Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Proposal
Delivery Location
Gariep Hydroelectric Power Station - Gariepdam (Gariep Dam) - Venterstad - 9798
Organization Type
GOVERNMENT
Published
28 Aug 2026
OCDS Reference
ocds-9t57fa-167451
Bidders are invited to provide welding, machining and associated services at eskom's gariep hydroelectric power station for a period of 5 years. The most consequential requirement is that bids must be submitted exclusively through the ESKOM etendering portal, with mandatory csd registration and strict file size limits.
Closing date: 14 September 2026 at 10:00 (South African time).
Bids must be submitted electronically via Eskom's eTendering portal at https://eTendering.eskom.co.za.
Bidders must be registered on the eTendering system and have a valid CSD (Central Supplier Database) number.
Upload documents under the correct category: Technical, Commercial, Finance.
File size limit: 50 MB per file, total upload limit 900 MB.
Submission must be finalised before the closing date and time; incomplete submissions are not allowed.
After finalisation, save the confirmation email with the submission ID for future reference.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Monday, 14 September 2026 - 10:00
Venue
https://teams.microsoft.com/meet/355407249896449?p=6w2JmFz6MK2q1d6Xr4
Categories
Request for Proposal
Gariep Hydroelectric Power Station - Gariepdam (Gariep Dam) - Venterstad - 9798
AI Document Analysis Stages
Description
Source: Annexure N Technical Specification Document No 151A 3037.pdf28 Aug
2026
Tender Published
Tender was published
14 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Annexure N Technical Specification Document No 151A 3037.pdf
Eskom is procuring a contractor for welding, machining and associated services during mini overhaul outages at Gariep Hydroelectric Power Station, covering repairs to spiral casing liners, stay vanes, mandoors, draft tube liners and turbine runner blades over a 5-year period.
Annexure Q SDLI Strategy Setting Template for Bidders.pdf
Eskom is inviting tenders for the provision of welding, machining and associated services at the Gariep Hydroelectric Power Station for a period of 60 months (5 years). The tender includes specific goals for B-BBEE preference points, mandatory local content requirements for steel products, and a compulsory CIDB skills development goal.
Annexure O NEC3 Draft TSC.pdf
Eskom is procuring a five-year contract for on-site machining, welding, and associated services at the Gariep Hydroelectric Power Station, to be delivered through task orders under an NEC3 Term Service Contract (TSC3). The contract is a priced contract with a price list, with work instructed by the Service Manager and governed by detailed technical specifications and additional conditions.
Annexure L Tenderers E-Tendering Training Acknowledgement Form.pdf
Provision of welding, machining and associated services at Gariep Hydroelectric Power Station for a period of 5 years, issued by Eskom.
Invitation to Tender (ITT) Rev. 28 - Machining Welding Ass Services_Gariep.pdf
Eskom is inviting tenders for the provision of welding, machining and associated services at the Gariep Hydroelectric Power Station under a five-year NEC3 Term Service Contract. The tender is open to suitably qualified contractors, with a non-compulsory clarification meeting scheduled and a closing date of 14 September 2026.
Annexure P Technical Evaluation Strategy Document No 151A 3037A.pdf
Eskom is inviting tenders for a five-year contract to provide welding, machining and associated services during mini overhaul outages at Gariep Hydroelectric Power Station. The work includes welding repairs, machining, heat treatment and quality control on turbine components, with outages scheduled from March 2027 to July 2028. Bidders must be technically competent and experienced, and will be evaluated against mandatory and qualitative criteria.
Annexure M E-Tendering Help Manual for Supplier Form.pdf
Provision of welding, machining and associated services at Garikep Power Station for a period of five years, under an Eskom tender. The tender is managed through Eskom's eTendering system, which requires bidders to register and submit documents electronically.
Annexure R Quality Tender Returnables.pdf
Eskom is inviting tenders for the provision of welding, machining and associated services at the Gariep Hydroelectric Power Station under a five-year contract. The tender is governed by Eskom's Supplier Quality Management specification 240-105658000 (QM 58), which sets out quality requirements aligned with ISO 9001, and requires bidders to complete and sign Form A acknowledging acceptance of these quality requirements.
Annexure S Occupational Health and Safety OHS Tender Returnables.pdf
Eskom is inviting tenders for the provision of welding, machining and associated services (including heat treatment) at Gariep Hydroelectric Power Station, Gariep Dam, Free State, for a five-year contract. The contractor must supply manpower, consumables, tools and equipment, and comply with extensive Eskom Occupational Health and Safety (OHS) requirements, including the Eskom PPE Standard, Life-Saving Rules, and statutory appointments.
Annexure K Tax Evaluation questionnaire.pdf
Eskom is inviting tenders for the provision of welding, machining and associated services at the Gariep Hydroelectric Power Station for a period of five years. The tender pack consists of a PAYE classification questionnaire (Evaluation Pack A for companies/close corporations/trusts and Evaluation Pack B for individuals) used to determine whether the contractor is an independent contractor, personal service provider, labour broker or dependent contractor for tax purposes.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 22 000 000
Range
Based on Industry avg. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Provision of welding, machining and associated services at Gariep Hydroelectric Power Station for a period of 5 years. The power station has 4 units (each 90 MW, 136.4 rpm, 62.5 m head). Services are required during Mini Overhaul (MO) outages to repair turbine components (spiral casing, stay vanes, draft tube, runner blades) using SMAW/GTAW weld build-ups, machining, and heat treatment.
Important Dates
Source: Annexure N Technical Specification Document No 151A 3037.pdf (unknown)Outage schedule (subject to change):
Closing date: 2026-09-14 at 10:00 (from tender record).
Contact Information
Source: Annexure N Technical Specification Document No 151A 3037.pdf (unknown){"name":null,"email":null,"phone":null,"department":"s each with separate vertical shaft turbine plants capable of","address":null}
Evaluation Criteria
Source: Annexure N Technical Specification Document No 151A 3037.pdf (unknown)ISO 3834-2 certification (current). Approval by Eskom for Level 1 plant welding. Welding procedure and welder qualifications per BS EN 15614-1/ISO 9606-1 or ASME IX. Compliance with OHSA and NEMA. Adherence to Eskom site safety and security regulations. No work without an accepted QCP. Concessions required for any deviations; poor planning concessions not considered.
Technical Specifications
Source: Annexure N Technical Specification Document No 151A 3037.pdf (unknown)Scope: Welding, general machining and heat treatment on turbine components at Gariep Hydroelectric Power Station during Mini Overhaul (MO) outages.
Power station details: 4 units, each 90 MW, 136.4 rpm, max net head 62.5 m.
Components requiring repair:
Welding requirements: ISO 3834-2 certified contractor, welding per Eskom Standard 240-106628253, procedures per BS EN 15614-1 Level 2 or ASME IX, welders per ISO 9606-1.
Contractor supplies all manpower, consumables, tools, equipment, quality control.
Off-site work may be subcontracted; contractor remains responsible.
Experience & Qualifications
Source: Annexure N Technical Specification Document No 151A 3037.pdfContractor must be suitably experienced. Key personnel:
Quality Management
Source: Annexure N Technical Specification Document No 151A 3037.pdfQuality Control Plan (QCP) required for each repair item, submitted at least 2 weeks before outage. Minimum intervention points: Approval of QCP (H), As-Found Inspection (W), PMI (H), NDT Procedures and Operators (H), Weld Maps (R), WPS/WPQR (H), Welder Qualifications (H), Consumable Certificates (H), Material Verification (H), Machining (W), Weld as per WPS (S), PWHT (H), Final Machining (W), NDT (H), Final Inspection (H), Final Databook Acceptance (H). NDT acceptance per BS EN ISO 5817 Quality Level B. Contractor performs visual/dimensional inspections. Final databook includes all reports, certificates, weld maps, etc.
Compliance Requirements
Source: Annexure N Technical Specification Document No 151A 3037.pdf (unknown)Mandatory certifications/qualifications:
Compliance with:
Quality Control Plan (QCP) must be accepted by Employer at least 2 weeks before each outage.
Non-Destructive Testing per 240-8353994 (Eskom standard) – performed by Employer's NDT provider, contractor requests inspection 1 day in advance.
Acceptance criteria: BS EN ISO 5817 Quality Level B.
B-BBEE Minimum Level 2 (from currentAnalysis).
Health & Safety
Source: Annexure N Technical Specification Document No 151A 3037.pdfComply with Occupational Health and Safety Act (OHSA), SABS 10238 (Welding and Thermal Cutting Processes), and Eskom Power Station safety regulations. Provide all required PPE. Adhere to Hazardous Chemical Regulations and NEMA. Security: mandatory identification, adhere to station security. Voltage regulation in confined conductive areas: max 24 Vdc for lighting/power tools, 12 Vdc for handheld lamps, welding open circuit voltage preferably below 60 Vdc.
Contractual Terms
Source: Annexure N Technical Specification Document No 151A 3037.pdfContract duration: 5 years. Services required during MO outages scheduled March 2027 – July 2028. Outage durations: 25 days for Unit 2 and Unit 1; 31 days for Unit 3 and Unit 4. All work subject to Employer's acceptance. Concessions required for deviations; poor planning not accepted. Drawings available on request after signing NDA. No title to plant/materials transferred.
Description
Source: Annexure O NEC3 Draft TSC.pdf (unknown)11.2(14) The following matters will be included in 1.) Outage date changes, outage access
the Risk Register constraints and outage interface constraints
affecting planned Task Order work.
2.) Availability and coordination of the
Employer’s appointed NDT service provider.
3.) Interfaces with Others working on or
affecting the Affected Property during outage
periods.
11.2(15) The Service Information is in Part C3: Scope of Work, C3.1 Employer’s
Service Information, Annexure A: Technical
Specification, and all documents and drawings
to which C3.1 Employer’s Service Information
makes reference.
12.2 The law of the contract is the law of the Republic of South Africa
13.1 The language of this contract is English
13.3 The period for reply is One (1) week, unless another period is stated in
the Contract Data, Service Information, a Task
Order or an instruction issued in accordance
with the contract
2 The Contractor’s main Data required by this section of the core
responsibilities clauses is also provided by the Contractor in
Part 2 and terms in italics used in this section
are identified elsewhere in this Contract Data
21.1 The Contractor submits a first plan for
acceptance within Two (2) weeks of the Contract Date
The first plan is the overall plan for managing
and Providing the Service during the service
period. A separate Task Order programme is
submitted for each Task Order in accordance
with Option X19
3 Time
30.1 The starting date is. The Contract Date
30.1 The service period is Five years, being 60 months from the starting
date.
4 Testing and defects There is no reference to Contract Data in this
section of the core clauses and terms in italics
used in this section are identified elsewhere in
this Contract Data
5 Payment
50.1 The assessment interval is 25th day of each successive month.
Part c1 agreements and contract data of 97 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Onsite machining, welding and associated services at gariep hydroelectric power station for a
Period of 5 years
51.1 The currency of this contract is the South African Rand
51.2 The period within which payments are Thirty days (30) after receipt by the Employer
made is of:
the Service Manager’s payment
certificate; and
a correct and valid tax invoice
complying with the requirements of the
contract.
Where the Contractor submits an incorrect,
incomplete or non-compliant tax invoice, the
payment period commences when the Employer
receives the corrected tax invoice
51.4 The interest rate is the publicly quoted prime rate of interest
(calculated on a 365 day year) charged by from
time to time by the Standard Bank of South
Africa Limited (as certified, in the event of any
dispute, by any manager of such bank, whose
appointment it must not be necessary to prove)
for amounts due in Rands and
(ii) the LIBOR rate applicable at the time for
amounts due in other currencies. LIBOR is the
6 month London Interbank Offered Rate quoted
under the caption “Money Rates” in The Wall
Street Journal for the applicable currency or if
no rate is quoted for the currency in question
then the rate for United States Dollars, and if no
such rate appears in The Wall Street Journal
then the rate as quoted by the Reuters Monitor
Money Rates Service (or such service as may
replace the Reuters Monitor Money Rates
Service) on the due date for the payment in
question, adjusted mutatis mutandis every 6
months thereafter (and as certified, in the event
of any dispute, by any manager employed in the
foreign exchange department of The Standard
Bank of South Africa Limited, whose
appointment it must not be necessary to prove.
6 Compensation events There is no reference to Contract Data in this
section of the core clauses and terms in italics
used in this section are identified elsewhere in
this Contract Data
7 Use of Equipment Plant and There is no reference to Contract Data in this
Materials section of the core clauses and terms in italics
used in this section are identified elsewhere in
this Contract Data
8 Risks and insurance
80.1 These are additional Employer's risks Discovery during disassembly or Employer
inspection of additional defects, concealed
defects, or actual conditions of the existing
plant which were not reasonably apparent to an
experienced Contractor at the Contract Date
Part c1 agreements and contract data of 97 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Onsite machining, welding and associated services at gariep hydroelectric power station for a
Period of 5 years
and which materially change the instructed
repair extent
9 Termination There is no reference to Contract Data in this
section of the core clauses and terms in italics
used in this section are identified elsewhere in
this Contract Data.
10 Data for main Option clause
A Priced contract with price list
20.5 The Contractor prepares forecasts of the
final total of the Prices for the whole of the
service at intervals no longer than As Requested by Service Manager.
11 Data for Option W1
W1.1 The Adjudicator the person selected from the ICE-SA Division
(or its successor body) of the South African
Institution of Civil Engineering Panel of
Adjudicators by the Party intending to refer a
dispute to him. (see www.ice-sa.org.za). If the
Parties do not agree on an Adjudicator the
Adjudicator will be appointed by the Arbitration
Foundation of Southern Africa (AFSA).
W1.2(3) The Adjudicator nominating body is: the Chairman of ICE-SA a joint Division of the
South African Institution of Civil Engineering
and the Institution of Civil Engineers (London)
(see www.ice-sa.org.za ) or its successor body.
W1.4(2) The tribunal is: Arbitration
W1.4(5) The arbitration procedure is the latest edition of Rules for the Conduct of
Arbitrations published by The Association of
Arbitrators (Southern Africa) or its successor
body.
The place where arbitration is to be held is Cape Town, South Africa
The person or organisation who will
choose an arbitrator
state who selects an arbitrator, is Africa) or its successor body.
12 Data for secondary Option
clauses
X1 Price adjustment for inflation
X1.1 The base date for indices is Month before the month in which the enquiry
closed.
The proportions used to calculate the proport linked to index Index prepared by
Price Adjustment Factor are: ion for
0.85 Cpi seifsa
0.15 non-adjustable
1.00
Part c1 agreements and contract data of 97 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Onsite machining, welding and associated services at gariep hydroelectric power station for a
Period of 5 years
X2 Changes in the law There is no reference to Contract Data in this
Option and terms in italics are identified
elsewhere in this Contract Data.
X17 Low service damages
X17.1 The service level table is in: Table Below
Value Of Low Service Limit Of Low Service
Low Service Damage Description
Damages Damage
Failure to mobilise the required personnel,
2% of the affected
supervision, tools and Equipment and to
Task Order value for 10% of affected Task
commence the instructed work by the Task starting
each calendar day of Order value
date or mobilisation date stated in the Task Order,
delay
where the delay is attributable to the Contractor.
Failure to submit mandatory pre-start documents
by the date required by the Service Information or 0.5% of the affected
Task Order, including the Task Order programme, Task Order value for 5% of affected Task
QCP, welding procedures, Equipment assurance each calendar day of Order value
information and other submissions required before delay
starting the applicable work.
Failure to submit the required Task Order 0.5% of the affected
Databook, handover records or close-out Task Order value for 5% of affected Task
documentation by the date stated in the Task each calendar day of Order value
Order. delay
Failure to submit a recovery plan or revised Task
1% of the affected
Order programme within the period instructed by
Task Order value for 5% of affected Task
the Service Manager where actual or forecast
each calendar day of Order value
progress indicates that the Task Completion Date
delay
may not be achieved.
1% of the affected
Failure to submit the daily progress report required
Task Order value for 10% of affected Task
during outage execution within the reporting period
each calendar day of Order value
stated by the Service Manager or Task Order.
failure
Failure to submit the required response and 1.5% of the affected
proposed corrective action for an NCR within three Task Order value for 10% of affected Task
working days after issue of the NCR, unless a each calendar day of Order value
different period is stated by the Service Manager. delay
X18 Limitation of liability
X18.1 The Contractor’s liability to the Employer
for indirect or consequential loss is limited
to R0.0 (zero Rand)
X18.2 For any one event, the Contractor’s the amount of the deductibles relevant to the
liability to the Employer for loss of or event
damage to the Employer’s property is
limited to
X18.3 The Contractor’s liability for Defects due to The greater of
his design of an item of Equipment is limited
to the total of R 7 000 000.00
and
the amounts excluded and unrecoverable
from the Employer’s insurance (other than
the resulting physical damage to the
Part c1 agreements and contract data of 97 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Onsite machining, welding and associated services at gariep hydroelectric power station for a
Period of 5 years
Employer’s property which is not excluded)
plus the applicable deductibles
X18.4 The Contractor’s total liability to the the total of the Prices other than for the
Employer, for all matters arising under or additional excluded matters.
in connection with this contract, other than
the excluded matters, is limited to The Contractor’s total liability for the additional
excluded matters is not limited.
The additional excluded matters are amounts
for which the Contractor is liable under this
contract for
Defects due to his design, plan and
specification,
Defects due to manufacture and fabrication
outside the Affected Property,
loss of or damage to property (other than
the Employer’s property, Plant and
Materials),
death of or injury to a person and
infringement of an intellectual property
right.
X18.5 The end of liability date is 12 months after the end of the service period.
X19 Task Order
X19.5 The Contractor submits a Task Order Two (2) working days of receiving the Task
programme to the Service Manager within Order.
The Task Order programme complies with Option
X19, the Service Information and the relevant Task
Order. The Contractor does not commence work
under the Task Order until the Task Order
programme has been accepted and the applicable
pre-start requirements stated in the Service
Information and Task Order have been satisfied.
Z The additional conditions of contract
are Z1 to Z14 always apply.
Z1 Cession delegation and assignment
Z1.1 The Contractor does not cede, delegate or assign any of its rights or obligations to any person
without the written consent of the Employer.
Z1.2 Notwithstanding the above, the Employer may on written notice to the Contractor cede and
delegate its rights and obligations under this contract to any of its subsidiaries or any of its
present divisions or operations which may be converted into separate legal entities as a result
of the restructuring of the Electricity Supply Industry.
Z2 Joint ventures
Z2.1 If the Contractor constitutes a joint venture, consortium or other unincorporated grouping of two
or more persons or organisations then these persons or organisations are deemed to be jointly
and severally liable to the Employer for the performance of this contract.
Part c1 agreements and contract data of 97 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Onsite machining, welding and associated services at gariep hydroelectric power station for a
Period of 5 years
Z2.2 Unless already notified to the Employer, the persons or organisations notify the Service
Manager within two weeks of the Contract Date of the key person who has the authority to bind
the Contractor on their behalf.
Z2.3 The Contractor does not alter the composition of the joint venture, consortium or other
unincorporated grouping of two or more persons without the consent of the Employer having
been given to the Contractor in writing.
Z3 Change of Broad Based Black Economic Empowerment (B-BBEE) status
Z3.1 Where a change in the Contractor’s legal status, ownership or any other change to his business
composition or business dealings results in a change to the Contractor’s B-BBEE status, the
Contractor notifies the Employer within seven days of the change.
Z3.2 The Contractor is required to submit an updated verification certificate and necessary
supporting documentation confirming the change in his B-BBEE status to the Service Manager
within thirty days of the notification or as otherwise instructed by the Service Manager.
Z3.3 Where, as a result, the Contractor’s B-BBEE status has decreased since the Contract Date the
Employer may either re-negotiate this contract or alternatively, terminate the Contractor’s
obligation to Provide the Service.
Z3.4 Failure by the Contractor to notify the Employer of a change in its B-BBEE status may
constitute a reason for termination. If the Employer terminates in terms of this clause, the
procedures on termination are P1, P2 and P4 as stated in clause 92, and the amount due is A1
and A3 as stated in clause 93.
Z4 Confidentiality
Z4.1 The Contractor does not disclose or make any information arising from or in connection with
this contract available to Others. This undertaking does not, however, apply to information
which at the time of disclosure or thereafter, without default on the part of the Contractor, enters
the public domain or to information which was already in the possession of the Contractor at the
time of disclosure (evidenced by written records in existence at that time). Should the
Contractor disclose information to Others in terms of clause 25.1, the Contractor ensures that
the provisions of this clause are complied with by the recipient.
Z4.2 If the Contractor is uncertain about whether any such information is confidential, it is to be
regarded as such until notified otherwise by the Service Manager.
Z4.3 In the event that the Contractor is, at any time, required by law to disclose any such information
which is required to be kept confidential, the Contractor, to the extent permitted by law prior to
disclosure, notifies the Employer so that an appropriate protection order and/or any other action
can be taken if possible, prior to any disclosure. In the event that such protective order is not,
or cannot, be obtained, then the Contractor may disclose that portion of the information which it
is required to be disclosed by law and uses reasonable efforts to obtain assurances that
confidential treatment will be afforded to the information so disclosed.
Z4.4 The taking of images (whether photographs, video footage or otherwise) of the Affected
Property or any portion thereof, in the course of Providing the Service and after the end of the
service period, requires the prior written consent of the Service Manager. All rights in and to all
such images vests exclusively in the Employer.
Z4.5 The Contractor ensures that all his subContractor abide by the undertakings in this clause.
Z5 Waiver and estoppel: Add to core clause 12.3:
Part c1 agreements and contract data of 97 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Onsite machining, welding and associated services at gariep hydroelectric power station for a
Period of 5 years
Z5.1 Any extension, concession, waiver or relaxation of any action stated in this contract by the
Parties, the Service Manager or the Adjudicator does not constitute a waiver of rights, and does
not give rise to an estoppel unless the Parties agree otherwise and confirm such agreement in
writing.
Z6 Health, safety and the environment: Add to core clause 27.4
Z6.1 The Contractor undertakes to take all reasonable precautions to maintain the health and safety
of persons in and about the execution of the service. Without limitation the Contractor:
accepts that the Employer may appoint him as the “Principal Contractor” (as defined and
provided for under the Construction Regulations 2014 (promulgated under the Occupational
Health & Safety Act ) (“the Construction Regulations”) for the Affected Property;
warrants that the total of the Prices as at the Contract Date includes a sufficient amount for
proper compliance with the Construction Regulations, all applicable health & safety laws
and regulations and the health and safety rules, guidelines and procedures provided for in
this contract and generally for the proper maintenance of health & safety in and about the
execution of the service; and
undertakes, in and about the execution of the service, to comply with the Construction
Regulations and with all applicable health & safety laws and regulations and rules,
guidelines and procedures otherwise provided for under this contract and ensures that his
Subcontractors, employees and others under the Contractor’s direction and control,
likewise observe and comply with the foregoing.
Z6.2 The Contractor, in and about the execution of the service, complies with all applicable
environmental laws and regulations and rules, guidelines and procedures otherwise provided for
under this contract and ensures that his Subcontractors, employees and others under the
Contractor’s direction and control, likewise observe and comply with the foregoing.
Z7 Provision of a Tax Invoice and interest. Add to core clause 51
Z7.1 Within one week of receiving a payment certificate from the Service Manager in terms of core
clause 51.1, the Contractor provides the Employer with a tax invoice in accordance with the
Employer's procedures stated in the Service Information, showing the amount due for payment
equal to that stated in the payment certificate.
Z7.2 If the Contractor does not provide a tax invoice in the form and by the time required by this
contract, the time by when the Employer is to make a payment is extended by a period equal in
time to the delayed submission of the correct tax invoice. Interest due by the Employer in terms
of core clause 51.2 is then calculated from the delayed date by when payment is to be made.
Z7.3 The Contractor (if registered in South Africa in terms of the companies Act) is required to
comply with the requirements of the Value Added Tax Act, no (as amended) and to
include the Employer’s VAT number 4740101508 on each invoice he submits for payment.
Z8 Notifying compensation events
Z8.1 Delete the last paragraph of core clause 61.3 and replace with:
If the Contractor does not notify a compensation event within eight weeks of becoming aware of
the event, he is not entitled to a change in the Prices.
Z9 Employer’s limitation of liability
Z9.1 The Employer’s liability to the Contractor for the Contractor’s indirect or consequential loss is
limited to R0.00 (zero Rand)
Part c1 agreements and contract data of 97 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Onsite machining, welding and associated services at gariep hydroelectric power station for a
Period of 5 years
Z9.2 The Contractor’s entitlement under the indemnity in 82.1 is provided for in 60.1(12) and the
Employer’s liability under the indemnity is limited to compensation as provided for in core
clause 63 and X19.11 if Option X19 Task Order applies to this contract.
Termination: Add to core clause 91.1, at the second main bullet point, fourth sub-bullet
Z10
point, after the words "against it":
Z10.1 or had a business rescue order granted against it.
Z11 Ethics
For the purposes of this Z-clause, the following definitions apply:
Affected Party means, as the context requires, any party, irrespective of whether it is the Contractor
or a third party, such party’s employees, agents, or Subcontractors or subContractor’s
employees, or any one or more of all of these parties’ relatives or friends,
Coercive means to harm or threaten to harm, directly or indirectly, an Affected Party or the
Action property of an Affected Party, or to otherwise influence or attempt to influence an
Affected Party to act unlawfully or illegally,
Collusive means where two or more parties co-operate to achieve an unlawful or illegal
Action purpose, including to influence an Affected Party to act unlawfully or illegally,
Committing means, as the context requires, the Contractor, or any member thereof in the case of
Party a joint venture, or its employees, agents, or Subcontractors or the subContractor’s
employees,
Corrupt Action means the offering, giving, taking, or soliciting, directly or indirectly, of a good or
service to unlawfully or illegally influence the actions of an Affected Party,
Fraudulent means any unlawfully or illegally intentional act or omission that misleads, or attempts
Action to mislead, an Affected Party, in order to obtain a financial or other benefit or to avoid
an obligation or incurring an obligation,
Obstructive means a Committing Party unlawfully or illegally destroying, falsifying, altering or
Action concealing information or making false statements to materially impede an
investigation into allegations of Prohibited Action, and
Prohibited means any one or more of a Coercive Action, Collusive Action Corrupt Action,
Action Fraudulent Action or Obstructive Action.
Z11.1 A Committing Party may not take any Prohibited Action during the course of the procurement
of this contract or in execution thereof.
Z11.2 The Employer may terminate the Contractor’s obligation to Provide the Services if a
Committing Party has taken such Prohibited Action and the Contractor did not take timely and
appropriate action to prevent or remedy the situation, without limiting any other rights or
remedies the Employer has. It is not required that the Committing Party had to have been
found guilty, in court or in any other similar process, of such Prohibited Action before the
Employer can terminate the Contractor’s obligation to Provide the Services for this reason.
Z11.3 If the Employer terminates the Contractor’s obligation to Provide the Services for this reason,
the amounts due on termination are those intended in core clauses 92.1 and 92.2.
Z11.4 A Committing Party co-operates fully with any investigation pursuant to alleged Prohibited
Action. Where the Employer does not have a contractual bond with the Committing Party, the
Contractor ensures that the Committing Party co-operates fully with an investigation.
Part c1 agreements and contract data of 97 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Onsite machining, welding and associated services at gariep hydroelectric power station for a
Period of 5 years
Z12 Insurance
Z 12.1 Replace core clause 83 with the following:
Insurance cover 83
83.1 When requested by a Party, the other Party provides certificates from his insurer
or broker stating that the insurances required by this contract are in force.
83.2 The Contractor provides the insurances stated in the Insurance Table A from the
starting date until the earlier of Completion and the date of the termination
certificate.
Insurance table a
Insurance against Minimum amount of cover or minimum limit of
Important Dates
Source: Annexure O NEC3 Draft TSC.pdf (unknown)Starting date: Contract Date. Service period: Five years (60 months) from the starting date. Assessment interval: 25th day of each successive month. Payment period: Thirty days (30) after receipt by the Employer of the Service Manager's payment certificate and a correct and valid tax invoice. Period for reply: One (1) week unless another period is stated. First plan for acceptance: within Two (2) weeks of the Contract Date. Base date for indices (Option X1): Month before the month in which the enquiry closed.
Contact Information
Source: Annexure O NEC3 Draft TSC.pdf (unknown)Engineering Contract Strategies: Tel 011 803 3008, Fax 086 5391902, www.ecs.co.za. Adjudicator: ICE-SA Division of the South African Institution of Civil Engineering (www.ice-sa.org.za). Arbitration: Association of Arbitrators (Southern Africa), Cape Town, South Africa.
Submission Guidelines
Source: Annexure O NEC3 Draft TSC.pdf (unknown)Complete the Form of Offer and Acceptance (Part C1.1) and submit the signed tender. Provide key person details (CVs) as required in Contract Data Part 2. Submit a first plan for acceptance within two weeks of the Contract Date. Notify the Service Manager within two weeks of the Contract Date of the key person authorised to bind the Contractor. Submit an updated B-BBEE verification certificate within thirty days of any change in B-BBEE status. Provide a tax invoice within one week of receiving a payment certificate. Submit mandatory pre-start documents (Task Order programme, QCP, welding procedures, Equipment assurance information) by the date required in the Service Information or Task Order.
Evaluation Criteria
Source: Annexure O NEC3 Draft TSC.pdf (unknown)B-BBEE Minimum Level: 2. The tender is evaluated on the basis of the B-BBEE status level and price. The contract is a priced contract with a price list (Option A) and secondary Option X19: Task Order. No minimum quantities are guaranteed; payment is only for work instructed via Task Orders. Low service damages apply for failure to mobilise personnel, supervision, tools, and Equipment by the Task start date (2% of affected Task Order value per calendar day of delay, up to 10% of affected Task Order value) and for failure to submit mandatory pre-start documents (0.5% of affected Task Order value per calendar day of delay, up to 5% of affected Task Order value).
Technical Specifications
Source: Annexure O NEC3 Draft TSC.pdf (unknown)The service involves onsite machining, welding, and associated services at Gariep Hydroelectric Power Station. The scope includes welding repair activities (SMAW, GTAW, weld build-up on carbon/structural steel and stainless/martensitic stainless steel), defect excavation and weld preparation, removal of defective weld metal, parent material preparation, coating and corrosion removal, spiral casing liner weld repair, stay vane weld repair, draft tube liner weld repair, turbine runner blade/component weld repair, pre-heating, PWHT, post-weld bake-out, inspection and quality services (visual, dimensional, PMI, thickness verification, weld maps, NDT coordination), and off-site workshop mobilisation and transport of Employer components. The contract uses NEC3 TSC Option A (priced contract with price list) and secondary Option X19 (Task Order). The Price List is a schedule of tendered rates; no minimum quantities are guaranteed. Rates include all necessary costs (wages, supervision, overheads, profit) unless otherwise stated. Labour rates are paid only for actual authorised productive time. Equipment rates apply only where expressly identified as separately payable. NDT is performed by the Employer's appointed NDT service provider unless otherwise stated in the Task Order.
Experience & Qualifications
Source: Annexure O NEC3 Draft TSC.pdf (unknown)2 Name:
Job
Responsibilities:
3 Available from Engineering Contract Strategies Tel 011 803 3008 Fax 086 5391902 or www.ecs.co.za
Part c1 agreements and contract data of 97 c.1.2B Contract data part 2
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Onsite machining, welding and associated services at gariep hydroelectric power station for a
Period of 5 years
CV's (and further key person's data including
CVs) are in .
A Priced contract with price list
11.2(12) The price list is in Part C2.2 – The Price List
11.2(19) The tendered total of the Prices is R Not applicable – Rates Based
Part c1 agreements and contract data of 97 c.1.2B Contract data part 2
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Project or contract title
Onsite machining, welding and associated services at gariep hydroelectric power station for a
Period of 5 years
Part 2: Pricing Data
TSC3 Option A
Document Title No of
reference pages
C2.1 Pricing assumptions: Option A 3 (23-25)
C2.2 The price list 2 (26-27)
Part c2 pricing data of 97 tsc3 option a
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Project or contract title
Onsite machining, welding and associated services at gariep hydroelectric power station for a
Period of 5 years
C2.1 Pricing assumptions: Option A
How the service is priced
The contract uses main Option A: Priced contract with price list together with secondary Option X19: Task
Order.
The Price List in C2.2 is a schedule of tendered rates and percentages used for pricing work instructed
through Task Orders.
No Employer quantities are stated in the Price List at tender stage. The Tenderer completes the Rate column
for each item in the Price List.
The inclusion of an item in the Price List does not constitute an instruction to carry out the work and does not
guarantee any minimum quantity, frequency, duration, number of Task Orders or value of work during the
service period.
The Contractor is paid only for work instructed in accordance with the conditions of contract and Provided in
accordance with the Service Information and the applicable Task Order.
Pricing of Task Orders
When a Task Order is prepared, the applicable work is priced using the tendered rates and percentages
contained in C2.2.
The priced list for a Task Order identifies, as applicable:
a. the relevant Price List item number and description;
b. the applicable unit;
c. the quantity, duration, number of hours, days, kilometres, cycles, tests, items or other measurable unit
applicable to the Task;
d. the applicable tendered rate; and
e. the resulting Price.
Where an applicable tendered rate exists, the Price for the item is calculated by multiplying the applicable
quantity or duration by the tendered rate.
Where an instructed item is not covered by an applicable tendered rate, the item is priced and assessed in
accordance with Option X19 and the applicable provisions of the conditions of contract.
No work outside an issued Task Order is payable merely because a rate for that work appears in the Price
List.
Function of the Price List
Information in the Price List is not Service Information.
The Contractor Provides the Service in accordance with:
a. the conditions of contract;
b. the Service Information;
c. Annexure A: Technical Specification;
d. the applicable drawings and technical information;
Part c2 pricing data of 97 c2.2 Option a price list
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Project or contract title
Onsite machining, welding and associated services at gariep hydroelectric power station for a
Period of 5 years
e. the Accepted Plan;
f. the accepted Task Order programme;
g. the accepted quality and technical submissions; and
h. the relevant Task Order.
The descriptions in the Price List are pricing descriptions and do not prescribe the Contractor's method,
sequence, number of personnel, resource allocation, Equipment, shift arrangements or Subcontracting
arrangements.
The Contractor determines the resources required to Provide the Service and remains responsible for
complying with all requirements of the contract.
Rates
Unless the Price List expressly states otherwise, each tendered rate includes everything necessary and
incidental to complete the item described in accordance with the contract, including, as applicable:
a. wages, employment costs and ordinary labour-related costs;
b. normal supervision associated with carrying out the item;
c. administration and coordination associated with the item;
d. ordinary hand tools;
e. ordinary personal protective equipment;
f. ordinary minor consumables associated with carrying out the activity;
g. preparation, protection, housekeeping and ordinary reinstatement associated with the activity;
h. Contractor overheads; and
i. profit.
An item is not paid more than once.
Where a composite activity rate is used, the Contractor is not additionally paid for labour, supervision,
Equipment, travel, consumables or other resources already included in that activity rate unless the relevant
Task Order expressly identifies the resource as separately payable.
Labour, management, supervision and Equipment rates contained in the Price List are used only where they
are expressly identified as separately payable in the relevant Task Order, including for variable, additional or
unforeseen work for which an appropriate composite activity rate is not available.
Labour rates
Labour rates are tendered for the time categories stated in the Price List.
The applicable labour rate is paid only for actual authorised productive time or other time expressly identified
as payable in the Task Order and supported by the records required by the Service Information.
Labour rates include the Contractor's employment-related costs, overheads and profit.
Normal supervision associated with the labour activity is included in the labour rate unless the Task Order
expressly identifies a dedicated management, supervisory, technical or quality resource as separately
payable.
Part c2 pricing data of 97 c2.2 Option a price list
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Project or contract title
Onsite machining, welding and associated services at gariep hydroelectric power station for a
Period of 5 years
Contractor's Equipment rates
Contractor's Equipment rates apply only where the Equipment is expressly identified as separately payable
in the relevant Task Order.
Unless the Price List expressly states otherwise, an Equipment rate includes the cost of providing,
transporting where applicable, operating, maintaining, inspecting and controlling the Equipment.
Where an operator is included in the Equipment rate, the operator is not separately paid under a labour-rate
item.
Where an operator is expressly excluded from an Equipment rate, the applicable labour rate may be
separately included in the Task Order.
Ordinary hand tools and Equipment normally required by a person to carry out an activity are included in the
applicable activity or labour rate and are not separately payable.
Mobilisation, travel, accommodation and subsistence
Mobilisation, transport, travel, accommodation and subsistence are paid only where the applicable item is
expressly included in the relevant Task Order.
The Contractor does not receive duplicate payment for travel, transport, mobilisation, accommodation or
subsistence already included in another Price List item.
Additional journeys, accommodation or mobilisation arising from the Contractor's own resource planning,
replacement of personnel, correction of Defects, failure of Contractor's Equipment or failure to complete an
instructed attendance are not separately payable unless the conditions of contract provide otherwise.
Ndt
The Employer's appointed NDT service provider performs the NDT identified in the Service Information and
Annexure A: Technical Specification unless the relevant Task Order states otherwise.
The Contractor's tendered rates include its obligations for NDT readiness, preparation, coordination,
inspection requests, identification, traceability, access assistance, review of NDT reports and incorporation of
the NDT records into the applicable Task Order Databook where these obligations form part of the priced
activity.
NDT performed by the Employer's appointed NDT service provider is not separately payable to the
Contractor.
Plant, Materials and consumables
Plant and Materials expressly included in a tendered activity rate are not separately payable.
Ordinary minor consumables normally associated with performing an activity are included in the applicable
tendered rate.
Plant and Materials, welding filler materials, welding consumables, gases, specialist products or other
materials specifically required for an instructed Task and not included in an applicable tendered rate are
priced using the applicable Plant and Materials item in the Price List where authorised by the Service
Manager.
A cost already included in another tendered rate is not recovered again through a Plant and Materials or
specialist-service item.
Part c2 pricing data of 97 c2.2 Option a price list
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Project or contract title
Onsite machining, welding and associated services at gariep hydroelectric power station for a
Period of 5 years
Cost-plus items
Cost-plus items are used only for Plant and Materials, specialist Subcontracted services or third-party
services:
a. required by an instructed Task Order;
b. not already included in another applicable tendered rate; and
c. accepted by the Service Manager for procurement under the applicable Price List item.
The applicable tendered percentage is applied to the accepted net cost excluding VAT and after deduction of
all discounts, rebates, credits and similar benefits.
The Contractor provides the supporting quotation, order, invoice, proof of cost and other records required by
the Service Manager.
No further fee, handling charge, procurement charge, administration percentage or mark-up is added to an
item already subject to the applicable tendered percentage.
Records supporting payment
The Contractor keeps and submits sufficient records to substantiate the quantities, durations and other units
claimed under each Task Order.
Where an item is priced per hour, day, kilometre, cycle, test, item or other measurable unit, payment is
based on the supported quantity actually Provided and accepted for assessment under the relevant Task
Order.
Preparation and submission of a quotation for a Task Order is not separately payable unless the Price List
expressly provides otherwise.
Price adjustment
Option X1 applies to the tendered rates in the Price List in accordance with the Contract Data.
Option X1 does not apply to verified net supplier, Subcontractor or third-party costs reimbursed under a cost-
plus item because those costs are assessed using the accepted current net cost.
The tendered percentage applied to a cost-plus item remains the percentage tendered unless changed in
accordance with the conditions of contract.
Changes to the Prices
The rates and percentages in the Price List are changed only in accordance with the conditions of contract
.
Part c2 pricing data of 97 c2.2 Option a price list
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Project or contract title
Onsite machining, welding and associated services at gariep hydroelectric power station for a
Period of 5 years
C2.2 the price list
Item
Description Unit Rate
nr
1.1 Task Order planning and pre-start coordination ea R
1.2 Task Order programme preparation and submission ea R
1.3 Task-specific QCP preparation and submission ea R
1.4 Task-specific technical submissions required before commencement ea R
1.5 Mobilisation to Gariep Hydroelectric Power Station ea R
1.6 Site establishment ea R
1.7 Demobilisation and de-establishment ea R
1.8 Contractor / Task Order Manager H R
1.9 Task Supervisor / Site Supervisor H R
International Welding Engineer / International Welding Technologist
1.10 H r
(Iwe/iwt)
1.11 Quality Controller – Level 2 SAIW Inspector H R
1.12 Health and Safety Officer, where specifically required by the Task Order H R
1.13 Document Controller / Quality Records Coordinator H R
1.14 Transport – light vehicle km R
1.15 Transport – truck / component transport vehicle km R
1.16 Accommodation p.p.p.n R
1.17 Subsistence / living-out allowance p.p.p.d R
Item
Description Unit Rate
nr
2.1 SMAW repair welding H R
2.2 GTAW repair welding H R
2.3 Carbon / structural steel weld build-up H R
2.4 Stainless / martensitic stainless steel weld build-up H R
2.5 Defect excavation and weld preparation by mechanical means H R
2.6 Removal of defective weld metal and affected parent material H R
2.7 Parent material preparation prior to welding H R
2.8 Coating and corrosion removal necessary for welding preparation H R
2.9 Spiral casing liner weld repair H R
2.10 Stay vane weld repair H R
2.11 Spiral casing mandoor, flange and sealing surface weld repair H R
2.12 Draft tube liner weld repair H R
2.13 Draft tube mandoor, flange and sealing surface weld repair H R
2.14 Turbine runner blade / runner component weld repair H R
Part c2 pricing data of 97 c2.2 Option a price list
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Project or contract title
Onsite machining, welding and associated services at gariep hydroelectric power station for a
Period of 5 years
2.15 Stainless-steel pickling and passivation m2 R
Item
Description Unit Rate
nr
3.1 General in-situ machining setup ea R
machine
3.2 General in-situ machining R
H
machine
3.3 General off-site workshop machining R
H
3.4 Grinding H R
3.5 Blending H R
3.6 Polishing H R
3.7 Profiling and profile restoration H R
3.8 Turbine runner blade profile restoration H R
3.9 Machining / restoration of mandoor or flange sealing surfaces H R
3.10 Final finishing of sealing surfaces to the specified surface finish m2 R
Item
Description Unit Rate
nr
4.1 Pre-heating setup ea R
4.2 Pre-heating and interpass temperature control H R
4.3 Resistance heating Equipment day R
4.4 Induction heating Equipment day R
4.5 PWHT setup ea R
4.6 PWHT cycle including temperature monitoring and recording cycle R
4.7 PWHT Equipment – additional retention / utilisation day R
4.8 Post-weld bake-out setup ea R
4.9 Post-weld bake-out cycle cycle R
4.10 Heat-treatment technician / operator H R
4.11 Task-specific PWHT method statement ea R
4.12 Thermocouple installation and removal point R
Item
Description Unit Rate
nr
5.1 As-found visual inspection and report ea R
5.2 As-found dimensional inspection and report ea R
5.3 Positive Material Identification (PMI) test and report test R
5.4 Material thickness verification and record location R
5.5 Weld map preparation ea R
5.6 Weld map updating and finalisation ea R
5.7 NDT inspection request preparation and coordination request R
Part c2 pricing data of 97 c2.2 Option a price list
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Project or contract title
Onsite machining, welding and associated services at gariep hydroelectric power station for a
Period of 5 years
5.8 NDT report review and traceability verification report R
5.9 Final visual inspection and report ea R
5.10 Final dimensional inspection and report ea R
5.11 Task Order quality records compilation ea R
5.12 Task Order Databook compilation and submission ea R
5.13 Revised Databook submission following Employer comments ea R
5.14 Task Order handover and close-out documentation ea R
Item
Description Unit Rate
nr
6.1 Qualification of additional WPS/WPQR – carbon / structural steel ea R
Qualification of additional WPS/WPQR – stainless / martensitic stainless
6.2 ea R
steel
6.3 Qualification of overlay welding WPS/WPQR ea R
6.4 Additional welder qualification – SMAW ea R
6.5 Additional welder qualification – GTAW ea R
6.6 Additional welding operator qualification ea R
Independent AIA / examiner involvement specifically required for an
6.7 H r
additional qualification
Note: Rates in this Bill apply only where an additional qualification is required for an instructed Task and the
requirement is not already part of the Contractor's tendered capability or existing accepted WPS/WPQR and welder
qualification obligations.
7.1 Normal Time
Item
Description Unit Rate
nr
7.1.1 Qualified GTAW Welder H R
7.1.2 Qualified SMAW Welder H R
7.1.3 Qualified Boilermaker H R
7.1.4 Machinist / Fitter and Turner H R
7.1.5 Grinding / blending / profiling Artisan H R
7.1.6 Heat-treatment Technician H R
7.1.7 Semi-skilled Mechanical Assistant H R
7.1.8 General Assistant / Labourer H R
7.2 Overtime
Item
Description Unit Rate
nr
7.2.1 Qualified GTAW Welder H R
7.2.2 Qualified SMAW Welder H R
7.2.3 Qualified Boilermaker H R
Part c2 pricing data of 97 c2.2 Option a price list
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Project or contract title
Onsite machining, welding and associated services at gariep hydroelectric power station for a
Period of 5 years
7.2.4 Machinist / Fitter and Turner H R
7.2.5 Grinding / blending / profiling Artisan H R
7.2.6 Heat-treatment Technician H R
7.2.7 Semi-skilled Mechanical Assistant H R
7.2.8 General Assistant / Labourer H R
7.3 Sundays and Public Holidays
Item
Description Unit Rate
nr
7.3.1 Qualified GTAW Welder H R
7.3.2 Qualified SMAW Welder H R
7.3.3 Qualified Boilermaker H R
7.3.4 Machinist / Fitter and Turner H R
7.3.5 Grinding / blending / profiling Artisan H R
7.3.6 Heat-treatment Technician H R
7.3.7 Semi-skilled Mechanical Assistant H R
7.3.8 General Assistant / Labourer H R
Item
Description Unit Rate
nr
8.1 Welding machine complete with normal leads and accessories day R
8.2 Additional welding machine complete with normal leads and accessories day R
8.3 Welding consumable holding / drying oven day R
8.4 PMI / XRF analyser day R
8.5 Portable / in-situ machining Equipment day R
8.6 Specialised grinding, blending and profiling Equipment day R
8.7 Resistance heating unit day R
8.8 Induction heating unit day R
8.9 PWHT power and control unit including recorder day R
8.10 PWHT heating pad package day R
8.11 Calibrated temperature-measuring Equipment day R
8.12 Calibrated dimensional measuring Equipment package day R
8.13 Low-voltage / 24 V compliant temporary electrical supply arrangement day R
8.14 Low-voltage / 24 V compliant power tool package day R
Contractor-provided material-handling Equipment where specifically
8.15 H r
instructed
Item
Description Unit Rate
nr
9.1 Off-site workshop mobilisation / establishment ea R
9.2 Transport of Employer component from Gariep to off-site facility km R
9.3 Return transport of Employer component from off-site facility to Gariep km R
Part c2 pricing data of 97 c2.2 Option a price list
Qualifications:
Experience:
2 Name:
Qualifications:
3 Available from Engineering Contract Strategies Tel 011 803 3008 Fax 086 5391902 or www.ecs.co.za
Part c1 agreements and contract data of 97 c.1.2B Contract data part 2
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Period of 5 years
Experience:
CV's (and further key person's data including
CVs) are in .
Quality Management
Source: Annexure O NEC3 Draft TSC.pdf (unknown)80.1 These are additional Employer's risks Discovery during disassembly or Employer
inspection of additional defects, concealed
defects, or actual conditions of the existing
plant which were not reasonably apparent to an
experienced Contractor at the Contract Date
Part c1 agreements and contract data of 97 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Period of 5 years
Z14.2 Upon written request by the Contractor, the Employer certifies that these conditions prevail. All
measurements and reporting are effected by an independent, competent, and certified
occupational hygiene inspection body, i.e. a SANAS accredited and Department of Employment
and Labour approved AAIA. The Contractor may perform Parallel Measurements and related
control measures at the Contractor’s expense. For the purposes of compliance the results
generated from Parallel Measurements are evaluated only against South African statutory limits as
detailed in clause Z14.1. Control measures conform to the requirements stipulated in the AAIA-
approved asbestos work plan.
Z14.3 The Employer manages asbestos and ACM according to the Standard.
Z14.4 In the event that any asbestos is identified while Providing the Services, a risk assessment is
conducted and if so required, with reference to possible exposure to an airborne concentration of
above the AL for asbestos, immediate control measures are implemented and relevant air
monitoring conducted in order to declare the area safe.
Z14.5 The Contractor’s personnel are entitled to stop working and leave the contaminated area forthwith
until such time that the area of concern is declared safe by either Compliance Monitoring or an
inspection requests, identification, traceability, access assistance, review of NDT reports and incorporation of
the NDT records into the applicable Task Order Databook where these obligations form part of the priced
activity.
nr
1.1 Task Order planning and pre-start coordination ea R
1.2 Task Order programme preparation and submission ea R
1.3 Task-specific QCP preparation and submission ea R
1.4 Task-specific technical submissions required before commencement ea R
1.5 Mobilisation to Gariep Hydroelectric Power Station ea R
1.6 Site establishment ea R
1.7 Demobilisation and de-establishment ea R
1.8 Contractor / Task Order Manager H R
1.9 Task Supervisor / Site Supervisor H R
1.10 H r
(Iwe/iwt)
1.11 Quality Controller – Level 2 SAIW Inspector H R
1.12 Health and Safety Officer, where specifically required by the Task Order H R
1.13 Document Controller / Quality Records Coordinator H R
1.14 Transport – light vehicle km R
1.15 Transport – truck / component transport vehicle km R
1.16 Accommodation p.p.p.n R
1.17 Subsistence / living-out allowance p.p.p.d R
nr
4.1 Pre-heating setup ea R
4.2 Pre-heating and interpass temperature control H R
4.3 Resistance heating Equipment day R
4.4 Induction heating Equipment day R
4.5 PWHT setup ea R
4.6 PWHT cycle including temperature monitoring and recording cycle R
4.7 PWHT Equipment – additional retention / utilisation day R
4.8 Post-weld bake-out setup ea R
4.9 Post-weld bake-out cycle cycle R
4.10 Heat-treatment technician / operator H R
4.11 Task-specific PWHT method statement ea R
4.12 Thermocouple installation and removal point R
nr
5.1 As-found visual inspection and report ea R
5.2 As-found dimensional inspection and report ea R
5.3 Positive Material Identification (PMI) test and report test R
5.4 Material thickness verification and record location R
5.5 Weld map preparation ea R
5.6 Weld map updating and finalisation ea R
5.7 NDT inspection request preparation and coordination request R
Part c2 pricing data of 97 c2.2 Option a price list
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Period of 5 years
5.8 NDT report review and traceability verification report R
5.9 Final visual inspection and report ea R
5.10 Final dimensional inspection and report ea R
5.11 Task Order quality records compilation ea R
5.12 Task Order Databook compilation and submission ea R
5.13 Revised Databook submission following Employer comments ea R
5.14 Task Order handover and close-out documentation ea R
Pricing Schedule
Source: Annexure O NEC3 Draft TSC.pdf (unknown)Station for a period of 5 years
Contents: No of
pages
Part C1 Agreements & Contract Data 20 (2–21)
Part C2 Pricing Data 9 (22–31)
Part C3 Scope of Work 64 (32-96)
CONTRACT No. [Insert at award stage]
Tsc3 of 97 cover page
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _________
Value Added Tax @ 15% is Rates Based
The offered total of the amount due inclusive of VAT is1 Rates Based
(in words) Rates Based
Part C1 Agreements and Contract Data, (which includes this Form of Offer and Acceptance)
Part C2 Pricing Data
Part C3 Scope of Work: Service Information
and drawings and documents (or parts thereof), which may be incorporated by reference into the above listed
11.2(12) The price list is in Part C2.2 – The Price List
11.2(19) The tendered total of the Prices is R Not applicable – Rates Based
Part c1 agreements and contract data of 97 c.1.2B Contract data part 2
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Period of 5 years
Part 2: Pricing Data
TSC3 Option A
reference pages
C2.1 Pricing assumptions: Option A 3 (23-25)
C2.2 The price list 2 (26-27)
Part c2 pricing data of 97 tsc3 option a
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Period of 5 years
C2.1 Pricing assumptions: Option A
The Price List in C2.2 is a schedule of tendered rates and percentages used for pricing work instructed
through Task Orders.
a. the conditions of contract;
b. the Service Information;
c. Annexure A: Technical Specification;
d. the applicable drawings and technical information;
Part c2 pricing data of 97 c2.2 Option a price list
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
expressly identifies a dedicated management, supervisory, technical or quality resource as separately
payable.
Part c2 pricing data of 97 c2.2 Option a price list
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
specialist-service item.
Part c2 pricing data of 97 c2.2 Option a price list
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Option X1 applies to the tendered rates in the Price List in accordance with the Contract Data.
Option X1 does not apply to verified net supplier, Subcontractor or third-party costs reimbursed under a cost-
plus item because those costs are assessed using the accepted current net cost.
.
Part c2 pricing data of 97 c2.2 Option a price list
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
nr
2.1 SMAW repair welding H R
2.2 GTAW repair welding H R
2.3 Carbon / structural steel weld build-up H R
2.4 Stainless / martensitic stainless steel weld build-up H R
2.5 Defect excavation and weld preparation by mechanical means H R
2.6 Removal of defective weld metal and affected parent material H R
2.7 Parent material preparation prior to welding H R
2.8 Coating and corrosion removal necessary for welding preparation H R
2.9 Spiral casing liner weld repair H R
2.10 Stay vane weld repair H R
2.11 Spiral casing mandoor, flange and sealing surface weld repair H R
2.12 Draft tube liner weld repair H R
2.13 Draft tube mandoor, flange and sealing surface weld repair H R
2.14 Turbine runner blade / runner component weld repair H R
Part c2 pricing data of 97 c2.2 Option a price list
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
6.7 H r
additional qualification
Note: Rates in this Bill apply only where an additional qualification is required for an instructed Task and the
requirement is not already part of the Contractor's tendered capability or existing accepted WPS/WPQR and welder
qualification obligations.
7.1 Normal Time
nr
7.2.1 Qualified GTAW Welder H R
7.2.2 Qualified SMAW Welder H R
7.2.3 Qualified Boilermaker H R
Part c2 pricing data of 97 c2.2 Option a price list
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
nr
9.1 Off-site workshop mobilisation / establishment ea R
9.2 Transport of Employer component from Gariep to off-site facility km R
9.3 Return transport of Employer component from off-site facility to Gariep km R
Part c2 pricing data of 97 c2.2 Option a price list
Financial Requirements
Source: Annexure O NEC3 Draft TSC.pdf (unknown)Payment terms: The Employer pays within thirty days (30) after receipt of the Service Manager's payment certificate and a correct and valid tax invoice. If the tax invoice is incorrect, incomplete, or non-compliant, the payment period commences when the corrected invoice is received. Interest on late payments: the publicly quoted prime rate of interest (calculated on a 365-day year) charged by Standard Bank of South Africa Limited for amounts due in Rands; for other currencies, the LIBOR rate. The contract is rates-based; the tendered total of the Prices is not applicable. Price adjustment for inflation (Option X1) applies to tendered rates using 0.85 CPI (SEIFSA) and 0.15 non-adjustable. VAT is 15% and is rates-based.
Compliance Requirements
Source: Annexure O NEC3 Draft TSC.pdf (unknown)B-BBEE Minimum Level: 2. The Contractor must notify the Employer within seven days of any change in B-BBEE status and submit an updated verification certificate within thirty days. If B-BBEE status decreases, the Employer may re-negotiate or terminate. The Contractor must comply with health, safety, and environmental laws, including the Construction Regulations 2014 and Asbestos Regulations. The Employer may appoint the Contractor as Principal Contractor. The Contractor must comply with confidentiality obligations (Z4), intellectual property provisions (Z13) where Foreground IP vests in the Employer, and asbestos management (Z14). The Contractor must not alter the composition of a joint venture without written consent. The law of the contract is South African law; language is English. Insurance is provided by the Employer as per Insurance Table B (Assets All Risk, Contract Works, Environmental Liability, General and Public Liability, Transportation, Motor Fleet, Terrorism, Cyber Liability, Nuclear Material Damage).
Health & Safety
Source: Annexure O NEC3 Draft TSC.pdf (unknown)signature of Date
witness
Note: If a tenderer wishes to submit alternative tenders, use another copy of this Form of Offer and
service period, requires the prior written consent of the Service Manager. All rights in and to all
such images vests exclusively in the Employer.
Z4.5 The Contractor ensures that all his subContractor abide by the undertakings in this clause.
Z5 Waiver and estoppel: Add to core clause 12.3:
Part c1 agreements and contract data of 97 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
not give rise to an estoppel unless the Parties agree otherwise and confirm such agreement in
writing.
Z6 Health, safety and the environment: Add to core clause 27.4
Z6.1 The Contractor undertakes to take all reasonable precautions to maintain the health and safety
of persons in and about the execution of the service. Without limitation the Contractor:
accepts that the Employer may appoint him as the “Principal Contractor” (as defined and
provided for under the Construction Regulations 2014 (promulgated under the Occupational
Health & Safety Act ) (“the Construction Regulations”) for the Affected Property;
warrants that the total of the Prices as at the Contract Date includes a sufficient amount for
proper compliance with the Construction Regulations, all applicable health & safety laws
and regulations and the health and safety rules, guidelines and procedures provided for in
this contract and generally for the proper maintenance of health & safety in and about the
execution of the service; and
undertakes, in and about the execution of the service, to comply with the Construction
regulations published in GNR February 2002, under the Occupational Health and Safety
Act, 1993 (Act ) (“Asbestos Regulations”). The OEL for asbestos is 0.2 regulated
asbestos fibres per millilitre of air as a 4-hour TWA, averaged over any continuous period of four
hours, and the short term exposure limit of 0.6 regulated asbestos fibres per millilitre of air as a 10-
minute TWA, averaged over any 10 minutes, measured in accordance with HSG248 and
monitored according to HSG173 and OESSM.
Part c1 agreements and contract data of 97 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
statement however other clauses may also use the same data.
selected. Click on the form field once and type in the data. Otherwise complete by hand and in ink.
Environmental
Source: Annexure O NEC3 Draft TSC.pdf (unknown)guidelines and procedures otherwise provided for under this contract and ensures that his
Subcontractors, employees and others under the Contractor’s direction and control,
likewise observe and comply with the foregoing.
Z6.2 The Contractor, in and about the execution of the service, complies with all applicable
environmental laws and regulations and rules, guidelines and procedures otherwise provided for
under this contract and ensures that his Subcontractors, employees and others under the
Contractor’s direction and control, likewise observe and comply with the foregoing.
Z7 Provision of a Tax Invoice and interest. Add to core clause 51
Z7.1 Within one week of receiving a payment certificate from the Service Manager in terms of core
clause 51.1, the Contractor provides the Employer with a tax invoice in accordance with the
if applicable.
Z14.6 The Contractor continues to Provide the Services, without additional control measures presented,
on presentation of Safe Levels. The contractually agreed dates to Provide the Services, including
the Completion Date, are adjusted accordingly. The contractually agreed dates are extended by
the notification periods required by regulations 3 and 21 of the Asbestos Regulations, 2001.
Z14.7 Any removal and disposal of asbestos, asbestos containing materials and waste, is done by a
registered asbestos Contractor, instructed by the Employer at the Employer’s expense, and
conducted in line with South African legislation.
Part c1 agreements and contract data of 97 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Contractual Terms
Source: Annexure O NEC3 Draft TSC.pdf (unknown)The contract is NEC3 TSC Option A (priced contract with price list) with secondary Option X19 (Task Order). The Employer provides insurance as per Insurance Table B. Intellectual Property: Foreground IP vests in the Employer; the Contractor retains Background IP. The Contractor must provide Foreground IP documents to the Employer before/on completion. The Contractor indemnifies the Employer against third-party IP infringement claims. Asbestos: The Employer manages asbestos; the Contractor may stop work if asbestos is identified. The Contractor must comply with the Asbestos Regulations. Low service damages apply for late mobilisation and late submission of pre-start documents. The Adjudicator is selected from the ICE-SA panel; arbitration is held in Cape Town under the Association of Arbitrators rules. The law of the contract is South African law.
Section
Source: Annexure O NEC3 Draft TSC.pdf (unknown)c. provides a design of equivalent quality or modify such affected item or design so
as to make it non-infringing without affecting the quality.
Description
Source: Annexure R Quality Tender Returnables.pdf (unknown)The document is Eskom's Supplier Quality Management specification (240-105658000, Rev 3), which sets minimum quality requirements for all Eskom suppliers. It requires suppliers to develop, implement, maintain and continually improve a quality management system (QMS) based on ISO 9001, and to adhere to these requirements throughout the contract duration. The specification applies to all Eskom divisions, subsidiaries, suppliers and sub-suppliers, and forms part of all RFIs, RFQs and RFPs.
Important Dates
Source: Annexure R Quality Tender Returnables.pdf (unknown){"closingDate":"17 October 2021"}
Evaluation Criteria
Source: Annexure R Quality Tender Returnables.pdf (unknown)Bidders must complete and sign Form A (Tender and Contract Quality Requirements for Supplier Quality Management Specification 240-105658000/QM 58 and Quality Requirements for ISO 9001 Standard). Depending on the quality category selected, bidders must hold a valid ISO 9001 certificate (Categories 1 and 2) or demonstrate a developed QMS compliant with ISO 9001 (Categories 2, 3 and 4). Bidders must submit the required quality documentation as listed in the List of Tender Returnables (240-12248652). Sub-suppliers must also comply with the QMS requirements. Eskom reserves the right to assess sub-supplier facilities. The document does not specify other eligibility criteria such as CSD registration, tax clearance, B-BBEE level, CIDB grading, or local content requirements.
Technical Specifications
Source: Annexure R Quality Tender Returnables.pdf (unknown)Title: Supplier Quality Management: Document Identifier: 240-105658000
Alternative Reference QM 58
Number:
Area of Applicability: Eskom Holdings SOC Ltd
Functional Area: Quality Management
Revision: 3
Total Pages: 28
Next Review Date: October 2024
Disclosure Controlled Disclosure
Classification:
Compiled by Supported by Functional Authorized by
Responsibility
SA Sambo P Dondashe L Meyer K Pather
Chief Advisor Middle Manager Acting Senior General Manager
Quality Quality Manager Quality Risk and
Management Management Management Sustainability
Date: 15/10/2021 Date: 15/10/2021 Date: 15/10/2021 Date: 17 October 2021
EDC TN Formatted 15.10.2021
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Content
. Introduction ............................................................................................................................... 3
2.1 Scope ............................................................................................................................... 3
2.1.1 Purpose ................................................................................................................. 3
2.1.2 Applicability ........................................................................................................... 3
2.1.3 Effective date ......................................................................................................... 3
2.2 Normative/Informative References ................................................................................... 3
2.2.1 Normative .............................................................................................................. 3
2.2.2 Informative............................................................................................................. 3
2.3 Definitions ........................................................................................................................ 4
2.4 Abbreviations ................................................................................................................... 5
2.5 Roles and Responsibilities ............................................................................................... 6
2.6 Process for Monitoring ...................................................................................................... 6
2.7 Related/Supporting Documents ........................................................................................ 6
3.1 Supplier and Sub-Supplier Quality Management System Requirements .......................... 7
3.2 Quality Plan ...................................................................................................................... 8
3.3 Contract Quality Plan........................................................................................................ 8
3.4 Quality Control Plan ....................................................................................................... 10
3.5 Pre-Contract Award: Quality Requirement ...................................................................... 13
3.6 Main Supplier and Sub-supplier Capability and Capacity Assessment ........................... 16
3.7 Post-Contract Award ...................................................................................................... 17
3.7.1 Contract Execution .............................................................................................. 17
3.7.2 Supplier Quality Performance Monitoring Phase ................................................. 18
3.7.3 Supplier Quality Audit .......................................................................................... 18
3.8 Standard Conditions ....................................................................................................... 19
3.8.1 Rights of Access .................................................................................................. 19
3.8.2 Eskom Rights to Information ................................................................................ 20
3.8.3 Preservation ........................................................................................................ 21
3.8.4 Quality Audits Related Conditions ....................................................................... 25
3.8.5 Management of Nonconformities and Nonconforming Outputs Identified by
Eskom ................................................................................................................. 25
3.8.6 Special Processes ............................................................................................... 26
Acceptance ............................................................................................................................. 27
Revisions ................................................................................................................................ 27
Development Team ................................................................................................................ 27
Acknowledgements ................................................................................................................ 28
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The intention of this specification is to specify and describe the minimum quality requirements for all
existing and potential Eskom suppliers and define the quality criteria for the selection, evaluation,
position is to partner with suppliers who fully demonstrate commitment to the development,
implementation, and maintenance of a quality management system (QMS) that conforms to the
requirements of ISO 9001 standard. The priority is to encourage suppliers to continually improve
their QMS and enhance service delivery by implementing and conforming to the standard.
2.1 Scope
2.1.1 Purpose
The purpose of this specification is to outline the requirements according to which suppliers shall
develop,
implement,
maintain, and
continually improve
a quality management system (QMS) based on ISO 9001, which should form the basis for conformity
to Eskom quality requirements and continually adhere to them throughout the duration of a contract
2.1.2 Applicability
This specification shall apply throughout Eskom Holdings Limited divisions, its subsidiaries,
suppliers, and sub-suppliers and shall form part of all Eskom requests for information (RFI)/ requests
for quotation (RFQ)/ requests for proposal (RFP), including contracts for the procurement of products
and services.
2.1.3 Effective date
Date of authorisation of the specification
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] ISO 9001 Quality Management Systems Requirements
[2] ISO 10005 Quality Management Systems Guidelines for Quality Plans.
2.2.2 Informative
[3] ISO 9000 Quality Management Systems Fundamentals and Vocabulary
[4] 32-727: Safety, Health, Environment, and Quality (SHEQ) Policy
[5] ISO 10006 Quality Management Systems Guidelines for Quality Management in Projects
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
[6] ISO 9004 Quality Management Quality of an Organisation Guidance to Achieve Sustained
Success
[7] 32-
[8] 32-
[9] PPPFA: Preferential Procurement Policy Framework Act, 2000 (Act No. )
[10] CIDB 1004: Best Practice Guideline A4: Evaluating Quality in Tender Submissions
[11] 240-12248652 Supplier Quality Management: List of Tender Returnables
[12] IAEA Safety Standard GS-R-3.1 Application of the Management System for Facilities and
Activities
[13] SANS 10845-1 Construction Procurement Part1: Processes, Methods and Procedures
2.3 Definitions
The vocabulary of ISO 9000 and the following definitions apply in the application of this specification.
2.3.1 Component: a constituent part of the product or sub-assembly of the product. The product
may comprise multiple individual components
2.3.2 Contract Quality Plan:
process for delivering quality.
Purpose of a CQP is to outline how the results defined in the specifications will be achieved.
2.3.3 Hold Point: a predetermined stage in the quality control plan (QCP) beyond which work/
manufacturing shall not proceed without the attendance of, and written authorisation of, an
Eskom representative or Eskom inspection agency, whichever is applicable.
2.3.4 Intervention Points: those control points indicated by the various controlling bodies
concerned with the implementation of a specific QCP/ ITP. These can be in the form of
inspection, hold points, surveillances, witnesses, reviews and verifications.
2.3.5 Inspection Agency: an organisation or person appointed by Eskom for the purpose of
performing quality assurance/ quality control, monitoring, inspection and/ or expediting
services.
2.3.6 Level 1 Plant Items: equipment, whose failure has an effect on personnel safety and/ or
health, causes an environmental incident, cause a huge production loss or major equipment
damage. Equipment that are safety/ redundancy/ protective device or covered by statutory
regulations requirements.
2.3.7 Level 2 Plant Items: equipment, whose failure impacts plant availability and/or reliability,
causes significant costs or secondary damage.
2.3.8 Level 3 Plant Items: equipment that does not impact on personnel safety and/ or health,
environmental, cost, availability and/ or reliability of plant.
2.3.9 Nonconformity: a deficiency in material, composition, characteristic, or performance that
renders the quality of an item, component, or product unacceptable or indeterminate. The
term also covers a deficiency in, or deviation from/non-adherence to, the quality management
system requirements, prescribed production processes, and/or related documentation such
as procedures and instructions.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
2.3.10 Quality Plan: specification of the actions, responsibilities and associated resources to be
applied to a specific object.
2.3.11 Quality Control Plan: a document specifying the activities to be inspected throughout the
execution of the project, inclusive of test methods, procedures, and acceptance criteria (This
term is equivalent to QIP and ITP).
2.3.12 Requirement: the need or expectation that is stated, generally implied, or obligatory.
Requirements are generally specified in the purchase order and/or contract documentation,
but may not be limited to these.
2.3.13 Primary Plant (Power Plant): primary plant include High Voltage equipment situated inside
the control room (breakers, bus- .
2.3.14 Secondary Plant (Control Plant): secondary plant includes all equipment used to control
and protect the HV equipment on the primary plant side. (Protection, metering, AC/DC and
tele-control).
2.3.15 Special Process: is any production or service process which generates products or services
which cannot be measured, monitored, or verified prior to delivery and use.
2.3.16 Supplier: is a current or potential supplier, vendor, contractor, consultant, or service provider.
A supplier may be a natural or legal person and includes any employee acting within the
course and scope of his/her employment or any agent or manager acting for, or on behalf of,
or in the interests of, the person registered as supplier on the Eskom supplier database.
2.3.17 Sub-supplier: an organisation that provides a product/service to the supplier and/or that
enters into a subcontract and assumes some of the obligations of the supplier or prime
contractor.
2.3.18 Witness Point: a predetermined stage in the quality control plan where and inspection
activity will take place. Work may proceed, provided Eskom or its inspection agency has been
formally notified and confirmed that inspection is waived.
2.4 Abbreviations
Abbreviation Explanation
AIA Approved Inspection Authority
CA Corrective Action
CQP Contract Quality Plan
FIDIC Federation Internationale Des Ingenieurs- Conseils
FMECA Failure Mode, Effects and Criticality Analysis
HAZOP Hazard and Operability Study
ISO International Organisation for Standardisation
ITP Inspection and Test Plan
NC Nonconformity
NDT Non Destructive Testing
PMI Positive Material Identification
QCP Quality Control Plan
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Abbreviation Explanation
QMS Quality Management System
PQP Project Quality Plan
RFI Request for Information
RFQ Request for Quotation
RFP Request for Proposal
SHEQ Safety, Health, Environment, and Quality
SETA Skills Education Training Authorities
WPS Welding procedure specifications
WQR Qualification Record
2.5 Roles and Responsibilities
Eskom Quality representative/ professional will select applicable requirements for existing and
potential Eskom suppliers using Form A (Tender and Contract Quality Requirements for Supplier
Quality Management: Specification 240-105658000/ QM 58 and Quality Requirements for ISO 9001
Standard).
The existing and/ or potential suppliers must complete, sign and return Form A with the other
returnable as listed in the List of Tender Returnable document (240-12248652). Other roles and
responsibilities for this standard are defined within the text of this specification.
2.6 Process for Monitoring
The application of this specification throughout Eskom shall be audited as per the management
system audit schedule.
2.7 Related/Supporting Documents
The documents superseded by this specification: all divisional and business unit supplier quality
requirements standards and/or specifications.
Forms and templates:
[1] 240-68099512 Tender and Contract Quality Requirements for Supplier Quality Management
Specification 240-105658000/ QM 58 and Quality Requirements for ISO 9001 Standard (Form
A)
[2] 240-109253698 Template for a Typical Contract Quality Plan
[3] 240-109253302 Quality Control Plan/Inspection and Test Plan
[4] 240-126469599 Method Statement Template.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The quality assessment criteria and Form A of this specification will be selected and completed by
an Eskom Quality representative/ professional who will identify the applicable supplier quality
requirements to be met.
Form A of this specification must also be completed and signed by the supplier responding to an
Eskom invitation to tender, in order to acknowledge and accept Eskom Supplier Quality requirements
as per this specification and ISO 9001 Standard or any additional quality requirements specific to
the scope of work.
3.1 Supplier and Sub-Supplier Quality Management System Requirements
3.1.1 The supplier and sub-supplier shall develop, implement, maintain and improve a formal QMS
that conforms to the latest ISO 9001 standard or any applicable standard of QMS (latest
applicable revision) and in accordance with the requirements of this specification.
3.1.2 Such a formal system shall consist of the appropriate documented information required by
ISO 9001 and may include a quality manual, quality plans, work procedures, work
instructions, method statements, work flow documentation, etc., as the case may be. This
requirement constitutes the most basic QMS requirements.
3.1.3 Unless specifically excluded from the quality list of tender returnable, as per the categories of
quality requirements (Category 1, 2, 3, or 4), such a QMS shall carry a valid ISO 9001
certificate from an accredited certification body, as indicated in the applicable Eskom
invitation (this requirement applies equally to both the supplier and any/ all manufacturing
third-party organisations mentioned above).
3.1.4 Unless specifically excluded in the quality list of tender returnable, as per the categories of
quality requirements (Category 1, 2, 3, or 4), the supplier shall have a fully developed,
documented, implemented, reviewed and maintained QMS that complies with the
requirements of ISO 9001 standard or any applicable standard of QMS. In the event that the
main supplier invariably requires the assistance of a sub-supplier in order to realise its own
supply obligations. The aforementioned requirement applies equally in all cases where any
such sub- cludes the provision of any of the following
activities, namely, design and development, manufacturing, maintenance, testing, storage,
delivery, installation, commissioning, and project management, or in the cases the supplier
name changes, mergers, acquisitions and/ or cessions. Eskom Quality department must
ensure that the changed entity can still fulfil the requirements as set out in the contract
documentation.
3.1.5 Eskom reserves the right to request and perform necessary assessments at sub-supplier
facilities.
3.1.6 The main supplier shall be responsible for defining and managing the specific quality
assurance and control elements applicable to the respective sub-
work/supply and ensure that its sub-supplier(s) quality programmes support Eskom
requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.1.7 The supplier shall inform Eskom of any proposed changes to the QMS or staff that will affect
the quality system prior to implementation of these changes.
3.1.8 The main supplier shall develop and implement a performance management programme for
their sub-supplier. The programme shall include, but not limited to:
Verification of the QMS
Audits and surveillances
Regular assessment of the CQPs and reviews of QCPs.
NC and Defect Management
Inspection and test plans
Risk management
3.2 Quality Plan
The information in this section constitutes the minimum requirements for a quality plan.
3.2.1 Where specified in the Evaluation Criteria and/ or quality list of tender returnables , as per the
categories of quality requirements (Category 1, 2, 3, or 4); all individual products, services
and processes shall have a documented, implemented, reviewed and maintained contract
quality plan and/or quality control plan (inspection and test plan).
3.2.2 Where specified in the evaluation criteria and/ or quality list of tender returnables. All
production and/ or service provision shall be carried out in accordance with a documented
and agreed contract quality plan (CQP) and/ or quality control plan (QCP)/ inspection and test
plan (ITP).
3.2.3 The supplier shall plan for the required quality-related activities and interfaces within the
meeting specified Eskom requirements.
Note 1: Contract Quality Plan should address the quality assurance elements related to the scope
of work and/ or technical specification.
Note 2: Quality Control Plan (QCP)/ Inspection and Test Plan (ITP) should address the quality
control elements related to the scope of work and/ or technical specification.
3.3 Contract Quality Plan
The main supplier shall require sub-suppliers to submit project quality plans (PQPs)/ contract quality
plans (CQPs) and associated documentation in accordance with the requirements of project QMS
processes applicable to the sub-
The supplier shall, where applicable, based on scope of work criticality, ensure that procurement
documents clearly and unambiguously require sub-supplier submission of a sub-supplier CQP for
supplier and Eskom review.
The main supplier shall ensure that sub-supplier CQPs are developed and implemented in
accordance with the ISO 10005 Quality Management System Guidelines for Quality Plans. In
include the following (as applicable):
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.3.1 The management of records, including material tests, positive material identification (PMI)
testing, material certification, etc.
3.3.2 The provision for free and uninhibited access by the supplier and/or personnel at the time of
inspection.
3.3.3 The proposals for submission of final documentation, the final manufacturing data book, prior
to shipment.
3.3.4 The special processes related to welding:
(WQR), welding procedure specifications (WPS), and procedures qualification records (PQR)
that will be used in the performance of work for supplier review and acceptance prior to
commencing manufacture. Welders shall be qualified to the specified Codes of Construction
for the applicable procedures. The requirements for qualification shall be specified by the
supplier, and welder records shall be maintained by sub-suppliers performing the work.
3.3.5 The special installation procedures and other required fabrication or manufacturing
procedures (that is, those required for post-weld heat treatment, tube rolling, coatings, etc.)
that will be used in the performance of work shall require supplier review and acceptance
prior to commencing manufacture. The personnel carrying out special processes (for
example, NDE, welding, coating, heat treatment, etc.) where the results cannot be fully
verified by subsequent inspection and test shall be suitably qualified and, where applicable,
registered with statutory bodies as legally required, that is, as radiographic workers to conduct
radiography. The requirements for the qualification shall be specified, and personnel records
shall be maintained in accordance with the Project Quality Personnel Qualification
Specification and, where applicable, legal requirements.
3.3.6 The personnel required to perform special processes shall be certified competent through a
and competency control procedures or an external certification body (for example, NDT)
through an accredited service provider as per Skills Education Training Authorities (SETA)
requirements.
3.3.7 All personnel who perform activities that affect quality shall have their training needs identified
and documented. The required training shall be implemented in accordance with the
certificates shall meet the SETA requirements in terms of having the unit standard completed
and the accreditation number of the service providers.
3.3.8 Instructions and requirements for equipment and materials storage, preservation, and
maintenance, including identification of materials required for preservation and maintenance,
are to be provided sufficiently prior to receipt (prior to shipment or earlier) to ensure that
appropriate resources are available at the time of delivery.
3.3.9
sub-suppliers by Eskom or it agent.
3.3.10 The CQP information need to include, but not limited to:
Spells out the aspects of the QMS to be applied within a specific Eskom project, and the
methods to be utilised to ensure quality.
Outline the resources, the communication channels, applicable documents and records to be
generated.
Management Authority and Responsibility from both supplier and client need to outline in the
Cqp.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
List of documents and records that will be used and submitted during the execution of the
project.
Communications channels should include contact person and contact details
Monitoring & measurement procedures for activities need to be indicated.
3.3.11 The main supplier and sub-supplier CQPs shall comply with the Eskom Quality Requirements
Specifications and shall be submitted prior to the initial scope of work kick-off or initial pre-
fabrication meeting and prior to commencement of manufacturing, whichever is earlier.
3.3.12 The Eskom template for CQP provided shall be used as guideline, where the supplier does
not have a CQP template.
3.4 Quality Control Plan
The supplier shall develop and implement processes and procedures that efficiently and effectively
monitor, verify and document the quality of the scope of work for deliverables.
The main supplier shall ensure that sub-supplier QCPs/ ITPs are prepared at a level of detail
sufficient to address all quality-control-related activities in a chronological order, from contract review
through materials verification, manufacturing, fabrication, assembly, final testing, commissioning,
hand-over documentation, and certification. In addition, the supplier shall ensure compliance with
the following requirements:
3.4.1 All stages of manufacturing, fabrication, assembly and installation shall be controlled by a
performed and special attention to controls related to critical products and services.
3.4.2 QCP/ ITP shall be reviewed and accepted by Eskom, its inspection authority or agency, and
they shall allow for the insertion of Eskom specific requirements, including hold and witness
points prior to the commencement of work.
3.4.3 Subsequent changes to the Eskom accepted QCP/ ITP shall require Eskom, its inspection
affected by such changes.
3.4.4 The ITPs should cover materials certification, fabrication works, in-process inspections, final
acceptance tests, packaging and pre- shipment/ transportation, shipping/ transportation
inspections where contracted, preservation, site acceptance tests, construction and erection
works, and pre-commissioning and commissioning tests.
3.4.5 All sub-supplier QCP/ ITP activity shall be performed using an Eskom-accepted supplier
Qcp/ itp.
3.4.6 All applicable codes, standards, and relevant acceptance criteria documents are available at
the work location, and Eskom representatives on site shall have on-going access to this
information. Workplace documentation shall be available in English and in any workforce-
appropriate language.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.4.7 Where activities subject to inspection and test procedures are to be undertaken by a sub-
supplier, the QCP/ ITP shall make reference to this fact and shall include descriptive details
of the sub- -
supplier scope of work.
3.4.8 The supplier shall be ultimately accountable and responsible for the development and proper
implementation of all sub-supplier QCPs/ ITPs, including those reviewed or developed by
sub-suppliers.
3.4.9 Eskom reserves the right to select intervention points on QCPs/ ITPs for Eskom oversight of
selected functions and to perform surveillance or audits of the work.
3.4.10 Once signed, the ITPs and QCPs become addendums to the main contract. These ITPs can
other risks.
3.4.11 A QCP/ ITP shall contain the following information:
Eskom contract number and title
Identification of the area of works/contract
Description of the work, with components, item number, and activity date
QCP/ITP unique number
A list of the sequence of operations, including inspection and tests
The identification of the specification, drawing number, or procedure for each operation,
with reference to the relevant criticality risk rating
The acceptance criteria, with reference to the technical specification, in-house, national, or
international standard, with the relevant clause number for each operation
The inspection and test activities that the supplier has nominated for its intervention points
Provision for the inclusion of intervention points nominated by Eskom and/or its authority/
agency
Provision for intervention point acceptance by date and signature for all parties having
intervention in the plan
Inspection and test records to be generated by the supplier for each operation and an
indication of records to be provided to Eskom (as applicable)
3.4.12 The main supplier shall require sub-suppliers to submit QCPs/ ITPs and associated
documentation applicable to the sub-supplier scope of work. Any changes made to the QCP
after submission must be resubmitted to Eskom for further review. The supplier shall ensure
that all sub-supplier QCPs/ ITPs are in compliance with the Eskom Quality Requirements
Specifications, including, but not limited to, the following requirements:
Clear and unambiguous description of the equipment and location(s) at which each activity
will take place, including facility location(s)
Identification of quality verification activity and stage
The details of reference documents, procedures, or method statements to be utilised in
performance of the activity, including specific reference to actual sections and pages of
procedures, standards, instructions, specifications, etc.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Definition of acceptance criteria
Listing of certifying or verifying documents generated to provide evidence of compliance
with specified requirements; documents are to be provided using the proper Eskom
document numbering requirements
Identification of main supplier and sub-supplier (where applicable) third-party/approved
inspection authority (AIA) and Eskom inspection activities defined in terms of witness, hold,
document review, and verification monitoring points and provision for sign-off of each of the
above-mentioned parties for each intervention point
Qualification requirements for quality control inspectors, including any third-party/AIA
inspectors
Listing of all proposed test procedures
Acceptance criteria for each inspection or test in alignment with specified tolerances
A section for signed acceptance of the QC/ITP by the supplier, sub-supplier (where
applicable), and Eskom prior to commencement of work
Inspection or testing intervention points, including, but not limited to, factory acceptance test
and package acceptance test, witness, and hold points
3.4.13 A quality kick-off meeting will be held at the start of the contract and, if required, at the start
of each subsequent phase.
The supplier shall arrange coordination meetings with Eskom prior to placement of orders
for items or equipment to ensure that all technical and commercial requirements are clear
Supplier inspection personnel, including inspection agency personnel, shall be competent
and qualified to perform inspection and testing assignments. Mobilisation of all such
personnel shall be in compliance with the Project Quality Personnel Qualification
Specification.
3.4.14 Where QCP/ ITP is applicable, the supplier shall ensure that sub-suppliers are provided with
comprehensive, clearly written, and unambiguous inspection and testing protocols, including
processes, procedures, and methods that shall include, but not be limited to, the following:
Requirements for inspection checklists and inspection assignments, with lists of items to be
inspected
An inspection and testing report format, report content, schedule for report processing and
distribution, and report retention requirements
Inspection and test report results response tracking (log) and resolution of nonconformity in
inspection and test processes, procedures, or methods and nonconformity identified in
inspection and test results
Associated Failure Mode, Effects and Criticality Analysis (FMECA) reports relating to the
equipment and sub-systems (if applicable)
Hazard and Operability Study (HAZOP) report, as applicable
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.4.15 The supplier shall establish processes and procedures for formal assessment of sub-supplier
inspection and testing programmes. These shall include review of sub-supplier inspection
reports and other quality control documentation. Additional formal assessment of
manufacturing, fabrication, and assembly facility operations shall be conducted by the
supplier to ensure continuing suitability, adequacy, and effectiveness of the sub-
inspection and testing programmes. Assessment frequency shall be established in
consideration of the sub-supplier scope of work, criticality of scope of work deliverables, and
performance information. The assessment scope and schedule shall be developed in
consultation with Eskom.
3.4.16 Supplier processes and procedures for verification of supplier and sub-supplier purchased
product compliance with specifications shall obtain document return/review status prior to
implementation.
3.4.17 The objective is to finalise any outstanding procedural or other issues before proceeding to
deliver the works.
3.4.18 Eskom, in consultation with the supplier, develops an agenda for the meeting, and Eskom will
keep minutes of these meetings.
3.4.19 Mandatory pre-inspection meetings will be convened by Eskom or its inspection agency or
representatives who will be involved in the works, and records are to be kept.
3.4.20 Eskom reserves the right to appoint resident quality inspectors who can be based at the
sub-
supplier is expected to provide workspace at no cost to Eskom for the inspector, as required.
3.4.21 Eskom may appoint any organisation it prefers to perform quality assurance and quality
control activities, either in the capacity as an AIA or inspection agency, on the works
contracted to the supplier, and the supplier or its sub-suppliers may not object, prevent,
hinder, undermine, circumvent, question, discredit, or in any way make it impossible for such
organisation to carry out its work on behalf of Eskom.
3.4.22 The Eskom template for QCP/ ITP provided shall be used as guideline, where the supplier
does not have a QCP/ ITP template.
3.5 Pre-Contract Award: Quality Requirement
3.5.1 Main Supplier and Sub-supplier Categories
Eskom supplier quality requirements for all existing and potential suppliers and sub-suppliers are
classified into four categories (category 1, 2, 3 and 4). Suppliers must prepare and submit quality
documentation as per the tender selected category (indicated in Form A) using the list of tender
returnables document.
NOTE: Only one (1) category must be applicable per procurement process e.g. [Eskom requests for
information (RFI)/ requests for quotation (RFQ)/ requests for proposal (RFP), including contracts for
the procurement of products and services].
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The following are the minimum returnable documentation for Categories 1 to 4:
3.5.2 Category 1: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit a valid copy of ISO 9001 or any applicable certificate of a QMS (the
latest applicable revision). The QMS
The supplier shall submit the latest copy of the management system internal and external
audit reports. The audit reports must include, if applicable, nonconformity identified, and the
resulting remedial actions (correction and/ or corrective action reports).
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit a draft, or an example of an inspection and test
plan (ITP) or quality control plan (QCP) on similar and/ or previous work done.
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
The supplier shall submit documented information retained (records) of management review
meetings that include agenda, meeting minutes, attendance registers, reports, presentations,
etc.
Note: specific requirements per tender will be selected using the List of Tender Returnable
documents (240-12248652).
3.5.3 Category 2: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit objective evidence of a developed, implemented and maintained QMS
that complies with ISO 9001 or any applicable standard of quality management system (the latest
applicable revision). The following documents (approved/ signed copies) shall be submitted:
Quality Management System manual or a documented information that have defines and
describes the QMS and its scope
(documented information)
Quality Objectives (documented information)
Control of documented information (both maintain and retain documented information )
Internal audit procedure (documented information)
Control of nonconforming outputs (documented information)
Nonconformity and Corrective action procedure (documented information)
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The supplier shall submit the latest copy of the management system internal audit reports. The
audit reports must include, if applicable, nonconformity identified, and the resulting remedial
actions (correction and/ or corrective action reports).
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit an example of inspection and test plan (ITP) or
quality control plan (QCP) on similar or previous work done.
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
The supplier shall submit documented information retained (records) of management review
meetings that include agenda, meeting minutes, attendance registers, reports, presentations,
etc.
Note: specific requirements per tender will be selected using the List of Tender Returnable
document (240-12248652).
3.5.4 Category 3: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit objective evidence of a developed QMS that complies with ISO 9001
(or the latest applicable revision). The following documented information (approved/ signed
copies) shall be submitted:
o Quality management system manual or a (documented information) that have
defines and describes the QMS and its scope
o Quality P
information)
o Quality Objectives (documented information)
o Control of documented information (both maintain and retain documented
information )
o Internal audit procedure (documented information)
o Control of nonconforming outputs (documented information)
o Nonconformity and Corrective action procedure (documented information)
et on a consistent basis.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit an example inspection and test plan (ITP) or
quality control plan (QCP).
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
NB: specific requirements per tender will be selected using the List of Tender Returnables
document (240-12248652).
3.5.5 Category 4: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit a quality method statement based on ISO 9001 and specific to the
scope of work.
The quality method statement
direction). (documented information)
The supplier shall submit a copy of quality objectives. (documented information)
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of the documented information for roles, responsibilities and
authorities, specific to the project/ scope of work/ technical requirements. Examples of relevant
documented information are; organization charts, job descriptions, work instructions, duty
statements, manuals, procedures.
Note: specific requirements per tender will be selected using the List of Tender Returnables
document (240-12248652).
3.6 Main Supplier and Sub-supplier Capability and Capacity Assessment
Supplier capability and capacity assessments shall be performed prior to contract award on potential
suppliers participating in Eskom Holdings procurement process to:
provide products and services with high risk to operational sustainability
work on critical plant and equipment
supply of critical plant items or components
provide special processes
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
All sub-suppliers used by the main supplier/ contractor, performing work on Eskom critical plant
equipment, supplying commodities and providing specialised services shall be subjected to the
capability and capacity assessment.
Critical plant includes the following:
Generation Level 1 & 2 plant
Transmission and Distribution Power Plant & Control Plant
Mega Projects
All potential quality risks identified will be included in the assessment report provided for the tender
evaluation.
Note: Form A (Enquiry/ Contract/ Quality Requirements for Supplier Quality Management:
Specification 240-105658000/ QM 58 and ISO 9001) will be used to select and indicate whether
capability and capacity assessment will be conducted.
3.7 Post-Contract Award
3.7.1 Contract Execution
The supplier shall submit the following documents within 30 days or as per stated timeline after the
contract date, prior to the commencement of work, for acceptance by Eskom:
The supplier shall complete a QCP before contract award. This shall be reviewed and
signed off by Eskom within 30 days or as per stated timeline after contract award.
The supplier shall complete a quality control plan and ITP(s) for review and acceptance by
Eskom prior to the commencement of any work, inclusive of subcontracted work, within 30
days or as per stated timeline after contract award.
The sub-supplier QCP/ ITP shall be submitted for review and comment by the supplier and
by Eskom within 30 days or as per stated timeline after the award of the tender. All supplier
and Eskom comments shall be resolved prior to commencing work.
The equipment lists and an indication of pressurised components and systems.
Note:
discussed with, and approved by, Eskom prior to any work commencing.
Correspondence shall be directed to the project manager, and periodic quality review
meetings shall be convened by Eskom with the supplier.
The mandatory quality review meetings are to be convened by the nominated project quality
manager or his/her representative for the contract.
Monthly quality performance and management reports are to be prepared by the supplier
during contract execution. The content of these reports shall be agreed by Eskom when
submitted to Eskom on a monthly basis.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.7.2 Supplier Quality Performance Monitoring Phase
During the contract execution phase, suppliers shall be monitored by Eskom for performance on
quality-related aspects.
The outcomes of such monitoring will enable Eskom to take any appropriate actions pertaining to
the supplier.
The monitoring shall be carried out periodically by Eskom or at predetermined intervals during the
execution of a contract using agreed key performance indicators. The monitored key performance
areas include the following:
CQP and QCP /ITP
Delivery
Design
Cost
Management system
Subsequent key performance indicators associated with these areas will include the following:
Nonconformity monitoring
Audit and assessment evaluation scoring
Management system compliance and accreditation
Achievement of delivery targets as per contractual agreements
Process improvements
Correction and corrective action response and closure
3.7.3 Supplier Quality Audit
3.7.3.1 Quality audits and related quality performance reviews are intended to provide an objective
evaluation of compliance with performance expectations defined in this specification, in the
supplier contract quality plan (CQP), and in any other project scope of work specification.
3.7.3.2 Quality audits and related quality performance reviews include, but are not limited to, any
quality or other project functional area audits, assessments, verification of compliance
reviews, surveillance, inspections, or other interim or final assessments of scope of work
deliverables provided by the supplier or sub-suppliers
3.7.3.3 Quality audits and related quality performance reviews are intended to provide an objective
evaluation of compliance with performance expectations defined in this specification, in the
supplier contract quality plan (CQP), and in any other project scope of work specification.
3.7.3.4 Quality audits and related quality performance reviews include, but are not limited to, any
quality or other project functional area audits, assessments, verification of compliance
reviews, surveillance, inspections, or other interim or final assessments of scope of work
deliverables provided by the supplier or sub-suppliers.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.7.3.5 Quality audits and related quality performance reviews shall be carried out by trained,
accredited, and experienced personnel in accordance with procedures documented in the
Cqp.
3.7.3.6 The supplier shall submit, for Eskom review, documented processes for conducting project
scope of work quality audits and related quality performance reviews. Supplier quality audits
and related quality performance review processes shall be designed to address evaluation
of progress towards completion of project functional area deliverables as well as final
deliverable quality.
3.7.3.7 The supplier shall provide a schedule of anticipated quality audits covering all functional
areas and related quality performance reviews at the time of first post-contract award CQP
submission.
3.8 Standard Conditions
3.8.1 Rights of Access
Eskom:
3.8.1.1 shall be granted electronic and hard-copy access to all quality plans, procedures,
documentation, and other quality records relating to the work, including, but not limited to,
data extracts;
3.8.1.2
as any documentation, materials, or equipment associated with the work, at any time or
project work location; and
3.8.1.3 reserves the right to carry out assessments and audits on all new suppliers and sub-
suppliers.
The supplier:
3.8.1.4 shall
the work at any time;
3.8.1.5 shall cooperate with Eskom requests for documentation, records, and inspection and
witnessing. Eskom participation in audits, appraisals, assessment of plans, and verification
shall be conducted at no extra cost to Eskom;
3.8.1.6 shall ensure that a sub-supplier provides access to Eskom to all work procedures, records,
and supporting documentation through provision of access to view and photocopy, as
required, to support verification of scope of work requirements. Access shall include the
ability to photograph Eskom equipment, systems, system components, materials, etc.;
3.8.1.7 shall provide access to all quality-related information pertaining to activities performed by
itself or sub-suppliers, where Eskom might not have participated in the witnessing of their
quality assurance or control (this refers to inspections, audits, etc. performed by the supplier
on its own sub-suppliers);
3.8.1.8 shall allow Eskom to assess, audit, approve, or reject any sub-suppliers employed by
3.8.1.9 shall ensure that the above requirements flow down to sub-suppliers.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.2 Eskom Rights to Information
3.8.2.1 To expect that the works will be conducted in accordance with the contract between the
parties.
3.8.2.2
3.8.2.3
selected audits as an observer and by assessing the supplier during key work stages.
Eskom will coordinate with the supplier to develop an oversight schedule aligned with the
3.8.2.4 To obtain access to any audit reports of audits performed by the supplier reflected in the
audit programme.
3.8.2.5 To conduct independent quality audits during all phases of the contract, and the supplier
shall provide all resources to support these activities.
3.8.2.6 Eskom shall have the right to participate in, or request that, a technical investigation be
risk to Eskom products or service deliverables is identified.
3.8.2.7 To participate in, and/or lead, investigations related to incidents involving its products.
3.8.2.8 To require from suppliers to be responsible for the cost of re-inspections.
3.8.2.9 To withhold payment from suppliers as a result of outstanding nonconformities, irrespective
of the agreed payment schedule and in accordance with the conditions of contract.
3.8.2.10 Shall be granted electronic and hard-copy access to all quality plans, procedures,
documentation, and other quality records relating to the work, including, but not limited to,
data extracts.
3.8.2.11 Reserves the right to review, inspect, and audit an
well as any documentation, materials, or equipment associated with the work, at any time or
project work location.
3.8.2.12 Shall carry out assessments and audits on all new suppliers and sub-suppliers.
3.8.2.13 Reserves the right to
or sub-
3.8.2.14 Reserves the right to select intervention points within all developed supplier QCPs/ ITPs
for Eskom oversight of selected functions and to perform surveillance or audits of the work.
3.8.2.15 Shall be given access at all reasonable times before, during, and after manufacture and
before delivery, construction, erection, and commissioning to measure, test, and inspect the
pr
3.8.2.16 Reserves the right to suspend any pending deliveries by the issuing of a cease delivery
order at any time and for any portion of the work that is not being performed in accordance
with the specified/agreed requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3 Preservation
The supplier shall develop and implement a comprehensive preservation programme consisting of
plans, processes, procedures and actions undertaken for the purpose of planning for and
maintenance of material deliverables quality. The supplier preservation programme scope includes,
but is not limited to, the following:
3.8.3.1 Engagement of personnel suitably qualified for oversight of, and (as required) direct
implementation of, preservation programme requirements.
3.8.3.2 Development and implementation of preservation programme training appropriate to work
need.
3.8.3.3 Eskom may make use of its appointed service provider tasked to provide a full suite of
services encompassing an online monitoring system and asset tracking during, but not
limited to the following stages: inspections, testing, shipping, transportation, storage, and
commissioning. The supplier is to enable full access during all of these stages in order to
allow the installation of the devices on Eskom-identified products and equipment, which
include the sub-
deemed important towards effective and efficient quality control.
3.8.3.4
provider in ensuring seamless installation of the device and other associated installations.
Moreover, there is also a need to integrate data flows and systems between Eskom and the
supplier. Further details are included in the Eskom specifications and works information.
3.8.3.5 Review and tracking of compliance with Eskom and supplier engineering specification of
preservation requirements.
3.8.3.6 Review and tracking of compliance with sub-supplier provided preservation requirements
and recommendations.
3.8.3.7 Evaluation of prospective temporary and longer-term material storage sites for consistency
with preservation programme expectations.
3.8.3.8 Preservation work plan development and plan execution performance evaluation of all
parties engaged for provision of material transportation, handling, or storage services.
3.8.3.9 Oversight of material quality preservation plan preparation and plan execution performance
at all work locations.
3.8.3.10 Development of a preservation programme records management process, in compliance
with Eskom information management requirements, which comprehensively addresses
generation, maintenance, and ready access by Eskom to all preservation programme
records.
3.8.3.11 The supplier shall deploy a clearly defined documented programme providing for
identification of all physical asset pre-operation preservation of quality requirements. In this
including consumable items, equipment systems, system components, and any other
procured or supplied materials or equipment transferred to project control, but not deployed
for operational purposes.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3.12 Where the project responsibility for equipment and materials management has been
preservation programme shall ensure clear and
unambiguous communication of pre-operation preservation of goods quality requirements
to sub-suppliers.
3.8.3.13
processes and procedures for efficient and effective monitoring of compliance with
programme requirements.
3.8.3.14 Compliance monitoring shall commence with ensuring comprehensive consideration of
preservation requirements in the engineering instruction and subsequent inclusion of said
instruction in procurement documentation and shall be applicable until such time as
equipment or materials have been incorporated in an operating or operational system or
structure.
3.8.3.15 Compliance evaluation frequency shall anticipate transfer of tactical-level responsibility for
management of preservation responsibilities between project functional areas, for example,
procurement to logistics, logistics to fabrication, fabrication to logistics, logistics to
construction, etc., and shall, in similar fashion, anticipate transfer of support for tactical-level
responsibility between various subcontracted service providers.
3.8.3.16 Supplier engineering shall ensure that preservation requirements for scope of work
systems, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented and that preservation requirements are efficiently and
effectively communicated to project procurement, logistics, construction management,
quality, security, and other project functional areas, as required, for efficient and effective
implementation of preservation requirements. This shall take the form of a preservation
programme applicable to all systems, system components, equipment, materials, customer-
supplied materials, and other goods procured or managed under the scope of work.
3.8.3.17
address temporary, long-term, and in-transit preservation requirements, including, but not
limited to:
requirements for protection against, or insulation from, atmospheric conditions,
sunlight, temperature, soil, dust, humidity, salt spray, corrosive atmospheres, or
other physical environment conditions;
detailed procedures for application, use, monitoring, and maintenance of coatings,
coverings, fasteners, lines, and other components for internal and external weather
proofing;
requirements for electrical grounding or isolation;
requirements for internal or external environment creation, for example, inert gas
charging, heating, cooling, etc., inclusive of gas storage, electric power supply, etc.;
detailed procedures for initial set-up, charging, activation, and maintenance of
internal atmosphere generation, regeneration, monitoring, and relieving systems, for
example, inert gas management systems;
requirements for protection against, or insulation from, vibration or long-period
cyclical motion in transit, for example, wave-generated movement during sea
transport;
internal and external structural integrity protection, for example, internal and external
bracing, padding, framing, chocking, etc.;
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
support structure requirements, for example, stools, pads, or other devices,
substrates, or support required to ensure in-storage and in-transit stability of
systems, system components, equipment, and material, or other discrete units or
items;
provision for physical separation and/or barriers to prevent airborne or direct
transmittal of contaminants between work areas or between work areas and storage
areas, for example, prevention of carbon steel grinding or cutting debris impact on
stainless steel elements, airborne drift of blast aggregate into vessels or machinery,
etc.;
provision for, and final disposition of, temporary and longer-term storage or transit
required supports and related binding devices, for example, stools, stands, sea
fasteners, platforms, chocks, spacers, cabling, etc.;
provision of requirements for temporary work platforms or other support structures
required to ensure provision of preservation services, for example, provision of a
self-elevating work platform for periodic access to elevated fittings, gauges, man-
ways, etc.;
requirements for protection against, or insulation from, contact with other objects, for
example, padding or other protection for external tubing, fittings, or other impact-
sensitive structures or components;
clear physical delineation of temporary and longer-term storage areas supplemented
by hard and soft barriers, as required, to maintain a protective perimeter;
documented agreements with storage facility and transportation provider
management regarding security management, including, but not limited to, facility
access and egress control and control of access to project goods and materials
within facility boundaries or aboard vehicles or vessels; and
detailed procedures for inspection and testing to verify performance of preservation
procedures and to provide for timely notice and corrective action to maintain
preservation status.
3.8.3.18
management of preservation requirements, from initial transfer of ownership or management
responsibility to project scope of responsibility, through any period of temporary or longer-
term storage and through any period of transit, including transit for final delivery at point of
active use or installation.
3.8.3.19
address processes and procedures to ensure that storage and control of materials are
accomplished in accordance with manufacturer recommendations, specifications, and
project-specific requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3.20
to address preservation and control of valves, electrical motors and components,
mechanical and rotating equipment, piping and fittings, instrumentation, flange faces,
gaskets, coatings, insulation, and other materials. Special precautions include, but are not
limited to, supplier-specified maintenance procedures related to engines, electric motors,
pumps, compressors, etc., such as periodic shaft rotation, engine turnover, lubrication, etc.
3.8.3.21 The supplier shall ensure that clear and unambiguous requirements for preservation of the
system, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented in purchase orders, work authorisations, and other
communications between the supplier and sub-suppliers.
3.8.3.22 Where sub-supplier expertise is utilised in determination of the preservation protocol,
supplier procurement processes shall ensure clear and unambiguous documentation of sub-
supplier input into preservation management programme requirements.
3.8.3.23 Supplier procurement shall ensure that preservation requirements for scope of work
systems, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented and that preservation requirements are efficiently and
effectively communicated to project logistics, construction management, quality, security,
and other project functional areas, as required, for efficient and effective implementation of
preservation requirements.
3.8.3.24 The supplier shall ensure comprehensive, clear, and unambiguous designation of sub-
supplier responsibility for execution of all preservation management programme elements,
including, but not limited to, all systems, processes, procedures, methods, ready access to
records, and provision of equipment, tools, or services essential to efficient and effective
execution of the preservation management programme.
3.8.3.25 The supplier shall ensure that preservation management programme responsibilities are
clearly and unambiguously defined within the project team and efficiently and effectively
implemented at all project scope of work locations. Inclusion of supplier and sub-supplier
scope of work in the development and implementation of a preservation management
programme shall be considered essential to efficient and effective preservation
management programme execution.
3.8.3.26 The supplier shall ensure clear and unambiguous designation of project team responsibility
for oversight and management of preservation management programme elements during
every stage of project development.
3.8.3.27 The supplier shall ensure that Eskom has free and unrestricted access to all preservation
records for inspection and audit.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.4 Quality Audits Related Conditions
3.8.4.1 The supplier shall maintain an accurate quality audit and related quality performance review
schedule and shall incorporate the current schedule as an attachment to the supplier CQP.
3.8.4.2 it and related quality performance review schedule development
process shall be designed to incorporate consideration of information generated by
previously conducted audits and reviews, by input from project risk management evaluations
(risk register), or from Eskom or sub-supplier subject matter expertise.
3.8.4.3 Eskom reserves the right to oversee supplier audit programmes by participating in selected
audits as an observer and by assessing the supplier during key work stages. Eskom will
coordinate with the sup
audit schedule.
3.8.4.4 Eskom will have the right to obtain access to any audit reports of audits performed by the
supplier reflected in the audit programme.
3.8.4.5 Eskom reserves the right to conduct independent quality audits, scheduled and
unscheduled, during all phases of the contract. The supplier shall provide all resources to
support these activities.
3.8.4.6 Eskom shall be given access at all reasonable times before, during, and after manufacture
and before delivery, construction, erection, and commissioning to measure, test, and inspect
.
3.8.4.7 The supplier shall obtain access for Eskom to measure, test, witness tests, and inspect
products that are being manufactured by any sub-supplier. This includes surveillances.
3.8.4.8 The assessments and audits shall be carried out on all new suppliers and their sub-
suppliers.
3.8.4.9 Eskom shall have the right to participate in, or request that, a technical investigation be
risk to Eskom products or service deliverables is identified.
3.8.4.10 Qualification requirements for supplier and sub-supplier personnel engaged in conducting
quality audits and related quality performance reviews shall be defined in the supplier CQP
and shall be in compliance with the Project Quality Personnel Qualification Specification.
3.8.5 Management of Nonconformities and Nonconforming Outputs Identified by Eskom
3.8.5.1 Nonconformity reports raised by Eskom and issued against the supplier shall be investigated
by the supplier as a matter of urgency in order to determine the root cause, corrective action
measures, as required, with implementation time frames.
3.8.5.2 A formal response shall be prepared in respect of the defined criteria and submitted to
Eskom for its review, evaluation, and acceptance, within a maximum of 14 calendar days
from the date of issue of the nonconformity and should be aligned with the site
requirements/procedure.
3.8.5.3 Eskom may, at its discretion, request a response sooner and, in any case, before the
supplier proceeding with any pending/further intervention or corrective action, as may be
required by Eskom.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.5.4 Should Eskom or its inspection authority/agency identify any nonconforming products during
the conduct of its audits/surveillances/inspections, the supplier shall be deemed to be in
breach of contract and shall be held liable for any repair, rework, and/or associated
replacement costs. The supplier may, in such instances, also be held liable for the full costs
associated with the conducting of follow-up audits/surveillances/inspections.
3.8.5.5 The nature, magnitude, and/or frequency of nonconformity and inspection defect/rejection
reports raised by Eskom or its appointed inspection authority/agency shall form the basis of
.
3.8.5.6 Nonconforming outputs identified by Eskom shall be documented via a NC Report and
issued to the suppliers via the contract communication protocol. The suppliers shall
investigate the matter and respond in writing to Eskom of disposition within the stated
contractual conditions.
Note: The dates for the disposition should align to contractual conditions.
3.8.5.7
shall notify the supplier of the trends. Eskom can initiate an internal audit to highlight the
system failures. The supplier with raise a Corrective Action Report and undertake Root
Cause Analysis. In such cases, QMS rectification and/ or update measures shall be taken
immediately.
3.8.5.8 Should the Supplier fail to respond and rectify nonconforming products within stipulated
contractual conditions. The Project Manager should apply contractual remedies in
accordance with Fidic/ NEC contract.
3.8.5.9 Repeated Nonconformities; if there are any identified repeat nonconformities from the same
supplier within a period of 6 months or less. This must then be escalated to the management
review committees of the BU/ OU/ Cluster/ or Divisions for adjudication. If not resolved, then
the matter must be escalated to the supplier review committee for recommendation.
3.8.6 Special Processes
The following requirements shall be applicable as well as additional requirements as specified in the
scope of work for the provision of the following special process services:
3.8.6.1 The supplier shall ensure that all processes which require that procedures be pre-qualified
or work methods and operators tested and qualified are controlled and all steps followed
before the work can commence.
3.8.6.2 This typically covers such activities as welding, non-destructive testing, special fabrication
techniques, coating, painting, etc.
3.8.6.3 All special processes (procedures and processes) shall be submitted for review and
acceptance by Eskom, accredited or certified agency. No work shall commence until these
are accepted.
3.8.6.4 Where applicable, a relevant Management System for the special process shall be certified
or approved by an accredited body and proof of certification shall be submitted to Eskom for
review. An example for this will be the Welding Management System based on ISO 3834.
3.8.6.5 Where samples are required for acceptance, these shall be submitted to Eskom for review
and acceptance.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.6.6 The supplier shall ensure that all operators are suitably qualified for these processes in
accordance with the procedures, processes and/ or applicable standards/ codes.
3.8.6.7 The records of qualification of procedures, processes and operators shall be maintained by
the supplier in accordance with the applicable procedure or code and these made available
to Eskom at all times.
This document has been seen and accepted by:
Name Designation
Kerseri Pather General Manager: Risk and Sustainability
Lenock Meyer Acting Senior Manager: Quality Management
Pamela Dondashe Middle Manager: Quality Assurance
Mandla Mkhwanazi Middle Manager: SHEQ Procurement and Supply Chain Management
Suzette Manthe Senior Advisor: Quality Performance and Planning
Lorna Ndlela Middle Manager: Eskom Document and Records Management
Date Rev. Compiler Remarks
October 2021 3 SA Sambo Specification was due for revision and in addition, to
align the requirements with the latest Eskom business
processes and systems.
October 2018 2 SA Sambo Specification reviewed to be aligned with the
requirements of ISO 9001:2015
March 2016 1 SA Sambo Specification was due for revision and also to
repackage the requirements and tender returnable
documents into four categories.
December 2011 0 A Hunter New document
The following people were involved in the development of this document:
Andrew Else
Bongi Tshabalala
Feziwe Mogamisi
Lesego Garegae
Patrick Thwane
Xolani Zuma
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Eskom Operational Quality Forum Members
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Methodology
Source: Annexure R Quality Tender Returnables.pdf (unknown)The supplier must implement a documented preservation programme that includes: review and tracking of compliance with Eskom and supplier engineering specifications; evaluation of storage sites; preservation work plan development and performance evaluation; oversight of material quality preservation at all work locations; development of a records management process; and identification of all physical asset pre-operation preservation requirements, including consumables, equipment systems and components not yet deployed.
Experience & Qualifications
Source: Annexure R Quality Tender Returnables.pdf (unknown)Quality audits and related quality performance reviews must be carried out by trained, accredited and experienced personnel in accordance with procedures documented in the contract quality plan. The supplier must submit documented processes for conducting quality audits and reviews, and provide a schedule of anticipated quality audits covering all functional areas at the time of first post-contract award CQP submission.
Quality Management
Source: Annexure R Quality Tender Returnables.pdf (unknown)The supplier must develop, implement, maintain and improve a formal QMS conforming to the latest ISO 9001 standard. Unless excluded by the selected quality category, the QMS must carry a valid ISO 9001 certificate from an accredited certification body. The supplier must have a fully documented and implemented QMS, and must inform Eskom of any proposed changes to the QMS or staff that affect quality. The supplier must also manage sub-supplier quality through verification of QMS, audits, surveillance, assessment of contract quality plans, nonconformity and defect management, inspection and test plans, and risk management. Where specified, the supplier must provide a contract quality plan and/or quality control plan (inspection and test plan).
Health & Safety
Source: Annexure R Quality Tender Returnables.pdf (unknown)The specification references Eskom's Safety, Health, Environment and Quality (SHEQ) Policy (32-727) and the IAEA Safety Standard GS-R-3.1 for application of management systems. No specific OHS requirements beyond these references are detailed in the provided text.
Contractual Terms
Source: Annexure R Quality Tender Returnables.pdf (unknown)The supplier must implement a preservation management programme covering valves, electrical motors, mechanical and rotating equipment, piping, instrumentation, flange faces, gaskets, coatings, insulation and other materials. Preservation requirements must be documented in purchase orders and work authorisations, and communicated to sub-suppliers and project functions. The supplier must clearly designate sub-supplier responsibilities for preservation execution, ensure preservation responsibilities are defined within the project team, and give Eskom free and unrestricted access to all preservation records for inspection and audit.
Section
Source: Annexure R Quality Tender Returnables.pdf (unknown)The tenderer must complete and sign Form A (Tender and Contract Quality Requirements) to acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001. The form requires the tenderer to indicate applicability of pre-contract award quality requirements (Category 1, 2, 3 or 4) and post-contract award clauses including contract execution, supplier quality performance monitoring, Eskom rights of access and information, preservation, quality audits, management of nonconformities, and special processes. The form also requires the tenderer to indicate applicability of each ISO 9001 clause (4 to 10) and each quality principle (1 to 7).
Description
Source: Annexure S Occupational Health and Safety OHS Tender Returnables.pdf (unknown)The tender is for provision of welding, machining and associated services at Gariep Power Station, Gariep Dam, Free State, for a period of 5 years. Scope includes provision of manpower, consumables, tools, and equipment such as welding, general machining, and heat treatment. PPE compliance is mandatory for all contractor employees and Eskom Peaking employees. Contract custodians must ensure PPE standard is included in pricing schedules/BoQs, identify minimum PPE requirements, and enforce compliance. Contractor companies must issue PPE based on risk assessments, ensure PPE complies with Eskom PPE Standard, inspect PPE, provide training, and apply consequence management. Safety Department must include PPE costs in tender pricing, create awareness, and conduct audits. Non-compliance with PPE results in work stoppage and consequence management.
Important Dates
Source: Annexure S Occupational Health and Safety OHS Tender Returnables.pdf (unknown){"closingDate":"04 February 2026","briefingSession":"{"date":null,"time":null,"venue":"ion reports to the relevant management.","is_compulsory":false}"}
Contact Information
Source: Annexure S Occupational Health and Safety OHS Tender Returnables.pdf (unknown){"name":null,"email":null,"phone":"+27 21 941 5800","department":"Date: 04 February 2026","address":"ntifier"}
Evaluation Criteria
Source: Annexure S Occupational Health and Safety OHS Tender Returnables.pdf (unknown)Bidders must be registered with the Compensation Commissioner and provide a valid Letter of Good Standing (COID). They must sign the Acknowledgement Form for Eskom OHS legal and other requirements (Annexure B). A Section 37(2) agreement must be signed. The contractor must comply with all applicable South African legislation (OHS Act, BCEA, NEMA, National Road Traffic Act, etc.) and Eskom standards. No specific B-BBEE level, CIDB grading, or financial turnover thresholds are stated in the provided documents. The contractor must demonstrate the process and selection criteria for appointing subcontractors and provide references/testimonials upon Eskom's request.
Technical Specifications
Source: Annexure S Occupational Health and Safety OHS Tender Returnables.pdf (unknown)Scope of work: provision of manpower, consumables, tools, and equipment for welding, general machining, and heat treatment services at Gariep Power Station, Gariep Dam, Free State. Contract duration: 5 years.
Experience & Qualifications
Source: Annexure S Occupational Health and Safety OHS Tender Returnables.pdf (unknown)Key personnel must have understanding of ISO 45001, minimum 2 years work experience, and an OHS Diploma (applicable to 3-5 year contracts).
Quality Management
Source: Annexure S Occupational Health and Safety OHS Tender Returnables.pdf (unknown)Substance abuse: Eskom enforces a zero-tolerance policy (0% alcohol/drug level). Contractors must follow Eskom's Substance Abuse Procedure 32-37, which is Life-saving Rule 4 ("Be Sober"). Alcohol testing may be conducted on site. Disputes or procedure requirements are escalated to the Eskom project manager.
Compliance Requirements
Source: Annexure S Occupational Health and Safety OHS Tender Returnables.pdf (unknown)Mandatory OHS compliance: The supplier must understand and comply with all Eskom OHS requirements listed in the tender, including but not limited to: OHS specification, Incident Management procedure 32-95, Working at Height standard 32-418, Substance Abuse procedure 32-37, Life Saving Rules 240-62196227, Risk Assessment procedure 32-520, Contractor Health and Safety Requirements 32-136, PPE standard 240-441, Emergency Planning 32-123, and PPE Compliance Memorandum. Penalties will be enforced for non-conformance. All employees must undergo Eskom induction. The main contractor must manage subcontractors: demonstrate selection criteria, notify Eskom before appointment, ensure adequate resources, monitor via audits, and deal with non-conformances directly. Eskom may request references and contact details of previous similar work. An acknowledgement form (Annexure B) must be signed confirming understanding of OHS requirements.
Health & Safety
Source: Annexure S Occupational Health and Safety OHS Tender Returnables.pdf (unknown)Mandatory OHS compliance: The supplier must comply with all listed Eskom OHS documents including OHS specification, Incident Management procedure 32-95, Working at Height standard 32-418, Substance Abuse procedure 32-37, Life Saving Rules, Risk Assessment procedure 32-520, Contractor Health and Safety Requirements 32-136, PPE standard 240-441, Emergency Planning 32-123, and PPE Compliance Memorandum. Penalties apply for non-conformance. All employees must undergo Eskom induction. PPE compliance is mandatory: employees not complying must stop work immediately and leave site. PPE must be issued free of charge. Contract custodians must include PPE standard in pricing schedules/BoQs. Contractor companies must issue PPE based on risk assessments, ensure compliance with Eskom PPE Standard, inspect PPE, provide training, and apply consequence management. Safety Department must include PPE costs in tender pricing, create awareness, and conduct audits.
Environmental
Source: Annexure S Occupational Health and Safety OHS Tender Returnables.pdf (unknown)The contractor must meet all requirements pertaining to local authorities, municipal by-laws, and environmental legislation as applicable.
Contractual Terms
Source: Annexure S Occupational Health and Safety OHS Tender Returnables.pdf (unknown)The main supplier must monitor contractors/suppliers through audits and assessments for OHS compliance during work execution. Grounds for termination of subcontractor work must be provided by the main supplier. All non-conformances by subcontractors (all tiers) are dealt with directly with the main contractor under performance and penalty processes. Eskom reserves the right to verify compliance and may request copies of testimonials/references and contact details of previous clients (including Eskom) for similar work.
Section
Source: Annexure S Occupational Health and Safety OHS Tender Returnables.pdf (unknown)The document mentions a High Risk Safety File Evaluation Checklist as part of OHS requirements, but no scoring or evaluation criteria are provided.
Contact Information
Source: Annexure L Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown){"name":"__________________________________________________________","email":null,"phone":null,"department":null,"address":null}
Submission Guidelines
Source: Annexure L Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)Returnable documents: Annexure M (E-Tendering Training Acknowledgement Form) must be fully completed and submitted to Eskom within the prescribed period. Failure to do so renders the tenderer non-responsive and disqualified.
Evaluation Criteria
Source: Annexure L Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)Submission of the fully completed E-Tendering Training Acknowledgement Form is mandatory. Failure to submit it within the prescribed period will result in disqualification.
Compliance Requirements
Source: Annexure L Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)Mandatory returnable: Annexure M (E-Tendering Training Acknowledgement Form) – tenderer must acknowledge self-training on the e-Tendering Solution (via Noddy Guide, video, or clarification meeting) and confirm ability to operate the system.
Description
Source: Invitation to Tender (ITT) Rev. 28 - Machining Welding Ass Services_Gariep.pdf (RFP)Document No
151A/3037
1.1.19 NEC or other Contract Annexure O Y
See attached
NEC3 Term
Service Contract
(Tsc)
1.1.20 Pricing Schedule/BOQ (if not contained in Contract) Annexure O Y
PDF and a copy in excel format. The upload size per
document is 500 megabytes and total submission is See attached
restricted to 4 gigabytes. NEC3 Term
Service Contract
(Tsc)
1.1.21 Technical Evaluation Strategy Annexure P Y
1.1.22 SDL&I Strategy Setting Template for Bidders Annexure Q Y
1.1.23 Quality Tender Returnables Annexure R Y
1.1.24 Occupational Health and Safety OHS Tender Annexure S Y
Returnables
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 62
File name: Invitation to Tender (ITT) Rev. 28 - 21 April 2026
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 28
Invitation to Tender/ Request Identifier
for Proposal Effective Date 07 April 2026
Review Date April 2031
1.2 Tender Data
The Tender Data makes several references to the Eskom Standard Conditions of Tender and in those
instances, the clause numbers are referenced hereunder. If the Eskom Standard Conditions of Tender are not
attached to the Invitation to Tender/Request for Proposal, then tenderers are required to download this from
www.eskom.co.za. The “Tender Data” as detailed herein shall take precedence over the Standard Conditions
of Tender in the event of any ambiguity or inconsistency between the two documents.
Clause Number from Standard
Tender Data
Conditions of Tender
1.1 Parties The Employer is Eskom Holdings SOC Ltd
The Eskom Representative
Name: Chevon Goldstone-May
Tel: 021 522 1899
E-mail: [email protected]
1.3 Tender documents The Invitation to tender number is: E3377GXPOU
See the content list above for the tender documents.
1.4 Type of Invitation to Tender This Invitation to Tender is:
1.6 Eskom's right to accept or reject The tender shall be for the whole of the contract.
any tender
2.1 Eligibility Tenderers (whether a single company or an incorporated or
unincorporated joint venture or consortium) must meet the eligibility
criteria stated in the Tender Data. The tenderer, or any of its
principals, must not be under any restriction to do business with
Eskom or State-Owned Companies.
Tenderers are ineligible to submit a tender if:
sanctions list. A tenderer shall be found to have the nationality
of a country if the tenderer is a national or is constituted,
incorporated, or registered and operates in conformity with the
provisions of the laws of that country. This criterion shall also
apply to the determination of the nationality of proposed
subcontractors or suppliers for any part of the Contract including
related services.
individually or as a partner in a joint venture (JV) or consortium,
except on an E-Tendering system where there is a limit size
(The upload size per document is 500 megabytes and total
submission is restricted to 4 gigabytes).
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 62
File name: Invitation to Tender (ITT) Rev. 28 - 21 April 2026
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 28
Invitation to Tender/ Request Identifier
for Proposal Effective Date 07 April 2026
Review Date April 2031
Clause Number from Standard
Tender Data
Conditions of Tender
JV/consortium agreement does not explicitly state that the
parties of the JV or consortium shall be jointly and severally
liable for the execution of the Contract in accordance with the
Contract terms.
found to have a conflict of interest shall be disqualified. Prima
facie evidence that a tenderer has a conflict of interest with one
or more parties in this [tendering/RFP] process is:
(a) they have a controlling partner or majority shareholder in
common; or
(b) they have a relationship with each other, directly or through
common third parties, that puts them in a position to have
access to information about or influence on the tender of
another tenderer, or to influence the decisions of the
Employer regarding this bidding process;
Eskom will disqualify tenderers that are found not to have met
the eligibility criteria.
2.2 - 2.5 Tender Closing The deadline for Tender submission is:
Date 14 September 2026
Time 10h00
Late Tenders will not be accepted.
Tenders are uploaded via Eskom Tender bulletin site on the
Eskom E- tendering .7 - 2.11 Submitting a tender For Electronic Tender Submissions:
The tenderer must upload the tender via Eskom Tender bulletin
site on the Eskom E- tendering page. The documents need to
be uploaded under the folders:
Technical
Commercial
Financial
Other
All documents need to be submitted in a PDF format (The
upload size per document is 500 megabytes and total
submission is restricted to 4 gigabytes).
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 62
File name: Invitation to Tender (ITT) Rev. 28 - 21 April 2026
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 28
Invitation to Tender/ Request Identifier
for Proposal Effective Date 07 April 2026
Review Date April 2031
Clause Number from Standard
Tender Data
Conditions of Tender
The price list needs to be submitted in PDF and a copy in excel
format.
No Zip/condense files can be uploaded.
No hard copy will be accepted.
If for some reason you resubmit your tender, then the latest version of
the tender submitted will only be accepted and all previous
submission/s will be null and void.
Please ensure that the submission status is indicated as complete.
Supplier Help Manual guide and video can be found on Eskom E-
Tendering .12 Tender Validity Period The tender validity period is 12 Weeks from the closing date and
time.
2.15 Site visit and/or clarification A non-compulsory clarification meeting with representatives of
meeting Eskom will take place as follows:
Date: 8 September 2026
Time: 14h00
Venue: Platform - Microsoft Teams
Link to meeting - Join the meeting now
Meeting ID - 355 407 249 896 449
Passcode - hR6cy7BF
Tenderers must confirm their intention to attend with the Eskom
Representative, stating the name, position and contact details of each
proposed attendee.
Please note that if the tender stipulates that a site/clarification meeting
is mandatory/compulsory, then tenderers must attend such meeting.
Tenderers that do not attend such mandatory/compulsory meetings
will be disqualified and will not be evaluated.
2.16 Seeking clarification The tenderer will notify Eskom of any clarifications required before the
closing time for clarification queries, which is 3 working days before
the deadline for tender submission.
2.22 Alternative tenders Alternative tenders are not allowed.
If alternative tender(s) are allowed, it may be based only on the
following criteria and subject to acceptance by Eskom:
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 62
File name: Invitation to Tender (ITT) Rev. 28 - 21 April 2026
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 28
Invitation to Tender/ Request Identifier
for Proposal Effective Date 07 April 2026
Review Date April 2031
Clause Number from Standard
Tender Data
Conditions of Tender
option clauses, acceptable to Eskom as the Employer, selected
from the NEC Engineering and Construction Contract.
2.33 Cataloguing The successful tenderer may be required to provide the cataloguing
information per item after contract award and will need to ensure that
all materials delivered to Eskom are labelled in line with Eskom’s
labelling specifications as may be stipulated by Eskom. Where
cataloguing is a requirement, the Pricing Schedule must also include
a line item for cataloguing, which tenderers are required to quote for.
Eskom will pay for the cataloguing.
2.34 Provision of Security for Not Applicable
Performance
3.4 Tender Opening For E-tendering. There will be no public opening of tenders. Tenders
will be downloaded electronically.
3.5 Tender Prices Prices will not be read-out.
3.9 Basic Compliance Basic compliance with this Invitation to Tender requires a tenderer to
meet all the following requirements:
Basic compliance for this invitation to tender are:
technical information
as at stipulated deadlines.
For E-Tendering, a tenderer’s failure to have submitted/uploaded
tender documents will render the tender non-responsive.
3.10 Mandatory tender returnables A tenderer that does not submit mandatory documents by or the
complete information required in mandatory documents by the
deadlines stipulated in the Tender Returnable section of the
respective Invitation to Tender will be deemed non-responsive.
3.13 Functionality requirements Functionality requirements are applicable
The following criteria will be applicable for this transaction under
functionality criteria:
Criteria Weight
Proof of Qualified WPS and 85%
Wpqr
Capabilities – Experience and 13%
Important Dates
Source: Invitation to Tender (ITT) Rev. 28 - Machining Welding Ass Services_Gariep.pdf (RFP)Closing date and time: 14 September 2026 at 10h00. Tender validity period: 12 weeks from closing date. Clarification meeting (non-compulsory): 8 September 2026 at 14h00–15h00 via Microsoft Teams (Meeting ID 355 407 249 896 449, Passcode hR6cy7BF). Attendance must be confirmed with the Eskom Representative. Clarification queries must be submitted 3 working days before the tender deadline.
Contact Information
Source: Invitation to Tender (ITT) Rev. 28 - Machining Welding Ass Services_Gariep.pdf (RFP)Eskom Representative: Chevon Goldstone-May, Tel 021 522 1899, Email [email protected]. Procurement Manager: Ms. Zodidi Mvume (signatory on ITT). Fraud/corruption reporting: 0800 11 2722 / [email protected].
Submission Guidelines
Source: Invitation to Tender (ITT) Rev. 28 - Machining Welding Ass Services_Gariep.pdf (RFP)Submit electronically via the Eskom E-tendering site (Eskom Tender bulletin) by 14 September 2026 at 10h00. Upload documents under folders: Technical, Commercial, Financial, Other. All documents in PDF; price list in PDF and Excel. No zip files, no hard copies. Upload limit: 500 MB per document, 4 GB total. If resubmitting, only the latest version is accepted; previous versions are null and void. Ensure submission status is marked complete. Late tenders are not accepted. Mandatory returnables (disqualifiable if missing): Annexure A Authorisation Form, Annexure B Acknowledgement Form, Annexure C Tenderer's Particulars, Annexure D Integrity Declaration, Annexure E CPA for local goods/services, Annexure G1-G4 SBD 6.2 local content declarations, Annexure H SBD 1, Annexure I SBD 6.1 Preference Points Claim, Annexure J SBD 4 Bidders Disclosure, E-tendering Help acknowledgement form, CSD registration proof. Non-disqualifiable returnables (5 working days to submit if missing): Tax Evaluation questionnaire, Employment Equity proof (if designated employer), CIDB grading proof, additional documents (ECSA/permits/licenses), financial statements if applicable. Specific Goals evidence is non-disqualifiable but scores zero if not submitted.
Evaluation Criteria
Source: Invitation to Tender (ITT) Rev. 28 - Machining Welding Ass Services_Gariep.pdf (RFP)Evaluation uses the 80/20 preferential point system (PPPFA 2022). Functionality is scored first with a minimum threshold of 70%. Functionality criteria weights: Proof of Qualified WPS and WPQR 85%, Capabilities – Experience and Quality Control 13%, Deviations 2%. Tenderers scoring below 70% on functionality are not evaluated further. Price is scored out of 80 points. Price evaluation: inclusive of VAT, corrected for arithmetical errors, excluding contingencies, adjusted for acceptable variations, NPV comparison, unconditional discounts considered, conditional discounts applied at payment. Specific Goals scored out of 20 points; failure to submit evidence results in 0 points for that goal but not disqualification. Ranking: price + specific goals scores added, highest ranked. Detailed evaluation criteria in Annexure P (Technical Evaluation Document No 151A/3037A - Table 4).
Technical Specifications
Source: Invitation to Tender (ITT) Rev. 28 - Machining Welding Ass Services_Gariep.pdf (RFP)Scope: Provision of welding, machining and associated services at Gariep Hydroelectric Power Station for 5 years. Detailed technical requirements in Annexure N (Technical Specification Document No 151A/3037) and Annexure P (Technical Evaluation Document No 151A/3037A). Quality obligations: maintain compliance with applicable ISO standards, ASME IX and/or BS EN 15614-7. Contract is NEC3 Term Service Contract (TSC).
Quality Management
Source: Invitation to Tender (ITT) Rev. 28 - Machining Welding Ass Services_Gariep.pdf (RFP)Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 62
File name: Invitation to Tender (ITT) Rev. 28 - 21 April 2026
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 28
Invitation to Tender/ Request Identifier
for Proposal Effective Date 07 April 2026
Review Date April 2031
Clause Number from Standard
Tender Data
Conditions of Tender
Deviations 2%
Total 100%
Threshold 70%
Tenderers are required to score at least 70% or more to pass
functionality.
A detailed Evaluation Criteria is attached – See Annexure P
Technical Evaluation Document No 151A/3037A -Table 4
Tenderers who do not meet the threshold for functionality scoring will
not be evaluated further.
3.15 Evaluation of Price Prices will be evaluated as follows:
schedule’
alternative tenders submitted; and
tender based on the tendered programme (if provided) and
prices, on the estimated effect of Price Adjustment Factors and
rate of exchange fluctuations (if applicable) and on other
evaluation parameters relating to uncertainty and risk, where
applicable.
purposes.
evaluation purposes but will be implemented when payment is
effected.
Prices will be scored out of 80 points
3.18 Evaluation of Specific Goals Specific goals will be scored out of 20 points in accordance with the
PPPFA.
If a tenderer fails to submit evidence of its points claim for a Specific
Goal, it will not be disqualified. However, it will be awarded 0 points
for that Specific Goal.
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 62
File name: Invitation to Tender (ITT) Rev. 28 - 21 April 2026
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 28
Invitation to Tender/ Request Identifier
for Proposal Effective Date 07 April 2026
Review Date April 2031
Clause Number from Standard
Tender Data
Conditions of Tender
3.19 Ranking of tenders Tenderers will be ranked by applying the preferential point scoring for
the 80/20 system. Eskom will add the score from Pricing and Specific
Goals together and rank the suppliers from the highest to the lowest.
3.20 Objective Criteria Objective criteria are not applicable.
3.21 Reverse e-auction Not applicable
3.22 Contractual Requirements Mandatory Contractual Requirements that must be included in all
tenders is the following: -
Proof of CSD registration
Additional Contractual Requirements that may be included if
applicable:
Valid BBB-EE
SHEQ requirements
Financial viability (submission of financial statements) /
(financial analysis is compulsory as a contractual requirement
for CIDB-related transactions from R30 000 excluding VAT);
and/or
Contractual Requirements are not evaluation criteria. They will
be assessed after the evaluation and ranking of the tenders.
Proof that the tenderer recommended for award has met the
stipulated contractual requirements must be submitted prior to
contract award.
Failure to meet stipulated Contractual Requirements by the
stipulated deadlines may result in the tenderer being regarded
as non-responsive and ineligible for contract award.
3.23 Sign form of Agreement/ The conditions of the contract are the NEC3 Term Service Contract
Contractual Conditions (TSC)
CIDB Contract skills development goals (CSDG) are applicable –
6ME at 0.25% - See Attached Annexure Q SDLI Strategy Setting
Template for Bidders:
The recommended supplier shall submit all the documentation
(Annexure A-Targeted Enterprise Declaration Affidavit;
Project Interim Report, Project Completion Report and
Declaration) that may be required as returnables after contract
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 62
File name: Invitation to Tender (ITT) Rev. 28 - 21 April 2026
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 28
Invitation to Tender/ Request Identifier
for Proposal Effective Date 07 April 2026
Review Date April 2031
Clause Number from Standard
Tender Data
Conditions of Tender
award and as stipulated by Clause 3.3 of the Standard for
Indirect Targeting for Enterprise Development through
Construction Works Contract (published in GN 1779,
Government Gazette No. April 2023)
2.24 CIDB Requirements CIDB Requirements are applicable
Mechanical Engineering Works (ME) and estimated CIDB
grading of 6ME or higher is applicable.
2.25 CIDB Requirements (where CIDB Requirements are applicable
applicable for Engineering and
Construction Works Contracts) 1. It is estimated that tenderers must have a Construction
Industry Development Board (CIDB) contractor grading of
6ME or higher
Joint ventures are eligible to submit tenders provided that: -
the CIBD.
Mechanical Engineering Works (ME) and estimated CIDB
grading of 5ME or higher is applicable of construction work;
or not lower than one level below the required grading
designation in the class of construction works under
consideration and possesses the required recognition
status;
accordance with the CIBD regulations is equal to 6ME or
higher than a contractor grading designation determined in
accordance with the sum tendered for a or ME class of
construction work or a value determined in accordance with
Regulations 25 (1B) or 25 (7A) of the CIBD Regulations.
[Please note that only those tenderers that are registered with
the Construction Industry Development Board or are capable of
being so registered within twenty-one (21) working days from the
closing date for submission of tenders in a contractor grading
designation as stipulated in the tender data and determined in
accordance with the best estimated value of the scope of works
are eligible to submit tenders.
Eskom must, within 21 working days from date when contractors
offer to perform a construction works contract is accepted in
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 62
File name: Invitation to Tender (ITT) Rev. 28 - 21 April 2026
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 28
Invitation to Tender/ Request Identifier
for Proposal Effective Date 07 April 2026
Review Date April 2031
Clause Number from Standard
Tender Data
Conditions of Tender
writing, register and publish the award of all contracts equal to
or exceeding R10 M inclusive of VAT.]
2.26 Contract Skills Development The CSDG is applicable to this tender in terms of NEC3 Term
Goals (CSDG) is applicable Service contract and must be achieved in one of the following ways:
See detailed Annexure Q for a detailed SDL&I Strategy Setting
Template for Bidders
2.27 Contract Participation Goals Not applicable
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 62
File name: Invitation to Tender (ITT) Rev. 28 - 21 April 2026
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 28
Invitation to Tender/ Request Identifier
for Proposal Effective Date 07 April 2026
Review Date April 2031
Please note:
Tenderers are requested to bear in mind Eskom's standard payment terms as stipulated hereunder when
submitting tenders and concluding contracts with Eskom:
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
Suppliers within 30 days of receipt of undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
suppliers within 60 days of receipt of undisputed invoices.
Eskom reserves the right to negotiate with preferred bidders after a competitive bidding process or price
quotations should the tendered prices not be market-related.
Main contractors/ suppliers are discouraged from subcontracting with their subsidiary companies as this
may be interpreted as subcontracting with themselves and / or using their subsidiaries for fronting.
Where a main contractor subcontracts with a subsidiary, this must be declared in its tender documents.
A report containing a list of potential sub-contractors may be drawn by accessing the following link:
“proof of B-BBEE status level of contributor” means-
(a) the B-BBEE status level certificate issued by an authorised body or person; or
(b) a sworn affidavit as prescribed by the B-BBEE Codes of Good Practice; or
(c) any other requirement prescribed in terms of the Broad-Based Black Economic Empowerment Act
1.3 Tender returnables
The tenderer must submit the returnable set out hereunder as part of its tender at the stipulated deadline.
Note the following: -
These returnables are required to be completed, signed (if required on the returnable) and submitted with
the tender at Tender closing date and time. If not completed, signed (if required on the returnable) and/or
submitted by tender closing, the tenderer will be disqualified.
** Returnable required at Tender closing (non-disqualifiable): -
These returnables are required to be completed, signed (if required on the returnable) and submitted with
Tender at Tender closing date and time; however, if not submitted by Tender closing, or submitted with
incomplete information or without a required signature, the Procurement Practitioner will, in writing,
request the tenderer to submit the returnable within 5 working days. If the returnable is not completed,
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 62
File name: Invitation to Tender (ITT) Rev. 28 - 21 April 2026
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 28
Invitation to Tender/ Request Identifier
for Proposal Effective Date 07 April 2026
Review Date April 2031
signed if required and/or received by the Procurement Practitioner within 5 working days of the request,
the tenderer will be disqualified.
The 5 working days period does not apply to CIDB proof of grading. Refer to the returnable table the
prescribed period for CIDB proof of grading.
These returnables are required to be submitted at tender closing date and time. These returnables will
not be requested by the Procurement Practitioner. A tenderer that does not submit the required returnable
at stipulated deadline or submits an incomplete returnable; will not be disqualified but will score zero.
Returnable required prior to Contract Award.
Returnables that are mandatory for contract award must be submitted prior to award, completed if
completion is a requirement and signed if signature is a requirement.
Reference Returnable From Suppliers at at **
closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable)
to Tender Returnable Returnable Returnable
Basic Compliance Electronic copy of the tender in a PDF format. The √
price list needs to be submitted in PDF and/or a copy
in excel format (The upload size per document is 500
megabytes and total submission is restricted to 4
gigabytes)
Annexure A Authorisation Form √
Annexure B Acknowledgement Form √
Annexure C Tenderers Particulars √
Annexure D Integrity Pact Declaration form √
Annexure E CPA for local goods/services (if applicable) √
Annexure F CPA(IG) for imported goods/services (if applicable) √
Annexure G1-G4 SBD 6.2 -Declaration certificate for local production √
and content and Annexures G2,G3,G4
Annexure H SBD 1- to be completed and submitted by all √
tenderers.
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 62
File name: Invitation to Tender (ITT) Rev. 28 - 21 April 2026
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 28
Invitation to Tender/ Request Identifier
for Proposal Effective Date 07 April 2026
Review Date April 2031
Reference Returnable From Suppliers at at **
closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable)
to Tender Returnable Returnable Returnable
(applicable for all
suppliers including
Foreign suppliers)
PPPFA 2022 regulations
Annexure J SBD 4 – Bidders Disclosure √
Reverse e-auction √
training
acknowledgement
form (if applicable)
E-tendering Help √
Manual
acknowledgement
form
Additional Letter of intent to form a JV/consortium or Valid joint √
Documents required venture agreement confirming the rights and
in the event of JV: - obligations of each of the joint venture partners and
their profit-sharing ratios.
Separately written confirmation that the joint venture √
will operate as a single business entity (incorporated)
for the duration of the contract or this may be included
as an obligation within the JV agreement.
Details and confirmation of a single designated bank √
account in the name of the JV and independent of the
individual JV partners, as set out in the joint venture
agreement.
specific goals will not result in its disqualification.
The tenderer will, however, be scored zero for
Specific Goals for purposes of PPPFA scoring and
ranking.
Tax Clearance A certified copy of a tax clearance certificate is √
Certificates required from foreign tenderers (with a footprint in
South Africa but that are not registered on CSD and
have not provided a SARS pin number) and local
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 62
File name: Invitation to Tender (ITT) Rev. 28 - 21 April 2026
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 28
Invitation to Tender/ Request Identifier
for Proposal Effective Date 07 April 2026
Review Date April 2031
Reference Returnable From Suppliers at at **
closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable)
to Tender Returnable Returnable Returnable
tenderers (that have not provided their SARS e-filing
PIN number for verification by Eskom and/or their
CSD profile / CSD number).
Foreign suppliers with no footprint in South Africa must
complete the SBD1 document; however, no proof of
tax compliance is required.
Tax Evaluation Evaluation questionnaire to determine whether a √
Questionnaire (if company, close corporation (CC) or Trust is a personal
services contract service provider for purposes of PAYE
and was included as
annexure)
Compliance with To the extent that the tenderer falls within the definition √
Employment Equity of a “designated Employer” as contemplated in the
Act Employment Equity Act , the tenderer is
required to furnish the Employer with proof of
compliance with the Employment Equity Act, including
proof of submission of the Employment Equity report
to the Department of Labour. (South African tenderers
only)
CIDB (where Valid proof of the required CIDB grading designation √
applicable) for the main contractor; JV and /or sub-contractor as
may be required in the tender data at tender closing
deadline or within 21 working days from the closing
date of submission of tenders if this is agreed with the
Employer
NEC or other NEC or other Contract, completed. √
Contract
Pricing schedule Completed pricing schedule (if not already submitted √
in the NEC or other Contract).
For e-tendering the price schedule needs to be
submitted in PDF.
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 62
File name: Invitation to Tender (ITT) Rev. 28 - 21 April 2026
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 28
Invitation to Tender/ Request Identifier
for Proposal Effective Date 07 April 2026
Review Date April 2031
Reference Returnable From Suppliers at at **
closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable)
to Tender Returnable Returnable Returnable
And a copy in excel format. The upload size per √
document is 500 megabytes and total submission is
restricted to 4 gigabytes.
Additional √
documents required
(Ecsa/
SACPCMP/CVs/
permits/licenses/
specific registration
documents
(if applicable to
scope of work)
Mandatory contractual requirements
Supporting evidence
Mandatory CSD Registration (CSD number/CSD Report) √
Contractual
Proof of Qualified WPS and 85%
Wpqr
Capabilities – Experience and 13%
Quality Control
Quality The supplier will be expected to comply with supplier √
quality management specification:
Quality management specification 240-
105658000 (previously called QM58)
ISO 9001 requirements as per the relevant
Category 3 from 240-10565800
And other Eskom Holdings SOC Limited’s
Pricing Schedule
Source: Invitation to Tender (ITT) Rev. 28 - Machining Welding Ass Services_Gariep.pdf (RFP)(Tsc)
1.1.20 Pricing Schedule/BOQ (if not contained in Contract) Annexure O Y
option clauses, acceptable to Eskom as the Employer, selected
from the NEC Engineering and Construction Contract.
2.33 Cataloguing The successful tenderer may be required to provide the cataloguing
information per item after contract award and will need to ensure that
all materials delivered to Eskom are labelled in line with Eskom’s
labelling specifications as may be stipulated by Eskom. Where
cataloguing is a requirement, the Pricing Schedule must also include
a line item for cataloguing, which tenderers are required to quote for.
3.19 Ranking of tenders Tenderers will be ranked by applying the preferential point scoring for
the 80/20 system. Eskom will add the score from Pricing and Specific
Pricing schedule Completed pricing schedule (if not already submitted √
in the NEC or other Contract).
Financial Requirements
Source: Invitation to Tender (ITT) Rev. 28 - Machining Welding Ass Services_Gariep.pdf (RFP)Pricing schedule/BOQ to be submitted in PDF and Excel (Annexure O). Prices inclusive of VAT. Financial viability: submission of annual financial statements (compulsory for CIDB-related transactions from R30 000 excluding VAT). Financial statements must be of the tendering company (not parent), including signed director's report, auditor's/reviewer's/compiler's report, statement of financial position, comprehensive income, changes in equity, cash flows, notes. Public interest score and ITA34C required for South African entities not audited. For unincorporated JV/SPV, each partner must submit its own financial statements. No performance security required.
Compliance Requirements
Source: Invitation to Tender (ITT) Rev. 28 - Machining Welding Ass Services_Gariep.pdf (RFP)CSD registration: mandatory (CSD number/CSD report). Tax clearance: certified copy required from foreign tenderers without SARS PIN and local tenderers without CSD profile. B-BBEE: valid B-BBEE certificate required (contractual requirement). CIDB: contractor grading 6ME or higher (Mechanical Engineering Works). JV members must each be CIDB registered; lead partner 5ME or higher; combined grading 6ME or higher. Employment Equity: designated employers must provide proof of compliance. Local content: SBD 6.2 declarations (Annexures G1-G4) required if designated materials included. Tax Evaluation questionnaire (Annexure K) required to determine personal service provider status. CIDB Contract Skills Development Goals (CSDG) applicable: 6ME at 0.25%.
Health & Safety
Source: Invitation to Tender (ITT) Rev. 28 - Machining Welding Ass Services_Gariep.pdf (RFP)(Tsc)
1.1.21 Technical Evaluation Strategy Annexure P Y
1.1.22 SDL&I Strategy Setting Template for Bidders Annexure Q Y
1.1.23 Quality Tender Returnables Annexure R Y
1.1.24 Occupational Health and Safety OHS Tender Annexure S Y
applicable:
Valid BBB-EE
SHEQ requirements
Financial viability (submission of financial statements) /
(financial analysis is compulsory as a contractual requirement
for CIDB-related transactions from R30 000 excluding VAT);
and/or
Construction Works Contract (published in GN 1779,
Government Gazette No. April 2023)
2.24 CIDB Requirements CIDB Requirements are applicable
Mechanical Engineering Works (ME) and estimated CIDB
grading of 6ME or higher is applicable.
2.25 CIDB Requirements (where CIDB Requirements are applicable
applicable for Engineering and
Construction Works Contracts) 1. It is estimated that tenderers must have a Construction
Industry Development Board (CIDB) contractor grading of
Safety The following tender returnables are required and are √
contained in Annexure S
Annexure C 1
Annexure B - Is the acknowledgement of
form signed and submitted by the tenderer.
Occupation Health and Safety Plan- must
address the project /scope of work OHS
risk(s) and aligned with the health and safety
requirements.
Costing for Health and Safety management-
for Proposal Effective Date 07 April 2026
Review Date April 2031
Reference Returnable From Suppliers at at **
closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable)
to Tender Returnable Returnable Returnable
for OHS (the cost should be broken down not
provided as a lump sum).
Baseline OHS Risk Assessment (BRA)-
of OHS risks related to the scope of work. The
methodology used for the risk assessment
must be provided together with the BRA
Valid Letter of Good Standing (COIDA or
equivalent)
OHS policy signed by CEO - The submitted
policy must comply to OHS Act Section 7
OHS Competency- CV’s and
qualifications/certificates
for Occupational Health and Safety (OHS) Tender
for Proposal Effective Date 07 April 2026
Review Date April 2031
Reference Returnable From Suppliers at at **
closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable)
to Tender Returnable Returnable Returnable
Other safety/quality See complete list of requirements and supporting √
documents as documents for safety & quality:
required per scope Annexure S for Occupational Health and
of works Safety (OHS) Tender Returnables
Annexure R for Quality Tender Returnables
Environmental Detailed Environmental requirements are contained √
within the NEC3 TSC draft contract – Annexure O:
will need to include the identification of possible
waste streams – recyclable, general and
hazardous waste if applicable, temporary
storage and disposal options for each waste
type, and contingency plans in the case of any
environmental incident. A Safety Data Sheet
must be supplied for all chemical or hazardous
/ potentially hazardous material brought onto
site.
Environmental
Source: Invitation to Tender (ITT) Rev. 28 - Machining Welding Ass Services_Gariep.pdf (RFP) Waste management: The Contractor shall
dispose of all waste generated off-site at a
permitted waste disposal and /or recycling
facility and submit the waste records to Eskom.
satisfied that all environmental requirements
are covered.
NEC3 TSC draft contract – Annexure O
Due Latest, approved (No draft annual financial √
Contractual Terms
Source: Invitation to Tender (ITT) Rev. 28 - Machining Welding Ass Services_Gariep.pdf (RFP)sanctions list. A tenderer shall be found to have the nationality
of a country if the tenderer is a national or is constituted,
incorporated, or registered and operates in conformity with the
provisions of the laws of that country. This criterion shall also
apply to the determination of the nationality of proposed
subcontractors or suppliers for any part of the Contract including
related services.
individually or as a partner in a joint venture (JV) or consortium,
except on an E-Tendering system where there is a limit size
(The upload size per document is 500 megabytes and total
submission is restricted to 4 gigabytes).
submitting tenders and concluding contracts with Eskom:
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
Suppliers within 30 days of receipt of undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
suppliers within 60 days of receipt of undisputed invoices.
Requirements
Source: Invitation to Tender (ITT) Rev. 28 - Machining Welding Ass Services_Gariep.pdf (RFP)Eligibility criteria: Tenderers must meet eligibility criteria stated in the Tender Data. Tenderers are ineligible if: 1. They have the nationality of a country on any international sanctions list. 2. They submit more than one tender individually or as a partner in a JV/consortium, except on an E-Tendering system where there is a limit size. 3. JV/consortium agreements do not explicitly state joint and several liability. 4. They have a conflict of interest. 5. Tenders signed by non-authorised persons. 6. Restricted by National Treasury. 7. On the Tender Defaulters list. 8. Restricted by Eskom. 9. Sub-contract 100% of the Scope of Work. CIDB Requirements: Mechanical Engineering Works (ME) and estimated CIDB grading of 6ME or higher is applicable. Tenderers must have a CIDB contractor grading of 6ME or higher. Joint ventures are eligible provided every member is registered with the CIDB, the lead partner has a grading designation in ME of 5ME or higher or not lower than one level below the required grading, and the combined grading designation is equal to 6ME or higher.
Section
Source: Invitation to Tender (ITT) Rev. 28 - Machining Welding Ass Services_Gariep.pdf (RFP)1.1.9 *SBD 6.1 Preference Points Claim Form in terms of Annexure I Y
PPPFA 2022 regulations
1.1.11 Tax Evaluation questionnaire to determine whether a Annexure K Y
1.1.21 Technical Evaluation Strategy Annexure P Y
1.1.23 Quality Tender Returnables Annexure R Y
3.13 Functionality requirements Functionality requirements are applicable
functionality criteria
Quality Control
Threshold 70%
Tenderers are required to score at least 70% or more to pass
functionality.
A detailed Evaluation Criteria is attached – See Annexure P
Technical Evaluation Document No 151A/3037A -Table 4
Tenderers who do not meet the threshold for functionality scoring will
3.15 Evaluation of Price Prices will be evaluated as follows
evaluation parameters relating to uncertainty and risk, where
the 80/20 system. Eskom will add the score from Pricing and Specific
Contractual Requirements are not evaluation criteria. They will
be assessed after the evaluation and ranking of the tenders.
evaluation purposes but will be implemented when payment is
Prices will be scored out of 80 points
3.18 Evaluation of Specific Goals Specific goals will be scored out of 20 points in accordance with the
If a tenderer fails to submit evidence of its points claim for a Specific
Goal, it will not be disqualified. However, it will be awarded 0 points
Description
Source: Annexure P Technical Evaluation Strategy Document No 151A 3037A.pdf (unknown)The Gariep (GRP) Hydroelectric Power Station turbine plants necessitate specialised welding and
associated services during the Mini Overhaul (MO) outages to support the refurbishment and maintenance
of turbine components to ensure plant availability, reliability as well as production performance.
The Power Station consists of four units each with separate vertical shaft turbine plants capable of
generating 90 MW individually, operating at 136.4 rpm with a maximum net head of 62.5m. The turbine
plant generally consists of a main shaft rotating by means of water flowing through a runner of the turbine,
which turns the rotor of the generator and generate electricity to the national grid of South Africa.
Turbine mini overhaul (MO) outages, for Gariep Hydroelectric Power Station, are currently on a 6 yearly
routine, during which a limited opportunity is granted to inspect and maintain components. There will be
an open tender with the main objective of awarding the specified contract for welding and all associated
services to an experienced and technically competent service providing Contractor. The Contractor shall
execute the required welding repairs during the GRP MO outages for all units, which are currently
scheduled, and subject to possible date and duration changes, for March 2027 (GRP Unit 2), April 2027
(GRP Unit 3), June 2027 (GRP Unit 4) and July 2028 (GRP U1). The MO outages are currently limited to
25 days for GRP U2 and GRP U1, while GRP U3 and GRP U4 are currently scheduled for 31 days.
This document lays out the strategy for performing the technical evaluation of the received tenders.
2.1 Scope
The works include provision of manpower, consumables, tools, equipment, quality control and associated
services, such as welding, general associated machining and heat treatment, by the Contractor during the
planned MO outages, to perform the specified welding according to the applicable codes, standards and
Employer’s requirements as per the Technical Specification document 151A/3037.
The works shall be implemented by the Contractor at the Employer’s site (Eskom Gariep Hydroelectric
Power Station) as well as at the Contractor’s, or sub-Contractor’s, facilities, only if required.
This document covers the different aspects that will be evaluated and scored by the Technical Evaluation
Team (TET) to identify an experienced and technically competent Contractor, and potential subContractors for associated services. A potential sub-Contractor will be scored as per the evaluation criteria
stipulated for the Contractor.
2.1.1 Purpose
The purpose of this tender technical evaluation strategy is to define the Mandatory Evaluation Criteria,
Qualitative Evaluation Criteria and TET member responsibilities for tender technical evaluation. The
technical evaluation strategy serves as basis for the tender technical evaluation process.
2.1.2 Applicability
This document applies to the Gariep Hydroelectric Power Station turbine system. The project applies to
the Turbine Engineering department, Gariep Mechanical Maintenance department, Materials Management
department, Procurement department and Outage department.
2.2 Normative/informative references
Parties using this document shall apply the most recent edition of the documents listed in the following
paragraphs.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Tender Technical Evaluation Strategy Unique Identifier: 151A/3037-A
Gariep Hydroelectric Power Station Revision: 1
Welding and Machining Page:
2.2.1 Normative
[1] Doc. No. 151A/3037: Technical Specification – GRP – 6Y MO - Welding and Machining
[2] All drawings as referenced in Doc. No. 151A/3037: Technical Specification – GRP – 6Y MO -
Welding and Machining
2.2.2 Informative
[3] 240-48929482: Tender Technical Evaluation Procedure
2.3 Definitions
2.3.1 Classification
Controlled Disclosure: Controlled Disclosure to external parties (either enforced by law, or discretionary).
2.4 Abbreviations
Abbreviation Description
ASME American Society of Mechanical Engineers
BS British Standard
BPVC Boiler and Pressure Vessel Code
Doc. No. Document Number
EN European Standard
GRP Gariep
ISO International Organisation for Standardisation
IWE International Welding Engineer
IWT International Welding Technologist
N/A Not Applicable
PMI Positive Material Identification
PSS Pumped Storage Scheme
PWHT Post Weld Heat Treatment
QCP Quality Control Plan
QMS Quality Management System
Rev. Revision
TET Technical Evaluation Team
WT Wall Thickness
WPS Welding Procedure Specification
WPQR Welding Procedure Qualification Record
2.5 Roles and responsibilities
Tender Technical Evaluation Team Members:
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Tender Technical Evaluation Strategy Unique Identifier: 151A/3037-A
Gariep Hydroelectric Power Station Revision: 1
Welding and Machining Page:
These members are responsible to study the Technical Specification, develop the Engineering Tender
Technical Evaluation Strategy as well as to review and evaluate technical aspects of the tender
documentation as per the Engineering Tender Technical Evaluation Strategy.
2.6 Process for monitoring
N/a
2.7 Related/supporting documents
All referenced documents as per Section 2.2.
3.1 Technical evaluation threshold
A weighted score-card approach is used to evaluate the technical compliance of tenders against the
technical specification. Tenders need to have a minimum weighted score of 70% to technically qualify for
further evaluation. The evaluation of the tender submission will be based on the tender’s ability to meet
the technical requirements.
Mandatory Technical Evaluation Criteria (gatekeepers) are ‘must meet’ criteria. These criteria shall not be
weighted or scored any points but shall be assessed on a Yes/No basis as to whether or not the criteria
are met. An assessment of ‘No’ against any criteria shall technically disqualify the tender and further
evaluation against the Qualitative Criteria will therefore not be performed.
Qualitative Technical Evaluation Criteria is a weighted evaluation used to identify the highest technically
ranked tender after determining that all the Mandatory Evaluation Criteria have been met. The Qualitative
Evaluation Criteria are weighted to reflect the relevant importance of each criterion. The minimum weighted
final score (threshold) required for the tender to be considered from the technical perspective is 70%.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Tender Technical Evaluation Strategy Unique Identifier: 151A/3037-A
Gariep Hydroelectric Power Station Revision: 1
Welding and Machining Page:
Table 1: Qualitative Evaluation Criteria Scoring Guideline
Score Percent (%) Definition
5 100 compliant
Meet technical requirement(s) AND;
No foreseen technical risk(s) in meeting technical
requirements.
4 80 compliant with associated qualifications
Meet technical requirement(s) with;
Acceptable technical risk(s) AND/OR;
Acceptable exceptions AND/OR;
Acceptable conditions.
2 40 non-compliant
Does not meet technical requirement(s) AND/OR;
Unacceptable technical risk(s) AND/OR;
Unacceptable exceptions AND/OR;
Unacceptable conditions.
0 0 totally deficient or non-responsive
Note 1: The scoring table does not allow for scoring of 1 and 3.
Note 2: Foreseen acceptable and unacceptable risk(s), exceptions and conditions shall be
unambiguously defined in the relevant Tender Technical Evaluation Strategy.
3.2 Tet members
Table 2: TET Members
TET number TET Member Name Designation
TET 1 Christo du Preez Pr. Eng. Senior Engineer – Turbine Engineering
TET 2 Jaco van Zyl Pr. Eng. Senior Engineer – Turbine Engineering
TET 3 Edmond Dumema Pr. Eng. Chief Engineer (Mechanical) – Peaking Asset Management
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Tender Technical Evaluation Strategy Unique Identifier: 151A/3037-A
Gariep Hydroelectric Power Station Revision: 1
Welding and Machining Page:
3.3 Mandatory technical evaluation criteria on tender closing
Table 3 defines all Mandatory Technical Evaluation Criteria to be submitted by the Contractor by the tender closing date. Should the Contractor fail to
submit these criteria by the tender closing date, the Contractor will be disqualified.
Table 3: Mandatory Technical Evaluation Criteria on Tender Closing
Mandatory Technical Criteria
Reference to Technical Specification / Tender Returnable Motivation for use of Criteria
3.3.1 N/a n/a n/a
3.4 Qualitative technical evaluation criteria
Table 4 defines all Qualitative Technical Evaluation Criteria to be submitted by the Contractor by the tender closing date. Should the Contractor fail to
submit these criteria by the tender closing date, the Contractor will score zero for the criterion not provided.
Table 4: Qualitative Technical Evaluation Criteria
Criteria
Criteria
Sub
Qualitative Technical Criteria Description Reference to Technical Specification / Tender Returnable Weighting Weighting
(%)
(%)
Relevant to sections 3.4.1.1 and 3.4.1.2:
Refer to Technical Specification Document 151A/3037.
WPS & WPQR to be authorised/signed off by IWE/IWT and
AIA; All destructive and non-destructive test results as required
by the welding code (BS EN 15614-1 or ASME IX) must be
3.4.1. Proof of qualified WPS and WPQR as per the following: submitted as proof of qualification. 85%
Multiple WPS’s and WPQR’s can be submitted, if necessary,
by the Contractor to ensure the required dimensional range is
covered.
Tender Technical Evaluation Strategy Unique Identifier: 151A/3037-A
Gariep Hydroelectric Power Station Revision: 1
Welding and Machining Page:
Criteria
Criteria Sub
Qualitative Technical Criteria Description Reference to Technical Specification / Tender Returnable Weighting Weighting
(%) (%)
Proof of qualified WPS & WPQR for Turbine Runner Scoring for group 7 material weld repairs for section3.4.1.1.
3.4.1.1:
Runner Material: JIS G5121 SCS1 (Martensitic
Refer to Technical Specification Document 151A/3037.
Stainless-Steel Casting)
Parent Material Group (ISO 15608): 7 5/5 - The Contractor provides a qualified WPS and WPQR,
Minimum Build-Up Thickness: From 3 mm including the hardness test, destructive and non-destructive
testing results and reports, for the required dimensional ranges, Maximum Build-Up Thickness: 10 mm material group and welding process as required per the
Technical Specification Document 151A/3037, qualified
according to BS EN 15614-1.
4/5 - The Contractor provides a qualified WPS and WPQR,
including the hardness testing, destructive and non-destructive
testing results and reports, for the required dimensional ranges,
material group and welding process as required per the
Technical Specification Document 151A/3037 qualified
according to ASME. Additionally, any acceptable technical
risks or technical exceptions noted by the TET members will
50% result in a 4/5.
2/5 - The Contractor provides a qualified WPS and WPQR,
including destructive and non-destructive testing results but
lacking hardness testing results, for the required dimensional
ranges, material group and welding process as required per the
Technical Specification Document 151A/3037. Additionally,
any unacceptable technical risks or technical exceptions noted
by the TET members will result in a 2/5.
0/5 - The Contractor fails to provide a relevant WPS and/or
WPQR; Or the provided WPS and/or WPQR is not authorised
and signed by the IWE/IWT and AIA; Or the WPQR does not
include any testing results.
Tender Technical Evaluation Strategy Unique Identifier: 151A/3037-A
Gariep Hydroelectric Power Station Revision: 1
Welding and Machining Page:
Criteria
Criteria
Sub
Qualitative Technical Criteria Description Reference to Technical Specification / Tender Returnable Weighting Weighting
(%)
(%)
Scoring for group 1 material weld repairs for section3.4.1.2. Proof of qualified WPS & WPQR for Spiral Casing Liner,
3.4.1.2: Stay Vanes, Draft Tube Liner and their respective
Mandoors
Refer to Technical Specification Document 151A/3037.
Spiral Casing Liner and Mandoor Material: JIS G3106
5/5 - The Contractor provides a qualified WPS and WPQR, SM50B (modified)
including the destructive, non-destructive and laboratory Stay Vanes Material: BS 968 (High Tensile Structural
testing results and reports, for the required dimensional ranges,
Steel for General Building Construction) material group and welding process as required per the
Draft Tube Liner and Mandoor Material: BS 15 (Mild Technical Specification Document 151A/3037, qualified
Steel Plate for Structural Purposes) according to BS EN 15614.
Parent Material Group (ISO 15608): 1
4/5 - The Contractor provides a qualified WPS and WPQR,
Diameters (Ø): >500 mm including the destructive, non-destructive and laboratory
Minimum Build-Up/Butt-Weld Thickness: From 3 mm testing results and reports, for the required dimensional ranges,
Maximum Build-Up/Butt-Weld Thickness: 13 mm material group and welding process as required per the
Technical Specification Document 151A/3037, qualified
according to ASME. Additionally, any acceptable technical
risks or technical exceptions noted by the TET members will 50%
result in a 4/5.
2/5 - Any unacceptable technical risks or technical exceptions
noted by the TET members will result in a 2/5.
0/5 - The Contractor fails to provide a relevant WPS and/or
WPQR; Or the provided WPS and/or WPQR is not authorised
and signed by the IWE/IWT and AIA; Or the WPQR does not
include the required testing results; Or the WPS & WPQR is not
according to the required welding processes.
Tender Technical Evaluation Strategy Unique Identifier: 151A/3037-A
Gariep Hydroelectric Power Station Revision: 1
Welding and Machining Page:
Criteria Criteria
Sub Qualitative Technical Criteria Description Reference to Technical Specification / Tender Returnable Weighting
Weighting
(%) (%)
3.4.2. Capabilities - Experience and Quality Control. 13%
Scoring for section 3.4.2.1:3.4.2.1. Previous Projects/Experience.
The Contractor submits any valid proof of at least one previous 5/5 - The Contractor submits valid proof of previous welding
done at a PSS or Hydro Electric Power Station (any PSS or project whereby the Contractor performed welding on a
Hydro Electric plant worldwide, including Eskom plants) with
pressure containing pipe or vessel (can be any Hazard PWHT on a vessel, pipe or turbine runner.
Category per SANS 347) or turbine runner. The welding
4/5 - The Contractor submits valid proof of previous welding performed can be on any material group, any dimensional
done at a PSS or Hydro Electric Power Station (any PSS or
range and with PWHT.
Hydro Electric plant worldwide, including Eskom plants), but
without PWHT on a vessel, pipe or turbine runner. Additionally,
80% any acceptable technical risks or technical exceptions noted by
the TET members will result in a 4/5.
2/5 - The Contractor submits valid proof of welding performed
that was not at a PSS or Hydro Electrical Power Station, on a
vessel, pipe or turbine runner with or without PWHT. Any
unacceptable technical risks or technical exceptions noted by
the TET members will result in a 2/5.
0/5 – Non-response. Or the welding performed was not on a
pressure containing pipe or vessel or on a turbine runner.
Scoring for section 3.4.2.2:3.4.2.2. Previous Profiling Experience
The Contractor submits any valid proof of at least one previous 5/5 - The Contractor submits valid proof of previous profiling
done on a PSS or Hydro Electric Power Station’s (any PSS or project whereby the Contractor performed profiling of a runner,
Hydro Electric plant worldwide, including Eskom plants) runner.
rotor, shaft of similar component.
4/5 - The Contractor submits valid proof of previous profiling
done on a PSS or Hydro Electric Power Station’s (any PSS or 5%
Hydro Electric plant worldwide, including Eskom plants) turbine
rotor or similar component. Additionally, any acceptable
technical risks or technical exceptions noted by the TET
members will result in a 4/5.
2/5 - The Contractor submits valid proof of previous profiling
done on a PSS or Hydro Electric Power Station’s (any PSS or
Tender Technical Evaluation Strategy Unique Identifier: 151A/3037-A
Gariep Hydroelectric Power Station Revision: 1
Welding and Machining Page:
Hydro Electric plant worldwide, including Eskom plants) vessel
or pipe where welding was performed. Any unacceptable
technical risks or technical exceptions noted by the TET
members will result in a 2/5.
0/5 – Non-response. Or the profiling performed was not on a
pressure containing pipe, vessel or on a turbine runner or rotor.
Scoring for section 3.4.2.3:3.4.2.3. Quality Control Plan.
The Contractor submits a detailed Quality Control Plan (QCP) 5/5 - The Contractor submits a detailed quality control plan
(QCP) to the Employer for acceptance as part of the tender for the Turbine Runner Blade Repairs (Item 3.2.1.3 as per
returnable documents. This QCP includes inspection, hold and
Document 151A/3037), as part of the tender returnable
witness points as listed in Document 151A/3037.
documents to the Employer for acceptance. The QCP must
include the high-level scope of work as well as intervention 4/5 - The Contractor submits a basic quality control plan (QCP)
points (including hold and witness points) indicating the quality to the Employer for acceptance as part of the tender returnable
documents. This QCP includes inspection, hold and witness 15% control planned for this project.
points as listed in Document 151A/3037. Additionally, any
acceptable technical risks or exceptions will result in a 4/5.
2/5 - The Contractor submits a basic QCP without any hold,
witness or inspection points as requested in Document
151A/3037. Additionally, any unacceptable technical risks or
exceptions will result in a 2/5.
0/5 - Non-response.
3.4.3. Deviations. Scoring for section 3.4.3:
The Contractor lists all their technical deviations from the
Refer to Technical Specification Document 151A/3037.
Technical Specification document (151A/3037). If there are
none, the Contractor must clearly indicate this in writing for the 5/5 - The Contractor indicates that they have no technical
Employer’s review, as a non-response will be evaluated as deviations.
non-responsive (Score = 0). 4/5 - The Contractor lists their technical deviations, and the
Should the Employer identify any deviations during the tender Employer identifies them to have minor impacts on the Works. 2%
technical evaluation, which the Contractor did not identify, the
2/5 - The Contractor lists their technical deviations, and the
Contractor will be score as deficient (Score = 0). Employer identifies them to have mild impacts on the Works.
0/5 - Non-response from the Contractor; Or the Contractor lists
their technical deviations, and the Employer identifies them to
have a major impact on the Works.
Tender Technical Evaluation Strategy Unique Identifier: 151A/3037-A
Gariep Hydroelectric Power Station Revision: 1
Welding and Machining Page:
Total 100% n/a
Tenderers, please take note: Please be so kind to name the technical submitted documents according to the correlating numbering system for each of
the criteria above. This is to ensure ease of evaluation and reduce the risk of missing key information during the evaluation process due to incorrect
submission. There will be no positive or negative scoring associated with this friendly request.
3.5 Mandatory technical evaluation criteria before contract award
Table 5 defines all Mandatory Technical Evaluation Criteria to be submitted by the Contractor before the contract award date. Any outstanding or unclear
information, related to the mandatory criteria specifically, identified by the Employer during the technical evaluation, shall be requested from the
Contractor by the Employer (in writing) and must be submitted by the Contractor within 5 working days from the request to the Employer for acceptance.
If the Contractor doesn’t provide the requested information within the 5 days to the Employer, the Contractor will be disqualified.
Table 5: Mandatory Technical Evaluation Criteria on Contract Award
Reference to Technical Specification / Tender
Mandatory Technical Criteria Description Motivation for use of Criteria
Important Dates
Source: Annexure P Technical Evaluation Strategy Document No 151A 3037A.pdf (unknown)Planned MO outages (subject to change): March 2027 (GRP Unit 2), April 2027 (GRP Unit 3), June 2027 (GRP Unit 4), July 2028 (GRP Unit 1). Outage durations: 25 days for GRP U2 and GRP U1; 31 days for GRP U3 and GRP U4.
Contact Information
Source: Annexure P Technical Evaluation Strategy Document No 151A 3037A.pdf (unknown)Technical Evaluation Team members: Christo du Preez (Pr. Eng., Senior Engineer – Turbine Engineering), Jaco van Zyl (Pr. Eng., Senior Engineer – Turbine Engineering), Edmond Dumema (Pr. Eng., Chief Engineer (Mechanical) – Peaking Asset Management).
Submission Guidelines
Source: Annexure P Technical Evaluation Strategy Document No 151A 3037A.pdf (unknown)Submit all required documents by the tender closing date; failure to do so results in disqualification. Mandatory technical evaluation criteria must be submitted by the closing date. Any outstanding or unclear information related to mandatory criteria before contract award must be provided within 5 working days of a written request. Returnable documents include a detailed Quality Control Plan (QCP) for acceptance by the Employer, and proof of qualified WPS and WPQR as specified.
Evaluation Criteria
Source: Annexure P Technical Evaluation Strategy Document No 151A 3037A.pdf (unknown)Technical evaluation uses a weighted score-card approach. Mandatory criteria (gatekeepers) are assessed on a Yes/No basis; a 'No' on any mandatory criterion disqualifies the tender. Qualitative criteria are weighted; the minimum weighted technical score to qualify is 70%. Scoring guideline: 5 (100%) compliant, 4 (80%) compliant with acceptable risks/exceptions, 2 (40%) non-compliant, 0 (0%) totally deficient or non-responsive. Qualitative criteria: 3.4.1 Proof of qualified WPS and WPQR (weighting 85%) – sub-criteria: 3.4.1.1 (50%) for Turbine Runner material JIS G5121 SCS1 (Group 7, build-up 3-10mm); 3.4.1.2 (50%) for Spiral Casing Liner, Stay Vanes, Draft Tube Liner and Mandoors (Group 1, diameters >500mm, thickness 3-13mm). 3.4.2 Capabilities – Experience and Quality Control (weighting 13%) – sub-criteria: 3.4.2.1 Previous Projects/Experience (80%), 3.4.2.2 Previous Profiling Experience (5%), 3.4.2.3 Quality Control Plan (15%). 3.4.3 Deviations (weighting 2%). Mandatory before award: ISO 3834-2 certification covering specified standards, welding processes (MMA 111, TIG 141), and material groups 1 and 7; if expiring within 6 months, written confirmation of renewal required. Labour broker shall not be used for specialised welding services.
Technical Specifications
Source: Annexure P Technical Evaluation Strategy Document No 151A 3037A.pdf (unknown)Specialised welding and associated services (manpower, consumables, tools, equipment, quality control) during Mini Overhaul (MO) outages at Gariep Hydroelectric Power Station. The station has four units, each generating 90 MW, operating at 136.4 rpm with a maximum net head of 62.5m. MO outages are on a 6-yearly routine. Works include welding, general associated machining and heat treatment, performed at Eskom Gariep site and possibly at Contractor's facilities. Welding must comply with codes and standards per Technical Specification 151A/3037. Specific weld repairs: Turbine Runner (material JIS G5121 SCS1, Group 7, build-up 3-10mm); Spiral Casing Liner, Stay Vanes, Draft Tube Liner and Mandoors (materials JIS G3106 SM50B, BS 968, BS 15, Group 1, diameters >500mm, thickness 3-13mm).
Experience & Qualifications
Source: Annexure P Technical Evaluation Strategy Document No 151A 3037A.pdf (unknown). Introduction ...................................................................................................................................................... 3
2.1 Scope .............................................................................................................................................................. 3
2.1.1 Purpose ..................................................................................................................................................... 3
2.1.2 Applicability................................................................................................................................................ 3
2.2 Normative/informative references .................................................................................................. 3
2.2.1 Normative .................................................................................................................................................. 4
2.2.2 Informative ................................................................................................................................................. 4
2.3 Definitions .................................................................................................................................................... 4
2.3.1 Classification ............................................................................................................................................. 4
2.4 Abbreviations .............................................................................................................................................. 4
2.5 Roles and responsibilities .................................................................................................................... 4
2.6 Process for monitoring ........................................................................................................................ 5
2.7 Related/supporting documents ......................................................................................................... 5
3.1 Technical evaluation threshold ....................................................................................................... 5
3.2 Tet members ................................................................................................................................................. 6
3.3 Mandatory technical evaluation criteria on tender closing ............................................. 7
3.4 Qualitative technical evaluation criteria .................................................................................... 7
3.5 Mandatory technical evaluation criteria on contract award ........................................ 12
3.6 Tet member responsibilities ............................................................................................................... 13
3.7 Foreseen acceptable / unacceptable qualifications............................................................. 13
3.7.1 Risks ........................................................................................................................................................ 13
3.7.2 Exceptions / Conditions ........................................................................................................................... 13
Authorisation .................................................................................................................................................. 14
Revisions ............................................................................................................................................................ 14
Development team ......................................................................................................................................... 14
Acknowledgements ...................................................................................................................................... 14
generating 90 MW individually, operating at 136.4 rpm with a maximum net head of 62.5m. The turbine
plant generally consists of a main shaft rotating by means of water flowing through a runner of the turbine,
which turns the rotor of the generator and generate electricity to the national grid of South Africa.
Turbine mini overhaul (MO) outages, for Gariep Hydroelectric Power Station, are currently on a 6 yearly
routine, during which a limited opportunity is granted to inspect and maintain components. There will be
an open tender with the main objective of awarding the specified contract for welding and all associated
services to an experienced and technically competent service providing Contractor. The Contractor shall
execute the required welding repairs during the GRP MO outages for all units, which are currently
scheduled, and subject to possible date and duration changes, for March 2027 (GRP Unit 2), April 2027
(GRP Unit 3), June 2027 (GRP Unit 4) and July 2028 (GRP U1). The MO outages are currently limited to
25 days for GRP U2 and GRP U1, while GRP U3 and GRP U4 are currently scheduled for 31 days.
Team (TET) to identify an experienced and technically competent Contractor, and potential subContractors for associated services. A potential sub-Contractor will be scored as per the evaluation criteria
stipulated for the Contractor.
2.1.1 Purpose
Table 1: Qualitative Evaluation Criteria Scoring Guideline
Score Percent (%) Definition
5 100 compliant
Meet technical requirement(s) AND;
No foreseen technical risk(s) in meeting technical
requirements.
4 80 compliant with associated qualifications
Meet technical requirement(s) with;
Acceptable technical risk(s) AND/OR;
Acceptable exceptions AND/OR;
3.6 Tet member responsibilities
Table 6: TET Member Responsibilities
Qualitative Criteria Number TET 1 TET 2 TET 3
3.4.1 X x x
3.4.2 X x x
3.4.3 X x x
Mandatory Criteria Number before Contract Award TET 1 TET 2 TET 3
3.5.1 X x x
3.7 Foreseen acceptable / unacceptable qualifications
3.7.1 Risks
Table 7: Acceptable Technical Risks (Scoring 4 out of 5)
Quality Management
Source: Annexure P Technical Evaluation Strategy Document No 151A 3037A.pdf (unknown)Quality requirements include: Proof of qualified WPS and WPQR authorised/signed by IWE/IWT and AIA, with destructive and non-destructive test results per BS EN 15614-1 or ASME IX. For Turbine Runner (Group 7, 3-10mm build-up): qualified per BS EN 15614-1 with hardness test and destructive/non-destructive results (5/5); ASME or acceptable risks (4/5); lacking hardness (2/5); no relevant WPS/WPQR (0/5). For Spiral Casing Liner, Stay Vanes, Draft Tube Liner and Mandoors (Group 1, >500mm, 3-13mm): qualified per BS EN 15614 with destructive, non-destructive and laboratory results (5/5); ASME or acceptable risks (4/5); unacceptable risks (2/5); missing results or not per required processes (0/5). A detailed Quality Control Plan (QCP) with inspection, hold and witness points must be submitted for acceptance.
Compliance Requirements
Source: Annexure P Technical Evaluation Strategy Document No 151A 3037A.pdf (unknown)ISO 3834-2 certification (Welding Quality Management System) required before contract award, covering ASME VIII and at least one of BS/PD 5500, EN 13480, EN 13445, EN 12952, and AWS D1.1; welding processes MMA (111) and TIG (141); material groups 1 and 7. If certificate expires within 6 months, written confirmation of renewal required. Labour broker shall not be used for specialised welding services.
Contractual Terms
Source: Annexure P Technical Evaluation Strategy Document No 151A 3037A.pdf (unknown)The contract covers specialised welding and associated services during planned Mini Overhaul outages at Gariep Hydroelectric Power Station. Outage dates and durations are subject to change. The Contractor must provide manpower, consumables, tools, equipment, quality control and associated services such as welding, machining and heat treatment. Works are performed at Eskom Gariep site and possibly at Contractor's facilities. The Contractor must comply with Technical Specification 151A/3037 and applicable codes and standards.
Section
Source: Annexure P Technical Evaluation Strategy Document No 151A 3037A.pdf (unknown)Title: Tender Technical Evaluation Unique Identifier: 151A/3037-A
Tender Technical Evaluation Strategy Unique Identifier: 151A/3037-A
This document lays out the strategy for performing the technical evaluation of the received tenders.
The works include provision of manpower, consumables, tools, equipment, quality control and associated
This document covers the different aspects that will be evaluated and scored by the Technical Evaluation
Team (TET) to identify an experienced and technically competent Contractor, and potential subContractors for associated services. A potential sub-Contractor will be scored as per the evaluation criteria
The purpose of this tender technical evaluation strategy is to define the Mandatory Evaluation Criteria,
Qualitative Evaluation Criteria and TET member responsibilities for tender technical evaluation. The
technical evaluation strategy serves as basis for the tender technical evaluation process.
Description
Source: Annexure K Tax Evaluation questionnaire.pdfThis PAYE Questionnaire is applicable to contractors supplying services to Eskom Holdings SOC Ltd and its subsidiaries. Contractors must complete the questionnaire to determine their tax classification (Independent Contractor, Personal Service Provider, Labour Broker, or Dependent Contractor). The contractor or its duly authorised representative must declare that all questions have been answered truthfully. The pack applies from 1 March 2026 to 28 February 2027 and is subject to changes in tax legislation.
Important Dates
Source: Annexure K Tax Evaluation questionnaire.pdf (unknown){"closingDate":"1 March 2026"}
Contact Information
Source: Annexure K Tax Evaluation questionnaire.pdf (unknown)Eskom Group Tax: [email protected]
Submission Guidelines
Source: Annexure K Tax Evaluation questionnaire.pdf (unknown)Submit the completed PAYE Questionnaire Pack, including the signed summary sheet and all required signed affidavits, to Eskom Group Tax via email at [email protected]. The pack must be completed truthfully by the contractor or its duly authorised representative. Missing or unsigned affidavits may result in PAYE being withheld from payments.
Evaluation Criteria
Source: Annexure K Tax Evaluation questionnaire.pdf (unknown)The document does not specify eligibility criteria such as CSD registration, tax clearance, B-BBEE level, CIDB grading, or financial capacity. The only criteria relate to tax classification: residency status, number of employees, connected persons, income concentration, place of work, control/supervision, and the dominant impression test. Contractors who are non-residents must sign Appendix 9 and have the pack referred to Eskom Group Tax Department. Contractors who fail to sign required affidavits or declarations will have PAYE withheld from payments.
Technical Specifications
Source: Annexure K Tax Evaluation questionnaire.pdf (unknown)The Fourth Schedule to the Income Tax Act (“the Act”) requires that Employees' Tax must be withheld from "remuneration" paid
by an "Employer" to an "Employee". This tool is intended to establish whether an Individual, Close Corporation, Company or Trust should
be classified as an Independent Contractor, Personal Service Provider, Labour Broker or a Dependent Contractor, and the tax
consequences of such classification.
This Pack is applicable ONLY to Contractors that supply Eskom Holdings SOC Ltd (“Eskom”) and its subsidiaries with services.
The Contractor or its duly authorised representative must declare that all questions have been answered truthfully.
Answering the questions will direct you to your next step.
Please note:
This Pack is based on tax legislation for the 2026/2027 tax year and is subject to change.
In the questions, any references to "you" refers to the Contractor.
In the questions, the term Contractor is used interchangeably with Individual/CC/Company/Trust.
Definitions in terms of the Act are included in Appendix 10.
Any reference to “Eskom” refers to Eskom Holdings SOC Ltd and its subsidiaries:
Eskom Rotek Industries SOC Ltd
National Transmission Company SA
Eskom Enterprises SOC Ltd
Pebble Bed Modular Reactor SOC Ltd
Escap SOC Ltd
Eskom Development Foundation NPC
Eskom Finance Company SOC Ltd
The Pack is based on legislation and case law applicable to the 2026/2027 tax year. We therefore recommend that, if it is used outside of
this period, you should first consult with your representative in Eskom to refer it to Eskom’s Group Tax Department in Megawatt Park.
Return the completed Pack; i.e. the signed summary sheet and signed affidavits to Eskom Group Tax on
Email address: [email protected].
The Contractor or its duly Authorised Representative acknowledges and accepts that:
Definitions as per the Income Tax Act, No , as amended, are listed in Appendix 10 for ease of reading;
It is responsible for accuracy and completeness of all information, which is provided in completing this Pack;
The Pack will not be automatically updated with any changes in legislation.
Disclaimer
Eskom accepts no liability whatsoever for any loss or damages whatsoever and howsoever incurred, or suffered, resulting, or arising, from
the use of this Pack.
Applicable to the 2014/2015 Tax Years
Contractor type
Supplier category
Company/Close Corporation/Trusts - EVALUATION PACK A on .
Individuals - EVALUATION PACK B on .
Applicable to the 2014/2015 Tax Years
Evaluation pack a
(To determine whether a Company, Close Corporation (CC) or Trust is a Personal Service Provider)
Fields marked with an Asterisk (*) must be completed
Contractor’s details for a company or close corporation or trust
Contractor’s Name* Vendor No
Duly Authorised Representative Full Names Representative Surname
Capacity Representative ID* (Press Enter after typing)
Representative Passport No. (if no RSA ID) Country of Passport Issue
VAT Registration No. Income Tax Registration No.*
CO/CC/Trust Registration No.* E-Mail Address
Telephone Number* Fax Number
Contractor’s Physical Business Address*
Unit No
Complex Name
Street Number
Street Name
Suburb
City/Town
Postal Code
Contractor’s Postal Business Address*
Same as above (Mark with an X)
Address TYPE (Delete where not applicable) P O Box /Private Bag/Street
P O Box /Private Bag/Street NUMBER
Street Name
Suburb
Town
Postal Code
Contractor’s Bank Details*
Account Number (Press Enter after typing) Bank Name
Branch Name Branch Number (Press Enter after typing)
Name of Account Holder Account Type (Delete where not applicable)
Current/Savings/Transmission/Credit Card/Bond Account
Account Holder Relationship*
i.e. own, joint or 3rd party (Delete not applicable) Own/Joint/3rd Party
Applicable to the 2014/2015 Tax Years
Please answer the following questions by marking the appropriate column with an
"X".
The term “You” will refer to the Company/CC/Trust in this Questionnaire.
Yes No
Question 1(i)
Are you a Resident of the Republic of South Africa in terms of the Income Tax Act? (Refer
to Appendix 10 for the definition of a resident).
If the answer is Yes, go to Question 2(i).
If the answer is No:
Eskom Group Tax Department in Megawatt Park.
Question 2(i)
Do you employ 3 (three) or more persons?
If the answer is Yes, go to Question 2(ii).
If the answer is No, go to Question 3(i).
Question 2(ii)
Are these employees employed:
On a full time basis; and
Are they engaged in the business of the Company/CC/Trust?
If the answer is Yes, go to Question 2(iii).
If the answer is No, go to Question 3(i).
Question 2(iii)
Are the above 3 employees connected to the shareholders or the members or the
beneficiaries of the Company/CC/Trust?
If the answer is Yes, go to Question 3(i).
If the answer is No:
payments.
your payments.
Corporation/Trust” at the end of the Evaluation Pack.
Applicable to the 2014/2015 Tax Years
Question 3(i)
Will/are any person who is a Connected person in relation to the Company/CC/Trust render
services personally to Eskom on behalf of the Company/CC/Trust? (Refer to Appendix 10
for the definition of a connected person).
If the answer is Yes, go to Question 4(i).
If the answer is No:
payments.
your payments.
Corporation/Trust” at the end of the evaluation Pack.
Question 4(i)
During the current year of assessment:
directly or indirectly, from:·
definition of an Associated institution)
If the answer is Yes:
Sign Appendix 7. PAYE will be withheld from your payments.
Go to Question 6(i) to determine the correct disclosure code on the IRP5.
Sign “Particulars of person acting as representative of the Company/Close
Corporation/Trust” at the end of the evaluation Pack.
If the answer is No:
payments.
Question 5(i)
Must your duties be performed /are your duties performed mainly (more than 50%) at the
premises of Eskom,
And
Will you be /are you subject to Eskom’s control or supervision as to the manner in which
your duties are performed or to the hours of work?
If the answer is Yes to BOTH questions:
Sign Appendix 7. PAYE will be withheld from your payments.
Corporation/Trust” at the end of the Evaluation Pack.
If the answer is No to ONE/BOTH questions:
payments.
Applicable to the 2014/2015 Tax Years
Question 6(i)
Do/will the payments by Eskom for services payable with reference to output or certain
agreed results, e.g. payment (be it a fixed fee or an hourly rate) be only due if and when a
specific deliverable has been completed?
Question 6(ii)
Does/Will Eskom have the contractual right to control the tools or equipment, staff, raw
materials, routines, patents or technology used in the provision of the services?
Question 6(iii)
Are you /will you be prohibited from rendering services to any other employers/clients during
the period of service to Eskom?
Question 6(iv)
Do/will you have the right to sub-contract work?
Question 6(v)
Are you personally at risk for the quality of the work done or to be done (risk for poor quality;
time over-runs, project not producing income)?
Question 6(vi)
Are you/will you or the person rendering the service be obliged to be present and perform
the work at Eskom regardless of whether work is available or not?
Question 6(vii)
Is Eskom's business or will Eskom’s business be critical to your financial/economical
survival?
Question 6(viii)
Does/will your position form part of the organisational structure?
Question 6(ix)
Does/will Eskom provide you with any of the following:
Question 6(x)
Does/will Eskom provide you with an office?
Question 6(xi)
Does/will Eskom provide you with any equipment, tools, stationery and material?
Please go to the next section to establish your tax status
Applicable to the 2014/2015 Tax Years
Summary Yes No
6(i) Independent PSP
6(ii) PSP Independent
6(iii) PSP Independent
6(iv) Independent PSP
6(v) Independent PSP
6(vi) PSP Independent
6(vii) PSP Independent
6(viii) PSP Independent
6(ix) PSP Independent
6(x) PSP Independent
6(xi) PSP Independent
Decision
Independent 0
Psp 0
If you have answered “PSP" to any of the following questions: 6(i), 6(iii), 6(v), 6(vi), 6(ix);
or
If you have answered more than 50% “PSP" to questions 6(ii), 6(iv), 6(vii), 6(viii), 6(x), 6(xi);
Methodology
Source: Annexure K Tax Evaluation questionnaire.pdf (unknown)The questionnaire includes tests to determine tax classification. For companies/CCs/trusts: residence, number of employees exclusion, services rendered by connected persons, 80% of income test, place/control/supervision test, and dominant impression test. For individuals: service or people test, people test, residence test, number of employees exclusion, place and control test, and dominant impression test. Based on answers, contractors are directed to sign appropriate appendices and may be classified as Independent Contractor, Personal Service Provider, Labour Broker, or Dependent Contractor.
Pricing Schedule
Source: Annexure K Tax Evaluation questionnaire.pdfIf the contractor provides Eskom with a valid IRP30 certificate, no Employees' tax will be withheld from payments, and an IT3(a) certificate with code 3617 will be issued. If no valid IRP30 certificate is provided, Employees' tax will be withheld at individual tax rates until a valid certificate is provided, and an IRP5 certificate with code 3617 will be issued.
Compliance Requirements
Source: Annexure K Tax Evaluation questionnaire.pdf (unknown)Complete the PAYE Questionnaire (Annexure K) to determine tax classification as Independent Contractor, Personal Service Provider, Labour Broker, or Dependent Contractor. The pack applies from 1 March 2026 to 28 February 2027 and is subject to changes in tax legislation. Contractors must provide accurate and complete information; failure to do so may result in PAYE being withheld from payments.
Contractual Terms
Source: Annexure K Tax Evaluation questionnaire.pdf (unknown)The contractor must notify Eskom of any changes to the information provided in the questionnaire. Eskom is entitled to withhold from payments any taxes, interest, and penalties it may be required to pay to SARS as a result of inaccurate information. The contractor is liable for any taxes, penalties, and interest that SARS may impose on Eskom if the contractor fails to notify Eskom of changes.
Special Conditions
Source: Annexure K Tax Evaluation questionnaire.pdf (unknown)The contractor acknowledges that it is responsible for the accuracy and completeness of all information provided in completing this Pack. The Pack will not be automatically updated with changes in legislation. Eskom accepts no liability for any loss or damages arising from the use of this Pack.
Important Dates
Source: Annexure Q SDLI Strategy Setting Template for Bidders.pdf (TENDER)Closing date: 14 September 2026 at 10:00 (from the tender record).
The document itself does not state a closing date, briefing date, site visit date, or clarification deadline.
Contact Information
Source: Annexure Q SDLI Strategy Setting Template for Bidders.pdf (TENDER)No contact information is stated in the document.
Submission Guidelines
Source: Annexure Q SDLI Strategy Setting Template for Bidders.pdf (TENDER)Returnable documents — all must be completed, signed and submitted with the tender:
Disqualification risks:
Evaluation Criteria
Source: Annexure Q SDLI Strategy Setting Template for Bidders.pdf (TENDER)Preference point system: either the 90/10 or 80/20 system applies (the document does not state which one is used for this tender).
Specific goals (B-BBEE status level) — maximum points:
Points for specific goals are added to price points; the contract is awarded to the tenderer scoring the highest total, subject to the Preferential Procurement Policy Framework Act.
Objective criteria (conditions for contract award):
SDL&I objectives (RDP goals) do not form part of scoring but commitments become contractual obligations. Tenderers who submit objectives but do not meet Eskom's targets are not disqualified.
Technical Specifications
Source: Annexure Q SDLI Strategy Setting Template for Bidders.pdf (TENDER)Scope of work: Provision of Welding, Machining and Associated Services at Gariep Hydroelectric Power Station.
Contract duration: 60 months (5 years).
CIDB Skills Development training initiative:
Financial Requirements
Source: Annexure Q SDLI Strategy Setting Template for Bidders.pdf (TENDER)Pricing format: the tender response must be separated into its components as per the Price Schedule included with the tender documents.
Local procurement content: total spending minus the imported component; Eskom target is 100%.
SDL&I performance security:
Penalty: 1.5% of Contract Value for failure to meet SDL&I obligations.
Compliance Requirements
Source: Annexure Q SDLI Strategy Setting Template for Bidders.pdf (TENDER)CSD registration: Bidders must be registered on the Central Supplier Database (CSD).
Tax clearance: Bidders must have a valid tax clearance (SARS TCS or tax pin).
B-bbee:
Local content:
CIDB:
Sworn affidavit validity requirements:
B-BBEE Requirements
Source: Annexure Q SDLI Strategy Setting Template for Bidders.pdf (TENDER)Specific goals (B-BBEE status level) — maximum points:
Documents required to claim preference points:
Tenderers failing to provide documentation are not disqualified but may only score out of 90/80 for price and 0 out of 10/20 for specific goals.
Transformation – B-BBEE Improvement or Retention Plan:
Local procurement content:
Procurement spend on designated groups:
Jobs:
Contractual Terms
Source: Annexure Q SDLI Strategy Setting Template for Bidders.pdf (TENDER)SDL&I penalty and performance security:
Reporting and monitoring:
Requirements
Source: Annexure Q SDLI Strategy Setting Template for Bidders.pdf (TENDER)Objective criteria:
Sworn affidavit validity requirements:
Section
Source: Annexure Q SDLI Strategy Setting Template for Bidders.pdfSpecific goals (B-BBEE status level) — maximum points:
Points for specific goals are added to price points; the contract is awarded to the tenderer scoring the highest total.
Tenderers failing to provide preference-point documentation are not disqualified but may only score out of 90/80 for price and 0 out of 10/20 for specific goals.
Description
Source: Annexure M E-Tendering Help Manual for Supplier Form.pdfThe document is a user manual for the Eskom eTendering system, describing how suppliers register, log in, and upload tender documents online. It replaces physical submission at Eskom offices.
Important Dates
Source: Annexure M E-Tendering Help Manual for Supplier Form.pdf (TENDER)Closing date: 2026-09-14 at 10:00 (South African time). No other dates are stated in the document.
Contact Information
Source: Annexure M E-Tendering Help Manual for Supplier Form.pdf (TENDER)For system problems, contact the buyer responsible for the published tender. No specific contact details are provided in the document.
Submission Guidelines
Source: Annexure M E-Tendering Help Manual for Supplier Form.pdf (TENDER)Bid submission is exclusively through Eskom's eTendering portal at https://eTendering.eskom.co.za.
Evaluation Criteria
Source: Annexure M E-Tendering Help Manual for Supplier Form.pdf (TENDER)Bidders must have a CSD (Central Supplier Database) number to access the eTendering system. Registration on the eTendering portal is mandatory. No other eligibility criteria are stated in the provided document.
Technical Specifications
Source: Annexure M E-Tendering Help Manual for Supplier Form.pdf (TENDER)eTendering system is a web-based system that allows suppliers bidding for various tenders advertised
on Tender Bulletin system to “upload” their tender documents. Currently the tenderers or suppliers
submit tender documents at various Eskom tender offices. eTendering system replaces the manual or
physical submission of tender documents at various Eskom tender offices. eTendering system in a
nutshell is an electronic box where tender documents can be “dropped” or “uploaded”. Suppliers will
be required to register their details before they can be granted access to the eTendering system. An
OTP (one time pin) will be sent to both their cell phone and email address.
Quick and direct access is also available by using the following links:
of the public, to view and access Eskom published tenders. eTendering hyperlink will be found
on this site. Members of the public may follow prompt instructions once they have clicked on
the eTendering link (https://eTendering.eskom.co.za). This link will allow them to upload the
required tender documentation.
members of the public, to view information about published tenders and submit their tender
documents.
eTendering system.
2 Problems
A channel of communication has been created in case users of the system experiences a problem
with the system. In a case users come across some difficulties in using Tender bulletin, eTendering
and OpenText systems they need to contact the buyer responsible for the published tender.
3 What’s New
A new functionality to “add closed tenders”. Closed tenders refers to the tenders which are not listed
on Tenderbulletin as normal tenders, but are tenders sent directly to the relevant and potential
suppliers who meet the selection and evaluation criteria to offer what the buyer needs. These
suppliers will be sent a link via email to bid privately.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
4 Getting Started
To gain access to eTendering portal
Open your web browser
Type TenderBulletin (eskom.co.za) or https://eTendering.eskom.co.za
eTendering system login page will be displayed:
Fig 1
Registration Form Steps to follow
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Plus prefix e.g +27
capture picture to validate that you
are not a robot.
click on register button
the registerer to verify the email sent to
the provided email address.
click on “Resend Verification Email”
button
on link provided on
the email.
etendering site with a login screen
displayed, now complete the login
with your verified email address and
password
Fig1.1
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig2a.
Fig2b.
Fig3.
OTP page will be displayed
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
OTP sent to the registered cellphone number and email address
Insert the otp number then click “Verify OTP” button, to resend OTP click on “Resend OTP”
button
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Landing page once OTP is verified
Select the preferred “Ref No”
A page with the preferred Tender information is displayed before tender documentation can
be submitted.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Click on “Create New Submission” button to submit required Tender documents
Landing page once clicked on “Create New Submission” button. Take note of the
mentioned disclaimers.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
To submit tender documents, click on “Add file” button
Upload required tender documents by:
Giving the file a name
Select the listed file type e.g.: Technical, commercial, finance and etc
Choose the file you need to upload
Then click on “Upload” button, Fig5.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig4.
Fig5.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Continue to submit all the required documents under the correct category ,i.e: Technical
should be selected if technical documentation is uploaded and etc. Verify all required
documents are uploaded before making ‘Final Submission’ by clicking on ‘Finalize
Submission’ button.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
all uploaded files should not exceed 900MB.
will pop-up
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
If not all documents were submitted or still wish to add or submit more documents, click on
“No, continue adding files” button.
submission and closed time and date timestamp at the bottom.
submitted tenders will be displayed.
If you want to view or verify the submitted documents, click on “View Submission” button
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
submitted documents on email,Fig6.This is the final step for the submitter or tenderer.
It is vital to save the email with the submission ID for future enquiry if need be.
--------Originalmessage--------
From:Eskom E-Tender Document Submission 28 [email protected]
Date:Tue,23Aug2022,3:42pm
Subject: Response To Submitter
Eskom E-Tender Document Submission 28
Hi Monalisa
You have finalized a new submission with submission id:14 on tender #MPKUS10086PS
closing date : 2022-11-30 10:00:00.
Have started the submission from 2022-08-23 14:28:33 and finalized at 2022-08-23
15:42:28
Tender Description:
Award for Provision of Office Cleaning and Janitorial Services at Kusile Power Station
Project
Files Submitted:
ID Original Name Title Size Type
38 Test7.pdf testingCom 33141 Commercial
40 Test1.pdf testingTech 33502 Technical
41 Test15.pdf testingFin 33141 Finance
Thanks,
Eskom E-Tender Document Submission 28 Automated Mail
© 2022 Eskom E-Tender Document Submission 28. All rights reserved.
NB: This Email and its contents are subject to the Eskom Holdings SOC Ltd EMAIL
LEGAL NOTICE which can be viewed at
http://www.eskom.co.za/Pages/Email_Legal_Spam_Disclaimer.aspx
Fig6.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
5 Edit Registration
To edit already registered information such as Name, Organization, CSD and cell phone number
select “Edit Registration” on the drop down, Fig1. New window with information that needs to be
updated pop ups,Fig2. Click on “Update” button to update registration details.
Fig1.
Fig2.
6 Log off Button
To logout, click “Log out” on the dropdown next to your name
Fig1.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
7 Password reset
To reset a forgotten password, click “Forgot your password” Fig1. and a new screen will
pop up to enter an alternative email where the new password will be sent Fig2.Confirmation
message will be sent to the user, Fig3.
Fig1.
Fig2.
Fig3.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
An email confirming password reset will be sent to the email provided.
Click on the link or “Reset Password” button to reset the password.
Fig4.
A new window will pop up to reset and confirm the new password, Fig5.Enter new
password and confirm then click on “Reset Password” button.
Fig5.
OTP window will pop up, type in the OTP sent to either the cell phone or email address.
Fig6.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
OTP successfully goes through and lands on the below screen, password is successfully
reset.
Fig7.
8 General
This system is compatible to most web browsers however we recommend Ms Edge.
The end.
© 2023 Eskom of 19
Compliance Requirements
Source: Annexure M E-Tendering Help Manual for Supplier Form.pdf (TENDER)CSD (Central Supplier Database) registration is mandatory for accessing the eTendering system and submitting a bid.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 46 of 2000
Relevant where professional engineering services or regulated engineering work may be required.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Address
Gariep Hydroelectric Power Station - Gariepdam (Gariep Dam) - Venterstad - 9798
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
10
Last checked
29 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Get deep intelligence on Services: Electrical. Unlock full pricing strategies, bid frequency, and historical win rates.
Learn how to submit a winning bid with these related articles
A technical guide to municipal electrical tenders. Covers CIDB EB/EP grading, electrification projects (INEP), substation maintenance panels, and COC compliance.
How mechanical and electrical engineers, contractors, and consultants can win public sector contracts in South Africa — HVAC, plumbing, fire systems, electrical infrastructure, ECSA registration, CIDB ME designation, and tender documentation essentials.
How small electrical contractors use Joint Ventures to combine EP grading, win Eskom and municipal infrastructure projects, and compete for renewable energy installations.
How small office supplies, stationery, and general goods suppliers use Joint Ventures to win government procurement contracts by combining inventory with B-BBEE credentials.
💡 Want more tendering tips and strategies?
Explore Our Blog