in the service of the state, companies with state-employed directors, or close corporations with state-employed members. Foreign suppliers must complete the questionnaire confirming RSA residency status, branch presence, permanent establishment, income sources, and tax liability in RSA.
Submission Guidelines
Source: SBD 6.1 IN TERMS OF PPR222 Generic.pdf (TENDER)Returnable forms:
Disqualification risks:
Evaluation Criteria
Source: SBD 6.1 IN TERMS OF PPR222 Generic.pdf (TENDER)Preference point system: 80/20 (price 80 points, specific goals 20 points).
Price points calculated using the formula Ps = 80(1 - (Pt - Pmin)/Pmin), where Pmin is the price of the lowest acceptable tender.
Specific goals and maximum points:
Bidders must indicate how they claim points for each specific goal and provide supporting proof.
Compliance Requirements
Source: SBD 6.1 IN TERMS OF PPR222 Generic.pdf (TENDER)Bidders must study the General Conditions, Definitions and Directives applicable to the tender and the Preferential Procurement Regulations, 2022.
The organ of state may require substantiation of any preference claim before or after adjudication.
Contractual Terms
Source: SBD 6.1 IN TERMS OF PPR222 Generic.pdfFraudulent claims for specific goals may lead to disqualification, contract cancellation, recovery of costs, restriction from doing business with organs of state for up to 10 years, and criminal prosecution.
Section
Source: SBD 6.1 IN TERMS OF PPR222 Generic.pdfPreference point system: 80/20 (price 80 points, specific goals 20 points).
Price points calculated using the formula Ps = 80(1 - (Pt - Pmin)/Pmin), where Pmin is the price of the lowest acceptable tender.
Specific goals and maximum points:
Bidders must indicate how they claim points for each specific goal and provide supporting proof.
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Data conflicts
None detected