Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
14 - 16 Kgwebo Street, Mabe Business Park - Waterfall East - Rustenburg - 0300
Organization Type
GOVERNMENT
Published
12 Nov 2026
OCDS Reference
ocds-9t57fa-177964
ESKOM requires a contractor for the replacement of wooden poles on medium voltage networks and live work maintenance of 11kv, 22kv and 33kv overhead lines in the northwest operating unit gemma cluster, on an as-and-when-required basis for a four-year period. The contract covers both pole replacement and live line maintenance work, and bidders must submit a signed supplier declaration of interest as a returnable document.
Supplier Declaration of Interest: Must be completed, signed under oath by an authorised signatory, and submitted as a returnable. It requires disclosure of any conflicts of interest involving Eskom employees or directors, including private work, close family or associate relationships, and business courtesies.
False declaration risk: Eskom may take action against the supplier or the signatory personally if the declaration is found to be false.
Scope of work: Replacement of wooden poles on medium voltage networks and live work maintenance of 11kV, 22kV and 33kV overhead networks in the Northwest OU Gemma Cluster.
Contract duration: Four (4) years, on an as-and-when-required basis.
Submission: Bidders must ensure the signed declaration is included with their bid; failure to provide true and correct information may affect evaluation.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Date & Time
Wednesday, 09 December 2026 - 10:00
Venue
Main Boardroom Klerksdorp Main Building 181 Golden Avenue
Categories
Request for Bid(Open-Tender)
14 - 16 Kgwebo Street, Mabe Business Park - Waterfall East - Rustenburg - 0300
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: Professional Engineering Technologist (Pr.Tech Eng), CESA Membership
AI Document Analysis Stages
Submission Guidelines
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025 (G20 Logo).docx (unknown)12 Nov
2026
Tender Published
Tender was published
09 Dec
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Technical Evaluation - Wood Pole Replacement.pdf
Eskom's North West Operating Unit requires contractors for the replacement of rotten Class 3 and Class 4 wooden poles and live work maintenance on 11kV, 22kV and 33kV overhead networks, under live work (gloving) conditions, on an as-and-when-required basis for a period of four years. The contract covers the full scope of pole replacement, line maintenance and associated projects, with work executed according to Eskom task manuals and standards.
240-77471651 High risk Tender evaluation template Annexure C 1.docx
Provision of replacement of wooden poles and live-work maintenance of 11kV, 22kV, 33kV, 44kV and 132kV overhead networks and substations in the North West Gemma cluster, on an as-and-when-required basis for a period of four years. The contract is issued by Eskom and requires the successful bidder to manage operational health and safety (OHS) risks in line with the scope of work.
Invitation to Tender (ITT).pdf
Provision of replacement of wooden poles on the medium voltage (11kV, 22kV, and 33kV) overhead network, including live work maintenance, on an as-and-when-required basis for a period of four years, for Eskom's Northwest Operating Unit Gemma Cluster. The tender is an open invitation and will be awarded to more than one tenderer.
240-68099512 Form A_Cat 2_ Rev 9.pdf
Eskom requires the replacement of wooden poles on medium-voltage overhead lines and live-work maintenance of 11 kV, 22 kV, and 33 kV networks in the North West Gemma Cluster, on an as-and-when-required basis for four years. The tender also covers associated overhead network and substation work, with quality requirements aligned to Eskom specification 240-105658000 and ISO 9001.
NEC ECC3 Agreement draft NWOU-Replacement of 11-33kV Wooden Poles for Live Work.doc
Eskom requires as-and-when replacement of wooden poles and live work maintenance of 11kV, 22kV and 33kV overhead networks in the Northwest Operating Unit Gemma Cluster over a four-year period. The contract will be a rate-based NEC3 Engineering and Construction Contract with a priced bill of quantities, managed through individual task orders.
Live Work Environmental Requirements NW 2026.pdf
Provision for the replacement of wooden poles and live work maintenance of 11kV, 22kV, 33kV (and up to 132kV) overhead networks and substations in the North West Gemma Cluster, on an as-and-when-required basis for a period of four years (though the environmental annexure references three years).
Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf
Eskom requires the replacement of wooden poles on the medium voltage network and live work maintenance of 11kV, 22kV and 33kV overhead lines in the Northwest OU Gemma Cluster, on an as-and-when-required basis for a period of four years. The contract will be managed under Eskom's standard conditions of tender.
E-tendering Help Manual for supplier - 27 January 2025 (G20 Logo).docx
Eskom requires the replacement of wooden poles on the medium voltage network and live work maintenance of 11kV, 22kV and 33kV overhead lines in the Northwest OU Gemma Cluster, on an as-and-when-required basis for a period of four years.
240-109253698 Template for a Typical Contract Quality Plan.docx
Eskom requires a supplier for the replacement of wooden poles on medium voltage networks and live work maintenance of 11kV, 22kV and 33kV overhead lines in the Northwest OU Gemma Cluster, on an as-and-when-required basis for a period of four years. The contract includes both construction/maintenance and live work activities, with a strong emphasis on quality management through a Contract Quality Plan (CQP).
E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025 (G20 Logo).docx
Eskom requires a contractor for the replacement of wooden poles on medium voltage and live work maintenance of 11kV, 22kV, and 33kV overhead network in the Northwest OU Gemma Cluster, on an as-and-when-required basis, for a period of four years.
240-12248652_List of Tender Returnables_Cat 2_ Rev 7.pdf
Replacement of wooden poles and live-line maintenance on 11kV, 22kV, and 33kV overhead networks in the North West Gemma Cluster, on an as-and-when-required basis for four years. The contract includes quality management and planning deliverables, with bidders required to meet ISO 9001 requirements and submit specific quality documents.
Tender BOQ-Replacement of 11-33kV Wooden Poles for Live Work.pdf
Eskom's North West Operating Unit requires a contractor for the replacement of wooden poles on medium voltage (11kV, 22kV, and 33kV) overhead networks and live work maintenance in the Gemma Cluster, on an as-and-when-required basis for a period of four years. The contract is based on a bill of quantities with estimated quantities for items such as transport, labour, excavations, and pole replacement activities.
Supplier Declaration of Interest Template.docx
Eskom requires the replacement of wooden poles on the medium voltage network and live work maintenance of 11kV, 22kV and 33kV overhead lines in the Northwest OU Gemma Cluster, on an as-and-when-required basis for a period of four years.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
EskomWin Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 704 000
Range
Based on SITA benchmarks. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Returnable forms:
Disqualification risks:
Evaluation Criteria
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025 (G20 Logo).docx (unknown)Mandatory returnable: E-Tendering Training Acknowledgement Form (Template ID 240-9722574 Rev 1). Failure to fully complete and submit it within the prescribed period disqualifies the bidder from the procurement process.
Technical Specifications
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025 (G20 Logo).docx (unknown)The acknowledgement form requires the bidder's business name or JV name, contact person, telephone numbers, and email address.
Evaluation Criteria
Source: Live Work Environmental Requirements NW 2026.pdf (unknown)The environmental section (Annexure C1) lists 14 mandatory KPI items. Each item is scored 0 (not submitted or fails minimum requirements) or 1 (submitted and satisfies minimum requirements).
The overall environmental section is approved only if every one of the 14 items scores 1. Any single item scoring 0 results in an overall 'Not Approved' outcome.
Technical Specifications
Source: Live Work Environmental Requirements NW 2026.pdf (unknown)Scope: Provision for the replacement of wooden poles on the medium voltage and live work maintenance of 11 kV, 22 kV, 33 kV, and 44 kV and 132 kV overhead networks in the North West Gemma Cluster. Work is on an as-and-when-required basis.
Note: Although the tender record states a four-year period, this environmental document refers to a three-year period.
Methodology
Source: Live Work Environmental Requirements NW 2026.pdfThe environmental aspects and impacts register must be specific to the project scope of work and must include a rating methodology.
Compliance Requirements
Source: Live Work Environmental Requirements NW 2026.pdf (unknown)Each bidder must provide all 14 environmental KPI items listed in Annexure C1. Specific required submissions include:
Environmental
Source: Live Work Environmental Requirements NW 2026.pdfMandatory environmental submissions (Annexure C1) – each must be submitted and satisfy minimum requirements:
Section
Source: Live Work Environmental Requirements NW 2026.pdfThe environmental section is scored against the 14 KPIs in Annexure C1. Each KPI is scored 0 or 1. Overall approval requires a score of 1 on every KPI; any 0 results in 'Not Approved'.
Description
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdfSupply and delivery of replacement wooden poles and live-work maintenance on 11kV, 22kV, 33kV overhead network in North West OU (Gemma cluster), on as-and-when-required basis for 4 years.
Important Dates
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf (TENDER)Closing date: 9 December 2026. Closing time: not stated in available text; tender record indicates 08:00 (SAST) but use Tender Data.
Contact Information
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf (TENDER)Enquiry contacts: not stated in available text.
Submission Guidelines
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf (TENDER)Submission method: paper or e-tender.
Evaluation Criteria
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf (TENDER)Evaluation stages (per Eskom standard):
Technical Specifications
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf (TENDER)Scope: replacement of wooden poles on medium voltage and live-work maintenance of 11kV, 22kV and 33kV overhead networks in the North West operating unit (Gemma cluster).
Quality Management
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdfNo explicit quality management requirements beyond SHEQ (Safety, Health, Environment, Quality) proof and compliance.
Pricing Schedule
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdfPricing: include all duties, taxes, VAT, levies. Prices fixed and in ZAR.
Financial Requirements
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf (TENDER)Pricing:
Compliance Requirements
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf (TENDER)Mandatory compliance:
Health & Safety
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdfSHEQ compliance mandatory:
Contractual Terms
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdfContract duration: 4 years.
Section
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdfEvaluation per Eskom standard:
Description
Source: Invitation to Tender (ITT).pdfThe scope covers AS-AND-WHEN-REQUIRED replacement of wooden poles on the medium voltage network and live work maintenance of 11kV, 22kV and 33kV overhead lines in the Northwest OU Gemma Cluster, for a period of 4 years. Contract form is NEC3 Engineering and Construction Contract (ECC3). Pricing schedule/BOQ is attached.
Important Dates
Source: Invitation to Tender (ITT).pdf (RFP)Closing date: 09 December 2026 at 10:00
Clarification meeting (non-compulsory): 25 November 2026 at 10:00
Venue: Main Boardroom, Klerksdorp Main Building, 181 Golden Avenue, Klerksdorp
Clarification queries deadline: 5 working days before the tender submission deadline
Tender validity: 180 days from closing date
Contact Information
Source: Invitation to Tender (ITT).pdf (RFP)Eskom Representative:
Name: Ofentse Matlhatlhana
Email: [email protected]
Telephone: 051 404 2630
Procurement Manager signature:
Name: Max Simelane
Fraud hotline:
Telephone: 0800 11 2722
Email: [email protected]
Submission: via Eskom E-tendering site
Submission Guidelines
Source: Invitation to Tender (ITT).pdf (RFP)Submission method: Eskom E-tendering site (Eskom Tender Bulletin). Upload documents into folders labelled Technical, Commercial, Financial, and Other. All documents in PDF format; price list in PDF and Excel. No ZIP files, no hard copies. Max upload per document: 500 MB; total submission: 4 GB. If resubmitting, the latest submission replaces all previous; ensure the status shows 'complete'. Bids are considered non-responsive if not uploaded by the closing time. Returnable forms (must be completed, signed where required, and submitted at closing — disqualifiable if missing):
Disqualification risks:
Evaluation Criteria
Source: Invitation to Tender (ITT).pdf (RFP)Evaluation stages:
Tie-breaking: highest B-BBEE points; then highest functionality; then drawing of lots.
Contract award: Eskom intends to award to more than one tenderer; the contract is for the whole scope.
Technical Specifications
Source: Invitation to Tender (ITT).pdf (RFP)Scope of work: Replacement of wooden poles on the medium voltage network and live work maintenance of the 11kV, 22kV and 33kV overhead network in the Northwest OU Gemma Cluster, on an as-and-when-required basis for 4 years.
Contract type: NEC3 Engineering and Construction Contract (ECC3).
Pricing: Pricing Schedule/BOQ to be submitted in PDF and Excel.
No alternative tenders are allowed.
The tender is for the whole contract; multi-award is anticipated.
Potential requirement for cataloguing: successful tenderer may need to provide cataloguing information and label materials per Eskom specifications; a line item for cataloguing must be priced if required.
Pricing Schedule
Source: Invitation to Tender (ITT).pdfPricing Schedule/BOQ must be submitted in PDF and Excel; pricing must include a line item for cataloguing if required. Prices are evaluated inclusive of VAT, corrected for arithmetical errors, and compared on Net Present Value. Unconditional discounts are considered; conditional discounts applied at payment.
Financial Requirements
Source: Invitation to Tender (ITT).pdf (RFP)Payment terms:
No bid security or performance security stated (N/A).
Financial analysis is compulsory for CIDB-related transactions from R30,000 excluding VAT. Must submit latest approved annual financial statements (not draft, not management accounts) of the tendering company, including signed director's report, auditor's/reviewer's/compiler's report, financial position, comprehensive income, changes in equity, cash flows, and notes. For South African entities not audited: signed public interest score and ITA34C for current and previous years.
For unincorporated JV or SPV, each partner must submit its own financial statements.
Compliance Requirements
Source: Invitation to Tender (ITT).pdf (RFP)Mandatory requirements at closing (disqualifying if not met):
Additional contractual requirements (must be met before award):
B-BBEE: Proof of B-BBEE status level (certificate or sworn affidavit as per Codes). SBD 6.1 claim is required for preference points.
Joint ventures: every JV member must be registered with CIDB; lead partner must have CIDB grading of 1EP or higher, or not lower than one level below the required grading. JV must be registered or capable of being registered within 21 working days from closing.
Eskom discourages subcontracting with subsidiaries; if done, must be declared.
Health & Safety
Source: Invitation to Tender (ITT).pdfCOIDA certificate of good standing (or proof of application) required for SA tenderers. Quality, SHE, and environmental documents must be attached in the tender bulletin under the respective files.
Contractual Terms
Source: Invitation to Tender (ITT).pdfPayment terms: below R50m incl. VAT – 30 days; above R50m – 60 days from undisputed invoices. Eskom reserves the right to negotiate with preferred bidders. Main contractors are discouraged from subcontracting with subsidiaries; must be declared if done.
Section
Source: Invitation to Tender (ITT).pdfFunctionality is applicable with Desktop Evaluation (1000%) and Site Evaluation (100%); threshold is 90%. Price is scored out of 80 points; Specific Goals out of 20. Preference system is 80/20. If two or more tie, award goes to highest B-BBEE; then highest functionality; then drawing of lots.
Description
Source: 240-12248652_List of Tender Returnables_Cat 2_ Rev 7.pdfReplacement of wooden poles on the medium voltage overhead network, and live work maintenance of 11 kV, 22 kV, 33 kV, 44 kV and 132 kV overhead lines and substations, in the North West Gemma Cluster, on an as-and-when-required basis.
Evaluation Criteria
Source: 240-12248652_List of Tender Returnables_Cat 2_ Rev 7.pdf (TENDER)Quality management evaluation — bidders must either provide a valid ISO 9001 certificate (Option 1) or documented evidence of a compliant QMS (Option 2):
Additional required deliverables (each scored 1):
Technical Specifications
Source: 240-12248652_List of Tender Returnables_Cat 2_ Rev 7.pdf (TENDER)The work comprises the replacement of wooden poles on the medium voltage overhead network, and live work maintenance of 11 kV, 22 kV, and 33 kV (and as per the document header also 44 kV and 132 kV) overhead lines and substations, in the North West Gemma Cluster, on an as-and-when-required basis. The initial tender title notes a four-year period, while the document text states a three-year term — the discrepancy should be clarified with the buyer.
Methodology
Source: 240-12248652_List of Tender Returnables_Cat 2_ Rev 7.pdfA Method Statement is a required deliverable and will be evaluated as part of the quality requirements. It must be completed and signed before submission.
Section
Source: 240-12248652_List of Tender Returnables_Cat 2_ Rev 7.pdfQuality management deliverables are evaluated as a pass/fail indicator. Bidders must achieve the required score on either Option 1 (ISO 9001 certificate) or Option 2 (documented QMS) and must provide all additional required deliverables: draft Contract Quality Plan, example ITP/QCP, completed Form A, and a Method Statement.
Description
Source: Technical Evaluation - Wood Pole Replacement.pdfEskom North West Operating Unit requires contractors for replacement of wooden poles under live work conditions, live work maintenance, and associated projects on 11 kV, 22 kV and 33 kV overhead networks. The contract is for 60 months on an 'as and when required' basis. The document sets minimum technical evaluation criteria for live work contractors, covering human resources, vehicles, tools, PPE, live work equipment, lifting gear, expertise, business premises, quality management systems, safety risk process, and OHS Act compliance.
Important Dates
Source: Technical Evaluation - Wood Pole Replacement.pdf (unknown)Closing date: 9 December 2026 at 08:00 (from tender record).
No briefing session or site visit dates are stated in this document.
Contact Information
Source: Technical Evaluation - Wood Pole Replacement.pdf (unknown)No contact details are provided in this document. Refer to the main tender invitation for SCM and technical enquiry contacts.
Submission Guidelines
Source: Technical Evaluation - Wood Pole Replacement.pdf (unknown)Returnable documents for the desktop evaluation:
Submission method: Not specified in this document. Refer to the main tender invitation for submission channel and address.
Disqualification risks:
Evaluation Criteria
Source: Technical Evaluation - Wood Pole Replacement.pdf (unknown)Evaluation process has two stages:
Scoring weights (desktop, Annex A):
Sharing of resources is not allowed and leads to disqualification.
Technical Specifications
Source: Technical Evaluation - Wood Pole Replacement.pdf (unknown)Scope of work:
Key requirements:
Task manuals (Gloving method) include but are not limited to: pole replacement, cross-arm replacement, insulator changes, conductor splicing, tree pruning, bird flapper installation, stay insulator replacement, surge arrestor installation, and conversion of structures.
Experience & Qualifications
Source: Technical Evaluation - Wood Pole Replacement.pdfExperience and qualifications for live workers (per team, desktop evaluation):
Quality Management
Source: Technical Evaluation - Wood Pole Replacement.pdfQuality management requirements:
Financial Requirements
Source: Technical Evaluation - Wood Pole Replacement.pdf (unknown)No bid security, bonds, guarantees, retention, or payment terms are stated in this document.
Overtime: No overtime rates can be claimed; overtime due to contractor's fault is for contractor's account.
Standing time: Remuneration for standing time only allowed if Eskom is at fault (e.g., material shortage).
Compliance Requirements
Source: Technical Evaluation - Wood Pole Replacement.pdf (unknown)Mandatory compliance:
Site evaluation compliance:
Quality management:
Health & Safety
Source: Technical Evaluation - Wood Pole Replacement.pdfHealth and safety requirements:
Contractual Terms
Source: Technical Evaluation - Wood Pole Replacement.pdfThe evaluation does not guarantee contract award. Any actions taken by the supplier due to the evaluation are for the supplier's account, and liability is not transferable to Eskom. The Technical Evaluation Team has no authority in contract placement decisions, and its statements do not create liability for Eskom.
Section
Source: Technical Evaluation - Wood Pole Replacement.pdfAdditional evaluation criteria:
Description
Source: E-tendering Help Manual for supplier - 27 January 2025 (G20 Logo).docxThe eTendering system is an Eskom web portal at https://eTendering.eskom.co.za that replaces physical submission of tender documents. Suppliers must register on the portal, receive an OTP on cellphone and email, then upload required documents under the correct categories. Access requires a CSD number.
Contact Information
Source: E-tendering Help Manual for supplier - 27 January 2025 (G20 Logo).docx (unknown)System support: contact the buyer responsible for the published tender for any problems with Tender Bulletin, eTendering, or OpenText systems.
Submission Guidelines
Source: E-tendering Help Manual for supplier - 27 January 2025 (G20 Logo).docx (unknown)Returnable documents: none are named in the document.
Submission method: upload via the Eskom eTendering system at https://eTendering.eskom.co.za.
Access: a CSD number is required to use the system.
Process: register on the system, verify the email, upload tender documents under the correct category (technical, commercial, finance), then click "Finalize Submission" and "Finalise and Close Submission" to complete.
File limits: individual file up to 50 MB; total of all files up to 900 MB.
After finalising, the system records the submission timestamp; an email with the submission ID is sent and should be saved for enquiries.
Evaluation Criteria
Source: E-tendering Help Manual for supplier - 27 January 2025 (G20 Logo).docx (unknown)No evaluation criteria are stated in the provided document.
Technical Specifications
Source: E-tendering Help Manual for supplier - 27 January 2025 (G20 Logo).docx (unknown)The document is an Eskom eTendering help manual, not the tender specification. It describes an online system that replaces physical tender submission. Scope of the underlying tender (replacement of wooden poles and live-work maintenance of 11kV, 22kV and 33kV overhead networks in the Northwest OU Gemma cluster, four-year period) is not detailed in this manual.
Compliance Requirements
Source: E-tendering Help Manual for supplier - 27 January 2025 (G20 Logo).docx (unknown)CSD registration: bidders must have a valid CSD number to access the eTendering system.
Description
Source: Tender BOQ-Replacement of 11-33kV Wooden Poles for Live Work.pdfThe scope is the replacement of wooden poles and live work maintenance on 11kV, 22kV, and 33kV overhead networks in the Northwest Operating Unit (Gemma Cluster), on an as-and-when-required basis for a period of four years. The BOQ covers preliminaries, transport, general labour, excavations, materials, and activities.
Contact Information
Source: Tender BOQ-Replacement of 11-33kV Wooden Poles for Live Work.pdf (unknown)Contact: Nthabeleng Mefane
Role: Contract Manager / Project Manager
No email, telephone, or address provided in the document.
Submission Guidelines
Source: Tender BOQ-Replacement of 11-33kV Wooden Poles for Live Work.pdf (unknown)Returnable documents: The contractor must acknowledge the rates submitted in the bill of quantities by completing the acknowledgement block on the BOQ (company legal representative name, company name, designation, signature, and date).
Submission method: Not stated in the document.
Closing time: 08:00 on 9 December 2026 (from the tender record).
Evaluation Criteria
Source: Tender BOQ-Replacement of 11-33kV Wooden Poles for Live Work.pdf (unknown)The document does not specify evaluation criteria, scoring, or preference point systems. The only stated requirement is that the contractor acknowledges the rates submitted in the BOQ.
Technical Specifications
Source: Tender BOQ-Replacement of 11-33kV Wooden Poles for Live Work.pdf (unknown)Scope: Replacement of wooden poles and live work maintenance on 11kV, 22kV, and 33kV overhead networks in the Northwest Operating Unit (Gemma Cluster), on an as-and-when-required basis for a period of four years.
Key activities (with estimated quantities over 4 years):
Excavation works:
Transport requirements (estimated quantities):
General labour (estimated hours):
Materials: Eskom supplies materials. Where Eskom cannot supply, the contractor supplies at cost plus 10% handling fee, with prior authorisation by the project manager and proof of purchase.
Quality Management
Source: Tender BOQ-Replacement of 11-33kV Wooden Poles for Live Work.pdfQuality management system compliance is required as part of the preliminaries. The contractor must comply with the quality management system specification. Specific quality standards or certifications are not detailed in the document.
Pricing Schedule
Source: Tender BOQ-Replacement of 11-33kV Wooden Poles for Live Work.pdfPricing is via a bill of quantities (BOQ) with rates for each item. The BOQ summary includes sections for preliminaries & general, transport, general labour, excavations, materials, and activities. VAT at 15% is added to the total. Quantities are estimates only and do not represent actual contract quantities; they are for guidance in establishing the contract value.
The contractor must acknowledge the rates submitted by completing the acknowledgement block on the BOQ.
Financial Requirements
Source: Tender BOQ-Replacement of 11-33kV Wooden Poles for Live Work.pdf (unknown)Pricing: Bill of quantities (BOQ) with rates for each item. The BOQ summary includes sections for preliminaries & general, transport, general labour, excavations, materials, and activities. VAT at 15% is added to the total.
Quantities are estimates only and do not represent actual contract quantities; they are for guidance in establishing the contract value.
Site establishment: Paid only when instructed/agreed upon, with proof of agreement.
Sleeping out allowance: Paid per person per day for distances exceeding 100 km radius, with prior authorisation by the Programme Manager or Project Manager.
Transport: Authorised by Programme Manager or Project Manager; contractor submits invoice with a written task order stating duration and distance.
Materials supplied by contractor: Cost plus 10% handling fee, authorised by project manager, with proof of purchase.
Compliance Requirements
Source: Tender BOQ-Replacement of 11-33kV Wooden Poles for Live Work.pdf (unknown)The document does not specify CSD registration, tax clearance, B-BBEE, CIDB, or other pre-qualifications.
Safety and compliance obligations (from preliminaries):
Health & Safety
Source: Tender BOQ-Replacement of 11-33kV Wooden Poles for Live Work.pdfHealth and safety obligations:
Section
Source: Tender BOQ-Replacement of 11-33kV Wooden Poles for Live Work.pdfThe document does not specify evaluation criteria beyond the requirement to acknowledge the rates. No scoring or preference point system is mentioned.
Submission Guidelines
Source: Supplier Declaration of Interest Template.docx (unknown)Returnable documents:
Evaluation Criteria
Source: Supplier Declaration of Interest Template.docx (unknown)Bidders must submit the signed Supplier Declaration of Interest as a returnable. The declaration is part of the bid evaluation; failure to provide true and correct information may result in action by Eskom.
Description
Source: 240-109253698 Template for a Typical Contract Quality Plan.docxThe document is a Contract Quality Plan (CQP) template intended to assist the supplier in identifying and planning for meeting the client's/contract's quality management expectations and requirements. It provides a structured format covering definitions, scope of work, communication, organisation, interfacing documents, supplier management, quality control, records, non-conformance, and post-delivery activities.
Submission Guidelines
Source: 240-109253698 Template for a Typical Contract Quality Plan.docx (unknown)Returnable documents:
Evaluation Criteria
Source: 240-109253698 Template for a Typical Contract Quality Plan.docx (unknown)The tenderer must complete the Contract Quality Plan template as part of the bid. The CQP must be compiled and approved as indicated. No other evaluation criteria (e.g., price, functionality, B-BBEE) are stated in the provided document.
Technical Specifications
Source: 240-109253698 Template for a Typical Contract Quality Plan.docx (unknown)The Contract Quality Plan (CQP) template is to be used by the supplier to identify and plan for meeting the client's/contract's quality management expectations and requirements. The CQP must address the following sections:
Compliance Requirements
Source: 240-109253698 Template for a Typical Contract Quality Plan.docx (unknown)No specific compliance requirements (e.g., CSD registration, tax clearance, B-BBEE level, CIDB grading) are stated in the provided document.
Description
Source: 240-68099512 Form A_Cat 2_ Rev 9.pdfThe contract covers replacement of wooden poles on medium voltage and live work maintenance of 11kV, 22kV, 33kV, and 44kV and 132kV overhead networks and substations in the North West Gemma Cluster. The service is required on an as-and-when-required basis for a period of three years (as per the form), while the tender record states four years.
Quality Management
Source: 240-68099512 Form A_Cat 2_ Rev 9.pdfThe tenderer must accept Eskom's Supplier Quality Requirements as defined in specification 240-105658000 and the ISO 9001 standard. The completed Form A (Category 2) must be signed by the tenderer's quality representative. Selected quality clauses include pre-contract award quality requirements, contract execution, supplier quality performance monitoring, Eskom rights of access and information, preservation, quality audits, management of nonconformities, and special processes.
Section
Source: 240-68099512 Form A_Cat 2_ Rev 9.pdfThe tenderer must accept and sign the quality requirements. No specific evaluation criteria or scoring are stated in this document.
Description
Source: NEC ECC3 Agreement draft NWOU-Replacement of 11-33kV Wooden Poles for Live Work.docReplacement of wooden poles on medium voltage and live work maintenance of 11kV, 22kV and 33kV overhead network in the Northwest Operating Unit Gemma Cluster, on an as and when required basis for 4 years.
Contact Information
Source: NEC ECC3 Agreement draft NWOU-Replacement of 11-33kV Wooden Poles for Live Work.doc (unknown)Project Manager:
Submission Guidelines
Source: NEC ECC3 Agreement draft NWOU-Replacement of 11-33kV Wooden Poles for Live Work.doc (unknown)Returnable documents:
Submission method: not stated in the document.
Submission address: not stated in the document.
Closing time: 09 December 2026 at 08:00 (from tender record).
The offer is valid until the end of the validity period stated in the Tender Data, or as agreed.
Any deviations from the tender documents must be recorded in the Schedule of Deviations; otherwise they are not valid.
Evaluation Criteria
Source: NEC ECC3 Agreement draft NWOU-Replacement of 11-33kV Wooden Poles for Live Work.doc (unknown)The contract is a rate-based contract (as and when required).
Pricing data: rates are provided per task order.
Price adjustment for inflation applies after the first 12 months (Option X1).
Evaluation criteria: not stated in the document.
Minimum qualifying score: not stated.
Technical Specifications
Source: NEC ECC3 Agreement draft NWOU-Replacement of 11-33kV Wooden Poles for Live Work.doc (unknown)Scope of work:
Contract type: NEC3 Engineering & Construction Contract (ECC3), Main Option B (priced contract with bill of quantities).
Financial Requirements
Source: NEC ECC3 Agreement draft NWOU-Replacement of 11-33kV Wooden Poles for Live Work.doc (unknown)Contract is rate-based; rates are submitted per task order.
Price adjustment for inflation: rates apply for the first 12 months after the base date; thereafter adjusted using SEIFSA tables (65% labour rates, 20% transport rates, 15% non-adjustable).
Delay damages: R1,000.00 per day, up to a maximum of 10% of the task order value.
Limitation of liability: Contractor's liability for indirect or consequential loss is R0.00; total liability limited to the total of the Prices (except certain excluded matters).
Payment: within 30 days of submission of a tax compliant invoice to finance shared services.
Interest rate: publicly quoted prime rate of Standard Bank of South Africa.
Contractor must provide insurances as per Insurance Table A (not detailed in the text).
Compliance Requirements
Source: NEC ECC3 Agreement draft NWOU-Replacement of 11-33kV Wooden Poles for Live Work.doc (unknown)B-BBEE status must be maintained; any change in status must be notified to the Employer within 7 days, and updated verification certificate submitted within 30 days.
Failure to notify may lead to termination.
Compliance with Construction Regulations 2014 (under OHSA 85 of 1993) is required.
Contractor must comply with all applicable environmental laws.
VAT: if registered, must include Employer's VAT number 4740101508 on each invoice.
Contractor must not take any prohibited action (coercive, collusive, corrupt, fraudulent, obstructive) and must cooperate with investigations.
Description
Source: 240-77471651 High risk Tender evaluation template Annexure C 1.docxThe tender covers the replacement of wooden poles on the medium voltage network and live work maintenance of 11kV, 22kV, 33kV, 44kV and 132kV overhead lines and substations in the North West Gemma cluster, on an as-and-when-required basis for four years.
Submission Guidelines
Source: 240-77471651 High risk Tender evaluation template Annexure C 1.docx (unknown)Returnable documents:
Evaluation Criteria
Source: 240-77471651 High risk Tender evaluation template Annexure C 1.docx (unknown)OHS tender returnables are evaluated prior to contract award. Each returnable is marked Y (Yes), N (No), or N/A (Not applicable). The tenderer is recommended or not recommended based on submission of all required OHS documents. Missing or non-compliant OHS returnables may lead to disqualification.
Technical Specifications
Source: 240-77471651 High risk Tender evaluation template Annexure C 1.docx (unknown)Scope of work: replacement of wooden poles on medium voltage and live work maintenance of 11kV, 22kV, 33kV, 44kV and 132kV overhead network and substations in the North West Gemma cluster. Contract period: four (4) years, as and when required.
Compliance Requirements
Source: 240-77471651 High risk Tender evaluation template Annexure C 1.docx (unknown)OHS compliance requirements:
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 46 of 2000
Relevant where professional engineering services or regulated engineering work may be required.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Address
14 - 16 Kgwebo Street, Mabe Business Park - Waterfall East - Rustenburg - 0300
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
13
Last checked
13 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
How mechanical and electrical engineers, contractors, and consultants can win public sector contracts in South Africa — HVAC, plumbing, fire systems, electrical infrastructure, ECSA registration, CIDB ME designation, and tender documentation essentials.
How consulting engineers, engineering firms, and multidisciplinary practices can win public sector infrastructure contracts in South Africa — from ECSA registration and CESA membership to fee proposals, QBS scoring, and building a winning tender response.
A technical guide to municipal electrical tenders. Covers CIDB EB/EP grading, electrification projects (INEP), substation maintenance panels, and COC compliance.
How small electrical contractors use Joint Ventures to combine EP grading, win Eskom and municipal infrastructure projects, and compete for renewable energy installations.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: Electrical. Unlock full pricing strategies, bid frequency, and historical win rates.