Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
76E Schoeman Street - Polokwane - Polokwane - 0699
Organization Type
GOVERNMENT
Published
11 Aug 2026
OCDS Reference
ocds-9t57fa-165222
The independent development trust is procuring a contractor to produce and install 13 sculptural thrones representing chiefs, plus a central eternal flame vessel, at the university of limpopo fig tree monument as part of the resistance liberation and heritage route. The works span earthworks, concrete, granite cladding, corten steel metalwork, paving, solar lighting, and several provisional sums, with a contingencies allowance of r150 000,00. Bidders must be csd-registered with a valid tax clearance and must price the full bill of quantities, including VAT at 15%.
Bidders must be registered on the Central Supplier Database (CSD) and hold a valid tax clearance certificate.
Bidders must submit a B-BBEE certificate or affidavit, and CIDB grading may be necessary.
Pricing must be submitted on the Bill of Quantities covering eight bills: Preliminaries and General; Earthworks; Concrete, Formwork and Reinforcement; Stonework; Metalwork; Paving; Electrical Installation; and Provisional Sums.
Provisional sums include the Eternal Flame Vessel (R180 000,00), sculptural caps (R110 500,00), interpretive bronze plaques (R84 500,00), patination treatment (R45 000,00), and landscaping (R75 000,00), with profit and attendance percentages to be added by the bidder.
A contingencies allowance of R150 000,00 is included, and VAT at 15% must be added to the subtotal.
The contractor must comply with the OHS Act and Construction Regulations 2014, appoint a competent construction health and safety officer, and maintain a health and safety file.
The contractor must facilitate two inspections by LDPWR&I and LDSAC officials during off-site manufacture and before delivery, and must prepare and submit as-built drawings.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Learn how to submit a winning bid with these related articles
Win consulting, legal, accounting, and engineering service contracts with government. Learn registration requirements and proposal strategies.
Comprehensive guide to Institute of IT Professionals South Africa membership. Certification levels, requirements for ICT professionals, and how IITPSA membership enhances credibility for SITA and government IT tenders.
Definitive guide to Health Professions Council of South Africa registration for healthcare professionals bidding on government tenders. Covers the 12 professional boards, step-by-step registration, CPD requirements, foreign qualification evaluation, provincial health department tender opportunities, and how AI Tender Matching on Tenders-SA.org helps you find HPCSA-requiring contracts.
A strategic guide to getting listed on government consultancy, legal, and engineering panels. Learn why panels are the gateway to steady public sector work.
💡 Want more tendering tips and strategies?
Explore Our BlogDate & Time
Wednesday, 09 September 2026 - 12:00
Venue
University of Limpopo Fig Tree
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Bid(Open-Tender)
76E Schoeman Street - Polokwane - Polokwane - 0699
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: UL Fig Tree Bid Document.pdf. You don’t need to refresh — this page will pick up the updated review automatically.
11 Aug
2026
Tender Published
Tender was published
09 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
UL Fig Tree Bid Document.pdf
The Independent Development Trust is appointing a service provider to produce and install 13 sculptures of traditional chiefs and a centre piece at the University of Limpopo Fig Tree Monument, as part of the Resistance Liberation and Heritage Route. The work includes landscaping, electrical fixtures, throne benches, and commemorative stands with QR codes.
UL FIG TREE - A3 SHOP DRAWINGS.pdf
The Independent Development Trust is appointing a service provider/contractor for the production and installation of sculptures of 13 chiefs and a centre piece as part of the Resistance Liberation and Heritage Route at the University of Limpopo Fig Tree Monument. The tender includes associated works such as concrete benches and backrest reeds, with detailed shop drawings provided.
BoQ_Fig Tree Monument .pdf
The Independent Development Trust is procuring a service provider/contractor to produce and install sculptures of 13 chiefs and a centre piece as part of the Resistance Liberation and Heritage Route at the University of Limpopo Fig Tree Monument. The works include earthworks, concrete, stonework, metalwork, paving, electrical installation, and provisional sums for the centre piece and other elements.
To download these documents and access AI-powered analysis, visit the main tender page.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 2 439 000
Range
Based on 11 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Important Dates
Source: UL Fig Tree Bid Document.pdf (TENDER)Closing date: 09 September 2026 at 12:00. Clarification meeting (compulsory): 21 August 2026 at 11:00 at the University of Limpopo Fig Tree. Clarification requests must be submitted at least two working days before the closing date.
Contact Information
Source: UL Fig Tree Bid Document.pdf (TENDER)Technical queries: Matshipa Mohale ([email protected], 015 295 0000). Admin and procurement: David Motsase ([email protected], 012 845 2000). Submission address: IDT Limpopo, ABSA Building, 1st Floor, 76E Schoeman Street, Polokwane, 0699.
Submission Guidelines
Source: UL Fig Tree Bid Document.pdf (TENDER)Bids must be delivered by hand into the tender box at the IDT Limpopo office (ABSA Building, 1st Floor, 76E Schoeman Street, Polokwane, 0699) before 12:00 on 09 September 2026. Fax, email, or reproduced bids are rejected; only original documents issued by the employer are accepted. The bid must be sealed and clearly endorsed with the tender description. No two-envelope system applies. Bids must remain valid for 90 days. The Bill of Quantities must be handwritten in black ink. Compulsory documents must be ring-banded with dividers and an index page. Returnable forms include SBD 1 (Invitation to Bid), SBD 4 (Bidder's Disclosure), SBD 6.1 (Preference Points Claim), a signed and witnessed Form of Offer, a valid COIDA/FEM/RMA certificate, a full CSD report, and a signed authority to sign. Attendance at the compulsory briefing session is mandatory and will be verified by a register. Failure to submit any mandatory document leads to disqualification.
Evaluation Criteria
Source: UL Fig Tree Bid Document.pdf (TENDER)Evaluation is in two stages. Stage 1 checks administrative compliance; missing any mandatory document disqualifies the bid. Stage 2 scores functionality (minimum 70% required) and then price and preference points. Functionality criteria: experience in sculpturing works (30 points), capacity and resources (20 points), project plan and implementation plan (30 points), environmental integration plan (15 points), and sketch/3D of the chair and faceless sculpture (5 points). Price is scored under the 80/20 or 90/10 preference point system depending on the total value of responsive bids (80 points if any bid is R50 million or less, 90 points if all exceed R50 million). Preference points are available for specific goals: women (6), youth (6), people with disabilities (4), and black ownership (4).
Technical Specifications
Source: UL Fig Tree Bid Document.pdf (TENDER)The project is the production and installation of 13 realistic sculptures of Traditional Leaders who held a lekgotla under the Fig Tree on 11 October 1956, plus a centrepiece, at the University of Limpopo campus. Scope includes: 13 chief throne sculptures and a centrepiece, landscaping around the monument, fully operational electrical fixtures, throne benches and backrests, and stands for commemorative balls and half balls with inlays and QR codes (details in the Bill of Quantities). The site has already been identified on campus.
Financial Requirements
Source: UL Fig Tree Bid Document.pdf (TENDER)No upfront payment will be made; bidders must confirm financial resources to start the project. The Bill of Quantities must be handwritten in black ink. Price is scored under the 80/20 or 90/10 preference point system. Bids must remain valid for 90 days.
Compliance Requirements
Source: UL Fig Tree Bid Document.pdf (TENDER)Bidders must be registered on the Central Supplier Database (CSD) and submit a full CSD report. Mandatory documents: SBD 1 (Invitation to Bid), SBD 4 (Bidder's Disclosure), SBD 6.1 (Preference Points Claim), signed and witnessed Form of Offer, valid COIDA/FEM/RMA certificate, signed authority to sign, and company registration (CK) with directors' ID copies. Joint ventures must submit a signed JV agreement. Bidders must not be persons in the service of the state and must not be listed on the Register for Tender Defaulters or the List of Restricted Suppliers. Preference points require certified ID documents for women, youth, and black ownership, and a signed and stamped letter from a registered medical doctor for disability.
Contact Information
Source: UL FIG TREE - A3 SHOP DRAWINGS.pdf (unknown)Limpopo Department of Public Works, Roads and Infrastructure's Strategic Planning and Design Hub, 43 Church Street, Polokwane, 0700. Telephone: (015) 284 7000/1.
Evaluation Criteria
Source: UL FIG TREE - A3 SHOP DRAWINGS.pdf (unknown)Bidders must be registered on the Central Supplier Database (CSD) and hold a valid tax clearance. The following standard forms must be completed and signed: SBD 1 (Invitation to Bid), SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 6.2 (Declaration for Local Production and Content), SBD 8 (Declaration of Bidder's Past Supply Chain Management Practices), SBD 9 (Certificate of Independent Bid Determination), and an Authority to Sign / Board Resolution. The PPPFA preference points system applies. Bidders must demonstrate capacity and capability to produce and install the sculptures. Compliance with applicable SABS standards and local authority regulations is required.
Technical Specifications
Source: UL FIG TREE - A3 SHOP DRAWINGS.pdf (unknown)Scope: production and installation of sculptures of 13 chiefs and a centre piece for the Resistance Liberation and Heritage Route at the University of Limpopo Fig Tree Monument.
General construction requirements:
Specific works:
Quality Management
Source: UL FIG TREE - A3 SHOP DRAWINGS.pdf (unknown)The contractor must check all levels and dimensions on site before setting out and cross-check building dimensions during construction. Only figured dimensions in millimetres are to be used; do not scale drawings. Discrepancies must be reported in writing to DPWL before continuing work.
The contractor is responsible for works co-ordination and programming. Consultant and shop drawings must be cross-checked with DPWL drawings.
Any deviation from DPWL drawings or specifications requires written approval from edifice design before construction or installation.
DPWL accepts no responsibility for errors from misinterpretation of drawings or specifications; bidders should query details if in doubt.
Compliance with SABS 0400 standards, manufacturer's installation instructions, and local authority regulations is required.
The contractor must check all opening sizes and vertical and horizontal positions before construction, manufacture and installation of fitted items; discrepancies must be reported in writing to DPWL.
All structural work must be designed, detailed, specified and supervised by a structural engineer, built from the engineer's drawings, and certified stable by the engineer on completion.
Drawings are only to be read for the purpose intended.
Compliance Requirements
Source: UL FIG TREE - A3 SHOP DRAWINGS.pdf (unknown)Bidders must be registered on the Central Supplier Database (CSD) and have a valid tax clearance. The following standard forms must be completed and signed: SBD 1 (Invitation to Bid), SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 6.2 (Declaration for Local Production and Content), SBD 8 (Declaration of Bidder's Past Supply Chain Management Practices), SBD 9 (Certificate of Independent Bid Determination), and an Authority to Sign / Board Resolution. Compliance with the PPPFA preference points system is required. Compliance with applicable SABS standards and local authority regulations is required.
Health & Safety
Source: UL FIG TREE - A3 SHOP DRAWINGS.pdf (unknown)Construction procedures and methodology must be carried out and implemented in strict accordance with the latest occupational health and safety act and regulations.
Contractual Terms
Source: UL FIG TREE - A3 SHOP DRAWINGS.pdf (unknown)All documents prepared by DPWL for the project remain DPWL's property, subject to use by the client for this project only. The client may not use the documents for additional or similar works or publish them without DPWL's prior consent.
The contractor must provide guarantees for all materials, installations and systems to DPWL at practical completion.
Section
Source: UL FIG TREE - A3 SHOP DRAWINGS.pdf (unknown)Windows glazing to be in accordance with NBR. Bathroom and WC windows to be obscure.
Description
Source: BoQ_Fig Tree Monument .pdfThe works comprise the production and installation of sculptures of 13 chiefs and a centre piece as part of the Resistance Liberation and Heritage Route at the University of Limpopo Fig Tree Monument. The Bill of Quantities covers earthworks, concrete, stonework, metalwork, paving, electrical installation, and provisional sums, with a contingencies allowance of R150 000,00.
Contact Information
Source: BoQ_Fig Tree Monument .pdf (unknown){"name":null,"email":null,"phone":null,"department":"Qty Rate Amount","address":null}
Evaluation Criteria
Source: BoQ_Fig Tree Monument .pdf (unknown)Bidders must be registered on the Central Supplier Database (CSD) and hold a valid tax clearance certificate. Returnable forms include SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 8 (Declaration of Bidder's Past Supply Chain Management Practices), and SBD 9 (Certificate of Independent Bid Determination). A B-BBEE certificate or affidavit is required, and CIDB grading may be necessary. Bidders must demonstrate capacity to execute the works per the bill of quantities.
Technical Specifications
Source: BoQ_Fig Tree Monument .pdf (unknown)Scope: production and installation of 13 sculptural thrones (representing chiefs) and a central piece at the University of Limpopo Fig Tree Monument, part of the Resistance Liberation and Heritage Route.
Quality Management
Source: BoQ_Fig Tree Monument .pdfSolar pole lights must be SABS approved.
Pricing Schedule
Source: BoQ_Fig Tree Monument .pdf (unknown)Pricing is on a Bill of Quantities with eight bills: Preliminaries and General; Earthworks; Concrete, Formwork and Reinforcement; Stonework; Metalwork; Paving; Electrical Installation; and Provisional Sums.
Financial Requirements
Source: BoQ_Fig Tree Monument .pdf (unknown)Pricing must be submitted on the Bill of Quantities, comprising eight bills: Preliminaries and General; Earthworks; Concrete, Formwork and Reinforcement; Stonework; Metalwork; Paving; Electrical Installation; and Provisional Sums.
Compliance Requirements
Source: BoQ_Fig Tree Monument .pdf (unknown)Health and safety compliance per the OHS Act and Construction Regulations 2014, including appointment of a competent construction health and safety officer and maintenance of a health and safety file.
Contractual Terms
Source: BoQ_Fig Tree Monument .pdfContract to be the Small and Simple Works Contract, with Contract Data to be completed and signed.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Block B, Glenwood Office Park, 294 Sprite Ave, Faerie Glen, Pretoria, 0043, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
3
Last checked
11 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Contact
012-845-2000[email protected]www.idt.org.zaBlock B, Glenwood Office Park, 294 Sprite Ave, Faerie Glen, Pretoria, 0043, South Africa
Key Personnel
Get deep intelligence on Services: Professional. Unlock full pricing strategies, bid frequency, and historical win rates.