Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Issuing Organization
Eastern Cape - Coega Development CooperationLocation
KwaZulu-Natal
Closing Date
12 Oct 2026
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
CDC Umhlanga Office, 18 Cranbrook Crescent - Umhlanga - Durban - 4319
Organization Type
GOVERNMENT
Published
04 Sept 2026
OCDS Reference
ocds-9t57fa-168999
The coega development corporation, on behalf of the kwazulu-natal department of education, invites tenders from cidb-registered contractors (grade 7gb or higher) for storm damage repairs and renovations at seatides combined school in tongaat beach, pinetown district. The 12-month contract covers roof replacement, structural repairs, electrical and plumbing upgrades, disability-compliant facilities, fencing, sports field reinstatement, and stormwater control. Bidders must attend a compulsory briefing, meet a 70-point functionality threshold, and comply with the 80/20 preference point system.
CIDB grading: Bidders must have an active CIDB contractor grading of 7GB or higher; 6GB PE grading is not eligible. Bidders not yet registered must submit proof of application for CIDB registration within 21 working days from closing.
Compulsory briefing: Attendance at the compulsory briefing on 18 September 2026 at 11h00 at Seatides Combined School, 51 Dolphin Avenue, Tongaat Beach, is mandatory; failure to attend will result in elimination.
Closing and submission: Bids must be delivered in a sealed, tamper-proof envelope marked with the tender reference to the CDC Umhlanga Office, 18 Cranbrook Crescent, Umhlanga, Durban, by 12 October 2026 at 12h00. Late, emailed, faxed, or telegraphic bids will not be accepted.
Functionality threshold: Bidders must score a minimum of 70 out of 100 points on functionality criteria, including demonstrated experience (projects over R9 million in the last 5 years), local office establishment (within KwaZulu-Natal, preferably Tongaat), sub-contracting commitment to QSEs/EMEs (Form K), and key personnel qualifications and experience.
Key personnel: The Contracts Manager must be registered with SACPCMP as a PrCM or PrCPM, and the Construction Health and Safety Officer/Manager must be registered with SACPCMP with at least 5 years' experience. CVs and qualifications for Contracts Manager, Site Agent, and Foreman must be submitted.
Pricing and BoQ: Bids must include a fully completed, priced Bill of Quantities in permanent black ink, with P&G items clearly priced or stated as 'included or elsewhere covered'. Copies or scanned BoQs are not acceptable. The offered total must be VAT inclusive.
Compliance and registration: Bidders must be registered on the CSD, be VAT vendors (or register upon award if turnover exceeds R1 million), provide tax compliance status (SARS PIN or CSD number), and submit B-BBEE verification certificates or affidavits as applicable. CIPC registration is required; de-registered businesses will not be awarded.
Guarantees and insurance: A signed letter of intent from an approved insurer for a construction guarantee (variable or fixed, 10% of contract sum) must be submitted with the bid. The successful bidder must provide the guarantee within 21 working days of contract award.
Evaluation: 80/20 preference point system applies: 80 points for price, 20 points for B-BBEE status level. Bids will be evaluated on functionality first; only those scoring 70+ points proceed to price evaluation.
Enquiries: All enquiries must be in writing to Ms Zine Mtanda at [email protected]; no queries will be responded to after 29 September 2026.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Monday, 12 October 2026 - 12:00
Venue
Seatides Combined School in 51 Dolphin Avenue, Genazzano, eThekwini Metropolitan Municipality, KZN
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Bid documents can be downloaded free of charge from the cdc website (www.coega.com), And the national treasury e-tender from 10h00 on 04 september 2026. The cdc will not take responsibility for any errors that may occur in the downloading of documents. Bid documents can be collected from the cdc umhlanga office, 18 cranbrook crescent, umhlanga, durban from 04 september 2026 from 10h00. A non-refundable bid fee of r 500.00 Should be deposited to account name: cdc – DOE; standard bank, account NO: 080 224 555, branch code 05050 017 and proof of payment is required upon collection of the bid documents. For more information, please visit our cdc website.
Categories
Request for Bid(Open-Tender)
CDC Umhlanga Office, 18 Cranbrook Crescent - Umhlanga - Durban - 4319
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Description
Source: CDC-199-26 Tender Document.zip04 Sept
2026
Tender Published
Tender was published
12 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
CDC-199-26 Tender Document.zip
Analysis completed but response format was invalid
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
Eastern Cape - Coega Development CooperationContact Person
Ms. Zine Mtanda
Phone
031-584-1760
Key Personnel
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 633 233
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Repair and renovate storm damage at Seatides Combined School in Pinetown District, KwaZulu-Natal. The works include labour-intensive construction. Contract duration is 16 weeks. Site coordinates: 29°36'30.02"S, 31°09'06.55"E.
Important Dates
Source: CDC-199-26 Tender Document.zip (TENDER){"closingDate":"12 OCTOBER 2026","closingTime":"12H00","briefingSession":"{"date":"04 September 2026","time":"10h00","venue":"e of Closure of bids.","is_compulsory":true}"}
Contact Information
Source: CDC-199-26 Tender Document.zip (TENDER){"name":null,"email":null,"phone":null,"department":null,"address":"PINETOWN DISTRICT,"}
Submission Guidelines
Source: CDC-199-26 Tender Document.zip (TENDER)Returnable Documents: AND FORM OF OFFER ON SECTION C1.1, SBD 1 - PART A: INVITATION TO BID AND PART B: TERMS OF, SBD 4 – BIDDER’S DISCLOSURES, SBD 6.1 PREFERENCE CLAIM FORM, PROOF OF CIDB REGISTRATION (PROVIDE CIDB REGISTRATION, PROPOSED KEY PERSONNEL, FORM OF OFFER AND ACCEPTANCE, BILL OF QUANTITIES IN FULL, C1.1 FORM OF OFFER AND ACCEPTANCE, EXPERIENCE AND QUALIFICATIONS OF CONTRACTS MANAGER, Qualifications, (Copies of all relevant qualifications and registrations must be attached to this form), Education / Qualifications: Year Obtained: Institution
Evaluation Criteria
Source: CDC-199-26 Tender Document.zip (TENDER)Unable to extract eligibility criteria
Technical Specifications
Source: CDC-199-26 Tender Document.zip (TENDER)Works description a. Replace damaged roofs with new trussed systems, insulation,
gutters, and downpipes
b. Rebuild cracked/collapsed gable walls with reinforced
brickwork and ring beams; repair and repaint all external
plaster.
c. Refurbish/replace steel windows with safety glazing and
replace damaged doors and frames
d. Replace floors, replaster, and repaint all interior walls and
ceilings across classrooms, staffrooms, and bathrooms.
e. Replace all bathroom fittings, re-tile and waterproof wet areas,
and upgrade to disability-compliant facilities.
f. Replace water tank, piping, and fittings; camera inspect all
underground services
g. Install ramps, handrails, and accessible walkways throughout.
h. Replace perimeter fencing with galvanised fencing and install
new pedestrian and vehicle gates
i. Reinstate sports field and cricket pitch and play structures.
j. Stabilise eroded slopes and complete landscaping for erosion
control
k. Construct dry-stacked retaining walls with stormwater control
Works description at terraced levels
continued... l. Install stormwater drainage and clear all existing channels.
m. Install fire hose reels, extinguishers, and safety signage; certify
to SANS 10400
Contract No: CDC/199/26 of 13 C1.2 Part C1: Agreement and Contract Data
Coega
Coega Development Corporation KZN Province
Supply Chain Management ISO 9001: 2008 Clause 5.5.3
n. Replace all electrical boards, wiring, fittings, and LED lighting;
install external floodlights and lightning protection system;
certify all circuits to SANS 10142 and SANS 10313
A 2.0 Site [1.1]
Erf / stand number 4792
Tongaat Beach
Township / Suburb
51 Dolphin Avenue, Tongaat Beach, Tongaat
Site address
GPS Site Co-ordinates: (29° 36'30.02"S and 31°09'06.55"E)
Local authority EThekwini Metropolitan Municipality
A 3.0 Employer [1.1]
JBCC Clause Data
The Employer is.
Name: COEGA DEVELOPMENT CORPORATION (PTY) LTD
1.1 The address of the Employer is:
Address (physical): 18 Cranbrook Crescent
Umhlanga Ridge
Durban
Address (postal): 18 Cranbrook Crescent
Umhlanga Ridge
Durban,
4319
e-mail: [email protected]
VAT registration number: 4030119947
Contract No: CDC/199/26 of 13 C1.2 Part C1: Agreement and Contract Data
Coega
Coega Development Corporation KZN Province
Supply Chain Management ISO 9001: 2008 Clause 5.5.3
A 4.0 Principal agent [1.1]
1.1 The Principal Agent and Project Manager is:
Name:
Address (postal):
Telephone:
e-mail:
1.1 A 5.0 Agent Discipline:
The Agent (2) is Architect
Name:
Address (postal):
Telephone:
e-mail:
1.1 A 6.0 Agent Discipline:
The Agent (3) is: Quantity Surveyor
Name:
Address (postal)
Telephone:
e-mail:
1.1 A 7.0 Agent [1.1] Discipline:
The Agent (4) is: Structural Engineer
Name:
Address (postal):
Telephone:
e-mail:
1.1 A 8.0 Agent [1.1] Discipline:
The Agent (5) is: Civil Engineer
Name:
Address (postal):
Telephone:
e-mail:
Contract No: CDC/199/26 of 13 C1.2 Part C1: Agreement and Contract Data
Coega
Coega Development Corporation KZN Province
Supply Chain Management ISO 9001: 2008 Clause 5.5.3
1.1 A 9.0 Agent [1.1] Discipline:
The Agent (6) is: Electrical Engineer
Name:
Address (postal):
Telephone:
e-mail:
1.1 A 10.0 Agent [1.1] Discipline:
The Agent (7) is: Mechanical Engineer
Name:
Address (postal):
Telephone:
e-mail:
1.1 A 11.0 Agent [1.1] Discipline:
The Agent (8) is: SHE Agent
Name:
Address (postal):
Telephone:
e-mail:
The Contractor is:
[1.2]
The address of the Contractor is:
Address (physical):
Address (postal):
Telephone:
Facsimile:
e-mail:
VAT registration number:
B 17.0 Changes made to JBCC documentation
B contract information
Contract No: CDC/199/26 of 13 C1.2 Part C1: Agreement and Contract Data
Coega
Coega Development Corporation KZN Province
Supply Chain Management ISO 9001: 2008 Clause 5.5.3
B 1.0
Definitions BILLS OF QUANTITIES: System / Method of measurement
[1.1] The Bills of Quantities were drawn up in accordance with the measurement system
stated in Part 2: Pricing Data
Definitions: Add the definition of;
CONTRACT SUM is the total offered price inclusive of VAT as stated and agreed to in
the Form of Offer and Acceptance.
INTEREST: The interest rates applicable on this contract, whether specifically
indicated in the relevant clauses or not, will be the rate as determined by the Minister
of Finance from time to time, in terms of section 80(1)(b) of the Public Finance
Management Act, 1999 (Act No ), calculated as simple interest, in respect of
debts owing to the State, and will be the rate as determined by the Minister of Justice
and Constitutional Development from time to time, in terms of section 1(2) of the
Prescribed Rate of Interest Act, 1975 (Act No ), calculated as simple
interest, in respect of debts owing by the state
PENALTY: Penalty for late or non-completion (clause 24.0):
For the whole works as per sub-clause 24.1: The penalty will be calculated as 1,25
cents per 100 rand of the Contract Value per calendar day rounded up to the nearest
R10.
B.2.0 Law applicable to the works, state country:
Law, regulations The governing law is the law of the Republic of South Africa.
and notices The parties’ consent to the jurisdiction of the Gqeberha (Port Elizabeth) High Court for
[2.0] the purposes of this clause.
B 3.0 Add to the clause:
Offer and Formal signatures in the Form of Offer and Acceptance are required to render this
acceptance agreement binding.
[3.3]
B 3.0 New Clause - The Form of Offer and Acceptance and Schedule of Deviations
Offer and shall form part of the contract document and constitutes the tender acceptance and
acceptance agreement.
[3.6]
B 4.0 Documents [5.0]
5.0 Documents Add the following:
[5.1]
Contract No: CDC/199/26 of 13 C1.2 Part C1: Agreement and Contract Data
Coega
Coega Development Corporation KZN Province
Supply Chain Management ISO 9001: 2008 Clause 5.5.3
The documents forming the agreement are to be taken as mutually explanatory of one
another and for the purpose of interpretation, the priority of the documents shall be in
accordance with the following sequence:
(a) the Form of Offer and Acceptance;
(b) the Schedule of Deviations;
(c) this Contract Data;
(d) the standard JBCC building agreement as general conditions of contract;
(e) the Drawings;
(f) the Specifications;
(g) Detailed Works Programme;
(h) the Bills of Quantities;
(i) Detailed Projected Cashflows.
If an ambiguity or discrepancy is found in the documents, the Principal Agent shall
issue any necessary clarification or instruction.
5.0 Documents The original signed agreement is to be held by the Employer
[5.2]
5.0 Documents Number of copies of construction information issued to the contractor at no cost:
[5.6] Three (3) copies of drawings and related Technical data are to be supplied to the
Contractor free of charge.
10.0 Insurances Insured amounts, deductibles and duration of cover will be as follows:
[10.1.1] Contracts works insurance to be affected by: CONTRACTOR
For sum of: Contract sum plus 20%
With a deductible of 10%
Supplementary/special insurance to be affected by: CONTRACTOR
For sum of: Contractor sum plus 20%
[10.1.2] With a deductible of 10%
Public liability insurance to be effected by: CONTRACTOR
For sum of: R 10,000,000.00
With a deductible of: 5%
[10.1.3]
Add new clause : In the event of a claim, the Contractor is liable for the
deductible/excess amount.
Insurances shall be in place for the construction period until issue of the Practical
[10.11] Completion Certificate.
11.0 Securities
Contract No: CDC/199/26 of 13 C1.2 Part C1: Agreement and Contract Data
Coega
Coega Development Corporation KZN Province
Supply Chain Management ISO 9001: 2008 Clause 5.5.3
[11.5] Amend 11.5.1 and 11.5.2 to read as follows:
The Employer shall not provide a payment guarantee.
11.0 Securities
[11.1.1] The contractor is to provide either a variable construction security as per clause
11.1.1 or a fixed construction security as per clause 11.1.2.
[11.2.1] The variable construction guarantee to be provided shall not contain an expiry date.
[11.1.3] New Clause 11.1.3 –
The fixed construction guarantee shall be accompanied by a 5% retention, to be
released once the project has reached Practical Completion.
[11.8] The variable construction guarantee shall be returned within fourteen (14) calendar
days of the issue of the Works Completion to the Contractor.
[11.10] Amend the clause:
Waiver of the contractor’s lien or right on continuing possession is required from the
Contractor without the Employer providing a payment guarantee.
Execution
12.0 Obligations of
the Parties
[12.1.2] Add: The Employer shall provide a construction permit issued by Department of
Labour before site possession can be given to the Contractor.
[12.1.4] The following restrictions to the Contractor apply to the site:
The Contractor will be restricted to work only within the area demarcated for the
specific works
[12.1.5] Add: Possession of site shall be twenty-one (21) calendar days after acceptance
subject to the conditions of clause 12.1.2 being satisfied, Principal Agent and
Employer agreement and complying with terms of 12.2.22.
The period for the commencement of the works after the Contractor is given
possession of the site is seven (7) working days subject to the conditions of clauses
12.1.2 and 12.1.15 being satisfied.
[12.1.11] Amend to read as follows: The type and extent of work to be undertaken by direct
contractors: As per the scope of works.
Contract No: CDC/199/26 of 13 C1.2 Part C1: Agreement and Contract Data
Coega
Coega Development Corporation KZN Province
Supply Chain Management ISO 9001: 2008 Clause 5.5.3
[12.1.14] Add new clause: A detailed programme for the works will be provided to the Principal
Agent in “Microsoft Projects (Latest version)” clearly indicating the critical path
activities and all dependencies within fourteen (14) working days after the issue of the
Form of Offer and Acceptance. A detailed cash flow must also accompany this
construction programme.
[12.2.2] Amend to read: Contractor to submit to principal agent all required documents as for
sub-clauses 12.2.2 and 12.2.2 within fourteen (14) working days, except for
securities.
[12.4] Add new clause:
The Contractor shall remain responsible for contract work insurance where the works
is for alterations or renovations to an existing building(s).
17.0 Contract
INSTRUCTIONS Add new clause:
17.6 The Principal Agent shall obtain the Employer’s approval before issuing an instruction
to execute a Variation.
17.7 Add new clause:
No expenditure shall be incurred under a Contingency Allowance without the written
approval of the Employer.
19.0 Practical
Completion
[19.1.3] The date for practical completion is twelve (12) calendar months from the date of the
site handover/possession which shall include the December builder’s holidays.
[19.5] Delete the words “subject to the contractor’s lien or right of continuing possession of
the works where this has not been waived”
20.0 Completion
[20.1] Sectional completion will not be applicable.
20.2 The principal agent shall issue:
20.2.1 A certificate of practical completion [19.3]
20.2.2 A certificate of final completion indicating where applicable, if it is for the last section to
reach final completion [21.6.2]
Contract No: CDC/199/26 of 13 C1.2 Part C1: Agreement and Contract Data
Coega
Coega Development Corporation KZN Province
Supply Chain Management ISO 9001: 2008 Clause 5.5.3
21.0
Defects
Liability
[21.1] Amend the clause: The defect liability period shall commence on the date of the
works completion and end twelve (12) calendar months from such date.
The defects liability period for electrical works shall commence on the date of works
completion and end twelve (12) calendar months from such date.
23.0 Revision of
THE DATE Amend to read: The Contractor shall allow twenty (20) working days per year (12
[23.1.1] months) for the adverse effect of weather conditions and shall not be entitled to a
revision of the date for Practical Completion for delays suffered by adverse weather
conditions
24.0 PENALTY Add: In addition to penalties for late or non-completion, the employer shall be entitled
to impose a penalty on the contractor for each calendar day for non-compliance with
the Occupational Health and Safety Act No. (as amended), or any
regulations made thereunder, where such non-compliance has been duly recorded by
the principal agent or health and safety agent and remains unremedied within the
prescribed time. The rate of such penalty shall be as stated below. The imposition of
such penalty shall not limit the employer’s rights to other remedies, including
suspension or termination under the provisions of this agreement
Penalty for late or non-completion shall be R28 140.00 per Calander day.
Penalty for non-compliance of the Occupational Health and Safety Act No.
as determined by the Principal Agent shall be R42 210.00 per Calander day.
25.0 Payment
[25.2] Add: The interim payment certificate is to be issued by the 20th day of each month or
otherwise agreed by the parties which is to be provided in the Post Tender section under
clause 41.6
[25.10] Amend the clause: The Employer shall pay to the Contractor the amount certified in
an interim payment certificate within thirty (30) calendar days of the date of receipt of
the payment certificate by the client, provided that the mandatory monthly progress
report is submitted by the Contractor not later than the twentieth (20TH) of every
calendar month.
26.0 Adjustment
Of the
Contract No: CDC/199/26 of 13 C1.2 Part C1: Agreement and Contract Data
Coega
Coega Development Corporation KZN Province
Supply Chain Management ISO 9001: 2008 Clause 5.5.3
Contract
Value
[26.1] Amend to read: The principal agent shall in line with the Contract Price Adjustment
Provisions determine the value of adjustments to the contract value in cooperation with
the Contractor in the preparation of the final account. Where such adjustments require
measurement on site, the contractor shall have the right to be present.
[26.2[ Delete and Replace the clause: The Principal Agent shall determine the value of
adjustments to the contract value according to the priced document. Where items of
additional work are required the Principal Agent and the Contractor must agree on
the adjustment and the Principal Agent must get approval from the Employer before
the commencement of such work.
30.0
Storm damage repairs and renovations at seatides combined school in pinetown district, kwazulu-
Natal
Compliance Requirements
Source: CDC-199-26 Tender Document.zip (TENDER)No specific requirements found
CIDB grading/category: 7GB OR HIGHER
CIDB grade: 7gb or higher
Completion Certificate
And form of offer on section c1.1
Sbd 1 - part a: invitation to bid and part b: terms of
Sbd 4 – bidder’s disclosures
Sbd 6.1 Preference claim form
Proof of CIDB registration (provide CIDB registration
Proposed key personnel
Form of offer and acceptance
Bill of quantities in full
Tax compliance status
Tax compliance requirements
Tax compliance status (tcs) pin may be made via e-filing through the SARS website
Csd number
Central supplier database (csd), a csd number
Key personnel cv and qualifications
2.3 Application for tax compliance status (tcs) pin may be made via e-filing through the SARS website
Tcs certificate / pin / csd number.
2.6 Where NO tcs is available but the bidder is registered on the central supplier database (csd), a csd number
Experience and qualifications of contracts manager
Qualifications
(Copies of all relevant qualifications and registrations must be attached to this form)
Education / Qualifications: Year Obtained: Institution
VAT registration
If the answer is “NO” to all of the above, then IT is not a requirement to register for a tax compliance status
B-BBEE Details: NATAL
Schedule of work carried out by the tenderer
Schedule of current contracts
Proposed key personnel
Schedule of construction plant and equipment
Financial references
Proposed construction work programme and methodology
Record of addenda to tender documents
Form l: occupational health and safety act specifications
Form of offer and acceptance
Bill of quantities in full
Construction guarantee (3 x pages)
Form h: protection of personal information: consent
Authority for signatory
Certificate of authority for signatory to agreement
Jiont venture disclosure form
BBBEE preferencing
Quality management plan
Certificate of acquaintance with tender documents
T1.1: Tendering Procedure
Contract No. CDC/199/26
C1.1 Form of offer and acceptance
Storm damage rapairs and renovations at seatides combined school in pinetown district,
Kwazulu-natal
CONTRACT No. CDC/199/26
C1.1 Form of Offer and Acceptance
Offer
The Employer, identified in the acceptance signature block, has solicited offers to enter a
contract for the procurement of a Contractor for the STORM DAMAGE REPAIRS AND
Renovations at seatides combined school in pinetown district, kwazulu-
Natal – CDC/199/26.
The Tenderer, identified in the offer signature block, has examined the documents listed in the
Tender Data and Addenda thereto as listed in the Returnable Schedules and by submitting this
offer has accepted the Conditions of Tender.
The Tenderer, identified in the offer signature block, has examined the draft contract as listed in
the acceptance section and agreed to provide this offer.
The offered total of the prices inclusive of VAT is:
R (in words)
.................................................................................................................
Section
Source: CDC-199-26 Tender Document.zipFunctional scoring criteria include demonstrated experience (past performance) in similar projects, with points awarded based on number of projects (e.g., 0 points for none, 25 for one, 50 for two, 75 for three, 100 for more than three). Service provider location is scored: no information (0), outside KwaZulu-Natal (25), within KwaZulu-Natal (50), within eThekwini (75), within Tongaat Area (100). Other criteria as per Part T1.3.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
CDC Umhlanga Office, 18 Cranbrook Crescent - Umhlanga - Durban - 4319
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
22 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Get deep intelligence on Construction. Unlock full pricing strategies, bid frequency, and historical win rates.
Learn how to submit a winning bid with these related articles
💡 Want more tendering tips and strategies?
Explore Our Blog