Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
O. R. Tambo International Airport - O. R. Tambo International Airport - Kempton Park -
Organization Type
GOVERNMENT
Published
24 Nov 2026
OCDS Reference
ocds-9t57fa-179623
Airports company south africa requires engineering, procurement and construction services to integrate elevators l9a and l9b into the building management system (bms) at or tambo international airport, including imcs integration readiness and cloud-based monitoring and analytics. The works are located near international arrivals, with site access available 24/7. the most consequential bidder consideration is the mandatory 30% of work that must be contracted to a qualifying targeted enterprise, with failure attracting penalties of 50% of the shortfall value.
Closing: 8 December 2026 at 10:00; submission method not stated in the document.
Targeted Enterprise: minimum 30% of work must go to a Targeted Enterprise (partnership, JV or sub-contract) that is CIDB-registered, SARS-registered, at least EME or QSE with B-BBEE Level Two, 50%+ black owned or 30%+ black women owned, with no shared equity and a written co-operation agreement.
Performance bond: 5% of contract value excluding VAT, submitted within 10 working days of award notification.
Insurance certificates (Contract Works min R250,000; Public Liability R275,000 landside / R525,000 airside per claim; Professional Indemnity min R5 million) must be provided before contract signature.
Key personnel: Control and Instrumentation Engineer and Control Technician with CVs appended to the Resource Proposal (Annex F).
Sub-contracting: no more than 25% of tendered value (excluding Targeted Enterprise work) may go to enterprises with lower B-BBEE status, unless the sub-contractor is an EME with capability.
B-BBEE: a compliant B-BBEE certificate must be presented annually; failure is a material breach that may lead to contract cancellation.
Check the registered grade against the tender conditions, or estimate a possible grade. Check CIDB registration · Estimate a CIDB grade.
Date & Time
Tuesday, 08 December 2026 - 12:00
Venue
null
Categories
Request for Quotation
O. R. Tambo International Airport - O. R. Tambo International Airport - Kempton Park -
AI Document Analysis Stages
Important Dates
Source: Rec 74105(a) BMS Installation.pdf (RFP)24 Nov
2026
Tender Published
Tender was published
08 Dec
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Rec 74105 EPC for the integration of elevators l9a and l9b into a bms imc.pdf
Engineering, procurement and construction to integrate elevators L9A and L9B at OR Tambo International Airport into a building management system, prepare IMCS integration readiness, and deliver cloud-based monitoring and analytics. The contract is let by Airports Company South Africa SOC Ltd under the NEC3 Engineering and Construction Contract (April 2013), main Option A priced contract with activity schedule, with sectional completion per elevator. Bids close on 8 December 2026 at 12:00.
Rec 74105(a) BMS Installation.pdf
Installation of a Building Management System (BMS) at O.R. Tambo International Airport for the Airports Company of South Africa SOC Limited, as Phase 2 of Project 6473. The appointed contractor must integrate BMS, PLC, SCADA and IoT systems and complete the works within 18 months to earn full functionality points.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
Airports Company South Africa (ACSA)Win ACSA tenders with AI Matching Engine, airport-infrastructure intelligence, compliance analysis, and application support for aviation operations.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 1 150 000
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Closing date: 08 December 2026 at 12:00
Compulsory briefing: N/A (no briefing session scheduled)
Site inspection: compulsory, directly after briefing (but briefing is N/A, so site inspection details unclear)
Enquiries closing date: 01 December 2026 at 15:00
Employer response to clarification: 03 December 2026 at 15:00
Tender validity: 12 weeks (84 days) from closing date
Contact Information
Source: Rec 74105(a) BMS Installation.pdf (RFP)Enquiries (bidding procedure and technical):
Submission email: [email protected]
Employer: Airports Company South Africa SOC Limited
Employer's Agent: Sandra Sebokolodi
Address for delivery: [email protected] (email submission)
Submission Guidelines
Source: Rec 74105(a) BMS Installation.pdf (RFP)Submission method: email to [email protected] (do not CC any ACSA employee).
Submit 1 original and 1 copy, plus an electronic copy on USB flash drive. Seal original and copy in separate packages marked "ORIGINAL" and "COPY", with the tenderer's name, contact details, tender reference number and description on the outside. Include the bidder's return address on the outside.
Complete the Bid Register when submitting.
Bids must be submitted on the official forms provided; do not retype.
Returnable documents: complete and sign all forms, including the Form of Offer and Acceptance (C1.1), the Contract Document (Appendix 1), and any other schedules in Part T2.
Late bids will not be accepted; ACSA is not liable for late delivery.
Telegraphic, telephonic, telex, facsimile and e-mailed tenders will not be accepted (except the email submission method stated above).
Bids must be delivered by the closing time; proof of posting is not proof of delivery.
Evaluation Criteria
Source: Rec 74105(a) BMS Installation.pdf (RFP)Evaluation stages:
Stage 1: Pre-qualification – bidders must meet the mandatory criteria at closing date or be disqualified.
Stage 2: Mandatory administration – completed and signed Form of Offer (C1.1), valid CIDB grading of 3EP or higher, valid COIDA letter of good standing.
Stage 3: Functionality – scored out of 100; minimum threshold of 85 points required to proceed to price and B-BBEE evaluation.
Functionality breakdown:
Stage 4: Price and preference – 80/20 system for bids ≤ R50 million, 90/10 for bids > R50 million. Price points per formula. Preference points for B-BBEE status levels and specific goals (black youth, black women, people with disabilities).
Stage 5: Objective criteria – award to highest points scorer unless objective criteria justify another bidder.
ECSA and SACPCMP registrations verified; only active status earns points.
Technical Specifications
Source: Rec 74105(a) BMS Installation.pdf (RFP)Scope: Phase 2 of Project 6473 – BMS (Building Management System) installation at O.R. Tambo International Airport.
Work includes integration of BMS / PLC / SCADA / IoT systems.
Key personnel requirements:
Delivery timeline: complete in 18 months or less for full points.
Site inspection: compulsory, bring ID or driver's license, safety boots, reflector vest.
Financial Requirements
Source: Rec 74105(a) BMS Installation.pdf (RFP)Pricing: fixed prices, no contract price adjustments; rates and prices remain fixed for the full contract duration.
VAT shown separately.
Prices in Rand.
No bid security or guarantee mentioned.
Insurance: proof of insurance required on award only; contract will not be signed without valid insurance.
Payment terms not specified.
Compliance Requirements
Source: Rec 74105(a) BMS Installation.pdf (RFP)CSD registration: mandatory; no award to a supplier not registered on the Central Supplier Database.
Tax compliance: TCS PIN or CSD number required; each consortium/JV/subcontractor party must submit separate TCS certificate/PIN/CSD number.
COIDA: valid Letter of Good Standing with the Workmen's Compensation Commissioner required; contract will not be signed without it.
CIDB grading: 3EP or higher.
B-BBEE: valid sworn affidavit or SANAS-accredited B-BBEE certificate; consolidated certificate for JVs. Preference points per B-BBEE status level (Level 1 = 5 points, Level 2 = 4.5, Level 3 = 4, Level 4 = 3, Level 5 = 2, Level 6 = 0.5, Level 7 = 0.3, Level 8 = 0.1). Specific goals: black youth majority-owned (5 points), black women majority-owned (5 points), company majority owned by people with disabilities (5 points).
ECSA and SACPCMP registrations verified at evaluation; only active status earns points.
Foreign suppliers: complete questionnaire if not RSA resident.
Description
Source: Rec 74105 EPC for the integration of elevators l9a and l9b into a bms imc.pdfEngineering, Procurement, Construction of the integration of elevators L9A and L9B into a BMS, IMCS integration readiness, and cloud-based monitoring and analytics, at OR Tambo International Airport.
Contact Information
Source: Rec 74105 EPC for the integration of elevators l9a and l9b into a bms imc.pdf (unknown)Employer: Airports Company South Africa SOC Ltd (Reg no: 1993/004149/30)
Registered office: OR Tambo International Airport, Kempton Park, 1627
Project Manager: TBA
Address: ACSA Admin. Building, 3rd Floor North Wing Offices, OR Tambo International Airport, Kempton Park, 1627
Supervisor: TBA
Address: ACSA Admin. Building, 3rd Floor North Wing Offices, OR Tambo International Airport, Kempton Park, 1627
ACSA Treasury (Project Notification forms): [email protected]
Submission Guidelines
Source: Rec 74105 EPC for the integration of elevators l9a and l9b into a bms imc.pdf (unknown)Returnable documents:
Submission method: not stated in the document. Closing time: 10:00 on 8 December 2026 (from tender record).
Evaluation Criteria
Source: Rec 74105 EPC for the integration of elevators l9a and l9b into a bms imc.pdf (unknown)Targeted Enterprise participation: minimum 30% of work must be contracted to a Targeted Enterprise (via partnership, joint venture or sub-contracting).
Targeted Enterprise requirements:
Skills development: must achieve the CIDB Standard for developing skills through infrastructure contracts (August 2013) goal. Failure without acceptable justification attracts a penalty equal to 50% of the Total Notional Cost over the contract duration of the skills development programme.
Sub-contracting: not more than 25% of the tendered contract value (excluding work to Targeted Enterprises and specified services) may be sub-contracted to enterprises without an equal or higher B-BBEE status, unless the sub-contractor is an EME with capability.
B-BBEE: a compliant B-BBEE certificate must be presented annually; failure is a material breach that may result in contract cancellation.
Technical Specifications
Source: Rec 74105 EPC for the integration of elevators l9a and l9b into a bms imc.pdf (unknown)Scope: Engineering, Procurement, Construction of the integration of elevators L9A and L9B into a BMS, IMCS integration readiness, and cloud-based monitoring and analytics.
Location: OR Tambo International Airport, in the vicinity of International Arrivals.
Key deliverables: integration of elevators L9A and L9B into the Building Management System (BMS), IMCS integration readiness, and cloud-based monitoring and analytics.
Completion: sectional completion for installation, commissioning and handover of each elevator.
Site access: 24 hours, 7 days a week.
Experience & Qualifications
Source: Rec 74105 EPC for the integration of elevators l9a and l9b into a bms imc.pdfKey personnel required:
CVs must be appended to the Resource Proposal (Annex F).
Quality Management
Source: Rec 74105 EPC for the integration of elevators l9a and l9b into a bms imc.pdfLatent defects: a latent defect is one not discovered on reasonable inspection before the defects date. The Employer or Supervisor is not required to undertake inspections beyond reasonable inspection. The defects date may be extended if the Employer cannot use the works due to a defect, up to twice the original defects period.
Pricing Schedule
Source: Rec 74105 EPC for the integration of elevators l9a and l9b into a bms imc.pdfPricing: Priced contract with Activity Schedule (NEC3 Option A). The offered total price (excl. VAT), VAT @ 15%, and total incl. VAT must be stated in the Form of Offer and Acceptance. In case of conflict, the amount in the Form of Offer prevails over Pricing Data Subtotal F.
Method of measurement: 6th edition of the Standard System of Measuring Building Works, as amended in Part C2.1 Pricing Assumptions.
Payment: assessments every 4 weeks, on the 14th working day of each successive month; payment within 30 working days from receipt of a valid tax invoice.
Financial Requirements
Source: Rec 74105 EPC for the integration of elevators l9a and l9b into a bms imc.pdf (unknown)Pricing: Priced contract with Activity Schedule (NEC3 Option A). Method of measurement: 6th edition of the Standard System of Measuring Building Works.
Performance bond: 5% of contract value excluding VAT, submitted within 10 working days from notification of award.
Retention: 5% (unless a Retention Money Guarantee is provided).
Delay damages: 0.05% of contract value per day, up to a maximum of 10% of contract value (for each section and for the whole of the works).
Payment: assessments every 4 weeks, on the 14th working day of each successive month. Payment within 30 working days from receipt of a valid tax invoice.
Insurance (contractor must secure and provide proof before contract signature):
Employer's liability for indirect/consequential loss: limited to R0.00.
Compliance Requirements
Source: Rec 74105 EPC for the integration of elevators l9a and l9b into a bms imc.pdf (unknown)B-BBEE: annual compliant B-BBEE certificate required; failure is a material breach.
Targeted Enterprise: must be at least EME or QSE with B-BBEE Status Level Two Contributor, 50%+ black owned or 30%+ black women owned, CIDB-registered, SARS-registered, and registered under Companies Act 2008 or Close Corporation Act 1984.
OHS: contractor must comply with the Occupational Health and Safety Act and Construction Regulations.
No specific CSD, tax clearance, or CIDB grading requirements stated in the document.
Health & Safety
Source: Rec 74105 EPC for the integration of elevators l9a and l9b into a bms imc.pdfThe contractor must comply with the Occupational Health and Safety Act and Construction Regulations. The contractor is an employer in its own right with duties under the Act. All work, equipment, plant and materials must be in accordance with the Act.
Contractual Terms
Source: Rec 74105 EPC for the integration of elevators l9a and l9b into a bms imc.pdfContract: NEC3 Engineering and Construction Contract, April 2013, with main Option A (Priced contract with Activity Schedule), dispute resolution Option W1, and secondary Options X2 (Changes in the law), X5 (Sectional Completion), X7 (Delay damages), X13 (Performance Bond), X16 (Retention), X17 (Low performance damages), X18 (Limitation of liability), and Z (Additional conditions).
Completion date: 2 years after signing of the contract by ACSA.
Defects date: 12 months after completion of the whole of the works. Defect correction period: 2 weeks.
Programme: first programme within 2 weeks of contract date; revised programmes at intervals no longer than 2 weeks.
Liability: no liability for indirect or consequential loss; liability for property damage limited to total losses incurred; end of liability date 5 years after defects date for latent defects, or prescription date for other matters.
Termination: business rescue proceedings are grounds for termination.
Cession/delegation: contractor may not cede, delegate or assign without written consent of the Employer.
Joint and several liability: if contractor is a joint venture, members are jointly and severally liable. Key person authorised to bind the contractor must be notified within 1 week of contract date.
Ethics: contractor must not engage in corrupt practices; breach is grounds for termination.
Confidentiality: all information obtained under the contract is confidential; images of the works require prior written consent.
Step-in rights: Employer may remedy defaults if contractor fails to remedy within 2 weeks of notification.
Intellectual property: IP rights remain with originator; contractor grants Employer an irrevocable, transferable, non-exclusive, royalty-free licence to use IP for the works.
Dispute resolution: adjudication by a panel of adjudicators; arbitration in Kempton Park under the Rules for the Conduct of Arbitrations.
Compensation events: notification period is 4 weeks (instead of 8 weeks).
Employer's consent required for design/scope changes of 5% or more, or completion date extension of more than 30 days.
OHS: contractor is an employer in its own right and must comply with the Occupational Health and Safety Act and Construction Regulations.
Transformation: minimum 30% of work to Targeted Enterprises; penalty of 50% of the value by which payments to Targeted Enterprises fall short; skills development goal penalty of 50% of Total Notional Cost.
Section
Source: Rec 74105 EPC for the integration of elevators l9a and l9b into a bms imc.pdfNo additional evaluation criteria beyond those in the standard evaluationCriteria section.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
O. R. Tambo International Airport - O. R. Tambo International Airport - Kempton Park -
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
2
Last checked
24 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Get deep intelligence on Services: General. Unlock full pricing strategies, bid frequency, and historical win rates.
Learn how to submit a winning bid with these related articles
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Your meticulously crafted General sector tender submission can be disqualified for a single, seemingly minor compliance oversight. The reality for South African contractors is that technical competence is no longer sufficient; it is underpinned by a non-negotiable framework of documentary compliance. This regulatory guide: mastering CSD and BBBEE compliance for general sector tenders in south africa provides a comprehensive, step-by-step breakdown of the mandatory registrations and certificates you must secure and present. We detail the precise requirements for CSD, BBBEE, SARS TCS, CIPC, and COIDA, explaining their function within the procurement ecosystem governed by the PFMA and PPPFA. Learn the actionable steps to prepare your business, avoid the most common disqualifying errors, and leverage technology to streamline your compliance process for successful bidding in 2026 and beyond.
For South African General contractors, the path to government procurement is paved with non-negotiable regulatory requirements. The most common barrier to entry is not a lack of capability, but a failure to master the foundational compliance frameworks that govern every bid. This complete regulatory guide to CSD and BBBEE compliance for General sector tender suppliers in South Africa demystifies the process. It provides a meticulous, step-by-step field manual for ensuring your company is fully compliant and audit-ready, enabling you to confidently access the R billions in opportunities across infrastructure maintenance, facilities management, and service delivery within the General sector.
This definitive guide provides General sector contractors with the precise, actionable steps required to achieve and maintain CSD and BBBEE compliance for South African public tenders in 2026. Authored by Dr. Sarah Mokwena, a Legal Compliance Specialist, it meticulously walks through the regulatory framework, mandatory registrations, and the critical documentation needed to avoid disqualification. We dissect the common, costly errors made during submission and provide a clear checklist to ensure your bid is responsive and competitive. Learn how to navigate the Central Supplier Database, validate your BBBEE status, and integrate compliance into your tender preparation process.
💡 Want more tendering tips and strategies?
Explore Our Blog