Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
311 Solomon Mahlangu Drive, Rossburgh - Rossburgh - Durban - 4000
Organization Type
GOVERNMENT
Published
26 Nov 2026
OCDS Reference
ocds-9t57fa-180022
TRANSNET engineering requires construction of an approximately 900 m reinforced-concrete flood mitigation wall with associated piling, anti-climb fencing, and a complete three-phase led area-lighting installation along the mhlathuzana canal at the durban main plant, 311 solomon mahlangu drive, durban. The works respond to april 2022 flooding and must be completed within ten months on a once-off basis. Bidders must hold a valid CIDB grade 7 ce or higher at tender closing, and the contract includes extensive environmental authorisation, safety-file, and independent pile-testing obligations.
CIDB grading: Bidders must hold a valid CIDB contractor grading of 7 CE or higher at tender closing, verified in the CIDB Register of Contractors before award.
Contract period: The works are once-off, for a period not exceeding ten (10) months from appointment.
Environmental authorisations: The contractor must obtain all required NEMA EIA authorisations, Water Use Licences or General Authorisations (National Water Act Sections 21(c), 21(i), 21(j)), and municipal approvals under D'MOSS before any construction, site establishment, or related activity commences.
Mandatory appointments: The contractor must appoint a competent Environmental Officer, an Environmental Assessment Practitioner (EAP), and an Environmental Control Officer (ECO) as legislated requirements.
Safety file: No work may commence until the safety file (construction health and safety plan, baseline and task-specific risk assessments, method statements, legal appointments, emergency response plan, medical fitness certificates, training records, incident reporting procedure, toolbox talk programme) is reviewed and accepted, followed by a SHE induction.
Piling testing: Allow for 150 low-strain pile integrity tests (100% of production piles), one preliminary sacrificial or trial load test, and three working-pile verification load tests, all by an independent competent testing entity.
Electrical design: The contractor must provide the complete three-phase electrical design (load schedule, phase balance, voltage-drop, fault-level, protection coordination, earthing, lightning protection, cable schedule, single-line diagram, photometric calculations) signed by a professionally registered competent electrical engineer or technologist.
Closing: Tenders close on 22 January 2027 at 14:00 (submission method and address not stated in the document).
Check the registered grade against the tender conditions, or estimate a possible grade. Check CIDB registration Β· Estimate a CIDB grade.
Venue
311 Solomon Mahlangu Drive, Rossburgh
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Bid(Open-Tender)
311 Solomon Mahlangu Drive, Rossburgh - Rossburgh - Durban - 4000
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Contact Information
Source: TE-RET-001-1.pdf (unknown)Contact: Zelda Group Engineers
Email: [email protected]
Address: 405 Zelda Street, Rossburgh, Durban, 4001
26 Nov
2026
Tender Published
Tender was published
22 Jan
2027
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
RFP FLOOD MITIGATION CANAL _NEC _25 Nov 2026.pdf
Transnet Engineering requires the construction of a flood mitigation structure and all associated infrastructure along the Mhlathuzana Canal at its Durban Main Centre, on a once-off basis over a period not exceeding ten (10) months. The works are contracted under the NEC3 Engineering and Construction Contract and include earthworks, piling, reinforced concrete, fencing, three-phase underground electrical installation and commissioning. The contract is reserved for CIDB 7CE or higher contractors with professionally registered key personnel.
TE-RET-001-301.pdf
Construction of a flood mitigation structure and all associated infrastructure along the Mhlathuzana Canal at Transnet Engineering's Durban Main Centre, on a once-off basis over a period not exceeding ten months. The works are reinforced-concrete heavy, with retaining walls, ground beams, pilecaps, columns and slabs detailed on drawing TE-RET-001-301.
TE-RET-001-1.pdf
Construction of a flood mitigation structure, including all associated infrastructure, along the Mhlathuzana Canal for the Durban Main Centre. The work is a once-off project with a contract period not exceeding ten months, and includes reinforced concrete walls, earthworks, and related civil works.
Updated_BOQ_Mhlathuzana_Canal_BSC_Rev6_16 Sept 2026.pdf
Transnet SOC Ltd requires the construction of a flood mitigation structure, including all associated infrastructure, along the Mhlathuzana Canal for the Durban Main Centre. The works are to be completed on a once-off basis within a period not exceeding ten months, covering site clearance, bulk earthworks, piling, structural concrete, a new anti-climb fence, electrical and area lighting, and handover documentation.
TE-RET-001-300.pdf
Construction of a flood mitigation structure, including a retaining wall and associated infrastructure, along the Mhlathuzana Canal at the Transnet Engineering Durban Main Centre. The work is a once-off contract with a duration not exceeding ten months.
Updated_Technical_Evaluation_Criteria_Mhlathuzana_Canal_Rev_Final.pdf
Transnet Engineering requires a contractor to construct a flood mitigation structure along the Mhlathuzana Canal in Durban, including associated infrastructure such as a reinforced-concrete wall, piling, earthworks, fencing, and three-phase underground electrical and lighting installations. The contract is a once-off engagement for a period not exceeding ten months, with a mandatory CIDB grading of 7 CE or higher and a two-stage technical evaluation.
Updated_Specification_Flood_Mitigation_Mhlathuzana_Canal_Final.pdf
Construction of a flood mitigation structure along the Mhlathuzana Canal for the Transnet Engineering Durban Main Plant at 311 Solomon Mahlangu Drive. The works comprise an approximately 900 m reinforced-concrete flood wall with piling, anti-climb fencing, and a complete three-phase LED area-lighting installation, to be completed within ten months.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
TransnetSecure Transnet tenders using AI Matching & Recommendations, logistics infrastructure intelligence, compliance analysis, and application support for rail, ports, and pipelines.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
RΒ 633Β 233
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically β no action required from you.
Technical Specifications
Source: TE-RET-001-1.pdf (unknown)Construction of a flood mitigation structure along the Mhlathuzana Canal, Durban Main Centre.
Includes associated infrastructure such as reinforced concrete walls, storm poles, power poles, manholes, and railway level crossings.
Work involves earthworks, level adjustments, and installation of finished water levels.
Contract period: once off, not exceeding ten (10) months.
Compliance Requirements
Source: TE-RET-001-1.pdf (unknown)B-BBEE Minimum Level: 80
Important Dates
Source: RFP FLOOD MITIGATION CANAL _NEC _25 Nov 2026.pdf (RFP)Compulsory briefing and site visit: 09 December 2026 at 10:00, at Transnet Engineering Durban Main Centre, 311 Solomon Mahlangu Drive, Rossburgh. Attendance is mandatory; failure to attend disqualifies the bid. Bring the RFP document and T2.2-01 Certificate of Attendance for signature. PPE required: safety shoes with steel toe cap, reflector vest, goggles, long sleeve shirts, hard hats. No PPE means no access. Breathalyzer testing and ID/passport/driver's licence required for access.
Closing date and time: 22 January 2027 at 16:00.
Tender validity period: 12 weeks from closing date.
Contact Information
Source: RFP FLOOD MITIGATION CANAL _NEC _25 Nov 2026.pdf (RFP)Employer's Agent: Sagie Naiker
Address: Transnet Engineering, Supply Chain Management, Koedoespoort, Pretoria
Telephone: 011-012 2709
Email: [email protected]
Fraud and corruption tip-offs: 0800 003 056 or [email protected]
Submission Guidelines
Source: RFP FLOOD MITIGATION CANAL _NEC _25 Nov 2026.pdf (RFP)Submission method: Transnet e-Tender Submission Portal at https://esupplierportal.transnet.net/portal/.
Evaluation Criteria
Source: RFP FLOOD MITIGATION CANAL _NEC _25 Nov 2026.pdf (RFP)Evaluation stages: Stage 1 β Eligibility (compulsory briefing attendance, CIDB grading, mandatory professional registrations); Stage 2 β Pre-qualification (CIDB 7CE or higher, professional registrations); Stage 3 β Functionality (minimum 80 points); Stage 4 β Price and preference (80/20 system).
Functionality criteria (total 100 points, minimum qualifying score 80):
Price and preference (80/20 system):
Only tenders achieving the minimum functionality score are evaluated further. Evaluation is done by at least 3 evaluators and averaged.
Technical Specifications
Source: RFP FLOOD MITIGATION CANAL _NEC _25 Nov 2026.pdf (RFP)Scope: Construction of a flood mitigation structure including all associated infrastructure along Mhlathuzana Canal, Durban Main Centre, on a once-off basis for a period not exceeding 10 months.
Key works (from functionality criteria):
Contract type: NEC3 Engineering and Construction Contract.
Special requirement: Awarded bidder must subcontract 5% of the contract value. Job creation or preservation to local communities must be demonstrated upon contract award.
Financial Requirements
Source: RFP FLOOD MITIGATION CANAL _NEC _25 Nov 2026.pdf (RFP)Pricing: Bill of Quantities (C2.2) with pricing instructions (C2.1).
Bonds/Guarantees/Insurance: Forms of Securities (C1.3) and Insurance provided by the Contractor (T2.2-27) are required.
Financial statements: Three years audited financial statements (T2.2-28) must be submitted.
No bid security or retention percentages stated in the document.
Compliance Requirements
Source: RFP FLOOD MITIGATION CANAL _NEC _25 Nov 2026.pdf (RFP)Mandatory eligibility:
Statutory and database compliance:
Disqualification: listed on Register of Tender Defaulters, Transnet restricted list, or National Treasury list; convicted of serious breach of law in preceding 5 years (including Competition Act) β must declare in Breach of Law returnable.
Description
Source: TE-RET-001-301.pdfThe project involves construction of a flood mitigation structure along Mhlathuzana Canal in Durban Main Centre. The work includes reinforced concrete elements such as pile caps, ground beams, strip footings, columns, shear/lift walls, slabs, staircases, and retaining walls. The contract is for a once-off basis for a period not exceeding ten months.
Important Dates
Source: TE-RET-001-301.pdf (unknown)Closing time: 14:00 on 22 January 2027
Contact Information
Source: TE-RET-001-301.pdf (unknown)Consultant: Zelda Consulting Engineers
Address: 405 Jabu Ndlovu Street, Pietermaritzburg, 3201
Email: [email protected]
Telephone: 033 086 3324
Technical Specifications
Source: TE-RET-001-301.pdf (unknown)Construction of a flood mitigation structure along Mhlathuzana Canal, Durban Main Centre.
Scope includes reinforced concrete works: pile caps, ground beams, strip footings, columns, shear/lift walls, slabs, staircases, retaining walls.
Reinforcement cover requirements:
Minimum lap lengths for rebar:
Contract period: not exceeding 10 months, once off.
Description
Source: Updated_Specification_Flood_Mitigation_Mhlathuzana_Canal_Final.pdfThe works comprise the construction of a flood mitigation structure along the Mhlathuzana Canal at the Transnet Engineering Durban Main Plant, 311 Solomon Mahlangu Drive, Durban.
The project responds to April 2022 flooding that affected buildings, workshop bays, internal roads and sidewalks, and created sinkholes.
The required outcome is a continuous, inspectable flood-mitigation barrier along the approved alignment.
Key parameters: approximately 900 m reinforced-concrete wall, nominal exposed height approximately 2.6 m; wall crest level presently identified as 8.1 m amsl; approximately 500 m existing fence removal; nominal 150 pile positions, nominal 10 m depth, 6 m spacing; 1 500 mm high anti-climb fence; 46 no. 200 W LED floodlights at nominal 20 m centres.
The works include civil, structural, fencing, lighting, electrical, testing and handover works.
The contract is for a once-off basis for a period not exceeding ten (10) months.
Evaluation Criteria
Source: Updated_Specification_Flood_Mitigation_Mhlathuzana_Canal_Final.pdf (unknown)Bidders must hold a valid CIDB grading of 7 CE or higher at tender closing, verified in the CIDB Register of Contractors before award.
The contractor must comply with the Occupational Health and Safety Act, Construction Regulations, National Environmental Management Act, National Water Act, and all applicable Transnet Engineering standards.
The contractor must obtain all required Environmental Authorisations, licences, permits and statutory approvals prior to commencement, including NEMA EIA authorisations where triggered, Water Use Licences or General Authorisations under the National Water Act, and municipal approvals under D'MOSS.
The contractor must appoint a competent Environmental Officer, an Environmental Assessment Practitioner (EAP) and an Environmental Control Officer (ECO) as legislated requirements.
The contractor must submit a safety file including construction health and safety plan, baseline risk assessment, task-specific risk assessments, method statements, legal appointments, emergency response plan, medical fitness certificates, training and competency records, incident reporting procedure, and toolbox talk programme before work commences.
The contractor must undergo a SHE induction session after the safety file is approved.
Technical Specifications
Source: Updated_Specification_Flood_Mitigation_Mhlathuzana_Canal_Final.pdf (unknown)The works comprise the construction of a flood mitigation structure along the Mhlathuzana Canal at the Transnet Engineering Durban Main Plant, 311 Solomon Mahlangu Drive, Durban.
The project responds to April 2022 flooding that affected buildings, workshop bays, internal roads and sidewalks, and created sinkholes.
The required outcome is a continuous, inspectable flood-mitigation barrier along the approved alignment.
Key parameters:
Civil works:
Piling works:
Structural concrete:
Anti-climb fence:
Electrical and area lighting:
Quality, inspection and testing:
Programme and reporting:
Methodology
Source: Updated_Specification_Flood_Mitigation_Mhlathuzana_Canal_Final.pdfThe contractor must provide a project-specific piling method statement, plant details, proposed sequence, obstruction procedure, concrete-placement method and records format.
The contractor must submit method statements for all work packages as part of the safety file.
The contractor must prepare a photographic and written pre-condition survey of adjacent assets before commencing physical work.
The contractor must submit a project quality plan and concrete inspection and test plan before concrete work starts.
The contractor must submit product data, certificates, method statements, inspection and test plans, temporary-works information and shop drawings before the related work begins.
The contractor must prepare a programme including kick-off and handover meetings, design verification and approvals, procurement, site establishment, services proving, fence removal, clearing, earthworks, piling, concrete, fence, electrical works, testing, commissioning, as-built documentation, snag correction and completion.
The programme must include logic links, critical path, key resources, hold points, access constraints, weather and flood risks, subcontractor interfaces and reporting dates.
The contractor must provide a procurement schedule for long-lead materials and equipment.
The contractor must provide a two-week or other accepted look-ahead schedule updated at the required reporting frequency.
The contractor must submit monthly HSE reports.
The contractor must provide a handover dossier and meet final acceptance criteria.
Quality Management
Source: Updated_Specification_Flood_Mitigation_Mhlathuzana_Canal_Final.pdfThe contractor must plan, perform, record and submit all inspections and tests necessary to demonstrate compliance.
Specified compliance testing is included in the tendered rates or designated BOQ items.
Additional testing instructed outside the specified regime is administered under the contract.
Minimum Inspection and Test Plan content must cover: survey and setting out (baseline acceptance, wall alignment and crest survey); earthworks (excavation, founding level, backfill layers, compaction results); piling (set-out, founding/termination, reinforcement, concrete and testing); concrete (formwork, reinforcement, cover, embeds, pre-pour release, testing and curing); fence (samples/product evidence, fixing detail and final inspection); electrical (design review, FAT where applicable, pre-energization and final survey).
Nonconforming work must be identified, isolated, recorded and corrected; corrected work remains subject to reinspection and retesting.
Concrete quality controls: submit project quality plan and concrete inspection and test plan before concrete work; submit approved mix designs, constituent certificates and trial information; do not place concrete until hold points passed; maintain daily concrete records; cure concrete for approved period and method; repair defects only to accepted remedial method; provide as-built survey.
Wall crest and continuity acceptance: completed wall must form continuous barrier at approved alignment and crest level; acceptance requires as-built survey identifying chainage, coordinates and crest levels; no surveyed point below approved design level.
Piling testing: low-strain pile integrity testing on 100% of production piles (allow 150 integrity tests); one preliminary sacrificial or trial load test before production piling; three working-pile verification load tests; tests by independent competent testing entity; no pile cap or ground beam work until results accepted.
Electrical testing: continuity, insulation resistance, polarity, phase sequence, earth continuity, earth-electrode resistance, protective-device operation, measured phase loading and phase balance, functional operation of photocells and contactors, DB verification, underground cable test results, luminaire operation, night aiming and lighting survey.
Submit signed test sheets, calibration certificates, Certificate of Compliance, commissioning report, approved phase load schedule, as-built drawings, circuit schedules, operating instructions, warranties and maintenance data.
Financial Requirements
Source: Updated_Specification_Flood_Mitigation_Mhlathuzana_Canal_Final.pdf (unknown)Measurement and payment are governed by the approved Contract Data and Pricing Data.
The order of precedence is: Contract Data and conditions of contract; project-specific Works Information; controlled project drawings; project-specific specifications; applicable standard specifications; general technical references. Project-specific requirements prevail over general references where expressly stated.
Pricing must be in accordance with the approved Pricing Data and BOQ items.
Provisional quantities for intermediate material, hard rock, groundwater, obstructions, additional pile depth or temporary support must be priced in corresponding BOQ items.
Allow for 150 pile integrity tests in pricing.
Allow for 33 m underground feeder route and 990 m underground three-phase distribution cable in pricing.
No other financial requirements (bid security, bonds, guarantees, retention, payment terms, turnover) are stated in the document.
Compliance Requirements
Source: Updated_Specification_Flood_Mitigation_Mhlathuzana_Canal_Final.pdf (unknown)CIDB grading: Grade 7 CE or higher at tender closing, verified in the CIDB Register of Contractors before award.
Compliance with Occupational Health and Safety Act, Construction Regulations, National Environmental Management Act, National Water Act, CIDB Regulations, SANS 10142-1, SANS 10160, SANS 2001, applicable SANS 1200 Specifications, COTO Specifications, and all Transnet Engineering standards, procedures and permits.
Environmental authorisations: NEMA EIA authorisations where triggered (Listing Notice 1 Activity 12, Listing Notice 3 Activity), Water Use Licences or General Authorisations under National Water Act Sections 21(c), 21(i), 21(j), and municipal approvals under D'MOSS.
Appointment of Environmental Officer, Environmental Assessment Practitioner (EAP) and Environmental Control Officer (ECO) as legislated requirements.
Safety file submission before work commences, including construction health and safety plan, baseline risk assessment, task-specific risk assessments, method statements, legal appointments, emergency response plan, medical fitness certificates, training and competency records, incident reporting procedure, toolbox talk programme.
SHE induction session required after safety file approval.
No work may commence until safety documentation reviewed and accepted.
Department of Labour and Employment notification within 7 days prior to excavation work.
Electrical installations must comply with SANS 10142-1 and Electrical Installation Regulations; Certificates of Compliance required upon completion.
All construction plant must have valid inspection certificates and be operated by competent personnel.
Waste disposal certificates form part of handover documentation.
HSE Close-Out Dossier required at project completion.
Health & Safety
Source: Updated_Specification_Flood_Mitigation_Mhlathuzana_Canal_Final.pdfComply with the Occupational Health and Safety Act, Construction Regulations, and all Transnet Engineering safety procedures applicable to the Site.
Submit a safety file before work commences, including: Construction Health and Safety Plan, Baseline Risk Assessment, Task-specific Risk Assessments, Method Statements, Legal Appointments, Emergency Response Plan, Medical Fitness Certificates, Training and Competency Records, Incident Reporting Procedure, Toolbox Talk Programme.
No work shall commence until the safety file is reviewed and accepted by the SHE Department.
After approval, the contractor must undergo a SHE induction session before project commencement.
Excavation and earthworks safety: conduct geotechnical and excavation risk assessment; notify Department of Labour and Employment within 7 days prior to excavation; inspect excavations daily; provide shoring, benching or battering where required; prevent unauthorised access; install barricading and warning signage; provide safe access and egress; protect and support exposed services; appoint competent excavation supervisors.
Working adjacent to the Mhlathuzana Canal: continuous monitoring of weather forecasts and rainfall warnings; flood emergency response procedures; emergency evacuation routes; safe working distances from canal edges; prevention of materials, debris and waste entering the canal; suitable life-saving equipment where required; canal-side exclusion zones during high-risk activities; erosion and sediment control; protection of vegetation and animal protection; water quality control.
Suspend activities where flood conditions may endanger personnel or infrastructure.
Plant and equipment safety: all plant fit for purpose, valid inspection certificates, operated only by competent personnel, daily pre-use inspections, maintained per manufacturer requirements. Special attention to piling equipment, cranes, excavators, concrete pumps, mobile elevated work platforms, electrical test equipment.
Electrical safety: comply with SANS 10142-1 and Electrical Installation Regulations; implement Lock-Out/Tag-Out procedures; protect underground services before excavation; provide Certificates of Compliance upon completion; only authorised persons perform electrical work; testing and commissioning prior to energisation; maintain safe clearances around temporary electrical installations.
Access control and site security: establish controlled access points; maintain temporary fencing and barriers; separate construction activities from operational Transnet Engineering areas; maintain safe pedestrian routes; provide warning signage, safety notices and directional signs; protect the public and Transnet personnel.
Emergency preparedness: first aid facilities, trained first aiders, fire-fighting equipment, incident reporting procedures, emergency contact lists, flood response procedures, spill response procedures, evacuation drills conducted quarterly. All emergency arrangements communicated during site induction.
HSE performance monitoring: submit monthly HSE reports detailing man-hours worked, safety observations, toolbox talks conducted, environmental inspections completed, incidents and near misses, waste disposal records, corrective actions and close-out status, audit findings and improvement actions. Employer reserves right to conduct audits and inspections at any time.
HSE handover: submit HSE Close-Out Dossier containing approved HSE Plans, Risk Assessments and Method Statements, Environmental Inspection Records, Environmental Authorisation/Licences, correspondence with stakeholders, specialist studies/reports, Waste Disposal Certificates, Incident Registers, Training and Induction Records, Emergency Drill Records, Audit Reports, Environmental Rehabilitation Records, Final Site Reinstatement Acceptance Documentation. Acceptance of dossier forms part of final project handover.
Environmental
Source: Updated_Specification_Flood_Mitigation_Mhlathuzana_Canal_Final.pdfThe contractor must undertake an environmental screening assessment to identify and confirm all applicable environmental legal requirements.
The contractor must ensure all necessary Environmental Authorisations, licences, permits and statutory approvals are obtained from competent authorities prior to commencement of any construction, site establishment or related project activities. No regulated activity requiring prior approval shall commence until the authorisation or permit is issued.
Potential triggers for environmental authorisations:
The contractor must appoint a competent and suitably qualified Environmental Officer for the duration of the project to monitor environmental performance, verify compliance with the approved Environmental Management Plan (EMP), and ensure effective implementation of all required environmental mitigation measures.
The contractor must facilitate appointment of an Environmental Assessment Practitioner (EAP) and Environmental Control Officer (ECO) should it be required as per legislative requirements prior to construction works. The appointment of EAP and ECO are mandatory legislated requirements.
Environmental management requirements:
Waste management:
Contractual Terms
Source: Updated_Specification_Flood_Mitigation_Mhlathuzana_Canal_Final.pdfThe contract is for a once-off basis for a period not exceeding ten (10) months.
The order of precedence is: Contract Data and conditions of contract; project-specific Works Information; controlled project drawings; project-specific specifications; applicable standard specifications; general technical references. Project-specific requirements prevail over general references where expressly stated.
Measurement and payment are governed by the approved Contract Data and Pricing Data.
The contractor must comply with all applicable standards, regulations and codes listed in the specification.
The contractor must acquire any authorisations or licences required prior to works start.
The contractor must provide all labour, supervision, temporary works, equipment, plant, materials, consumables, transport, testing, documentation and incidental work necessary to complete the Works, except items expressly identified as Employer-provided.
The contractor must validate setting-out information, prepare a photographic and written pre-condition survey of adjacent assets, locate and protect known services, and use new and compliant materials unless reuse is expressly permitted.
The contractor must submit product data, certificates, method statements, inspection and test plans, temporary-works information and shop drawings before related work begins.
The contractor must maintain the Site in a safe, orderly condition and prevent debris, silt, concrete washout, fuels or contaminants from entering the canal.
The contractor must coordinate subcontractors and remain responsible for the entire Works.
The contractor must provide all completion, testing and handover records required in Section 15.
The contractor must prepare and implement a Waste Management Plan.
The contractor must submit monthly HSE reports.
The contractor must submit an HSE Close-Out Dossier at project completion.
The contractor must provide a handover dossier and meet final acceptance criteria.
The contractor must comply with the requirement traceability schedule.
No unresolved template instruction or bracketed drafting note may remain in the tender issue version.
The current ten-month BOQ baseline must not be issued unless confirmed as the approved period.
Description
Source: Updated_BOQ_Mhlathuzana_Canal_BSC_Rev6_16 Sept 2026.pdfThe project involves construction of a flood mitigation structure along the Mhlathuzana Canal, including all associated infrastructure, for the Durban Main Centre. The work is divided into eight sections: preliminaries and general, site clearance and existing fence, bulk earthworks, piling, structural concrete, new anti-climb fence, electrical and area lighting, and completion and handover.
Contact Information
Source: Updated_BOQ_Mhlathuzana_Canal_BSC_Rev6_16 Sept 2026.pdf (unknown)No contact information is provided in the document.
Submission Guidelines
Source: Updated_BOQ_Mhlathuzana_Canal_BSC_Rev6_16 Sept 2026.pdf (unknown)Returnable documents: all mandatory forms and declarations must be completed, signed, and submitted with the bid. The bid must be submitted in accordance with the instructions in the tender document. No specific submission method or address is stated in the provided text.
Evaluation Criteria
Source: Updated_BOQ_Mhlathuzana_Canal_BSC_Rev6_16 Sept 2026.pdf (unknown)The document does not specify evaluation criteria, scoring split, or minimum qualifying scores. Bidders must comply with the contractual, health, safety, and environmental obligations listed in the Preliminaries and General section, and must complete all required forms and declarations as part of the tender submission.
Technical Specifications
Source: Updated_BOQ_Mhlathuzana_Canal_BSC_Rev6_16 Sept 2026.pdf (unknown)Scope of work: Construction of a flood mitigation structure along the Mhlathuzana Canal, including all associated infrastructure, for the Durban Main Centre.
Key work packages and indicative quantities:
Quality Management
Source: Updated_BOQ_Mhlathuzana_Canal_BSC_Rev6_16 Sept 2026.pdfQuality requirements include: project quality plan, inspection and test plans, document control and quality records; compaction testing of imported and placed material (30 tests); concrete cubes and specified routine testing (30 sets); pile integrity and load testing; as-built wall alignment and crest-level survey; final fence inspection, snagging and handover records.
Pricing Schedule
Source: Updated_BOQ_Mhlathuzana_Canal_BSC_Rev6_16 Sept 2026.pdfPricing is based on a bill of quantities (BOQ) with sections for preliminaries and general, site clearance and existing fence, bulk earthworks, piling, structural concrete, new anti-climb fence, electrical and area lighting, and completion and handover. The BOQ includes a summary of costs with subtotal before contingency, contingency, subtotal excluding VAT, VAT, and total including VAT. No amounts are stated in the provided text.
Financial Requirements
Source: Updated_BOQ_Mhlathuzana_Canal_BSC_Rev6_16 Sept 2026.pdf (unknown)Pricing format: Bill of quantities (BOQ) with tendered rates and amounts for each item. The BOQ includes a summary of costs with subtotal before contingency, contingency, subtotal excluding VAT, VAT, and total including VAT. No amounts are stated in the provided text. No bid security, bonds, guarantees, retention, or payment terms are specified.
Compliance Requirements
Source: Updated_BOQ_Mhlathuzana_Canal_BSC_Rev6_16 Sept 2026.pdf (unknown)No specific compliance requirements (CSD, tax, B-BBEE, CIDB, CIPC, local content) are stated in the provided text. Bidders must comply with contractual, health, safety, and environmental obligations as listed in the Preliminaries and General section.
Environmental
Source: Updated_BOQ_Mhlathuzana_Canal_BSC_Rev6_16 Sept 2026.pdfEnvironmental obligations include: health, safety and environmental fixed obligations, plans, mobilization and appointments; time-related health, safety and environmental management; authorisations or licences for potential EIA; disposal of vegetation and debris at approved facility; disposal of unusable fence at approved facility.
Description
Source: TE-RET-001-300.pdfConstruction of a flood mitigation wall, including layout, elevation and section, along Mhlathuzana Canal for Transnet Engineering Durban Main Centre.
Technical Specifications
Source: TE-RET-001-300.pdf (unknown)Construction of a flood mitigation structure along Mhlathuzana Canal, Durban Main Centre.
Scope includes retaining walls, pile caps, ground beams, strip footings, columns, shear and lift walls, slabs, beams, staircases, surface beds, and blinding.
Concrete classes: all structural concrete 30 MPa; blinding 10 MPa.
Concrete cover to reinforcement: pile caps and ground beams 50 mm; strip footings and bases 50 mm; columns below ground 50 mm, above ground 30 mm; shear and lift walls below ground 50 mm, above ground 30 mm; slabs, beams, staircases 30 mm; slabs on ground bottom 50 mm, top 30 mm; retaining walls earth face 50 mm, front face 30 mm.
All concrete work to comply with SABS 1200G.
Load-bearing brickwork to be 14 MPa NFX.
All foundation excavations and reinforcing fixing to be inspected by the engineer prior to casting.
Six concrete cubes to be taken per pour; three tested at 7 days and three at 28 days, results forwarded to the engineer.
Structural concrete to be cured for a minimum of five days.
Contractor to construct a blinding layer if soil conditions result in reinforcement cover not being maintained.
All single skin brickwork to be stopped two courses below soffit of slab and completed after props removed.
Concrete plaster and brickwork plaster interfaces to receive V-joint.
Engineer requires 24 hours notice for all inspections.
All levels and dimensions to be checked on site.
Drawing to be read in conjunction with architectural drawings.
Health & Safety
Source: TE-RET-001-300.pdfAll concrete work must comply with SABS 1200G. Concrete classes and reinforcement covers as specified in technical specifications. Load-bearing brickwork to be 14 MPa NFX. All foundation excavations and reinforcing fixing to be inspected by the engineer prior to casting. Six concrete cubes per pour, three tested at 7 days and three at 28 days. Structural concrete cured for minimum five days. Engineer requires 24 hours notice for all inspections.
Description
Source: Updated_Technical_Evaluation_Criteria_Mhlathuzana_Canal_Rev_Final.pdfConstruction of a flood mitigation structure along Mhlathuzana Canal, including all associated infrastructure, for the Durban Main Centre, on a once off basis for a period not exceeding ten (10) months.
Submission Guidelines
Source: Updated_Technical_Evaluation_Criteria_Mhlathuzana_Canal_Rev_Final.pdf (unknown)Returnable documents: completed, signed copies of all mandatory certification and accreditation evidence listed under Stage 1, plus CVs and confirmatory affidavits using Annexures A and B, a project organogram, responsibility matrix and resource schedule. Failure to submit any applicable mandatory requirement renders the tender technically non-responsive and the bidder will not proceed to Stage 2.
Evaluation Criteria
Source: Updated_Technical_Evaluation_Criteria_Mhlathuzana_Canal_Rev_Final.pdf (unknown)Evaluation is in two stages.
Stage 1 β Mandatory certification and accreditation (pass/fail):
Stage 2 β Weighted technical evaluation (100 points):
Scoring for each criterion is based on the depth and quality of the submission, as detailed in the evaluation matrix. For company experience, bidders must submit signed client reference letters for comparable projects (reinforced-concrete walls, retaining walls or flood-mitigation structures incorporating earthworks, piling, reinforced concrete, fencing, electrical integration, testing and handover). Each reference must include client name, scope, bidder role, contract reference, commencement and completion dates, project value or scale, completion evidence and verifiable client contact details. Transnet may verify submitted information.
Technical Specifications
Source: Updated_Technical_Evaluation_Criteria_Mhlathuzana_Canal_Rev_Final.pdf (unknown)The scope covers construction of a flood mitigation structure along Mhlathuzana Canal, including all associated infrastructure, for the Durban Main Centre. The works include:
Contract period: once off, not exceeding ten (10) months.
Methodology
Source: Updated_Technical_Evaluation_Criteria_Mhlathuzana_Canal_Rev_Final.pdfBidders must submit a project-specific method statement describing execution of the complete scope and activity schedule, addressing all 15 required activities: design verification and setting out; services proving; site establishment; existing fence removal; earthworks, groundwater and temporary support; piling and pile testing; reinforced concrete; 1 500 mm anti-climb fence with no gates; three-phase area lighting; underground feeder from the source approximately 30 m from the wall; underground distribution along the approximately 900 m wall; phase balancing across L1, L2 and L3; quality controls, ITP, environmental and canal protection; testing, commissioning, COC, as-builts; handover and defect close-out. Scoring is based on how comprehensively the method statement addresses these activities.
Experience & Qualifications
Source: Updated_Technical_Evaluation_Criteria_Mhlathuzana_Canal_Rev_Final.pdfKey personnel must be named and their qualifications and experience evaluated. For each role, submit CVs and confirmatory affidavits using Annexures A and B, a project organogram, responsibility matrix and resource schedule. Evidence must demonstrate relevant experience in flood mitigation, reinforced-concrete retaining walls, piling, earthworks, temporary works, surveys, quality control, environmental management, and three-phase underground electrical and lighting installations. Mandatory registration itself does not attract duplicate weighted points.
Quality Management
Source: Updated_Technical_Evaluation_Criteria_Mhlathuzana_Canal_Rev_Final.pdfThe method statement must address quality controls, inspection and test plans (ITPs), testing, commissioning, certificate of compliance (COC), as-builts, handover and defect close-out. The programme must demonstrate the bidder's ability to complete the works within the specified contract period.
Compliance Requirements
Source: Updated_Technical_Evaluation_Criteria_Mhlathuzana_Canal_Rev_Final.pdf (unknown)Mandatory compliance requirements (Stage 1):
B-BBEE Minimum Level: 4.
Health & Safety
Source: Updated_Technical_Evaluation_Criteria_Mhlathuzana_Canal_Rev_Final.pdfA Construction Health and Safety Manager registered as Candidate or Professional with SACPCMP must be named and responsible for ensuring compliance with all applicable occupational health and safety regulations and standards. Required qualification: National Diploma, Advanced Diploma, Degree or equivalent in Occupational Health and Safety, Safety Management, Environmental Health, Construction Management, or related field.
Environmental
Source: Updated_Technical_Evaluation_Criteria_Mhlathuzana_Canal_Rev_Final.pdfAn Environmental Officer registered with EAPASA or SACNASP (Pr. Sci. Nat.) is required, with a Diploma in Environmental Management, Environmental Science, or related Natural Science discipline, and a minimum of three years' relevant experience. The method statement must include environmental and canal protection measures.
Section
Source: Updated_Technical_Evaluation_Criteria_Mhlathuzana_Canal_Rev_Final.pdfStage 1 mandatory certification and accreditation must be submitted; failure to submit any applicable mandatory requirement renders the tender technically non-responsive and the bidder will not proceed to Stage 2. Stage 2 weighted technical evaluation covers method statement (10 points), programme/resource loading (10 points), key personnel capacity and experience (70 points), and company previous experience (10 points).
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
Level 200, Carlton Centre, 150 Commissioner St, Cbd, Johannesburg, 2001, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
7
Last checked
26 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
subsidiary of Transnet
Contact
011-012-2709[email protected]www.transnet.netLevel 200, Carlton Centre, 150 Commissioner St, Cbd, Johannesburg, 2001, South Africa
Key Personnel
Provinces Active
Industries