The industrial development corporation (IDC) is seeking a service provider to conduct an expanded market assessment for the rosslyn inland port programme (ripp). This study aims to broaden the project's focus from automotive logistics to a multi-sector and regionally integrated inland port platform, assessing demand across various industries and sadc trade corridors. The tender is targeted at professional consultants with expertise in market analysis, transport logistics, and infrastructure project preparation.
Key Requirements
Submit the bid electronically only via the specified SharePoint link by 11 August 2026 at 11:00 AM; late submissions will not be considered.
The bidder must demonstrate relevant experience with at least three reference projects in market demand studies for transport, logistics, or infrastructure over the last ten years.
The proposed team must include key personnel with specific qualifications and experience, including a Project Lead, Market Economist, Transport Specialist, Logistics Operations Specialist, Regional Trade Specialist, Financial Specialist, GIS Specialist, and Data Analytics Specialist.
Bidders must be tax compliant, registered on the Central Supplier Database (CSD), and submit a B-BBEE verification certificate or sworn affidavit (for EMEs/QSEs).
The technical evaluation requires a minimum qualifying score of 70%, assessed on experience (25%), methodology (35%), project plan (10%), and key personnel (30%).
All prices must be VAT inclusive in ZAR, with a detailed costing model and breakdown of disbursements; payments are linked to approved deliverables.
The contract duration is six months from appointment, with bi-weekly progress meetings and a final report required.
Professional Services & Consulting Industry Profile
Regulatory Bodies
SAICA
Tenders in this industry often require registration with these bodies.
Typical Documents
5 items
Company Registration (CIPC)
Tax Clearance Certificate
B-BBEE Certificate
CSD Registration
Company Profile
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
Review in progress · 0 of 1 documents being finalised
AI Document Analysis Stages
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
7 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
The Industrial Development Corporation of South Africa (IDC) seeks a service provider to conduct an expanded market assessment for the Rosslyn Inland Port Programme (RIPP). The project aims to broaden the concept from an automotive-focused inland port to a multi-sector, regionally relevant logistics hub. The successful bidder will analyze market demand across various sectors, assess SADC trade corridors, validate freight volumes, refine the value proposition, and strengthen the project's commercial viability and bankability. The assignment must be completed within six months of appointment.
Industrial Development Corporation of South Africa Limited
Google
Win IDC tenders with AI-Powered Matching, industrial finance intelligence, compliance analysis, and application support for advisory and professional services.
Similar Tenders
Matched by category & region
Supplier Readiness Hub
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Document read
Compliance review
Bid-ready summary
Closing date and time: 11 August 2026 at 11:00 AM.
Bid validity period: 120 days from the closing date.
Closing date: 11 August 2026 at 11:00 AM. Late bids will not be considered.
Submit at least 30 minutes before the deadline to avoid IT issues. Maximum file size is 50MB.
Use standard electronic formats (Microsoft suite or PDF). Non-accessible formats will disqualify.
Include all required returnable schedules clearly marked: Cover Page, Schedule 1 (including Annexures 2-8, financial statements, etc.), Schedule 2 (response to functional requirements), Schedule 3 (price proposal as a separate file).
Amended bids must be sent to the same platform marked “Amendment to bid” before the closing date.
Disqualification risks: submitting incomplete information, using non-standard formats, sending to the wrong platform, tax non-compliance, prime contractor holding a lower contract value percentage than any subcontractor.
Evaluation Criteria
Source: T39-07-26_Rosslyn Inland Port.pdf (RFP)
Bidders must: 1) Be tax compliant with SARS and provide proof. 2) Submit a valid B-BBEE certificate or sworn affidavit (for EME/QSE). 3) Submit all required returnable schedules completely and correctly. 4) Meet all Mandatory Functional Requirements in Section 2. 5) Propose a project team that meets the minimum specified qualifications and experience. 6) If a Prime Contractor with subcontractor(s), the Prime must hold a higher percentage of the contract value than any subcontractor. 7) Ensure all documentation is in English. 8) Not be disqualified for reasons such as submitting fraudulent information, non-compliance with POPIA, or late/incomplete submissions.
Technical Specifications
Source: T39-07-26_Rosslyn Inland Port.pdf (RFP)
Scope: Undertake an expanded market assessment for the Rosslyn Inland Port Programme (RIPP) to broaden from automotive focus to multi-sector and regional logistics platform.
Project management: Bi-weekly progress meetings via Microsoft Teams, ad hoc site visits, engagement with stakeholders, final report and presentation at GIFA offices.
Team requirements: Must include key personnel with specific qualifications and experience: Project Lead (Master’s, 8+ years), Market Economist (degree, 8+ years), Transport Specialist (degree, 7+ years), Logistics Operations Specialist (degree, 7+ years), Regional Trade Specialist (degree, 8+ years), Financial Specialist (qualification, 8+ years), GIS Specialist (degree, 5+ years), Data Analytics Specialist (degree, 5+ years).
Methodology: Must demonstrate detailed approach covering demand forecasting, market analysis, stakeholder engagement, and preparation of bankable reports. Project plan must include Work Breakdown Structure and Gantt chart.
Methodology
Source: T39-07-26_Rosslyn Inland Port.pdf
Methodology must cover: Demand forecasting, market and competitor analysis, customer assessments, demand modelling, stakeholder engagement, and preparation of bankable reports.
Project plan: Must include detailed Work Breakdown Structure (WBS) and Gantt chart, with final report within 6 months of appointment.
Project execution: Bi-weekly progress meetings, ad hoc site visits, stakeholder engagement with client support, and provision of all documents and data to IDC/GIFA.
Experience & Qualifications
Source: T39-07-26_Rosslyn Inland Port.pdf
Bidder experience: Must demonstrate proven experience in market demand studies for transport/logistics/infrastructure projects, with three reference projects from the last 10 years.
Key personnel qualifications: Team must include specialists with specified degrees and years of experience in infrastructure, logistics, market analysis, transport planning, trade, finance, GIS, and data analytics.
Submission requirements: Provide organisational structure (organogram), detailed CVs, and proof of professional registration where applicable.
Pricing Schedule
Source: T39-07-26_Rosslyn Inland Port.pdf
Pricing schedule: Provide detailed costing model per deliverable with resource, rate per hour, number of hours, and total cost.
Disbursements: Clearly define and itemise or state “No Charge”.
Price declaration: Include total bid price (VAT inclusive) and confirmation that it covers all services with no additional costs.
Financial Requirements
Source: T39-07-26_Rosslyn Inland Port.pdf (RFP)
All prices must be VAT inclusive and quoted in South African Rand (ZAR).
Pricing format: Provide a detailed costing model with hourly rates, number of hours, and total cost per deliverable. Include a clear breakdown of disbursements (travel, accommodation, printing) or state “No Charge”.
Payment terms: Linked to approved deliverables, paid within 30 days of invoice.
Rates must be firm for the contract period; if not, indicate adjustment basis (e.g., CPI).
Compliance with National Treasury Instruction 02 of 2016/2017 on cost containment measures is required.
Compliance Requirements
Source: T39-07-26_Rosslyn Inland Port.pdf (RFP)
Tax compliance: Bidders must be tax compliant with SARS and provide written confirmation. Submit Tax Compliance Status (TCS) or PIN.
Central Supplier Database (CSD): Registration is mandatory. Provide CSD supplier number and unique registration reference.
B-BBEE: Submit a B-BBEE verification certificate. For EMEs (annual revenue < R10 million) and QSEs (revenue R10-50 million), a sworn affidavit confirming revenue and black ownership is acceptable.
Company documentation: Provide certified copy of board resolution, ID copy of company representative, and completed annexures (2-8).
Joint ventures/consortiums/subcontractors: Prime contractor must not hold a lower percentage of contract value than any subcontractor. Submit agreements and individual compliance documents for all parties.
Contractual Terms
Source: T39-07-26_Rosslyn Inland Port.pdf
Bid validity: 120 days from closing date.
Contract terms: Successful bidder must conclude a Service Level Agreement (SLA) with IDC to measure performance.
IDC rights: May amend bid conditions, extend closing date, not accept lowest bid, conduct site visits, request verification documents, appoint multiple vendors, and interpret requirements.
Bidder undertakings: Offer remains binding during validity period, must prepare for possible presentation within 5 days if notified, responsible for all preparation costs, and supporting documents become IDC property.
Disqualification reasons: Tax non-compliance, incomplete/fraudulent information, receiving unfair information, non-compliance with mandatory requirements, POPIA non-compliance, prime contractor holding lower contract value percentage than subcontractor.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
19 Fredman Dr, Sandown, Sandton, 2031, South Africa
Document-Backed
Recently Synced
Source Snapshot Available
AI Enhanced
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
20 Jul 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.