Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Issuing Organization
Eskom National Transmission Company of South AfricaLocation
Mpumalanga
Closing Date
08 Oct 2026
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Corner Jellico and Water Meyer Street - Witbank, Eskom Park - North Eastern Region - 1035
Organization Type
GOVERNMENT
Published
28 Aug 2026
OCDS Reference
ocds-9t57fa-167430
Eskom's national transmission company south africa (ntcsa) requires a service provider for hydrocarbon spill management, oil dam cleaning, and hazardous waste management across its northeast grid. Services will be called on an as-and-when basis for both emergency and normal operational conditions. The single most consequential requirement is the ability to mobilise rapidly for emergency spill response while maintaining full hazardous-waste regulatory compliance.
Closing date and time: 8 October 2026 at 10:00 (South African Standard Time).
Submission method and address: not stated in the available text.
Mandatory briefing or site visit: not stated in the available text.
Returnable forms and documents: not stated in the available text.
Eligibility thresholds (CSD, tax clearance, B-BBEE, CIDB, CIPC, professional registrations, local content): not stated in the available text.
Pricing format and any bond/guarantee/insurance requirements: not stated in the available text.
Evaluation method (price vs functionality split, 80/20 or 90/10, minimum qualifying scores): not stated in the available text.
Financial capacity or turnover requirements: not stated in the available text.
Named SCM and technical contacts and enquiry channels: not stated in the available text.
Special disqualifying conditions (local production, liquidated damages, key-personnel requirements): not stated in the available text.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Thursday, 08 October 2026 - 10:00
Venue
null
Categories
Request for Bid(Open-Tender)
Corner Jellico and Water Meyer Street - Witbank, Eskom Park - North Eastern Region - 1035
Recommended Certifications
Having these can improve your winning chances: SABS Product Certification, NRCS Certification
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Documents being finalised: BOQ.pdf, 240-126469599_Method Statement template final 18 Oct2021.docx. You don’t need to refresh — this page will pick up the updated review automatically.
28 Aug
2026
Tender Published
Tender was published
08 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
BOQ.pdf
Environmental Tender Evaluation and Scoring Card_ Hydrocarbon Spill Management.docx
Provision of hydrocarbon spill management, oil dam cleaning, and hazardous waste management services for the NTCSA Northeast Grid, on an as-and-when required basis during both emergency and normal operational conditions. The tender is issued by Eskom National Transmission Company of South Africa and closes on 8 October 2026 at 10:00.
REVISED- Technical evaluation criteria for oil dam Rev2.pdf
Provision of hydrocarbon spill management, oil dam cleaning, and hazardous waste management services for the NTCSA Northeast Grid, on an as-and-when required basis during both emergency and normal operations. The tender is issued by Eskom's National Transmission Company of South Africa.
240-105658000 Supplier Quality Management Specification (3).pdf
Eskom's National Transmission Company South Africa (NTCSA) Northeast Grid requires a contractor to provide hydrocarbon spill management, oil dam cleaning, and hazardous waste management services on an as-and-when required basis, covering both emergency and normal operational conditions. The contract will be governed by Eskom's Supplier Quality Management specification, which mandates a quality management system conforming to ISO 9001 and requires the submission of quality documentation as part of the tender.
NTCSA Non-Disclosure Agreement (NDA) Vendors_.pdf
NTCSA is procuring services for hydrocarbon spill management, oil dam cleaning, and hazardous waste management under an as-and-when-required contract for its Northeast Grid. This document is the Non-Disclosure Agreement (NDA) that bidders must sign to participate in the tender process. The NDA binds the bidder to confidentiality regarding information obtained during the tender, governed by South African law.
240-68099512 Form A_Cat 4_ Rev 9 - Spill Management, Oil Dam cleaning and Hazardous Waste Management.pdf
Provision of hydrocarbon spill management, oil dam cleaning, and hazardous waste management services for the NTCSA Northeast Grid, on an as-and-when required basis during both emergency and normal operational conditions. The tenderer must accept Eskom's Supplier Quality Requirements as per specification 240-105658000 and ISO 9001.
Annexure B-to be completed and signed.pdf
Provision of hydrocarbon spill management, oil dam cleaning, and hazardous waste management services for Eskom's Northeast Grid, on an as-and-when required basis during both emergency and normal operational conditions.
NEC Term Service Contract REV1.pdf
Eskom Holdings SOC Ltd, through the National Transmission Company South Africa (NTCSA) Northeast Grid, is procuring a three-year, as-and-when-required service for hydrocarbon spill management, oil dam cleaning, and hazardous waste management, covering emergency and normal operational conditions across specified substations. The contract is based on the NEC3 Term Service Contract (TSC3) with Option A (priced contract with price list) and includes various secondary options and additional conditions.
NEG Baseline Risk Assessment Reviewed Jan 2025.xlsx
The National Transmission Company of South Africa (NTCSA) Northeast Grid seeks a service provider for hydrocarbon spill management, oil dam cleaning, and hazardous waste management services, required on an as-and-when basis for both emergency and normal operational conditions. The contract is issued by Eskom and covers the Northeast Grid, with a closing date of 8 October 2026.
SHE Specification.pdf
Provision of hydrocarbon spill management, oil dam cleaning, and hazardous waste management services at NTCSA Northeast Grid substations, on an as-and-when required basis during both emergency and normal operational conditions. The contract is issued by Eskom National Transmission Company of South Africa and requires the successful bidder to comply with a detailed SHE specification covering legal, safety, health, and environmental obligations.
Supplier Quality Management- QM 58.pdf
Eskom is procuring hydrocarbon spill management, oil dam cleaning, and hazardous waste management services for its Northeast Grid, on an as-and-when required basis covering both emergency and normal operational conditions. The contract will be governed by Eskom's Supplier Quality Management specification, requiring bidders to comply with ISO 9001 quality management system requirements and submit quality documentation as per the tender category.
SDL&I Inputs Hydrocarbon Spill Management, Oil Dam Cleaning.pdf
Provision of hydrocarbon spill management, oil dam cleaning, and hazardous waste management services for the NTCSA Northeast Grid, on an as-and-when required basis during both emergency and normal operational conditions. The contract runs for 3 years and includes SDL&I obligations with penalties and retention.
NTCSA Non-Disclosure Agreement (NDA) Vendors_.docx
Provision of hydrocarbon spill management, oil dam cleaning, and hazardous waste management services for the NTCSA Northeast Grid, on an as-and-when required basis during both emergency and normal operational conditions.
240-12248652_List of Tender Returnables_Cat 4_ Rev 7 - Spill Management, Oil cleaning and harzadous waste management.pdf
Eskom's National Transmission Company South Africa (NTCSA) is procuring as-and-when hydrocarbon spill management, oil dam cleaning, and hazardous waste management services for its Northeast Grid, covering both emergency and normal operational conditions. The tender requires bidders to demonstrate a quality management system (QMS) compliant with ISO 9001, including documented policies, objectives, and operational controls, and to complete specified quality and administrative returnables.
240-126469599_Method Statement template final 18 Oct2021.docx
Provision of hydrocarbon spill management, oil dam cleaning, and hazardous waste management services for the National Transmission Company South Africa (NTCSA) Northeast Grid, on an as-and-when required basis during both emergency and normal operational conditions.
1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Oil dam.pdf
NTCSA is procuring as-and-when hydrocarbon spill management, oil dam cleaning, and hazardous waste management services for its Northeast Grid, covering both emergency and normal operational conditions. The contract will be awarded through an open tender, with evaluation based on functionality (minimum 70% threshold), price, and specific goals under the PPPFA 80/20 system.
eTendering_Supplier's User_Guide_v4.4.pdf
The provision of hydrocarbon spill management, oil dam cleaning, and hazardous waste management services for the National Transmission Company South Africa (NTCSA) Northeast Grid, on an as-and-when required basis during both emergency and normal operational conditions.
NTCSA Annexure 2 OHS Tender Evaluation Template-Medium Risk.pdf
Provision of hydrocarbon spill management, oil dam cleaning, and hazardous waste management services for the NTCSA Northeast Grid, on an as-and-when required basis during both emergency and normal operational conditions.
NTCSA Supplier Declaration of Interest.docx
Provision of hydrocarbon spill management, oil dam cleaning, and hazardous waste management services for the NTCSA Northeast Grid, on an as-and-when required basis during both emergency and normal operational conditions.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 373 031
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Important Dates
Source: SHE Specification.pdf (unknown){"closingDate":"06 May 2025","briefingSession":"{"date":null,"time":null,"venue":"ed work","is_compulsory":false}"}
Contact Information
Source: SHE Specification.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"drocarbon Spill Management, Oil Dam Cleaning, and Hazardous"}
Evaluation Criteria
Source: SHE Specification.pdf (unknown)Bidders must be registered on the CSD (Central Supplier Database) and have a valid tax clearance (SARS TCS or tax pin). Bidders must have a valid B-BBEE certificate or affidavit. Bidders must provide a valid Compensation Commissioner's Letter of Good Standing. Bidders must appoint a safety officer registered with SACPCMP or similar professional body. Bidders must have the necessary competencies and resources to perform the work safely. Bidders must comply with all applicable legislation, including the OHS Act and NEMA. Bidders must complete and submit all required SBD forms, including SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 8 (Declaration of Bidder's Past Supply Chain Management Practices), SBD 9 (Certificate of Independent Bid Determination), and any other forms specified in the tender document.
Technical Specifications
Source: SHE Specification.pdf (unknown)Eskom NTCSA- North East Grid responsibility and commitment is to ensure a safe working
environment is in line with its Safety, Health, Environmental and Quality Policy, along with
legislative obligations.
This SHE specification is the minimum requirements which are Eskom NTCSA- North East
Grid required to be met for the specific contract and for the duration of the contract period by
contractors and where required, the delivery organisation.
The contractor is expected to develop a SHE plan which meets these requirements as
well as all the relevant applicable legislation they conform to.
Eskom Transmission North East Grid in no way assumes the contractor’s legal
responsibilities. The contractor is and remains accountable for the quality and the
execution of his/her health and safety programme for his/her employees and appointed
contractor employees.
This SHE specification reflects minimum requirements and should not be construed as all
encompassing.
Note 1: All the requirements listed hereunder are in relation to the contract and do not
supersede or replace any organizational SHE requirements.
Where requirements listed are already in place, then the organisational requirements must be
taken cognisance of and listed in the respective SHE plans. If there are any additional Eskom
and or legislative requirements listed in the SHE specification, then these must be addressed.
2.1 Scope
This SHE specification lists the legislative and other requirements that are applicable, any
Eskom NTCSA- North East Grid requirements pertaining to Local Authorities / Municipal
bylaws / Environmental legislation that must be met by the contractor.
Public
When downloaded from the document management system, this document is uncontrolled and the
responsibility rests with the user to ensure it is in line with the authorized version on the system.
Template
240-73416879 Rev 2 Identifier
She specification
Document
The provision of Hydrocarbon Spill 240-138850942 Rev 1 Identifier
Management, Oil Dam Cleaning, and
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
Substations
2.1.1 Purpose
This document will provide a standardised approach to ensure compliance to OHS Legal and
other applicable requirements by the appointed contractor.
2.1.2 Applicability
This SHE specification is applicable to any contracting organisation who intends tendering for
the contract.
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] Basic Conditions of Employment Act No .
[2] Occupational Health and Safety Act and Regulations No .
[3] National Environmental Management Act .
[4] National Road Traffic Act .
[5] 32-37 Eskom Substance Abuse Procedure.
[6] 32-136 Contractor Health and Safety Requirements
[7] 240-62196227 Life- saving Rules
[8] 32-95 Environmental, Occupational Health and Safety Incident Management Procedure
[9] 32-727 SHEQ Policy
[10] 32- 418 Working at Heights Procedure
[11] 240-62946386 Vehicle and Driver Safety Management Procedure
[12] 32-520 Risk Assessment procedure [13] Plant Safety Regulations.
.
2.2.2 Informative
[1] Tobacco Products Control Act (Updated 2011.05.19)
Public
When downloaded from the document management system, this document is uncontrolled and the
responsibility rests with the user to ensure it is in line with the authorized version on the system.
Template
240-73416879 Rev 2 Identifier
She specification
Document
The provision of Hydrocarbon Spill 240-138850942 Rev 1 Identifier
Management, Oil Dam Cleaning, and
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
Substations
[2] SANS 1186 Symbolic Safety Signs
[3] Constitution of the Republic of South Africa No
[4] DMN 34-110 Operating A Vehicle Mounted Crane [5] DMN 34-1981 Excavations.
2.3 Definitions
Public
When downloaded from the document management system, this document is uncontrolled and the
responsibility rests with the user to ensure it is in line with the authorized version on the system.
Template
240-73416879 Rev 2 Identifier
She specification
Document
The provision of Hydrocarbon Spill 240-138850942 Rev 1 Identifier
Management, Oil Dam Cleaning, and
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
Substations
Definition Explanation
Appointed contractor Means a contractor appointed by the principal contractor
Baseline risk (32-520) baseline operational risks refer to the health and safety risks
assessment associated with all standard processes and routine activities in the business
Business unit (BU) (32-296) means any defined unit within the Eskom environment, operating as
a business under a particular cost-centre number. In the context of this
document and in terms of health and safety, any reference to a BU includes a
defined unit within any Eskom division and its subsidiaries
Client (OHS Act) Eskom representative (Internal – Asset Owner), also referred to as
the contract administrator/custodian or agent or project manager (as defined
in the contract). He/she is the person responsible for ensuring that the works
or services are executed in terms of the contract, as well as adherence to
legislation pertaining to the contract.
Competent person (OHS Act) means any person having the knowledge, training, experience,
and qualifications, specific to the work or task being performed, provided that,
where appropriate, qualifications and training are registered in terms of the
South African Qualifications Authority Act, 1995 (Act No. )
Contractor (OHS Act) means an employer as defined in section 1 of the Act who
performs contracted work and includes principal contractors
Construction work Any work in connection with
a. the construction, erection, alteration, renovation, repair, demolition or
dismantling of or addition to a building or any similar structure.
b. the construction, erection, maintenance, demolition or dismantling of any
bridge, dam, canal, road, railway, runway, sewer or water reticulation
system or the moving of earth, clearing of land, the making of excavation,
piling or any similar civil engineering structure or type of work.
Consultant means a person providing professional advice
Controlled disclosure controlled disclosure to external parties (either enforced by law or
discretionary)
Duty of care to the (32-136) anybody who causes or has caused or may cause significant
environment pollution or degradation of the environment must take reasonable measures
to prevent such pollution or degradation from occurring, continuing, or
recurring. If such harm to the environment is authorised by law or cannot
reasonably be avoided or stopped, such person must minimise and rectify
such pollution or degradation of the environment
Public
When downloaded from the document management system, this document is uncontrolled and the
responsibility rests with the user to ensure it is in line with the authorized version on the system.
Template
240-73416879 Rev 2 Identifier
She specification
Document
The provision of Hydrocarbon Spill 240-138850942 Rev 1 Identifier
Management, Oil Dam Cleaning, and
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
Substations
Definition Explanation
Employee (OHS Act) means, subject to the provisions of subsection (2), any person
who is employed by or works for an employer and who receives or is entitled
to receive any remuneration or who works under the direction or supervision
of an employer or any other person
Employer (OHS Act) means, subject to the provisions of subsection (2), any person
who employs or provides work for any person and remunerates that person
or expressly or tacitly undertakes to remunerate him/her, but excludes a TES
(ex labour broker) as defined in section 1(1) of the Labour Relations Act 1956
(Act No. )
Environment (32-94) means:
a. the land, water, and atmosphere of the earth;
b. micro-organisms and plant and animal life; and
c. any part or combination of (a) and (b) and the interrelationships among
and between them, and the physical, chemical, aesthetic, and cultural
properties and conditions of the foregoing that influence human health
and well-being
Environmental A detailed plan of action prepared to ensure that recommendations for
Management plan enhancing or ensuring positive impacts and limiting or preventing negative
environmental impacts are implemented during the life-cycle of a project.
This Environmental Management Plan should preferable form part of
Eskom’s Environmental Management System
Eskom requirements Eskom requirements flowing from directives, policies, standards, procedures,
specifications, work instructions, guidelines, or manuals
Fall protection plan (OHS Act) means a documented plan of all risks relating to working from an
elevated position, considering the nature of work undertaken, and setting out
the procedures and methods to be applied in order to eliminate the risk
Hazard (OHS Act) means a source of, or exposure to, danger
Hazard identification (OHS Act) means the identification and documenting of existing or expected
hazards to the health and safety of persons, which are normally associated
with the type of construction work being executed or to be executed
Health and safety file (OHS Act) means a file or other record in permanent form, containing the
information required in relation to the contract.
Health and safety plan (OHS Act) means a document plan that addresses hazards identified and
includes safe work procedures to mitigate, reduce, or control hazards
identified
Public
When downloaded from the document management system, this document is uncontrolled and the
responsibility rests with the user to ensure it is in line with the authorized version on the system.
Template
240-73416879 Rev 2 Identifier
She specification
Document
The provision of Hydrocarbon Spill 240-138850942 Rev 1 Identifier
Management, Oil Dam Cleaning, and
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
Substations
Definition Explanation
Health and safety (OHS Act) means a document specification of all health and safety
specification requirements pertaining to associated to a contract, so as to ensure the
health and safety of persons.
Health and safety means comprehensive health and safety requirements for a contract, project,
requirements site, and scope of work. This specification is intended to ensure the health
and safety of persons, both workers and the public, and the duty of care to
the environment. The health and safety requirements must be specific to
each contract, project, site, and scope of work
Lifesaving Rules (240-62196227) a rule that, if not adhered to, has the potential to cause
serious harm to people
Medical Certificate of (OHS Act) means a certificate valid for one year, issued by an occupational
fitness health practitioner, issued in terms of the regulations, whom shall be
registered with the Health Professions Council of South Africa
Medical surveillance (OHS Act) means a planned programme or periodic examination (which may
include clinical examinations, biological monitoring, or medical tests) of
employees by an occupational health practitioner or, in prescribed cases, by
an occupational medicine practitioner
Method statement (OHS Act) means a written document detailing the key activities to be
performed in order to reduce, as reasonably as practicable, the hazards
identified in any risk assessment
Organisation may be defined as a group of individuals (large of small) that is cooperating
under the direction of executive leadership in accomplishment of certain
common objects
Pre-job meetings (34-227) means a meeting that is held prior to the commencement of the
day’s work and that is attended by all the relevant employees associated with
the work task
Principal contractor (In the text of this document) Means an employer, as defined in section 1 of
the OHS Act, who intends to tender for or has signed a contract with Eskom
for services rendered.
Provincial director (OHS Act) means the provincial director as defined in Regulation 1 of the
General Administrative Regulations under the Act
Responsible Manager Is a Manager of a department, section or operating/business unit who has
been appointed as part of the Eskom delegation of authority process with the
aim to assist the applicable 16(2) assigned person in executing his/her duties
in terms of the Occupational Health and Safety Act
Public
When downloaded from the document management system, this document is uncontrolled and the
responsibility rests with the user to ensure it is in line with the authorized version on the system.
Template
240-73416879 Rev 2 Identifier
She specification
Document
The provision of Hydrocarbon Spill 240-138850942 Rev 1 Identifier
Management, Oil Dam Cleaning, and
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
Substations
Definition Explanation
Risk assessment (OHS Act) means a programme to determine any risk associated with any
hazard at a construction site in order to identify the steps needed to be taken
to remove, reduce, or control such hazard.
Site (34-228) means an Eskom department, unit, complex, building, specific
project, work site, or the site where agents, clients, principal contractors,
contractors, suppliers, vendors, and service providers provide a service to
Eskom, directly or indirectly
Service provider any private person or legal entity that provides any service(s) to Eskom for
compensation
Subsidiary (32-94) an enterprise controlled by another (called the parent) through the
ownership of greater than 50% of its voting stock
Supplier (32-1034)means a natural or legal person who renders a service and may
include the following current or potential supplier vendor, contractor,
consultant
Task (34-227) a segment of work that requires a set of specific and distinct actions
for its completion
Toolbox talks (34-227) where the team leader, after conducting pre-task planning, shares
all the tasks at hand and discusses task allocation, the identified risks, and
the control measures with all his/her team members on site before
commencing a specific task and documenting the agreed strategy. (This
shall be done to ensure common understanding of the tasks, risks, and
control measures required.)
The Act (OHS Act) means the Occupational Health and Safety Act No. , as
amended, and the Regulations thereto
Visitor any person visiting a workplace with the knowledge of, or under the
supervision of, an employer.
2.4 Abbreviations
Abbreviation Description
AIA Approved Inspection Authority
BU Business Unit
CE Chief Executive
CNC (Eskom) Customer Network Centre
Public
When downloaded from the document management system, this document is uncontrolled and the
responsibility rests with the user to ensure it is in line with the authorized version on the system.
Template
240-73416879 Rev 2 Identifier
She specification
Document
The provision of Hydrocarbon Spill 240-138850942 Rev 1 Identifier
Management, Oil Dam Cleaning, and
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
Substations
Abbreviation Description
AIA Approved Inspection Authority
BU Business Unit
CE Chief Executive
CR Construction Regulations of the OHS Act
COID Act Compensation for Occupational Injuries and Diseases Act
DMR Driven Machinery Regulations
DoL Department of Labour ( Inspection and Enforcement services – Provincial office)
EAP Employee Assistance Program
EP Emergency Preparedness
ERfW Environmental Regulations for Workplaces
GAR General Administrative Regulations
GSR General Safety Regulations
HCS Hazardous Chemical Substances
LDV Light Delivery Vehicle
LoG (COID) Letter of Good Standing
MSDS Material Safety Data Sheets
NEMA National Environmental Management Act
OHS Act Occupational Health and Safety Act and Regulations,
SACPCMP South African Council for the Project & Construction Management Professions
SABS South African Bureau Standard
SANS South African National Standard
NTCSA National Transmission Company of South Africa
2.6 Roles and Responsibilities
Public
When downloaded from the document management system, this document is uncontrolled and the
responsibility rests with the user to ensure it is in line with the authorized version on the system.
Template
240-73416879 Rev 2 Identifier
She specification
Document
The provision of Hydrocarbon Spill 240-138850942 Rev 1 Identifier
Management, Oil Dam Cleaning, and
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
Substations
2.6.1 Commitment
Visible commitment is essential to providing a safe work environment. Managers, supervisors
and employees at all levels must demonstrate their commitment by being proactively involved
in the day to day operations, in particular the Occupational Health and Safety aspects of any
project / contract. Legislation requires that each employee must take reasonable care of
themselves and their fellow workers, from management level down to the lowest employee
level.
2.6.2 Principal contractors and appointed contractors
Note 1: Most of the roles and responsibilities listed apply to both principal contractors and any
appointed contractors. Where some of the listed do not apply to both, then the specific
responsibilities will be listed and titled. The contractors shall:
form part of the OHS Act and Regulation 7 of the Construction Regulations.
in writing of all construction work if it falls within the scope of Regulation 4of the
Construction Regulations (if this has not been arranged and or done by the
client/agent);
their appointed contractors within their working area, as contemplated by section 37(2)
of the OHS Act;
including date of induction, relevant skills and licenses and be able to produce this list
at the request of the Eskom Project Manager.
responsibilities in terms of their appointment and that they advise and assist these
appointees in the execution of their duties.
North East Grid are complied with on all work sites.
responsible managers their full participation and cooperation.
Public
When downloaded from the document management system, this document is uncontrolled and the
responsibility rests with the user to ensure it is in line with the authorized version on the system.
Template
240-73416879 Rev 2 Identifier
She specification
Document
The provision of Hydrocarbon Spill 240-138850942 Rev 1 Identifier
Management, Oil Dam Cleaning, and
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
Substations
must be kept for each work site.
contractors files) health and safety file to the Eskom project manager on completion of
the project. This is to include all drawings, designs, lists of materials used and other
applicable information about the completed project, as well as the list of appointed
contractors, the agreement, and the type of work completed.
health and safety file to the principal contractor on completion of the project. This is to
include all drawings, designs, lists of materials used and other applicable information
about the completed project, as well as the list of appointed contractors, the agreement,
and the type of work completed.
his/her Compensation Commissioner’s valid letter of good standing before the
commencement of work and any future renewal letters obtained during the project for
record-keeping purposes. The letter of good standing shall reflect the name of the
contractor’s company. Similarly, the principal contractor must provide the Eskom
project manager with all the valid letters of good standing from their appointed
contractors.
Compensation Commissioner’s valid letter of good standing before the
commencement of work and any future renewal letters obtained during the project for
record-keeping purposes. The letter of good standing shall reflect the name of the
contractor’s company.
trained in the health and safety aspects relating to such work and that the employees
understand the hazards associated with all other work being carried out on the project.
they adhere to such procedures. Similarly (without removing the appointed contractors’
responsibilities), ensure that their appointed contractors and their employees are
conversant with all relevant work procedures and that they adhere to such procedures.
health;
Public
When downloaded from the document management system, this document is uncontrolled and the
responsibility rests with the user to ensure it is in line with the authorized version on the system.
Template
240-73416879 Rev 2 Identifier
She specification
Document
The provision of Hydrocarbon Spill 240-138850942 Rev 1 Identifier
Management, Oil Dam Cleaning, and
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
Substations
have made detailed provision for the cost of safety and health measures throughout
the project.
accordance with the health and safety plan or if such work poses a threat to the health
and safety of persons or a risk of degradation to the environment.
Take reasonable steps to ensure cooperation between all their appointed contractors.
Only appoint contractors to do work, if satisfied that the contractor has the necessary
competencies and resources to perform the work safely.
specified work throughout the contract period.
Note 2: No work may commence and or continue without the presence of the appointed project manager
or project supervisor during performance of the contracted work.
the site for which such supervisor has been appointed for.
Note 3: In determining the number of appointed competent supervisors, the nature and scope of work
being performed, shall be taken into consideration.
Note 4: If a sufficient number of competent employee(s) have been appointed to assist the construction
supervisor, the construction supervisor may supervise more than one site.
SACPCMP or similar professional body) in writing.
safety information or suspecting such information has been divulged, in the interests
of health and safety requirements;
contractor employees have transgressed any of the requirements of the health and
safety specification, safety and health plans, site rules or any other requirements.
of the public, and other contractors) present at work or in the vicinity of a construction
site against all risks that may arise from such site.
Public
When downloaded from the document management system, this document is uncontrolled and the
responsibility rests with the user to ensure it is in line with the authorized version on the system.
Template
240-73416879 Rev 2 Identifier
She specification
Document
The provision of Hydrocarbon Spill 240-138850942 Rev 1 Identifier
Management, Oil Dam Cleaning, and
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
Substations
public safety. This should be done by a competent person appointed in writing with a
view to identify hazardous and potentially hazardous work operations.
to the starting of any new task, irrespective of whether it is a repetitive task or not.
the project activity for which they are responsible.
on behalf, with the relevant sections Eskom NTCSA- North East Grid of the
documented SHE Eskom NTCSA- North East Grid Specification.
plans if they meet all the requirements.
the contract is in place and maintained.
person/man job specifications must be compiled and handed to the occupational health
practitioner.
employees. Medical assessments must be conducted by a registered Occupational
Health Practitioner. During the pre-employment medical, where employees will be
required to work at heights, they will also be required to undergo the required employee
physical and psychological fitness examinations.
the project work, as well as the appointed contractors, have received a health and
safety induction training session. Similarly, ensure that all visitors to site undergo the
site’s induction training.
their employees involved in the project work, as well as the appointed contractors, have
received task-specific training.
their employees, inspect such equipment regularly and ensure recipients of PPE are
trained in the proper use, care and where necessary, the maintenance of PPE;
Public
When downloaded from the document management system, this document is uncontrolled and the
responsibility rests with the user to ensure it is in line with the authorized version on the system.
Template
240-73416879 Rev 2 Identifier
She specification
Document
The provision of Hydrocarbon Spill 240-138850942 Rev 1 Identifier
Management, Oil Dam Cleaning, and
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
Substations
Note 5: should the principal contractor or his/her appointed contractors entertain visitors on site, they
will be held responsible for the provision and wearing PPE.
other structure as may be required. Any such structures shall be positioned and
erected in compliance with any instructions from the Eskom project manager and the
relevant site safety and fire prevention requirements;
by law rehabilitate the environment.
that where an Environment Management Plan is in place, then adhere to the plan.
activities;
the OHS Act.
on the work sites.
Note 6: Eskom will not tolerate the presence of anyone who is or who appears to be under the influence
of alcohol or any other intoxicating substance whilst performing work for them or on any work site.
respect to condition, use, care, storage, maintenance, and the management of these;
investigators.
Be involved in all of their appointed contractor’s investigations.
Establish health and safety committees, hold such committee meetings on all sites,
and ensure that appointed contractors participate in their health and safety meetings.
Chair their own health and safety committee meetings and record such meetings.
Appoint sufficient number of health and safety representatives in terms of legislative
requirements and ensure that the appointed contractors appoint health and safety
representatives for their work sites.
Public
When downloaded from the document management system, this document is uncontrolled and the
responsibility rests with the user to ensure it is in line with the authorized version on the system.
Template
240-73416879 Rev 2 Identifier
She specification
Document
The provision of Hydrocarbon Spill 240-138850942 Rev 1 Identifier
Management, Oil Dam Cleaning, and
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
Substations
obtain his/her approval prior to them commencing work.
including date of induction, relevant skills and licenses and be able to produce this list
at the request of the Eskom Project Manager.
2.6.3 Construction Managers/ Contract Managers
Note 1: No work may commence and or continue without the appointed supervisor or manager during
the performance of the contracted work.
been appointed to supervise;
training for new staff and site visitors;
procedures, before any work commences and thereafter, at such times as may be
determined by a risk assessment;
requirements are complied with on all work sites;
if such work poses a threat to the safety and health of persons or a risk of degradation
to the environment;
employees wear/use the PPE as instructed.
appointed contractors on instructions of their contractor.
procedures and that they adhere to such procedures;
risk assessments and ensure that appropriate mitigating measures have been
considered and implemented.;
and prior to the starting of any new task, irrespective of whether it is a repetitive task.
Ensure that the team are involved in the abovementioned risk assessments;
Public
When downloaded from the document management system, this document is uncontrolled and the
responsibility rests with the user to ensure it is in line with the authorized version on the system.
Template
240-73416879 Rev 2 Identifier
She specification
Document
The provision of Hydrocarbon Spill 240-138850942 Rev 1 Identifier
Management, Oil Dam Cleaning, and
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
Substations
well as confirming the requirements of the daily risk assessments;
of the public, and other contractors) present at work or in the vicinity of a construction
site against all risks that may arise from such site.
on, the premises / work sites and that no employee remains on site if he/she is under
the influence. Furthermore, report such instances to contract management;
with respect to condition, use, care, storage, maintenance, and the management of
these.
instructions for the project work, to the employees for whom they are responsible for.
information or suspecting such information has been divulged, in the interests of health
and safety requirements (reference – section 26 of the OHS Act).
damage is done to the environment and that where an Environment Management Plan
is in place, then the plan adhere to the plan.
accordance with the principal contractor’s and or appointed contractors health and
safety plan which poses a threat to the health and safety of persons.
2.6.4 Contractor Site Supervisor or Contract Supervisor
Must:
statutory and Eskom NTCSA- North East Grid project requirements;
and specifications
is in place.
results
Public
When downloaded from the document management system, this document is uncontrolled and the
responsibility rests with the user to ensure it is in line with the authorized version on the system.
Template
240-73416879 Rev 2 Identifier
She specification
Document
The provision of Hydrocarbon Spill 240-138850942 Rev 1 Identifier
Management, Oil Dam Cleaning, and
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
Substations
for the elimination of unsafe acts by all people whilst on the project site.
in the first instance and thereafter the Eskom project manager in the second instance
relating to procedure requirements, non-conformance’s identified, corrective actions,
audits and inspection schedules.
requirements;
employees.
procedures, work instructions and safety regulations issued by Eskom NTCSA- North
East Grid:
relevant inspection reports.
meetings.
to perform the tasks assigned.
appointed contractors deviate from safety requirements.
and relevant documentation.
2.6.5 Employees
Must:
Eskom NTCSA- North East Grid requirements;
training sessions, some of which are:
a. familiarising themselves with their workplaces and safety and health procedures;
b. working in a manner that does not endanger them or cause harm to others;
Public
When downloaded from the document management system, this document is uncontrolled and the
responsibility rests with the user to ensure it is in line with the authorized version on the system.
Template
240-73416879 Rev 2 Identifier
She specification
Document
The provision of Hydrocarbon Spill 240-138850942 Rev 1 Identifier
Management, Oil Dam Cleaning, and
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
Substations
c. ensuring that the work area is kept tidy;
d. reporting all incidents and near misses;
e. protecting fellow workers against injury by performing job observations;
f. reporting unsafe acts and unsafe conditions;
g. reporting any situation that may become dangerous; and
h. carrying out lawful orders and obeying safety and health rules;
regulation, immediately report this to the person concerned. If the person persists, stop
that person from working, and report the matter to contractor management and/or
Eskom’s project manager or supervisor immediately.
provided for the protection of the site or for the health and safety of persons this
includes any guarding of machinery or equipment.
routes. Where reflective jackets/bibs are required to be worn, wear them.
of the health and safety site rules, Eskom NTCSA- North East Grid requirements,
company requirements, or legislative requirements.
employees, members of the public, or visitors who may be affected by their acts and/or
omissions at work.
safety risks and measures related to the work processes.
protection or that of others.
believe that there is an imminent and serious danger to their health and safety and
have the duty to inform their supervisor immediately of such danger.
instance), and/or the Eskom NTCSA- North East Grid project manager, any
substandard acts and/or conditions that have come to their attention and that have not
been rectified or acted on by their contractor management timeously.
working conditions, to the extent of their control, over the equipment and methods of
work adopted.
of health, safety, and environmental concerns.
Public
When downloaded from the document management system, this document is uncontrolled and the
responsibility rests with the user to ensure it is in line with the authorized version on the system.
Template
240-73416879 Rev 2 Identifier
She specification
Document
The provision of Hydrocarbon Spill 240-138850942 Rev 1 Identifier
Management, Oil Dam Cleaning, and
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
Substations
instructions.
2.6.6 Contractor Health and Safety Officer
safety-related matters on the sites.
Be involved in the developing the project SHE plan and SHE policy.
Be in constant liaison and cooperate with Eskom’s NTCSA SHE professionals
responsible for providing them with a health and safety service.
submitted to any appointed contractors.
committees meetings.
accordance with the principal contractor’s and or appointed contractors health and
safety plan which poses a threat to the health and safety of persons.
on, the premises / work sites and that no employee remains on site if he/she is under
the influence. Furthermore, report such instances to contract management.
to undergo breathalyser and drug testing while entering and/or being on any work
Eskom NTCSA- North East Grid site by Eskom.
appointed contractors on instructions of their contractor;
monthly and any appointed contractors on instructions of their contractor.
2.5 Related/Supporting Documents
Eskom OHS Act section 37 (2) agreement to be signed at procurement during the signing of
the NEC contract, it is the responsibility of the project manager to ensure that the 37(2)
agreement is signed and a copy be kept in the contractor file at procurement.
Public
When downloaded from the document management system, this document is uncontrolled and the
responsibility rests with the user to ensure it is in line with the authorized version on the system.
Template
240-73416879 Rev 2 Identifier
She specification
Document
The provision of Hydrocarbon Spill 240-138850942 Rev 1 Identifier
Management, Oil Dam Cleaning, and
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
Substations
3.1 Scope of work
Hydrocarbon clean-up service
battery spillages and ensure that waste, contaminated soil, and affected materials are
disposed of in accordance with all applicable legal requirements for transporting and
disposing of hazardous waste.
absorbent materials to prevent the spread of the spill.
appropriately registered hazardous waste disposal facility.
appropriate chemicals supplied by the Contractor.
and the Employer must jointly agree on containment and clean-up methods before work
begins.
substance. Testing may only proceed after the Employer provides written approval.
approved Price List.
the clean-up, along with the Safety Data Sheets (SDS) for each chemical involved
Hazardous waste management services
Collection, classification, packaging, labelling, transportation, treatment, and safe disposal of
hazardous waste and expired chemicals. Safe recovery, handling, storage, transportation, and
disposal of ozone-depleting substances (including but not limited to CFCs, HCFCs, halons,SF6 and
other refrigerants) This includes ensuring that all waste is transported by licensed operators,
disposed of at legally permitted hazardous waste facilities, and accompanied by the required
documentation such as waste manifests, safe disposal certificates, weighbridge tickets, and
dangerous goods declarations. This also includes the thermal destruction of SF6 at an authorised
facility capable of high-temperature destruction in compliance with applicable environmental
legislation and international best practice. The provision of Hydrocarbon Spill Management, Oil
Dam Cleaning, and Waste Management Services
Public
When downloaded from the document management system, this document is uncontrolled and the
responsibility rests with the user to ensure it is in line with the authorized version on the system.
Template
240-73416879 Rev 2 Identifier
She specification
Document
The provision of Hydrocarbon Spill 240-138850942 Rev 1 Identifier
Management, Oil Dam Cleaning, and
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
Substations
For ozone depleting chemicals (ODCs):
other regulated ozone depleting substances) are handled, recovered, transported, and
disposed of only by licensed and authorised facilities.
ODCs shall be recovered or destroyed in compliance with:
The National Environmental Management: Air Quality Act: Regulations regarding the
phasing out and management of ozone depleting substances and any applicable
international environmental obligations
The Contractor shall submit the following to the Employer:
ODC recovery certificate or destruction certificate
Supporting documentation from the authorised disposal facility
Updated waste manifest reflecting ODC quantities and treatment methods
For SF6 (sulphur hexafluoride) gas:
The Contractor shall ensure that any SF6 gas (including contaminated, decomposed, or recovered
SF6 from switchgear and related equipment) is handled, recovered, transported, and disposed of
only by licensed and authorised facilities in accordance with applicable legal and other requirements
The Contractor shall submit the following to the Employer:
SF6 recovery, recycling, or destruction certificate,
Supporting documentation from the authorised disposal or recycling facility,
Updated waste manifest indicating SF6 quantities, cylinder serial numbers, and
treatment/disposal methods.
Oil dam cleanig services
Pumping out accumulated water, separate oil from water, removal of sludge and cleaning the dam
walls, transportation and safe disposal of sludge
Pumping out accumulated rainwater or contaminated water from the oil dam
Testing water before discharging it to the environment
Separating oil from water using appropriate separation methods
Removing sludge and settled residues from the bottom of the dam,
Thoroughly cleaning the dam walls to restore safe and compliant operating conditions.
Packaging, Transportation and safe disposal
Public
When downloaded from the document management system, this document is uncontrolled and the
responsibility rests with the user to ensure it is in line with the authorized version on the system.
Template
240-73416879 Rev 2 Identifier
She specification
Document
The provision of Hydrocarbon Spill 240-138850942 Rev 1 Identifier
Management, Oil Dam Cleaning, and
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
Substations
The provision of Hydrocarbon Spill Management, Oil Dam Cleaning, and Waste Management
Services Oil dams 2026
Public
When downloaded from the document management system, this document is uncontrolled and the
responsibility rests with the user to ensure it is in line with the authorized version on the system.
Template
240-73416879 Rev 2 Identifier
She specification
Document
The provision of Hydrocarbon Spill 240-138850942 Rev 1 Identifier
Management, Oil Dam Cleaning, and
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
Substations
Transportation
By-law for the transport of hazardous waste and provides the Employer with proof of such
accreditation.
for this purpose and provides the Employer with proof of such registration.
Disposal
The Contractor shall take a sample of the waste and perform a PCB analysis if there is doubt about
the PCB content level.
The Contractor shall dispose of the waste at an appropriately registered hazardous waste facility.
The Contractor shall provide the Employer with:
A copy of the disposal facility’s waste management licence,
Waste manifest,
Safe disposal certificate,
Dangerous goods declaration
Weighbridge ticket
3.2 Legal Compliance
3.2.1 Section 37(2) (Legal) Agreement
A section 37(2) agreement must be signed between NTCSA- North East Grid and the principal
contractor at the time of awarding the contract. The principal contractor must ensure that a
section 37(2) agreement is compiled between the principal contractor and all their appointed
contractors for the contract.
The original copy of the section 37(2) Agreement must be retained by the contractor and a
copy retained by the responsible project manager.
A copy of all the agreements must form part of the respective contractor’s SHE file.
3.2.2 Hazardous work by children (Child Labour)
The constitution of the Republic of South Africa, in the “Bill of Rights” is clear on the rights of
children, especially when it comes to:
being protected from exploitative labour practices;
not to be required or permitted to perform work or provide services that
Public
When downloaded from the document management system, this document is uncontrolled and the
responsibility rests with the user to ensure it is in line with the authorized version on the system.
Template
240-73416879 Rev 2 Identifier
She specification
Document
The provision of Hydrocarbon Spill 240-138850942 Rev 1 Identifier
Management, Oil Dam Cleaning, and
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
Substations
i. are inappropriate for a person of that child’s age; or
ii. place at risk the child’s well-being, education, physical or mental health or spiritual,
moral or social development;
and the Basic Conditions of Employment Act, Chapter six Section 43 “Prohibition of
employment of children”.
Before resorting to the use of child labour, due consideration must be given to the rights of the
child in terms of the constitution. Where work is being performed which is not prohibited in
terms of the constitution, then such work must be conducted in terms of the OHS Act
“Regulations on Hazardous Work by Children in South Africa” with emphasis on paragraph 2
Purpose and Interpretation. Eskom does not condone the use of child labour and therefore all
effort must be exercised and child labour should not be used.
3.2.3 OHS Act
The principal contractor and appointed contractors shall have an up to date copy of the OHS Act and
regulations which will be available to all employees.
3.2.4 Legislative compliance
All contractors will comply with all the legislation pertaining to this contract being:
The principal contractor and all appointed contractors will comply with all the legislation
pertaining to this project being (not limited to):
Rights).
Occupational Health and Safety Act 1993 (Act ) and its Regulations.
National Environmental Management Act 1998 (Act ).
Environment Conservation Act 1989 (Act ).
National Water Act 1998 (Act ).
Civil and Building Work Act.
National Road Traffic Act .
Compensation for Occupational Injures and Diseases Act.
Public
When downloaded from the document management system, this document is uncontrolled and the
responsibility rests with the user to ensure it is in line with the authorized version on the system.
Template
240-73416879 Rev 2 Identifier
She specification
Document
The provision of Hydrocarbon Spill 240-138850942 Rev 1 Identifier
Management, Oil Dam Cleaning, and
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
Substations
3.3 Eskom Requirements
All contractors shall, before commencement of the project ensure that all their employees are
familiar with the relevant Eskom NTCSA- North East Grid SHE documentation that is
applicable to contract services.
3.4 Construction Professional Registration
The principal contractor and all his/her appointed contractors shall be registered in their
respective levels as professionals in terms of the requirements of the SACPCMP or similar
professional body.
The SACPCMP web address is http://www.sacpcmp.org.za
as professionals with the SACPCMP.
Construction Managers are required to register as professionals with the SACPCMP.
Construction agents are required to register as a professional with the SACPCMP.
3.5 Notification of Construction Work
Unless otherwise contractually agreed upon, the principal contractor must notify the relevant
provincial director of the Department of Employment and Labour of the intention of carrying
out any construction work as defined in Construction Regulation 4 of the Act. The notification
form of construction work is listed as an annexure to the construction regulations of the OHS
Act. A copy of the notification letter sent to the DoEL shall be forwarded to the Project Manager
on the same day as sent to the DoEL. A copy of the letter and their approval must be kept in
the SHE file. When the DoEL provide a letter of approval, a copy of the approval must be sent
to the Eskom Project Manager and a copy filed in the SHE file.
3.6 SHE Policy
SHE policy is a statement of intent and a commitment by the organisation’s CE/CEO and
senior management in relation to the relevant SHE roles and responsibilities, the achievement
of their strategic objectives, values of integrity, customer satisfaction, excellence, and
innovation.
The principal contractor and all appointed contractors, if already not in place, will be required
to compile an organisational SHE policy in line with their SHE responsibilities. The policy must
Public
When downloaded from the document management system, this document is uncontrolled and the
responsibility rests with the user to ensure it is in line with the authorized version on the system.
Template
240-73416879 Rev 2 Identifier
She specification
Document
The provision of Hydrocarbon Spill 240-138850942 Rev 1 Identifier
Management, Oil Dam Cleaning, and
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
Substations
be signed by the organisation’s CE/CEO or the appointed assistant to the CE/CEO OHS Act
Section 16(2). The policy must be displayed in a prominent place within the workplace. A copy
of the policy must be filed in the contractor SHE files and attached as an annexure in the SHE
Plan.
subcontractors)
OHS Act Construction Regulation 9(1) - Person to Compile Risk Assessments
OHS Act Construction Regulation 10(1) - Competent Person to Compile Fall Protection
Plan
OHS Act: Pressure Equipment Regulations 11 & 12 Portable Gas Container Inspector
OHS Act: Construction Regulations 11(1) Person to Supervise Excavation Work
OHS Act: Construction Regulations 16(1) Scaffolding Supervisor
OHS Act: Construction Regulations 23(1)(d)(i) Construction Vehicle and Mobile Plant
Operator
construction sites
Construction sites
OHS Act: Construction Regulations 29(h) Firefighting Equipment Inspector
OHS Act General Safety Regulations 3(4) – First Aider/s
3.9.1 Non-statutory appointments
Eskom requirement – Emergency Planning Co-coordinator
Eskom requirement - Chairperson of Health and Safety Committee
3.10 Eskom Life-saving Rules
who performs work for Eskom in Eskom adopt the same view.
Employees, agents, consultants, and contractors. Failure to adhere to these rules by
any Eskom employee or employee of a Principal Contractor or appointed contractor
will be considered a serious transgression. These rules are being implemented to
Public
When downloaded from the document management system, this document is uncontrolled and the
responsibility rests with the user to ensure it is in line with the authorized version on the system.
Template
240-73416879 Rev 2 Identifier
She specification
Document
The provision of Hydrocarbon Spill 240-138850942 Rev 1 Identifier
Management, Oil Dam Cleaning, and
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
Substations
prevent serious injury or death of any employee, labour broker or contractor working in
any area within Eskom.
any product), then the rules shall be obeyed by any contractor and their employees.
The rules are:
Rule description of rule
Rule 1 OPEN, ISOLATE, TEST, EARTH, BOND, AND/OR INSULATE BEFORE TOUCH
( That is plant, any plant operating above 1000 V)
Rule 2 HOOK UP AT HEIGHTS
Working at height is defined as any work performed above a stable work surface or
where a person puts himself/herself in a position where he/she exposes himself/herself
to a fall from or into.
Rule 3 BUCKLE UP
No person may drive any vehicle on Eskom business and/or on Eskom premises:
Unless the driver and all passengers are wearing seat belts.
Rule 4 BE SOBER
No person is allowed to be under the influence of intoxicating liquor or drugs while on
duty
Rule 5 PERMIT TO WORK
Where an authorisation limitation exists, no person shall work without the required
permit to work.
Eskom will take a stance of zero tolerance on these rules.
Non-compliance to a Life Saving rule will be considered serious misconduct and will lead to
serious disciplinary action, which may include dismissal.
Public
When downloaded from the document management system, this document is uncontrolled and the
responsibility rests with the user to ensure it is in line with the authorized version on the system.
Quality Management
Source: SHE Specification.pdf (unknown)DoL Department of Labour ( Inspection and Enforcement services – Provincial office)
in the first instance and thereafter the Eskom project manager in the second instance
relating to procedure requirements, non-conformance’s identified, corrective actions,
audits and inspection schedules.
relevant inspection reports.
to undergo breathalyser and drug testing while entering and/or being on any work
walls, transportation and safe disposal of sludge
Pumping out accumulated rainwater or contaminated water from the oil dam
Testing water before discharging it to the environment
Separating oil from water using appropriate separation methods
Removing sludge and settled residues from the bottom of the dam,
Thoroughly cleaning the dam walls to restore safe and compliant operating conditions.
Packaging, Transportation and safe disposal
Compliance Requirements
Source: SHE Specification.pdf (unknown)No specific requirements found
Health & Safety
Source: SHE Specification.pdf (unknown)Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
Project Name: The provision of Hydrocarbon Spill Management, Oil Dam Cleaning, and Hazardous
NTCSA Contract’s Manager NTCSA Health and Safety Manager
Name: Tovhowani Tshikomba Name: Thandi Magagula
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
. Introduction .................................................................................................................... 5
2.1 Scope .......................................................................................................................... 6
2.1.1 Purpose ................................................................................................................ 7
2.1.2 Applicability ........................................................................................................... 7
2.2 Normative/Informative References............................................................................... 7
2.2.1 Normative.............................................................................................................. 7
2.2.2 Informative ............................................................................................................ 8
2.3 Definitions .................................................................................................................... 9
2.4 Abbreviations ............................................................................................................. 13
2.6 Roles and Responsibilities ......................................................................................... 15
2.4.1 Commitment ...........................................................................................................
2.5 Related/Supporting Documents ................................................................................. 25
3.1 Scope of work ............................................................................................................ 25
3.2 Legal Compliance ...................................................................................................... 26
3.2.1 Section 37(2) (Legal) Agreement ........................................................................ 26
3.2.2 Hazardous work by children (Child Labour) ......................................................... 26
3.3 Eskom Requirements ................................................................................................ 27
3.4 Construction Professional Registration ...................................................................... 28
3.5 Notification of Construction Work ............................................................................... 28
3.6 SHE Policy ................................................................................................................28
3.8 Costing for SHE within the Project ............................................................................. 29
3.9 Statutory Appointments ............................................................................................. 29
3.10 Eskom Life-saving Rules ......................................................................................... 30
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
3.11 Substance Abuse .................................................................................................... 32
3.12 Contractor organisational Structure ......................................................................... 32
3.12.1 Principal Contractor Organogram ...................................................................... 32
3.12.2 Appointed Contractor/s Organogram ................................................................. 33
3.13 Risk assessment (refer to 32-520) ........................................................................... 33 3.14
Safe work procedures / method statements ............................................................. 34
3.15 Roof work (refer to 32- 418) ................................................................................... 34
3.16 Construction Sites ................................................................................................... 35
3.17 Fire Equipment and maintenance ............................................................................ 35
3.18 Flammable and Combustible Liquids ....................................................................... 36
3.18.1 Refuelling at the construction site ...................................................................... 36
3.19 First Aid and Equipment .......................................................................................... 37
3.19.1 Boxes and equipment........................................................................................ 37
3.20 SHE Communication Systems ................................................................................. 38
3.20.1 Statutory Health and Safety Committees ........................................................... 39
3.20.2 Non-statutory health and safety committees ...................................................... 40
3.20.3 Agenda ............................................................................................................. 40
3.20.4 Minutes and action items for all health and safety committee meetings ............. 41
3.20.5 Tool box talks / Daily team talks / pre job meetings ........................................... 42
3.21 SHE Training ........................................................................................................... 42
3.21.1 Induction training ............................................................................................... 43
3.21.2 Site specific induction training ........................................................................... 43
3.21.3 Visitors to site induction .....................................................................................43
3.21.4 General training................................................................................................. 44
3.22 Contractor Site Establishment ................................................................................. 44
3.22.1 Site roads .......................................................................................................... 44
3.22.2 Construction vehicle safety ............................................................................... 44
3.23 Housekeeping and Order ......................................................................................... 45
3.23.1 Stacking ............................................................................................................ 46
3.24 Workplace Signage and Colour Coding ................................................................... 46
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
3.25 Tools and Equipment ............................................................................................... 47
3.25.1 Hand tools ......................................................................................................... 48
3.26 Ladders ................................................................................................................... 48
3.27 Scaffolding ............................................................................................................... 49
3.28 Auditing ................................................................................................................... 49
3.28.1 Approval and compliance of principal contractor SHE plan ............................... 49
3.28.2 Eskom SHE audits ............................................................................................ 50
3.28.1 Contractor audits ............................................................................................... 50
3.29 Smoking .................................................................................................................. 50
3.30 Cellular Phones ....................................................................................................... 50
3.31 Occupational Health, Hygiene and Rehabilitation .................................................... 50
3.31.1 Medicals ............................................................................................................ 50
3.32 Working at Heights .................................................................................................. 51
3.32.1 General Requirements ...................................................................................... 51
3.33 Risk Assessments ................................................................................................... 52
3.34 Safe Work Procedures and Practices / Safe Operating ............................................ 53
3.35 Personal Protective Equipment Requirements ......................................................... 53
3.36 Incident Investigation ............................................................................................... 54
3.37 Emergency Management .........................................................................................54
3.38 Non-Conformance and Compliance ......................................................................... 54
3.39 SHE File .................................................................................................................. 55
3.40 Work Stoppage ........................................................................................................ 55
3.41 Hours of Work.......................................................................................................... 56
3.41.1 Normal work ...................................................................................................... 56
3.41.2 Night work ......................................................................................................... 56
3.41.3 Overtime ........................................................................................................... 56
3.42 Omissions from Safety and Health Requirements Specification ............................... 57
3.43 Contract Sign-Off ..................................................................................................... 57
Acceptance .................................................................................................................. 57
Revisions ..................................................................................................................... 57
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
environment is in line with its Safety, Health, Environmental and Quality Policy, along with
legislative obligations.
well as all the relevant applicable legislation they conform to.
Eskom Transmission North East Grid in no way assumes the contractor’s legal
responsibilities. The contractor is and remains accountable for the quality and the
execution of his/her health and safety programme for his/her employees and appointed
contractor employees.
encompassing.
Note 1: All the requirements listed hereunder are in relation to the contract and do not
supersede or replace any organizational SHE requirements.
taken cognisance of and listed in the respective SHE plans. If there are any additional Eskom
and or legislative requirements listed in the SHE specification, then these must be addressed.
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
following paragraphs.
2.2.1 Normative
[1] Basic Conditions of Employment Act No .
[2] Occupational Health and Safety Act and Regulations No .
[3] National Environmental Management Act .
[4] National Road Traffic Act .
[5] 32-37 Eskom Substance Abuse Procedure.
[6] 32-136 Contractor Health and Safety Requirements
[7] 240-62196227 Life- saving Rules
[8] 32-95 Environmental, Occupational Health and Safety Incident Management Procedure
[9] 32-727 SHEQ Policy
[10] 32- 418 Working at Heights Procedure
[11] 240-62946386 Vehicle and Driver Safety Management Procedure
[12] 32-520 Risk Assessment procedure [13] Plant Safety Regulations.
.
2.2.2 Informative
[1] Tobacco Products Control Act (Updated 2011.05.19)
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
[2] SANS 1186 Symbolic Safety Signs
[3] Constitution of the Republic of South Africa No
[4] DMN 34-110 Operating A Vehicle Mounted Crane [5] DMN 34-1981 Excavations.
2.3 Definitions
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
Baseline risk (32-520) baseline operational risks refer to the health and safety risks
assessment associated with all standard processes and routine activities in the business
Business unit (BU) (32-296) means any defined unit within the Eskom environment, operating as
a business under a particular cost-centre number. In the context of this
document and in terms of health and safety, any reference to a BU includes a
defined unit within any Eskom division and its subsidiaries
Client (OHS Act) Eskom representative (Internal – Asset Owner), also referred to as
the contract administrator/custodian or agent or project manager (as defined
in the contract). He/she is the person responsible for ensuring that the works
or services are executed in terms of the contract, as well as adherence to
legislation pertaining to the contract.
Competent person (OHS Act) means any person having the knowledge, training, experience,
and qualifications, specific to the work or task being performed, provided that,
where appropriate, qualifications and training are registered in terms of the
South African Qualifications Authority Act, 1995 (Act No. )
Contractor (OHS Act) means an employer as defined in section 1 of the Act who
performs contracted work and includes principal contractors
Controlled disclosure controlled disclosure to external parties (either enforced by law or
discretionary)
Duty of care to the (32-136) anybody who causes or has caused or may cause significant
environment pollution or degradation of the environment must take reasonable measures
to prevent such pollution or degradation from occurring, continuing, or
recurring. If such harm to the environment is authorised by law or cannot
reasonably be avoided or stopped, such person must minimise and rectify
such pollution or degradation of the environment
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
specifications, work instructions, guidelines, or manuals
Fall protection plan (OHS Act) means a documented plan of all risks relating to working from an
elevated position, considering the nature of work undertaken, and setting out
the procedures and methods to be applied in order to eliminate the risk
Hazard (OHS Act) means a source of, or exposure to, danger
Hazard identification (OHS Act) means the identification and documenting of existing or expected
hazards to the health and safety of persons, which are normally associated
with the type of construction work being executed or to be executed
Health and safety file (OHS Act) means a file or other record in permanent form, containing the
information required in relation to the contract.
Health and safety plan (OHS Act) means a document plan that addresses hazards identified and
includes safe work procedures to mitigate, reduce, or control hazards
identified
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
Health and safety (OHS Act) means a document specification of all health and safety
specification requirements pertaining to associated to a contract, so as to ensure the
health and safety of persons.
requirements site, and scope of work. This specification is intended to ensure the health
and safety of persons, both workers and the public, and the duty of care to
the environment. The health and safety requirements must be specific to
each contract, project, site, and scope of work
Lifesaving Rules (240-62196227) a rule that, if not adhered to, has the potential to cause
serious harm to people
Medical Certificate of (OHS Act) means a certificate valid for one year, issued by an occupational
fitness health practitioner, issued in terms of the regulations, whom shall be
registered with the Health Professions Council of South Africa
Medical surveillance (OHS Act) means a planned programme or periodic examination (which may
include clinical examinations, biological monitoring, or medical tests) of
employees by an occupational health practitioner or, in prescribed cases, by
an occupational medicine practitioner
Method statement (OHS Act) means a written document detailing the key activities to be
performed in order to reduce, as reasonably as practicable, the hazards
identified in any risk assessment
Organisation may be defined as a group of individuals (large of small) that is cooperating
under the direction of executive leadership in accomplishment of certain
common objects
Pre-job meetings (34-227) means a meeting that is held prior to the commencement of the
day’s work and that is attended by all the relevant employees associated with
the work task
Principal contractor (In the text of this document) Means an employer, as defined in section 1 of
the OHS Act, who intends to tender for or has signed a contract with Eskom
for services rendered.
Provincial director (OHS Act) means the provincial director as defined in Regulation 1 of the
been appointed as part of the Eskom delegation of authority process with the
aim to assist the applicable 16(2) assigned person in executing his/her duties
in terms of the Occupational Health and Safety Act
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
Risk assessment (OHS Act) means a programme to determine any risk associated with any
hazard at a construction site in order to identify the steps needed to be taken
to remove, reduce, or control such hazard.
Site (34-228) means an Eskom department, unit, complex, building, specific
project, work site, or the site where agents, clients, principal contractors,
contractors, suppliers, vendors, and service providers provide a service to
Service provider any private person or legal entity that provides any service(s) to Eskom for
compensation
Subsidiary (32-94) an enterprise controlled by another (called the parent) through the
ownership of greater than 50% of its voting stock
Supplier (32-1034)means a natural or legal person who renders a service and may
include the following current or potential supplier vendor, contractor,
consultant
Task (34-227) a segment of work that requires a set of specific and distinct actions
for its completion
Toolbox talks (34-227) where the team leader, after conducting pre-task planning, shares
all the tasks at hand and discusses task allocation, the identified risks, and
the control measures with all his/her team members on site before
commencing a specific task and documenting the agreed strategy. (This
shall be done to ensure common understanding of the tasks, risks, and
control measures required.)
The Act (OHS Act) means the Occupational Health and Safety Act No. , as
amended, and the Regulations thereto
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
and employees at all levels must demonstrate their commitment by being proactively involved
in the day to day operations, in particular the Occupational Health and Safety aspects of any
project / contract. Legislation requires that each employee must take reasonable care of
themselves and their fellow workers, from management level down to the lowest employee
level.
2.6.2 Principal contractors and appointed contractors
Note 1: Most of the roles and responsibilities listed apply to both principal contractors and any
appointed contractors. Where some of the listed do not apply to both, then the specific
responsibilities will be listed and titled. The contractors shall:
form part of the OHS Act and Regulation 7 of the Construction Regulations.
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
must be kept for each work site.
contractors files) health and safety file to the Eskom project manager on completion of
the project. This is to include all drawings, designs, lists of materials used and other
applicable information about the completed project, as well as the list of appointed
contractors, the agreement, and the type of work completed.
health and safety file to the principal contractor on completion of the project. This is to
include all drawings, designs, lists of materials used and other applicable information
about the completed project, as well as the list of appointed contractors, the agreement,
and the type of work completed.
trained in the health and safety aspects relating to such work and that the employees
understand the hazards associated with all other work being carried out on the project.
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
have made detailed provision for the cost of safety and health measures throughout
the project.
accordance with the health and safety plan or if such work poses a threat to the health
and safety of persons or a risk of degradation to the environment.
the site for which such supervisor has been appointed for.
Note 3: In determining the number of appointed competent supervisors, the nature and scope of work
being performed, shall be taken into consideration.
Note 4: If a sufficient number of competent employee(s) have been appointed to assist the construction
supervisor, the construction supervisor may supervise more than one site.
SACPCMP or similar professional body) in writing.
safety information or suspecting such information has been divulged, in the interests
of health and safety requirements;
contractor employees have transgressed any of the requirements of the health and
safety specification, safety and health plans, site rules or any other requirements.
of the public, and other contractors) present at work or in the vicinity of a construction
site against all risks that may arise from such site.
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
public safety. This should be done by a competent person appointed in writing with a
view to identify hazardous and potentially hazardous work operations.
on behalf, with the relevant sections Eskom NTCSA- North East Grid of the
documented SHE Eskom NTCSA- North East Grid Specification.
plans if they meet all the requirements.
person/man job specifications must be compiled and handed to the occupational health
practitioner.
the project work, as well as the appointed contractors, have received a health and
safety induction training session. Similarly, ensure that all visitors to site undergo the
site’s induction training.
their employees involved in the project work, as well as the appointed contractors, have
received task-specific training.
their employees, inspect such equipment regularly and ensure recipients of PPE are
trained in the proper use, care and where necessary, the maintenance of PPE;
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
Note 5: should the principal contractor or his/her appointed contractors entertain visitors on site, they
will be held responsible for the provision and wearing PPE.
other structure as may be required. Any such structures shall be positioned and
erected in compliance with any instructions from the Eskom project manager and the
relevant site safety and fire prevention requirements;
on the work sites.
Note 6: Eskom will not tolerate the presence of anyone who is or who appears to be under the influence
of alcohol or any other intoxicating substance whilst performing work for them or on any work site.
and ensure that appointed contractors participate in their health and safety meetings.
requirements and ensure that the appointed contractors appoint health and safety
representatives for their work sites.
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
procedures, before any work commences and thereafter, at such times as may be
determined by a risk assessment;
if such work poses a threat to the safety and health of persons or a risk of degradation
to the environment;
employees wear/use the PPE as instructed.
risk assessments and ensure that appropriate mitigating measures have been
considered and implemented.;
and prior to the starting of any new task, irrespective of whether it is a repetitive task.
Ensure that the team are involved in the abovementioned risk assessments;
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
well as confirming the requirements of the daily risk assessments;
of the public, and other contractors) present at work or in the vicinity of a construction
site against all risks that may arise from such site.
on, the premises / work sites and that no employee remains on site if he/she is under
the influence. Furthermore, report such instances to contract management;
information or suspecting such information has been divulged, in the interests of health
and safety requirements (reference – section 26 of the OHS Act).
accordance with the principal contractor’s and or appointed contractors health and
safety plan which poses a threat to the health and safety of persons.
2.6.4 Contractor Site Supervisor or Contract Supervisor
Must:
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
procedures, work instructions and safety regulations issued by Eskom NTCSA- North
appointed contractors deviate from safety requirements.
and relevant documentation.
2.6.5 Employees
Must:
Eskom NTCSA- North East Grid requirements;
training sessions, some of which are:
a. familiarising themselves with their workplaces and safety and health procedures;
b. working in a manner that does not endanger them or cause harm to others;
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
c. ensuring that the work area is kept tidy;
d. reporting all incidents and near misses;
e. protecting fellow workers against injury by performing job observations;
f. reporting unsafe acts and unsafe conditions;
g. reporting any situation that may become dangerous; and
h. carrying out lawful orders and obeying safety and health rules;
provided for the protection of the site or for the health and safety of persons this
includes any guarding of machinery or equipment.
of the health and safety site rules, Eskom NTCSA- North East Grid requirements,
company requirements, or legislative requirements.
safety risks and measures related to the work processes.
believe that there is an imminent and serious danger to their health and safety and
have the duty to inform their supervisor immediately of such danger.
instance), and/or the Eskom NTCSA- North East Grid project manager, any
substandard acts and/or conditions that have come to their attention and that have not
been rectified or acted on by their contractor management timeously.
of health, safety, and environmental concerns.
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
instructions.
2.6.6 Contractor Health and Safety Officer
safety-related matters on the sites.
responsible for providing them with a health and safety service.
committees meetings.
accordance with the principal contractor’s and or appointed contractors health and
safety plan which poses a threat to the health and safety of persons.
on, the premises / work sites and that no employee remains on site if he/she is under
the influence. Furthermore, report such instances to contract management.
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
battery spillages and ensure that waste, contaminated soil, and affected materials are
disposed of in accordance with all applicable legal requirements for transporting and
disposing of hazardous waste.
absorbent materials to prevent the spread of the spill.
appropriately registered hazardous waste disposal facility.
appropriate chemicals supplied by the Contractor.
and the Employer must jointly agree on containment and clean-up methods before work
begins.
substance. Testing may only proceed after the Employer provides written approval.
approved Price List.
the clean-up, along with the Safety Data Sheets (SDS) for each chemical involved
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
A copy of the disposal facility’s waste management licence,
Waste manifest,
Safe disposal certificate,
Dangerous goods declaration
Weighbridge ticket
3.2 Legal Compliance
3.2.1 Section 37(2) (Legal) Agreement
A section 37(2) agreement must be signed between NTCSA- North East Grid and the principal
contractor at the time of awarding the contract. The principal contractor must ensure that a
section 37(2) agreement is compiled between the principal contractor and all their appointed
contractors for the contract.
The original copy of the section 37(2) Agreement must be retained by the contractor and a
copy retained by the responsible project manager.
A copy of all the agreements must form part of the respective contractor’s SHE file.
3.2.2 Hazardous work by children (Child Labour)
The constitution of the Republic of South Africa, in the “Bill of Rights” is clear on the rights of
children, especially when it comes to:
being protected from exploitative labour practices;
not to be required or permitted to perform work or provide services that
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
child in terms of the constitution. Where work is being performed which is not prohibited in
terms of the constitution, then such work must be conducted in terms of the OHS Act
“Regulations on Hazardous Work by Children in South Africa” with emphasis on paragraph 2
pertaining to this project being (not limited to):
Rights).
Occupational Health and Safety Act 1993 (Act ) and its Regulations.
National Environmental Management Act 1998 (Act ).
Environment Conservation Act 1989 (Act ).
National Water Act 1998 (Act ).
Civil and Building Work Act.
National Road Traffic Act .
Compensation for Occupational Injures and Diseases Act.
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
familiar with the relevant Eskom NTCSA- North East Grid SHE documentation that is
applicable to contract services.
3.4 Construction Professional Registration
respective levels as professionals in terms of the requirements of the SACPCMP or similar
professional body.
The SACPCMP web address is http://www.sacpcmp.org.za
as professionals with the SACPCMP.
Construction Managers are required to register as professionals with the SACPCMP.
Construction agents are required to register as a professional with the SACPCMP.
3.5 Notification of Construction Work
on the same day as sent to the DoEL. A copy of the letter and their approval must be kept in
the SHE file. When the DoEL provide a letter of approval, a copy of the approval must be sent
to the Eskom Project Manager and a copy filed in the SHE file.
3.6 SHE Policy
SHE policy is a statement of intent and a commitment by the organisation’s CE/CEO and
senior management in relation to the relevant SHE roles and responsibilities, the achievement
of their strategic objectives, values of integrity, customer satisfaction, excellence, and
innovation.
to compile an organisational SHE policy in line with their SHE responsibilities. The policy must
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
be signed by the organisation’s CE/CEO or the appointed assistant to the CE/CEO OHS Act
Section 16(2). The policy must be displayed in a prominent place within the workplace. A copy
of the policy must be filed in the contractor SHE files and attached as an annexure in the SHE
subcontractors)
OHS Act Construction Regulation 9(1) - Person to Compile Risk Assessments
OHS Act Construction Regulation 10(1) - Competent Person to Compile Fall Protection
OHS Act: Construction Regulations 29(h) Firefighting Equipment Inspector
OHS Act General Safety Regulations 3(4) – First Aider/s
3.9.1 Non-statutory appointments
Eskom requirement – Emergency Planning Co-coordinator
Eskom requirement - Chairperson of Health and Safety Committee
3.10 Eskom Life-saving Rules
Hazardous Waste Management Effective Date 06 May 2025
Services in NTCSA Northeast Grid Review Date 06 May 2026
where a person puts himself/herself in a position where he/she exposes himself/herself
to a fall from or into.
Rule 3 BUCKLE UP
Section
Source: SHE Specification.pdf (unknown)environment is in line with its Safety, Health, Environmental and Quality Policy, along with
responsibilities. The contractor is and remains accountable for the quality and the
Description
Source: Environmental Tender Evaluation and Scoring Card_ Hydrocarbon Spill Management.docx (unknown)The tender is for the provision of hydrocarbon spill management, oil dam cleaning, and hazardous waste management services for the NTCSA Northeast Grid, on an as-and-when required basis during both emergency and normal operational conditions.
Submission Guidelines
Source: Environmental Tender Evaluation and Scoring Card_ Hydrocarbon Spill Management.docx (unknown)Returnable documents: signed acknowledgement of Eskom's SHE rules and requirements form (Annexure B) must be attached to the tender submission.
Evaluation Criteria
Source: Environmental Tender Evaluation and Scoring Card_ Hydrocarbon Spill Management.docx (unknown)Evaluation is based on a scoring card. For each KPI, a score of 0 is given if the document is not submitted or does not satisfy minimum requirements, and 1 if submitted and satisfies minimum requirements. The tenderer must achieve a score of 1 on each applicable KPI. KPIs include: signed Annexure B, Environmental Management Plan (with content varying by risk category), detailed costing for environmental management (high risk only), identification of environmental aspects and impacts (medium and high risk only), signed environmental/SHE/SHEQ policy, and environmental competency CVs and qualifications (high risk only). ISO 14001 certificate is marked as N/A.
Technical Specifications
Source: Environmental Tender Evaluation and Scoring Card_ Hydrocarbon Spill Management.docx (unknown)The scope covers hydrocarbon spill management, oil dam cleaning, and hazardous waste management services for the NTCSA Northeast Grid, on an as-and-when required basis during both emergency and normal operational conditions. The tenderer must provide an Environmental Management Plan for the scope of work, with content depending on risk category (low, medium, high). For low risk: waste management (reduction, re-use, recycling, disposal) and environmental induction. For medium risk: the above plus environmental incident management and emergency planning for environmental incidents. For high risk: all of the above plus environmental management structure, professional registration of environmental resources, method statements for activities with significant environmental impacts, approach to compliance with environmental obligations, environmental competency and training, and environmental communication and awareness.
Financial Requirements
Source: Environmental Tender Evaluation and Scoring Card_ Hydrocarbon Spill Management.docx (unknown)For high risk only: detailed costing for environmental management must be provided, broken down, not as a lump sum.
Compliance Requirements
Source: Environmental Tender Evaluation and Scoring Card_ Hydrocarbon Spill Management.docx (unknown)Signed acknowledgement of Eskom's SHE rules and requirements form (Annexure B) is a prerequisite. ISO 14001 certificate is marked as N/A. No other compliance requirements are stated.
Important Dates
Source: BOQ.pdf (unknown)Closing date and time: 8 October 2026 at 10:00 (South African Standard Time). Submission method and address not stated in the available text.
Technical Specifications
Source: BOQ.pdf (unknown)Scope: Provision of hydrocarbon spill management, oil dam cleaning, and hazardous waste management services for the National Transmission Company South Africa (NTCSA) Northeast Grid. Services are required on an as-and-when basis during both emergency and normal operational conditions.
Compliance Requirements
Source: BOQ.pdf (unknown)Insufficient searchable text - AI extraction recommended
Description
Source: REVISED- Technical evaluation criteria for oil dam Rev2.pdf (unknown).................................................................................................................................
.........................
1.1 Technical evaluation threshold
Mandatory Technical Evaluation Criteria (gatekeepers) are ‘must meet’ criteria. These criteria shall
not be weighted or point scored but shall be assessed on a Yes/No basis as to whether or not the
criteria are met. An assessment of ‘No’ against any criterion shall technically disqualify the tenderer
and shall not be further evaluated against Qualitative Criteria.
Qualitative Technical Evaluation Criteria are weighted evaluation criteria used to identify the highest
technically ranked tenderer after determining that all the Mandatory Evaluation Criteria have been
met. The Qualitative Evaluation Criteria are weighted to reflect the relevant importance of each
criterion.
The minimum weighted final score (threshold) required for a tender to be considered from a technical
perspective is 70%. The following scoring method will be used:
Table 1: Scoring Methodology
Score Description
Fully compliant – all requirements met 10
Partially compliant – approximately 50% of requirements met
Minimally compliant – approximately 20% of requirements met
0 Non compliant – requirements not met
.
Document
559-1704178445 Rev 0
Identifier
Technical evaluation strategy
Effective Date July 2024
Review Date July 2027
1.2 Mandatory technical evaluation criteria
Mandatory Technical Criteria Description Reference to Technical Specification / Motivation for use of Criteria YES/ NO
Tender
Submission Guidelines
Source: REVISED- Technical evaluation criteria for oil dam Rev2.pdf (unknown)Returnable documents (all mandatory, assessed on a Yes/No basis; failure on any one disqualifies the bid):
Qualitative evaluation applies only to bidders who meet all mandatory criteria.
Evaluation Criteria
Source: REVISED- Technical evaluation criteria for oil dam Rev2.pdf (unknown)Mandatory (gatekeeper) technical criteria, assessed Yes/No – failure on any one disqualifies the tenderer outright. These include: a valid hazardous waste transportation authorisation (permit, licence, accreditation certificate or written confirmation from the competent authority); a TDG certificate with certification that the vehicle and driver are compliant; training certificates for personnel handling, transporting and disposing of hazardous waste (including driver, operator and spill response personnel); access to a licensed disposal/recycling/treatment facility (letter of acceptance or facility licence); and proof of competency, authorisation or appointment for personnel handling ODS and SF6 gas. Bidders who fail any mandatory criterion are disqualified and excluded from qualitative scoring.
Qualitative criteria are weighted and scored 0, 2, 5 or 10. The minimum weighted technical threshold is 70%.
Weights:
Qualitative evaluation is only applied to bidders who meet all mandatory criteria. Minimum qualifying weighted technical score: 70%.
Experience & Qualifications
Source: REVISED- Technical evaluation criteria for oil dam Rev2.pdf (unknown)Proof to mobilise to emergency incidents within 24 hours
(Emergency preparedness plan)
4 Company Experience and track record 20
4.1 Hydrocarbon spill containment and remediation (Referral letter, 20
completion certificate or appointment letter)
4.2 Number of years in operation, minimum 3 years in operation
Completed similar projects minimum of 3 projects (including
references/referral letter)
5 Driver experience on transportation of hazardous waste 10
5.1 Minimum 2 years 10
Total 100
Compliance Requirements
Source: REVISED- Technical evaluation criteria for oil dam Rev2.pdf (unknown)Mandatory compliance documents (each must be valid and submitted):
Failure to meet any mandatory criterion results in disqualification.
Health & Safety
Source: REVISED- Technical evaluation criteria for oil dam Rev2.pdf (unknown)hazardous waste permit, license, accreditation certificate
legally authorised to transport
or written authorization issued by
hazardous waste
relevant competent authority
compliance Goods (TDG) certificate, permit authorised to transport
certification that vehicle used is hazardous waste, oil
compliant, the driver is compliant. contaminated waste, ozone
depletion substances and sf6
training personnel who will be handling, transport, handling, transport and disposed of
disposing of hazardous waste including the hazardous waste are competent to
driver, operator and spill response do the job,
personnel
disposal/recycling/treatment facility letter from a registered and licensed
hazardous waste landfill/disposal
facility, confirming that the facility will
access to an authorised facility
accept and dispose of the hazardous
for the disposal of waste
waste generated under this contract.
or Valid waste management
license/registration certificate of the
disposal/recycling/treatment facility.
training or appointment for personnel
competent to prevent
handling Ozone-Depleting Substances
noncompliance
and SF6 gas
Failure to meet all mandatory technical evaluation criteria will results into disqualification.
Qualitative technical evaluation will be applicable to only the bidders who meant all mandatory technical
evaluation criterion,
1.3 Qualitative technical evaluation criteria
No. Evaluation Criteria Weight (%) Evaluator Score Weighted Score
(0,2,5,10)
1 Understanding of Full Scope of Work (Hydrocarbon spills, oil 30
dam cleaning, hazardous waste, ODCs & SF6)
1.1 Detailed method statement covering: 30
3 Emergency Response Capability 20
3.1 Emergency response plan 20
Environmental
Source: REVISED- Technical evaluation criteria for oil dam Rev2.pdf (unknown)ODCs & SF6 handling and disposal.
2 Waste Tracking & Reporting 20
2.1 Sample of: 20
Effective Date July 2024
Review Date July 2027
Tovhowani Tshikomba Environmental Manager ........................ ................30/07/2016
Section
Source: REVISED- Technical evaluation criteria for oil dam Rev2.pdf (unknown)559-1704178445 Rev 0
Technical evaluation strategy
1.1 Technical evaluation threshold
Mandatory Technical Evaluation Criteria (gatekeepers) are ‘must meet’ criteria. These criteria shall
not be weighted or point scored but shall be assessed on a Yes/No basis as to whether or not the
Qualitative Technical Evaluation Criteria are weighted evaluation criteria used to identify the highest
technically ranked tenderer after determining that all the Mandatory Evaluation Criteria have been
met. The Qualitative Evaluation Criteria are weighted to reflect the relevant importance of each
The minimum weighted final score (threshold) required for a tender to be considered from a technical
perspective is 70%. The following scoring method will be used
Score Description
1.2 Mandatory technical evaluation criteria
Description
Source: NEG Baseline Risk Assessment Reviewed Jan 2025.xlsx (unknown)Cell B3: Occupational Health and Safety Baseline risk assessment template
Important Dates
Source: NEG Baseline Risk Assessment Reviewed Jan 2025.xlsx (unknown){
"tenderPublicationDate": null,
"siteBriefingDate": null,
"tenderClosingDate": null
}
Submission Guidelines
Source: NEG Baseline Risk Assessment Reviewed Jan 2025.xlsx (unknown)Returnable Documents: The official tender documents must be obtained from the relevant procurement portal. Bidders must register and return all completed forms as instructed. No specific forms are listed in the risk assessment provided.
Evaluation Criteria
Source: NEG Baseline Risk Assessment Reviewed Jan 2025.xlsx (unknown)The document does not specify eligibility criteria beyond the requirement to comply with the OHS Act 85 of 1993 and Eskom's OHS procedures. The risk assessment references the National Road Traffic Act, Eskom SHEQ Policy 32-726, and the OHS Risk Assessment Procedure 32-520. No specific pre-qualification thresholds such as CSD registration, B-BBEE level, or CIDB grading are stated in the provided content.
Technical Specifications
Source: NEG Baseline Risk Assessment Reviewed Jan 2025.xlsx (unknown)Cell B3: Occupational Health and Safety Baseline risk assessment template
Description
Source: Supplier Quality Management- QM 58.pdf (unknown)This document is the Eskom Supplier Quality Management specification (QM 58, revision 3), which sets out the minimum quality requirements for all existing and potential Eskom suppliers. It applies to all Eskom divisions, subsidiaries, suppliers and sub-suppliers, and forms part of all RFIs/RFQs/RFPs and contracts for procurement of products and services. The specification is based on ISO 9001 and requires suppliers to develop, implement, maintain and continually improve a quality management system.
Important Dates
Source: Supplier Quality Management- QM 58.pdf (unknown)Closing date: 17 October 2021 (per document authorisation date; note the tender record lists closing date as 2026-10-08T10:00:00.000Z — verify the correct closing date with the issuing authority).
Submission Guidelines
Source: Supplier Quality Management- QM 58.pdf (unknown)Returnable documents — all must be completed, signed and submitted with the bid:
Disqualification risks:
Evaluation Criteria
Source: Supplier Quality Management- QM 58.pdf (unknown)Quality assessment criteria are selected by an Eskom Quality representative using Form A, which identifies the applicable supplier quality requirements and the quality category (1, 2, 3 or 4).
Technical Specifications
Source: Supplier Quality Management- QM 58.pdf (unknown)Scope: Provision of hydrocarbon spill management, oil dam cleaning, and hazardous waste management services for the NTCSA Northeast Grid, on an as-and-when required basis during both emergency and normal operational conditions.
Quality requirements apply throughout Eskom Holdings divisions, subsidiaries, suppliers and sub-suppliers, and form part of all RFIs/RFQs/RFPs and contracts for procurement of products and services.
Suppliers must develop, implement, maintain and continually improve a quality management system (QMS) based on ISO 9001, which forms the basis for conformity to Eskom quality requirements throughout the contract duration.
Suppliers and sub-suppliers must comply with the latest ISO 9001 standard (or applicable QMS standard) and the requirements of this specification.
Eskom reserves the right to perform assessments at sub-supplier facilities and to appoint resident quality inspectors at sub-supplier premises (workspace provided at no cost to Eskom).
Quality kick-off meetings will be held at the start of the contract and, if required, at the start of each subsequent phase. Mandatory pre-inspection meetings will be convened by Eskom or its inspection agency.
Suppliers must prepare monthly quality performance and management reports during contract execution.
Methodology
Source: Supplier Quality Management- QM 58.pdf (unknown)Methodology requirements include:
Experience & Qualifications
Source: Supplier Quality Management- QM 58.pdf (unknown)Quality audits and related quality performance reviews must be carried out by trained, accredited, and experienced personnel in accordance with procedures documented in the CQP.
Suppliers must submit, for Eskom review, documented processes for conducting project scope of work quality audits and related quality performance reviews.
Suppliers must provide a schedule of anticipated quality audits covering all functional areas and related quality performance reviews at the time of first post-contract award CQP submission.
Quality Management
Source: Supplier Quality Management- QM 58.pdf (unknown)Quality management requirements:
Compliance Requirements
Source: Supplier Quality Management- QM 58.pdf (unknown)ISO 9001 certification (or applicable QMS certificate) from an accredited certification body, unless excluded per the quality category.
Form A (Tender and Contract Quality Requirements for Supplier Quality Management Specification 240-105658000/QM 58 and ISO 9001) — must be completed and signed.
List of Tender Returnables (240-12248652) — determines specific quality documentation required per tender.
Sub-suppliers must also comply with the same quality requirements and submit their own CQPs and QCPs/ITPs.
B-BBEE: The document references the Preferential Procurement Policy Framework Act (PPPFA), but no specific B-BBEE level is stated in the provided text.
Health & Safety
Source: Supplier Quality Management- QM 58.pdf (unknown)The specification references the Safety, Health, Environment, and Quality (SHEQ) Policy (32-727) as an informative reference. No specific health and safety requirements are detailed in the provided text.
Contractual Terms
Source: Supplier Quality Management- QM 58.pdf (unknown)Standard conditions include:
Description
Source: NTCSA Supplier Declaration of Interest.docx (unknown)I, the undersigned [insert full name of signatory]…………………………………………, in my capacity as [insert capacity, i.e., member, director, partner, etc.] …………………………………………... of the supplier [insert registered full legal name of the supplying entity AND their company registration number] ………………....................................................., certify under oath that, to the best of my knowledge, the information furnished herein is true and correct. I accept that NTCSA reserves its right to act against the supplier named above or me personally in terms hereof, should this declaration prove to be false.
Submission Guidelines
Source: NTCSA Supplier Declaration of Interest.docx (unknown)Returnable documents: the NTCSA Supplier Declaration of Interest Template (Rev 1) must be completed and submitted with the bid.
Evaluation Criteria
Source: NTCSA Supplier Declaration of Interest.docx (unknown)Bidders must complete the Supplier Declaration of Interest (Rev 1) as a returnable. The declaration requires the signatory to certify under oath the accuracy of the information, and to disclose any NTCSA employees or directors with interests in the supplier, close family or associate relationships with NTCSA personnel involved in the procurement, and any business courtesies exchanged in the last 12 months. Consultants must also declare any other services rendered to NTCSA, its subsidiaries, primary energy suppliers, strategic commodity suppliers, or key industrial customers.
Technical Specifications
Source: NTCSA Supplier Declaration of Interest.docx (unknown)Bidders must complete and sign the Supplier Declaration of Interest (Rev 1) template, providing the signatory's name, capacity (member, director, partner), the supplier's registered full legal name and company registration number, and a declaration certifying the truth of the information under oath.
Compliance Requirements
Source: NTCSA Supplier Declaration of Interest.docx (unknown)Bidders must submit the NTCSA Supplier Declaration of Interest (Rev 1), which requires certification under oath of the accuracy of the information provided. The declaration also requires disclosure of any conflicts of interest, including NTCSA employees or directors with an interest in the supplier, close family or associate relationships, and business courtesies exchanged in the last 12 months.
Description
Source: NEC Term Service Contract REV1.pdf (unknown)The service covers hydrocarbon spill management, oil dam cleaning, and hazardous waste management for the NTCSA Northeast Grid, on an as-and-when required basis during both emergency and normal operational conditions. Specific services include: oil spill clean-up from transformers, reactors, switchgear, CT and VT, oil drums/storage units; chemical spill management and clean-up; sewage waste spill response; battery acid leak clean-up; oil dam cleaning (pumping out water, separating oil, removing sludge, cleaning walls); hazardous waste management (collection, classification, packaging, labelling, transportation, treatment, safe disposal of hazardous waste and expired chemicals, including ozone depleting substances such as CFCs, HCFCs, halons, SF6 and other refrigerants). Waste must be transported by licensed operators, disposed of at legally permitted hazardous waste facilities, and accompanied by waste manifests, safe disposal certificates, weighbridge tickets, and dangerous goods declarations. SF6 must be thermally destroyed at an authorised facility. Substations covered: Witbank CLN (Kendal, Vulcan, Kriel, Matla, Kusile, Kruispunt and switchgear), Middleburg CLN (Rockdale, Arnot, Hendrina, Duvha and Komati), Lowveld CLN (Komatipoort, Khanyazwe, Marathon, Prairie, Gumeni, Barberton and Simplon), South CLN (Alpha, Tutuka, Camden, Normadie, Sol, Zeus, Majuba, Grootvlei, Vunomoya).
Contact Information
Source: NEC Term Service Contract REV1.pdf (unknown)Service Manager: Tovhowani Tshikomba, Eskom Park, Cnr Watermeyer and Jelicoe Street, Witbank, 1035, e-mail: [email protected]. For waste management site assessments, e-mail North East Grid Environmental Management at [email protected].
Submission Guidelines
Source: NEC Term Service Contract REV1.pdf (unknown)Returnable documents: C1.1 Form of Offer and Acceptance, C1.2a Contract Data provided by the Employer, C1.2b Contract Data provided by the Contractor, C2.1 Pricing assumptions, C2.2 Price List (refer to BOQ attached), and the Schedule of Deviations (if any). All must be completed, signed, and submitted. The Form of Offer and Acceptance must state the offered total of the Prices exclusive of VAT, VAT at 15%, and the total inclusive of VAT. The offer may be accepted by the Employer signing the Acceptance part and returning a copy before the end of the validity period. Failure to provide required securities, bonds, guarantees, proof of insurance, or other documentation within two weeks of receiving the completed agreement constitutes repudiation.
Evaluation Criteria
Source: NEC Term Service Contract REV1.pdf (unknown)The contract is a NEC3 Term Service Contract (TSC3) with main Option A (Priced contract with price list). Bidders must complete the Contract Data Part Two (Contractor Data), including company details, direct and subcontracted fee percentages, risk register matters, plan, key people with CVs, and the price list. The tendered total of the Prices must be stated. Bidders must comply with additional conditions Z1 to Z14, including B-BBEE status requirements (Z3), joint venture provisions (Z2), and ethics (Z11). Bidders must be able to provide the insurances stated in Insurance Table A. The Employer is Eskom Holdings SOC Ltd; the Service Manager is Tovhowani Tshikomba. The contract is governed by South African law, with English as the language. The period for reply is 1 week. The Adjudicator is selected from the ICE-SA Division panel; the tribunal is arbitration under the Association of Arbitrators (Southern Africa) rules. Bidders must note the limitation of liability clauses (X18 and Z9) and the low service damages (X17).
Technical Specifications
Source: NEC Term Service Contract REV1.pdf (unknown)Scope: Provision of hydrocarbon spill management, oil dam cleaning, and hazardous waste management services for the NTCSA Northeast Grid, on an as-and-when required basis during both emergency and normal operational conditions. Services include: Oil spills: clean up of oil spills from transformers, reactors, switchgear, CT and VT, oil drums/storage units. Chemical spills: management and clean up. Sewage waste spills: response to sewage spills from overflowing septic tanks, pipeline leaks, or bursts. Battery acid leaks: clean up of spillages or leaks from batteries in battery rooms. Oil dam cleaning: pumping out accumulated rainwater or contaminated water, separating oil from water, removing sludge and settled residues, and cleaning dam walls. Hazardous waste management: collection, classification, packaging, labelling, transportation, treatment, and safe disposal of hazardous waste and expired chemicals; safe recovery, handling, storage, transportation, and disposal of ozone depleting substances (CFCs, HCFCs, halons, SF6 and other refrigerants); ensuring waste is transported by licensed operators, disposed of at legally permitted hazardous waste facilities, and accompanied by waste manifests, safe disposal certificates, weighbridge tickets, and dangerous goods declarations; thermal destruction of SF6 at an authorised facility. Substations covered: Witbank CLN (Kendal, Vulcan, Kriel, Matla, Kusile, Kruispunt and switchgear), Middleburg CLN (Rockdale, Arnot, Hendrina, Duvha and Komati), Lowveld CLN (Komatipoort, Khanyazwe, Marathon, Prairie, Gumeni, Barberton and Simplon), South CLN (Alpha, Tutuka, Camden, Normadie, Sol, Zeus, Majuba, Grootvlei, Vunomoya).
Methodology
Source: NEC Term Service Contract REV1.pdf (unknown)Methodology: The Contractor must clean all hydrocarbon substance spillages, sewage, chemical and battery spillages and ensure waste, contaminated soil, and affected materials are disposed of in accordance with all applicable legal requirements. If initial spill containment is required, the Contractor must supply and apply sufficient absorbent materials to prevent spread. Contaminated soil must be excavated, placed into suitable containers, and transported to a registered hazardous waste disposal facility. Spillages on hard surfaces must be cleaned using appropriate chemicals supplied by the Contractor. For SF6 gas: must be handled, recovered, transported, and disposed of only by licensed and authorised facilities; the Contractor must be registered for this purpose and provide proof of registration. The Contractor must provide all labour, equipment, and facilities; the Employer shall not provide any. For more complex tasks, the contractor will conduct a site assessment before finalising the scope of work, then issue a quote, on which a task order will be issued. Management meetings: Kick-off meeting 7 days before start of task order activity (optional); Close-off meeting 7 days after last task order activity completed (compulsory).
Experience & Qualifications
Source: NEC Term Service Contract REV1.pdf (unknown)Key personnel: The Contractor must provide details of key people, including name, job, responsibilities, qualifications, and experience. CVs (and further key person's data including CVs) must be submitted. The Contract Data Part Two requires completion of company details, direct and subcontracted fee percentages, risk register matters, plan, and key people. The tendered total of the Prices must be stated.
Quality Management
Source: NEC Term Service Contract REV1.pdf (unknown)Asbestos management: The Employer ensures ambient air conforms to prescribed South African standards for asbestos. Measurements and reporting must be done by an independent, competent, and certified occupational hygiene inspection body (SANAS accredited and Department of Employment and Labour approved AAIA). The Contractor may perform parallel measurements, evaluated against South African statutory limits. Control measures must conform to the AAIA-approved asbestos work plan. If asbestos is identified, a risk assessment is conducted, and if exposure above the action level is possible, immediate control measures and air monitoring are implemented. The Contractor continues services on presentation of Safe Levels; contract dates are adjusted accordingly. Asbestos removal and disposal must be done by a registered asbestos contractor instructed by the Employer. After completion of activities issued in a task order, the employer and contractor schedule a meeting to discuss successful completion or corrective action.
Pricing Schedule
Source: NEC Term Service Contract REV1.pdf (unknown)Pricing: TSC3 Option A (Priced contract with price list). Prices are derived from a price list with items priced as lump sums or as expected quantities multiplied by rates, or a mix. The Price List is only a pricing document; Service Information contains instructions. The Contractor must link operations in the plan to items in the Price List. Items priced as lump sums are not adjusted if quantities differ; changes only via compensation events. Format: For lump sum items, enter amount in Price column only; for rate-based items, enter rate and expected quantity to produce the Price; for time-based items, state unit of time and expected length. The price list is in C2.2, referring to the attached BOQ. If an item is not found on the standard Bill of Quantities, the Contractor may submit three quotations for rate evaluation before work can be done.
Financial Requirements
Source: NEC Term Service Contract REV1.pdf (unknown)Pricing: TSC3 Option A (Priced contract with price list). Prices are derived from a price list with items priced as lump sums or as expected quantities multiplied by rates, or a mix. The Price List is only a pricing document; Service Information contains instructions. Lump sum items are not adjusted if quantities differ; changes only via compensation events. The price list is in C2.2, referring to the attached BOQ. Payment: assessment interval is between the 25th day of each successive month; payments are made within 4 weeks; currency is South African Rand; interest on late payments at the publicly quoted prime rate of Standard Bank (for Rand amounts) or LIBOR (for other currencies). Contractor must provide a tax invoice within one week of receiving a payment certificate; delayed tax invoice extends payment period. If an item is not found on the standard Bill of Quantities, the Contractor may submit three quotations for rate evaluation before work can be done.
Compliance Requirements
Source: NEC Term Service Contract REV1.pdf (unknown)C1.1 Form of Offer and Acceptance: signed by a duly authorised representative, committing the bidder to perform all obligations and liabilities of the Contractor. C1.2b Contract Data provided by the Contractor: complete company details, fee percentages, risk register, plan, key people with CVs, and price list. B-BBEE: Z3 requires notification of any change in B-BBEE status within seven days, and submission of an updated verification certificate within thirty days; a decrease in status may lead to re-negotiation or termination. Joint ventures: Z2 requires joint and several liability, notification of key person within two weeks, and no change in composition without written consent. Insurance: Contractor must provide insurances in Insurance Table A (loss/damage to Employer property, Plant and Materials, Equipment, public liability, employer's liability). Asbestos: Z14 requires compliance with asbestos regulations, including SANAS accredited and Department of Employment and Labour approved AAIA for measurements; asbestos removal and disposal by a registered asbestos contractor. Health and safety: Z6 requires compliance with Construction Regulations 2014 and all applicable health & safety laws.
Health & Safety
Source: NEC Term Service Contract REV1.pdf (unknown)Health and safety: The Contractor must take all reasonable precautions to maintain the health and safety of persons in and about the execution of the service. The Contractor warrants that the total of the Prices includes sufficient amount for proper compliance with the Construction Regulations 2014 (under the Occupational Health and Safety Act) and all applicable health & safety laws, regulations, rules, guidelines and procedures. The Contractor must comply with these and ensure subcontractors, employees, and others under their control do likewise. Environmental compliance: The Contractor must comply with all applicable environmental laws and regulations and ensure subcontractors, employees, and others under their control do likewise. Asbestos: OEL for asbestos is 0.2 regulated asbestos fibres per ml of air as a 4-hour TWA, and short-term exposure limit of 0.6 fibres per ml as a 10-minute TWA, measured in accordance with HSG248 and monitored according to HSG173 and OESSM. Measurements and reporting by a SANAS accredited and Department of Employment and Labour approved AAIA. The Contractor must provide proof of accreditation for the transport of hazardous waste.
Environmental
Source: NEC Term Service Contract REV1.pdf (unknown)Environmental compliance: The Contractor must comply with all applicable environmental laws and regulations and ensure subcontractors, employees, and others under their control do likewise. Hazardous waste must be transported by licensed operators, disposed of at legally permitted hazardous waste facilities, and accompanied by waste manifests, safe disposal certificates, weighbridge tickets, and dangerous goods declarations. Ozone depleting substances (ODCs) such as CFCs, HCFCs, halons, SF6 and other refrigerants must be handled, recovered, transported, and disposed of only by licensed and authorised facilities. SF6 must be thermally destroyed at an authorised facility capable of high temperature destruction in compliance with applicable environmental legislation and international best practice. Site assessments may be requested to confirm waste types and quantities before collection, disposal, or treatment commences. Site assessment requests must be e-mailed to North East Grid Environmental Management at [email protected].
Contractual Terms
Source: NEC Term Service Contract REV1.pdf (unknown)Contract Data provided by the Contractor: The Contractor must complete company name, address, tel/fax, direct fee percentage, subcontracted fee percentage, matters to be included in the Risk Register, Service Information for the Contractor, plan, key people (name, job, responsibilities, qualifications, experience), CVs, price list, and tendered total of the Prices.
Section
Source: NEC Term Service Contract REV1.pdf (unknown)For items not found on the standard Bill of Quantities, the Contractor may submit three quotations for rate evaluation before work can be done. When scanning invoices, check the quality before linking in SAP inboxes.
Evaluation Criteria
Source: 240-126469599_Method Statement template final 18 Oct2021.docx (unknown)No eligibility criteria specified
Important Dates
Source: eTendering_Supplier's User_Guide_v4.4.pdf (TENDER){"closingDate":"23Aug2022","closingTime":"3:42pm"}
Contact Information
Source: eTendering_Supplier's User_Guide_v4.4.pdf (TENDER){"name":null,"email":"[email protected]","phone":null,"department":null,"address":"ls before they can be granted access to the eTendering system. An"}
Submission Guidelines
Source: eTendering_Supplier's User_Guide_v4.4.pdf (TENDER)All bids must be submitted electronically through the eTendering system at https://eTendering.eskom.co.za. Bidders must have a CSD number and register on the system before accessing the portal. Documents must be uploaded in the appropriate category (e.g., Technical, Commercial, Finance). Each file cannot exceed 500MB and total upload size cannot exceed 4GB. Uploads must be finalized by clicking 'Finalize Submission' then 'Finalise and Close Submission'. The system will record the submission and closing timestamps. A confirmation email with all submitted documents will be sent. Save the email with the submission ID for future enquiries.
Evaluation Criteria
Source: eTendering_Supplier's User_Guide_v4.4.pdf (TENDER)Bidders must have a CSD (Central Supplier Database) number to access the eTendering system. Registration requires a valid email address and cell phone number (with +27 prefix).
Technical Specifications
Source: eTendering_Supplier's User_Guide_v4.4.pdf (TENDER)eTendering system is a web based system that allows suppliers bidding for various tenders advertised
on Tender Bulletin system to “upload” their tender documents. Currently the tenderers or suppliers
submit tender documents at various Eskom tender offices. eTendering system replaces the manual or
physical submission of tender documents at various Eskom tender offices. eTendering system in a
nutshell is an electronic box where tender documents can be “dropped” or “uploaded”. Suppliers will
be required to register their details before they can be granted access to the eTendering system. An
OTP (one time pin) will be sent to both their cell phone and email address.
Quick and direct access is also available by using the following links:
https://tenderbulletin.eskom.co.za or https://tenderbulletin.ntcsa.co.za - this is used by
members of the public, to view and access Eskom published tenders. eTendering hyperlink
will be found on this site. Members of the public may follow prompt instructions once they
have clicked on the eTendering link (https://eTendering.eskom.co.za). This link will allow
them to upload the required tender documentation.
https://eTendering.eskom.co.za - this is used by members of the public, to view information
about published tenders and submit their tender documents.
eTendering system.
2 Problems
A channel of communication has been created in case users of the system experiences a problem
with the system. In a case users come across some difficulties in using Tender bulletin, eTendering
and OpenText systems they need to contact the buyer responsible for the published tender.
3 What’s New
A new functionality of submitting tender documents via an ebox or online application called
eTendering instead of a physical submission.
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
4 Getting Started
To gain access to eTendering portal
Open your web browser.
Type Eskom Tender Bulletin or Eskom Tender Bulletin (ntcsa.co.za) or Eskom E-Tendering
Click on the eTendering icon “ ”
eTendering system login page will be displayed:
Fig 1
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Registration Form Steps to follow
Plus prefix e.g +27
captcha picture to validate that you
are not a robot.
click on register button.
the registerer to verify the email sent to
the provided email address.
click on “Resend Verification Email”
button.
on link provided on
the email.
etendering site with a login screen
displayed, now complete the login
with your verified email address
and password.
Fig1.1
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig2a.
Fig2b.
Fig3.
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
OTP page will be displayed.
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
button.
Landing page once OTP is verified.
Select the preferred “Ref No”
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
be submitted.
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
mentioned disclaimers.
To submit tender documents, click on “Add file” button.
Upload required tender documents by:
Giving the file a name
Select the listed file type e.g.: Technical, commercial, finance and etc
Choose the file you need to upload
Then click on “Upload” button, Fig5.
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig4.
Fig5.
Continue to submit all the required documents under the correct category, i.e.: Technical
should be selected if technical documentation is uploaded and etc. Verify all required
documents are uploaded before making ‘Final Submission’ by clicking on ‘Finalize
Submission’ button.
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
all uploaded files should not exceed 4GB.
will pop-up.
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
If not, all documents were submitted or still wish to add or submit more documents, click on
“No, continue adding files” button.
submission and closed time and date timestamp at the bottom.
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
submitted tenders will be displayed.
If you want to view or verify the submitted documents, click on “View Submission” button.
submitted documents on email, Fig6.This is the final step for the submitter or tenderer.
It is vital to save the email with the submission ID for future enquiry if need be.
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
--------Originalmessage--------
From:Eskom E-Tender Document Submission 28 [email protected]
Date:Tue,23Aug2022,3:42pm
Subject: Response To Submitter
Eskom E-Tender Document Submission 28
Hi Monalisa
You have finalized a new submission with submission id:14 on tender
#MPKUS10086PS closing date : 2022-11-30 10:00:00.
Have started the submission from 2022-08-23 14:28:33 and finalized at 2022-
08-23 15:42:28
Tender Description:
Award for Provision of Office Cleaning and Janitorial Services at Kusile Power
Station Project
Files Submitted:
ID Original Name Title Size Type
38 Test7.pdf testingCom 33141 Commercial
40 Test1.pdf testingTech 33502 Technical
41 Test15.pdf testingFin 33141 Finance
Thanks,
Eskom E-Tender Document Submission 28 Automated Mail
© 2022 Eskom E-Tender Document Submission 28. All rights reserved.
NB: This Email and its contents are subject to the Eskom Holdings SOC Ltd
EMAIL LEGAL NOTICE which can be viewed at
http://www.eskom.co.za/Pages/Email_Legal_Spam_Disclaimer.aspx
Fig6.
5 Edit Registration
To edit already registered information such as Name, Organization, CSD and cell phone number
select “Edit Registration” on the drop down, Fig1. New window with information that needs to be
updated pop ups, Fig2. Click on “Update” button to update registration details.
Fig1.
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig2.
6 Log off Button
To logout, click “Log out” on the dropdown next to your name.
Fig1.
7 Password reset
To reset a forgotten password, click “Forgot your password” Fig1. and a new screen will
pop up to enter an alternative email where the new password will be sent Fig2.Confirmation
message will be sent to the user, Fig3.
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig1.
Fig2.
Fig3.
An email confirming password reset will be sent to the email provided.
Click on the link or “Reset Password” button to reset the password.
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig4.
A new window will pop up to reset and confirm the new password, Fig5.Enter new
password and confirm then click on “Reset Password” button.
Fig5.
OTP window will pop up, type in the OTP sent to either the cell phone or email address.
Fig6.
OTP successfully goes through and lands on the below screen, password is successfully
reset.
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig7.
8 General
This system is compatible to most web browsers however we recommend Ms Edge.
The end.
© 2025 Eskom of 19
Methodology
Source: eTendering_Supplier's User_Guide_v4.4.pdf (TENDER)Once the email is verified, login using your registered email address and password then the OTP page will be displayed. OTP sent to the registered cell phone number and email address. Insert the otp number then click “Verify OTP” button, to resend OTP click on “Resend OTP” button. Landing page once OTP is verified. Select the preferred “Ref No”. A page with the preferred Tender information is displayed before tender documentation can be submitted. Click on “Create New Submission” button to submit required Tender documents. Landing page once clicked on “Create New Submission” button. Take note of the mentioned disclaimers. To submit tender documents, click on “Add file” button. Upload required tender documents by: 1. Giving the file a name 2. Select the listed file type e.g.: Technical, commercial, finance and etc 3. Choose the file you need to upload 4. Then click on “Upload” button. Once clicked on “Upload” button, this page will be displayed with the submitted document(s). Continue to submit all the required documents under the correct category, i.e.: Technical should be selected if technical documentation is uploaded and etc. Verify all required documents are uploaded before making ‘Final Submission’ by clicking on ‘Finalize Submission’ button. Click on “Finalize Submission” button. A file size cannot exceed 500MB and a total size of all uploaded files should not exceed 4GB. Once “Finalize Submission” button is clicked the pop-up message confirming the submission will pop-up. Click on “Finalise and Close Submission” button to finalize the submission of documents. If not, all documents were submitted or still wish to add or submit more documents, click on “No, continue adding files” button. Once the submission is finalised the page with all submitted documents will display with the submission and closed time and date timestamp at the bottom. To view submitted tenders, click on “My Submissions” menu option. All your individually submitted tenders will be displayed. If you want to view or verify the submitted documents, click on “View Submission” button. Once the submission process is complete an email with be sent to the submitter with all submitted documents on email. This is the final step for the submitter or tenderer. It is vital to save the email with the submission ID for future enquiry if need be.
Compliance Requirements
Source: eTendering_Supplier's User_Guide_v4.4.pdf (TENDER)CSD number to gain access to
Requirements
Source: eTendering_Supplier's User_Guide_v4.4.pdf (TENDER)To edit already registered information such as Name, Organization, CSD and cell phone number select “Edit Registration” on the drop down. New window with information that needs to be updated pop ups. Click on “Update” button to update registration details.
Contact Information
Source: NTCSA Non-Disclosure Agreement (NDA) Vendors_.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"................... a company incorporated under the laws of [insert"}
Contractual Terms
Source: NTCSA Non-Disclosure Agreement (NDA) Vendors_.pdf (unknown)The document is a Non-Disclosure Agreement (NDA) between NTCSA and the vendor. Key obligations: Confidential Information must not be disclosed to third parties without prior written consent; the receiving party must protect confidential information with at least a reasonable standard of care; on request, the receiving party must return or destroy all confidential material within 7 business days and provide a written statement confirming destruction; the NDA term is 3 years after termination of the relationship; breach must be remedied within 7 business days of written notice, failing which the disclosing party may seek legal remedies including urgent proceedings and damages; the agreement is governed by South African law; no assignment of rights or obligations without prior written consent, except NTCSA may cede to its departments or entities resulting from Electricity Supply Industry restructuring; no public announcements without prior written consent.
Description
Source: 240-68099512 Form A_Cat 4_ Rev 9 - Spill Management, Oil Dam cleaning and Hazardous Waste Management.pdf (unknown)operational conditionsSECTION (TENDERER)
Clauses of 240- clause description indicate with an
105658000 (x) as applicable
Specification or (-) if not
Applicable
Pre-contract award quality requirements x
(*Select Only Applicable Category). NB: Not more than one category must be selected. Also indicate
whether site assessment is applicable.
Category 1 (refer to clause 3.5.-105658000) -
Category 2 (refer to clause 3.5.-105658000) -
Category 3 (refer to clause 3.5.-105658000) -
Category 4 (refer to clause 3.5.-105658000) X
Main Supplier and Sub-supplier Capability and Capacity Assessment (refer to clause 3.-105658000) -
3 post-contract award(eskom)
Submission Guidelines
Source: 240-68099512 Form A_Cat 4_ Rev 9 - Spill Management, Oil Dam cleaning and Hazardous Waste Management.pdf (unknown)Complete and sign Tender and Contract Quality Requirements form (240-105658000 / 240-68099512 Rev 9) to acknowledge and accept Eskom Supplier Quality Requirements for ISO 9001. The tenderer must complete and sign the form as part of the tender submission.
Evaluation Criteria
Source: 240-68099512 Form A_Cat 4_ Rev 9 - Spill Management, Oil Dam cleaning and Hazardous Waste Management.pdf (unknown)Pre-contract award quality requirements apply. Eskom will evaluate the tenderer's acceptance of the quality requirements per specification 240-105658000 and ISO 9001. Category 4 is selected for quality requirements. A site assessment may be applicable. The tenderer must indicate which category applies; only one category may be selected. Post-contract award conditions include contract execution, supplier quality performance monitoring, quality audits, rights of access, rights to information, preservation, and management of nonconformities.
Technical Specifications
Source: 240-68099512 Form A_Cat 4_ Rev 9 - Spill Management, Oil Dam cleaning and Hazardous Waste Management.pdf (unknown)Provision of Hydrocarbon Spill Management, Oil Dam Cleaning, and Hazardous Waste Management services for Eskom's National Transmission Company South Africa (NTCSA) Northeast Grid, on an as-and-when required basis, covering both emergency and normal operational conditions. Bidders must complete Form A Category 4 to acknowledge and accept Eskom's Supplier Quality Requirements set out in specification 240-105658000 and the ISO 9001 standard.
Methodology
Source: 240-68099512 Form A_Cat 4_ Rev 9 - Spill Management, Oil Dam cleaning and Hazardous Waste Management.pdf (unknown)CLAUSE 5 Leadership - PRINCIPLE 2 Leadership X
CLAUSE 6 Planning - PRINCIPLE 3 Engagement of people X(ESKOM)
C CLAUSE 7 Support - PRINCIPLE 4 Process approach X
CLAUSE 8 Operation - PRINCIPLE 5 Improvement X
CLAUSE 9 - Evidence based decision
Performance Evaluations PRINCIPLE 6 XSECTION making
CLAUSE 10 - Improvement PRINCIPLE 7 Relationship Management X
Quality Management
Source: 240-68099512 Form A_Cat 4_ Rev 9 - Spill Management, Oil Dam cleaning and Hazardous Waste Management.pdf (unknown)Authorisation Date January 2022
240-105658000 and
QUALITY REQUIREMENTS FOR ISO 9001 Review Date January 2027
Eskom Rights of Access (refer to clause 3.8.-105658000) X
Eskom Rights to Information (refer to clause 3.8.-105658000) X
Preservation (refer to clause 3.8.-105658000) X
Quality Audits Related Conditions (refer to clause 3.8.-105658000) X
Management of Nonconformities and Nonconforming Outputs Identified by Eskom (refer to clause 3.8.-
Special processes (refer to clause 3.8.-105658000) x
Clauses of iso iso 9001 standard indicate with an quality iso 9001 standard indicate with an
9001 standard clause description (x) as applicable principles principle description (x) as applicable
Or (-) if not or (-) if not
Representativesection (tenderer)
NB: The tenderer must complete and sign this form to acknowledge and accept Eskom Supplier Quality Requirements as per 240-
105658000 Specification and ISO 9001 Standard.
Compliance Requirements
Source: 240-68099512 Form A_Cat 4_ Rev 9 - Spill Management, Oil Dam cleaning and Hazardous Waste Management.pdf (unknown)Tenderers must complete and sign Form A to acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and the ISO 9001 standard. Quality requirements are assessed in the pre-contract award phase for Category 4 works, with post-contract award monitoring including supplier quality performance, quality audits and management of nonconformities. Eskom retains rights of access, information and preservation under the quality specification.
Health & Safety
Source: 240-68099512 Form A_Cat 4_ Rev 9 - Spill Management, Oil Dam cleaning and Hazardous Waste Management.pdf (unknown)CONTRACT Transmission Company South Africa (NTCSA) Northeast Grid, on an as-and-when required basis during both emergency and normal
DESCRIPTION operational conditionsSECTION (TENDERER)
Clauses of 240- clause description indicate with an
105658000 (x) as applicable
Specification or (-) if not
Section
Source: 240-68099512 Form A_Cat 4_ Rev 9 - Spill Management, Oil Dam cleaning and Hazardous Waste Management.pdf (unknown)Ard indicate with an quality iso 9001 standard indicate with an
Performance Evaluations PRINCIPLE 6 XSECTION making
Eskom’s quality
REPRESENTATIVE Siyabulela Nciweni Quality Management Officer 01 July 2026SECTION (ESKOM)
NB: The tenderer must complete and sign this form to acknowledge and accept Eskom Supplier Quality Requirements as per 240
TENDER & CONTRACT QUALITY Document Identifier 240-68099512 Rev 9
QUALITY REQUIREMENTS FOR ISO 9001 Review Date January 2027
Pre-contract award quality requirements x
B Contract Execution (refer to clause 3.7.-105658000) X CLAUSE Supplier Quality Performance Monitoring Phase (refer to clause 3.7.-105658000) X
Quality Audits Related Conditions (refer to clause 3.8.-105658000) X
Clauses of iso iso 9001 standard indicate with an quality iso 9001 standard indicate with an
Description
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Oil dam.pdf (RFP)The scope covers hydrocarbon spill management, oil dam cleaning, and hazardous waste management services for the NTCSA Northeast Grid, on an as-and-when required basis during both emergency and normal operational conditions. The contract is for an indefinite period with call-offs as needed.
Important Dates
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Oil dam.pdf (RFP)Closing date: 08 October 2026 at 10:00 SAST.
Tender validity period: 120 days from closing date.
Clarification queries deadline: 10 working days before tender closing date.
Site visit or clarification meeting: Not Applicable.
Addenda or clarifications will be posted on e-tender portal and Tender Bulletin; bidders must check regularly.
Contact Information
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Oil dam.pdf (RFP)NTCSA Representative: Tshifhiwa Modau
Tel: 011 629 5553
E-mail: [email protected]
Procurement Manager: Vukosi Maluleke (signatory on letter of invitation).
Escalation: Through the buyer to Procurement Manager, then Middle Manager/Senior Manager Procurement, then Group Executives/CEO as last resort.
Submission Guidelines
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Oil dam.pdf (RFP)Tenders must be submitted electronically via the NTCSA E-tendering site before 10:00 SAST on 08 October 2026. No hard copy will be accepted. Upload documents under the folders Technical, Commercial, Financial, and Other. All documents in PDF format; the price list must also be submitted in Excel. Maximum upload size per document is 500 MB, total submission limited to 4 GB. No zip/compressed files. If resubmitting, only the latest version is considered. Ensure submission status shows as complete. Late tenders will not be accepted.
Mandatory returnable forms (disqualifiable if missing or incomplete):
Non-disqualifiable returnables (5 working days to correct if missing):
Mandatory technical criteria (gatekeepers) that must be met:
Failure to meet any mandatory criterion will result in disqualification.
Evaluation Criteria
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Oil dam.pdf (RFP)Evaluation is conducted in stages:
Eligibility and compliance: Tenderers must not be on any sanctions list, restricted by National Treasury, on the Tender Defaulters list, or flagged suppliers. Must not have conflict of interest, must not subcontract 100% of scope, and must be authorised to sign. Joint ventures must have joint and several liability.
Mandatory technical criteria (gatekeepers): Assessed on a Yes/No basis. Any 'No' results in disqualification.
Functionality (qualitative technical criteria): Weighted evaluation with minimum threshold of 70%. Scoring methodology: 10 = fully compliant, 5 = partially compliant (50%), 2 = minimally compliant (20%), 0 = non-compliant. Criteria and weights:
Price evaluation: Prices scored out of 80 points (under 80/20 system). Evaluation includes VAT correction, arithmetic correction, exclusion of contingencies, adjustment for variations, NPV comparison, and unconditional discounts. Prices will be read out? Not applicable.
Specific goals (B-BBEE): Scored out of 20 points. Points based on B-BBEE status level: Level 1 = 20, Level 2 = 18, Level 3 = 14, Level 4 = 12, Level 5 = 8, Level 6 = 6, Level 7 = 4, Level 8 = 2, Non-compliant = 0. Failure to submit proof results in zero points for specific goals but not disqualification.
Objective criteria: NTCSA may award to a tenderer other than the highest scoring if objective criteria justify. Designated sectors: Local content threshold is N/A for this tender.
Final ranking: Price score + Specific goals score = total points. Highest ranked recommended for award.
Technical Specifications
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Oil dam.pdf (RFP)Scope: Provision of hydrocarbon spill management, oil dam cleaning, and hazardous waste management services for NTCSA Northeast Grid, on an as-and-when required basis during emergency and normal operational conditions.
Deliverables include:
Detailed method statement required covering all aspects.
Waste tracking and reporting: Must provide samples of waste manifests, weighbridge tickets, and disposal certificates.
Emergency response: Must have a plan to mobilise to incidents within 24 hours.
Company experience: Minimum 3 years in operation and at least 3 similar projects.
Driver experience: Minimum 2 years on transportation of hazardous waste.
Contractual conditions: NEC3 Term Service Contract.
Refer to attached scope of work and contractual requirements for full details.
Methodology
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Oil dam.pdf (RFP)Methodology: Bidders must submit a detailed method statement covering hydrocarbon clean-up, oil dam cleaning, hazardous waste handling and disposal, and ODS & SF6 handling and disposal. The method statement is part of the functionality evaluation (weight 30%). The tenderer must also provide an emergency response plan and spill response procedure. The method statement should demonstrate understanding of the full scope of work.
Experience & Qualifications
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Oil dam.pdf (RFP)Experience and qualifications: The tenderer must have a minimum of 3 years in operation. Must have completed at least 3 similar projects (hydrocarbon spill containment and remediation). Referral letters, completion certificates, or appointment letters are required. The driver transporting hazardous waste must have a minimum of 2 years experience. Training certificates for personnel handling hazardous waste are mandatory.
Pricing Schedule
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Oil dam.pdf (RFP)Pricing schedule: The Bill of Quantities (BOQ) must be filled in full; failure to do so will render the bid non-responsive. The price list must be submitted in PDF and a copy in Excel format. Prices are evaluated inclusive of VAT, corrected for arithmetic errors, and excluding contingencies. Unconditional discounts are considered; conditional discounts are not. The pricing schedule may include a line item for cataloguing if required. The BOQ is attached to the tender.
Financial Requirements
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Oil dam.pdf (RFP)Pricing format: Tenderers must complete the attached Bill of Quantities (BOQ) in full. Failure to complete the BOQ in full will be regarded as non-responsive. The price list must be submitted in PDF and a copy in Excel format.
Price evaluation: Prices evaluated inclusive of VAT, corrected for arithmetic errors, excluding contingencies, adjusted for variations and unconditional discounts. Conditional discounts not considered for evaluation.
Payment terms: NTCSA standard payment terms:
No performance security mentioned (Not Applicable).
Insurance deductibles: Not Applicable.
NTCSA reserves the right to negotiate with preferred bidders if tendered prices are not market-related.
Compliance Requirements
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Oil dam.pdf (RFP)Mandatory compliance documents:
Eligibility: Must not be under restriction to do business with NTCSA or SOCs, not on sanctions list, not restricted by National Treasury, not on Tender Defaulters list, not flagged suppliers (as per Zondo report, SIU, etc.), no conflict of interest, not subcontracting 100% of scope.
Joint ventures: Must submit letter of intent/JV agreement, written confirmation of single entity, single designated bank account.
CIDB grading: Not applicable.
Local content: Not applicable (N/A).
Health & Safety
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Oil dam.pdf (RFP)Safety requirements: Tenderers must submit a COIDA certificate of good standing (South African tenderers). Must comply with Eskom SHE Rules (Annexure B). A Baseline Risk Assessment and SHE Specification are required. The tenderer must have valid training certificates for personnel handling hazardous waste, and proof of competency for ODS/SF6 handling. An emergency response plan and spill response procedure are mandatory. The tenderer must be able to mobilise to incidents within 24 hours.
Environmental
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Oil dam.pdf (RFP)Environmental requirements: Tenderers must have access to a licensed hazardous waste disposal facility and provide a letter of acceptance or similar. Must comply with environmental regulations regarding hazardous waste handling and disposal. The Environmental Tender Evaluation and Scoring Card (Hydrocarbon Spill Management) is referenced. Environmental considerations are part of the contractual requirements.
Contractual Terms
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Oil dam.pdf (RFP)The conditions of contract are the NEC3 Term Service Contract. No performance security required. Payment terms: 30 days for contracts below R50M, 60 days for above R50M. NTCSA may negotiate with preferred bidders. Subcontracting with subsidiaries discouraged and must be declared. The contract is for the whole scope; no alternative tenders allowed. The successful tenderer may be required to provide cataloguing information after award. NTCSA reserves the right to award to a tenderer other than the highest scoring if objective criteria justify.
Section
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Oil dam.pdf (RFP)Additional evaluation criteria details: The functionality criteria are weighted as follows: Understanding of Full Scope of Work (30%), Waste Tracking & Reporting (20%), Emergency Response Capability (20%), Company Experience and Track Record (20%), Driver Experience on Transportation of Hazardous Waste (10%). Score methodology: 10 (fully compliant), 5 (50% compliant), 2 (20% compliant), 0 (non-compliant). Minimum threshold: 70% to proceed.
Submission Guidelines
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7 - Spill Management, Oil cleaning and harzadous waste management.pdf (unknown)Returnable forms — all must be completed, signed and returned with the quotation: SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 7.1 (Bidder's Past Supply Chain Management Practices), SBD 9 (Certificate of Independent Bid Determination), Form A (declaration of interest), and the pricing schedules as specified. Bids must be submitted in the prescribed format with all forms completed and signed.
Evaluation Criteria
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7 - Spill Management, Oil cleaning and harzadous waste management.pdf (unknown)Preference points will be awarded in accordance with the Preferential Procurement Policy Framework Act (PPPFA) and its regulations. Specific 80/20 or 90/10 preference point split is not stated in the available sections. Bidders must complete SBD 6.1 to claim preference points.
Technical Specifications
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7 - Spill Management, Oil cleaning and harzadous waste management.pdf (unknown)Scope includes hydrocarbon spill management, oil dam cleaning, and hazardous waste management services for the NTCSA Northeast Grid. Services are required on an as-and-when required basis, covering both normal operational conditions and emergency response. The exact quantities, service levels, and site locations are not specified in the available document sections.
Quality Management
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7 - Spill Management, Oil cleaning and harzadous waste management.pdf (unknown)E.1 Form A is completed and signed. E.2 Add other requirements (if applicable) as per the scope of work and/or specification. Section E Score 2.
Compliance Requirements
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7 - Spill Management, Oil cleaning and harzadous waste management.pdf (unknown)Bidders must be registered on the Central Supplier Database (CSD). A valid Tax Compliance Status (TCS) is required. SBD 4 (Declaration of Interest) requires disclosure of any director or shareholder relationships with the state.
Section
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7 - Spill Management, Oil cleaning and harzadous waste management.pdf (unknown)A.3 Quality Objectives Approved by top management. 1
Section A Score Option 2 3
SECTION B : Evidence of QMS in operation (Tender Quality Requirements -Ref 240-105658000)
not limited to quality management function/role) 1
B.2 Documented information for Control of Externally Provided Processes, Products and Services - Must include criteria for evaluation, selection,
monitoring of performance, and re-evaluation of external providers (Clause 8.4 of ISO 9001:2015)
Section B Score 2
Section E Score 2
Supplier Quality Management: Revision 7
Category 4 : Quality Requirements Deliverables to be evaluated indicator = 1
SECTION A : Quality Management System Requirements ISO 9001
A.1 Quality Method statement based on scope.(Method Statement Template-Ref 240-126469599) 1
A.2 Quality Policy Approved by top management. 1
Submission Guidelines
Source: Annexure B-to be completed and signed.pdf (unknown)Returnable documents: the completed and signed Annexure B Acknowledgement Form for Eskom OHS legal and other requirements, signed by an authorised person (CEO/Director/Managing Director) and witnessed by two witnesses.
Evaluation Criteria
Source: Annexure B-to be completed and signed.pdf (unknown)Bidders must complete and sign Annexure B confirming understanding of and compliance with Eskom's OHS legal and other requirements. The main supplier must demonstrate a process for appointing and managing sub-contractors/suppliers, ensure their compliance with OHS requirements, and monitor them through audits and assessments. Eskom reserves the right to verify compliance and may require copies of testimonials/references and contact details of previous clients.
Technical Specifications
Source: Annexure B-to be completed and signed.pdf (unknown)The main supplier must provide notification to Eskom prior to the appointment of contractors or suppliers for the commencement of work.
Compliance Requirements
Source: Annexure B-to be completed and signed.pdf (unknown)Compliance with Eskom OHS legal and other requirements is mandatory. Bidders must comply with: Eskom contractor Health and Safety requirements standards 32-136, the OHS specification/requirements provided, the Occupational Health and Safety Act, and the Compensation for Occupational Diseases and Illnesses Act. After contract award, the supplier must fully align its processes to Eskom's OHS requirements (policies, procedures, standards). Penalties will be enforced on the main supplier for non-conformance to Eskom and/or statutory OHS requirements. All employees (contractors/suppliers) must undergo the relevant Eskom induction and the company's induction.
Health & Safety
Source: Annexure B-to be completed and signed.pdf (unknown)Annexure B must be completed and signed by an authorised person (CEO/Director/Managing Director) and witnessed by two witnesses.
Contractual Terms
Source: Annexure B-to be completed and signed.pdf (unknown)The main supplier must demonstrate to Eskom the process and selection criteria applied when appointing contractors and suppliers. The main supplier must provide notification to Eskom prior to appointing contractors or suppliers for commencement of work. The main supplier must ensure contractors/suppliers have adequate resources and competencies. The main supplier is accountable for managing its contractors/suppliers to ensure compliance with applicable legal and Eskom requirements. The main supplier shall monitor contractors/suppliers through audits and assessments regarding OHS compliance during execution of work. The main supplier must provide grounds for termination of work done by contractors/suppliers. All non-conformances/non-compliance by contractors/suppliers (all tiers) shall be dealt with directly with the main contractor/supplier in terms of performance and penalty processes. Eskom reserves the right to verify compliance and may instruct the contractor to provide copies of testimonials/references and contact details of clients (including Eskom) for whom the company has done previous work of a similar nature.
Description
Source: SDL&I Inputs Hydrocarbon Spill Management, Oil Dam Cleaning.pdf (TENDER)Construction Skills Development
Goal % (CSDG)
2.3 Mandatory Subcontracting as condition of award
N/a
2.3 National Industrial Participation Programme
N/a
Section 3: SDL&I Objectives in line with Reconstruction and Development Programme (RDP) Goals
Tenderers who complete and submit the objectives as required, but who do not meet NTCSA’s targets, will
Contact Information
Source: SDL&I Inputs Hydrocarbon Spill Management, Oil Dam Cleaning.pdf (TENDER)Buyer: Tshifhiwa Modau. Department: Transmission. Compiled by Takalani Makhaphiedza (Learner non-technical, SDL&I) and supported by Rudzani Tsikungulu (Senior Advisor, SDL&I), both dated 03 July 2026.
Submission Guidelines
Source: SDL&I Inputs Hydrocarbon Spill Management, Oil Dam Cleaning.pdf (TENDER)Returnable documents: SBD 6.2 (Declaration for Local Production and Content) and Annex C (Local Content Declaration – Summary Schedule) are mandatory on contract award. A valid B-BBEE certificate (SANAS accredited), sworn affidavit, or CIPC affidavit is required to claim preference points. Bidders must be registered on the CSD (Central Supplier Database) and/or NTCSA Vendor Database. All required forms must be completed, signed, and submitted with the bid.
Evaluation Criteria
Source: SDL&I Inputs Hydrocarbon Spill Management, Oil Dam Cleaning.pdf (TENDER)Objective criteria are a condition for contract award; if a tenderer fails to meet them, the second-ranked tenderer may be recommended for award. Preference points are allocated under the PPPFA based on B-BBEE status. SDL&I objectives do not form part of scoring, but commitments become contractual obligations. B-BBEE improvement milestones are non-negotiable for certain status levels.
Technical Specifications
Source: SDL&I Inputs Hydrocarbon Spill Management, Oil Dam Cleaning.pdf (TENDER)Scope: Hydrocarbon spill management, oil dam cleaning, and hazardous waste management services for the NTCSA Northeast Grid, on an as-and-when required basis during both emergency and normal operational conditions. Duration: 3 years. No designated sector or CIDB compulsory training applies. Mandatory subcontracting and National Industrial Participation Programme are marked N/A.
Methodology
Source: SDL&I Inputs Hydrocarbon Spill Management, Oil Dam Cleaning.pdf (TENDER)their supply network. In certain cases, the SETA’s accredited training providers can be approached to
participate in developing critical and scarce skills.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No 2021/539129/30
File name: 559-156509788 (Rev 1) NTCSA SDL&I Input of 5
Document Identifier 559-156509788 Rev 1
SDL&I Input Effective Date July 2024
Review Date July 2027
Note: That these targets for skills development candidates categorically exclude Eskom employees
and registered learners. The tenderers are required to take full responsibility for the total cost of
developing the requisite skills, and Eskom shall not make any financial contribution towards the
fulfilment of this obligation. Tenderers also are advised to approach their relevant SETAs to access
grants, subsidies, and incentives as well as South African Revenue Services for tax rebates that
are earmarked for skills development initiatives
Section 4: SDL&I Penalty and Performance Security
NTCSA will apply a penalty of 2.5% of the invoice amount for failure to meet SDL&I obligations.
For the duration of the contract, NTCSA will retain 2.5% of every invoice (excluding VAT) as security
for the fulfilment of all SDL&I Obligations. The retained amounts shall only be released to the
Pricing Schedule
Source: SDL&I Inputs Hydrocarbon Spill Management, Oil Dam Cleaning.pdf (TENDER)“Local Procurement Content” refers to value added in South Africa by South African resources. Where a
single contract involves a combination of local and imported goods and/or services, the tender response
must be separated into its components as per the Price Schedule included with the tender documents.
Financial Requirements
Source: SDL&I Inputs Hydrocarbon Spill Management, Oil Dam Cleaning.pdf (TENDER)Local procurement content: tender response must separate local and imported components as per the Price Schedule. NTCSA target for local procurement content is 100%. A penalty of 2.5% of the invoice amount applies for failure to meet SDL&I obligations. NTCSA retains 2.5% of every invoice (excluding VAT) as security for SDL&I obligations; retained amounts are released upon receipt of SDL&I progress reports, fulfilment of all obligations, and submission of an approved compliance report.
Compliance Requirements
Source: SDL&I Inputs Hydrocarbon Spill Management, Oil Dam Cleaning.pdf (TENDER)CSD registration required. Valid B-BBEE certificate (SANAS accredited), sworn affidavit, or CIPC affidavit required for preference points. B-BBEE improvement plan required within 30 days of contract signing for bidders with status levels 2-8 or non-compliant. Sworn affidavits must meet validity requirements including designation, ownership percentages, revenue, and financial year end. SBD 6.2 and Annex C mandatory on contract award.
Health & Safety
Source: SDL&I Inputs Hydrocarbon Spill Management, Oil Dam Cleaning.pdf (TENDER)emergency and normal operational conditions
Duration of the Project 3 Years
following key pointers to ensure their validity:
know that person is duly authorised to depose of an affidavit. (Mark the applicable option).
applicable, and enterprise business address.
specialised enterprises as per Statement 004, the percentage of black beneficiaries must be
reflected. (No blank spaces to be left).
statements or management account. (Mark the applicable option).
determine the total revenue. (Financial year end to be stipulated by day/month/year).
for the empowering supplier status.
affidavit must be signed in the presence of the Commissioner of Oath. Furthermore the
Commissioner must also sign and stamp)
person cannot by law, commission a sworn affidavit in which they have an interest.
Compiled by: Supported by:
Environmental
Source: SDL&I Inputs Hydrocarbon Spill Management, Oil Dam Cleaning.pdf (TENDER)and Environmental Officer
*For every R2 million Invoiced by NTCSA on the contract the supplier shall develop a skill.
Contractual Terms
Source: SDL&I Inputs Hydrocarbon Spill Management, Oil Dam Cleaning.pdf (TENDER)Section 4: SDL&I Penalty and Performance Security - NTCSA will apply a penalty of 2.5% of the invoice amount for failure to meet SDL&I obligations. For the duration of the contract, NTCSA will retain 2.5% of every invoice (excluding VAT) as security for the fulfilment of all SDL&I Obligations. The retained amounts shall only be released to the Contractor upon:
Requirements
Source: SDL&I Inputs Hydrocarbon Spill Management, Oil Dam Cleaning.pdf (TENDER)Section 6: Market Research - Current Suppliers Providing the Services Potential Supplier NTCSA Vendor Database CSD Suppliers.
Section
Source: SDL&I Inputs Hydrocarbon Spill Management, Oil Dam Cleaning.pdf (TENDER)be allocated points in terms of a preference point system based on specific goals, NTCSA also requests that
Enterprise and must comply with all of the elements of QSE score card relevant to your sector unless an entity
Description
Source: NTCSA Non-Disclosure Agreement (NDA) Vendors_.docx (unknown)I. National Transmission company south africa SOC LTD a company incorporated under the laws of the Republic of South Africa, having its registered office at Megawatt Park, Maxwell Drive, Sunninghill ext.3, Sandton, Republic of South Africa, with registration number 2021/539129/30 [hereinafter referred to as “the Disclosing Party”.
Contact Information
Source: NTCSA Non-Disclosure Agreement (NDA) Vendors_.docx (unknown)Registered office of National Transmission Company South Africa SOC Ltd: Megawatt Park, Maxwell Drive, Sunninghill, Sandton, South Africa.
Submission Guidelines
Source: NTCSA Non-Disclosure Agreement (NDA) Vendors_.docx (unknown)Bidders must sign and return the NTCSA Non-Disclosure Agreement (NDA) as part of their submission. The agreement binds the receiving party to keep all confidential information secret, use it only for the tender, and return or destroy it on request. It runs for three years from signature and is governed by South African law. No other submission instructions were provided in the available document.
Evaluation Criteria
Source: NTCSA Non-Disclosure Agreement (NDA) Vendors_.docx (unknown)Bidders must sign and return the NTCSA Non-Disclosure Agreement (NDA) as part of the tender submission. The NDA requires the receiving party to protect confidential information, not disclose it to third parties without consent, and return or destroy all confidential material upon request. The NDA is governed by the laws of the Republic of South Africa.
Technical Specifications
Source: NTCSA Non-Disclosure Agreement (NDA) Vendors_.docx (unknown)I. National Transmission company south africa SOC LTD a company incorporated under the laws of the Republic of South Africa, having its registered office at Megawatt Park, Maxwell Drive, Sunninghill ext.3, Sandton, Republic of South Africa, with registration number 2021/539129/30 [hereinafter referred to as “the Disclosing Party”.
Compliance Requirements
Source: NTCSA Non-Disclosure Agreement (NDA) Vendors_.docx (unknown)Bidders must return a signed NTCSA Confidentiality Agreement (NDA) as part of the tender. The NDA binds the receiving party to confidentiality for three years after the relationship ends, restricts use of confidential information to the tender project only, and requires return or destruction of material on request. No other compliance requirements are stated in this extract.
Description
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)This document is Eskom's Supplier Quality Management Specification (240-105658000, Revision 3), which sets out the minimum quality requirements for all existing and potential Eskom suppliers. It defines quality criteria for selection, evaluation, vendor registration, management, monitoring, assessment, and auditing of suppliers. The specification applies to all Eskom divisions, subsidiaries, suppliers, and sub-suppliers, and forms part of all Eskom RFIs, RFQs, RFPs, and contracts for procurement of products and services. The specification references ISO 9001, ISO 10005, and other standards. Suppliers are classified into four quality categories (1–4) with corresponding documentation requirements.
Important Dates
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Closing date: 8 October 2026 at 10:00 (per tender record). No other dates (briefings, site visits, clarification deadlines) are stated in the document.
Contact Information
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)No specific contact details (names, emails, phones, submission address) are provided in the document. The department is Supply Chain Management.
Submission Guidelines
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Returnable documents — complete, sign and submit with the bid:
Disqualification risks:
Evaluation Criteria
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Quality assessment criteria are selected and completed by an Eskom Quality representative/professional using Form A. Bidders must complete and sign Form A to acknowledge and accept Eskom Supplier Quality requirements as per this specification and ISO 9001. Suppliers are classified into four quality categories (1–4); only one category applies per procurement process. The applicable category is indicated in Form A and the List of Tender Returnables. Bidders must submit quality documentation per the selected category. Capability and capacity assessments may be performed prior to contract award for suppliers providing high-risk products/services, working on critical plant, supplying critical plant items, or providing special processes.
Technical Specifications
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Scope: Provision of hydrocarbon spill management, oil dam cleaning, and hazardous waste management services for the NTCSA Northeast Grid, on an as-and-when required basis during both emergency and normal operational conditions.
Quality management system requirements:
Contract Quality Plan (CQP):
Quality Control Plan (QCP)/Inspection and Test Plan (ITP):
Quality kick-off and coordination meetings:
Eskom rights:
Preservation:
Methodology
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Method statements:
Preservation work plan:
Experience & Qualifications
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Quality audits and quality performance reviews must be carried out by trained, accredited, and experienced personnel in accordance with documented procedures. Personnel performing special processes (e.g., NDE, welding, coating, heat treatment) must be suitably qualified and, where applicable, registered with statutory bodies (e.g., radiographic workers). Training certificates must meet SETA requirements, including unit standard completion and accreditation number of service providers.
Quality Management
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Quality management system (QMS):
Quality Control Plan (QCP)/Inspection and Test Plan (ITP):
Quality meetings:
Eskom rights:
Pricing Schedule
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)No pricing schedule, rates, bill of quantities, or payment schedules are stated in the document.
Financial Requirements
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)No pricing format, bonds, guarantees, payment terms, or financial capacity thresholds are stated in the document.
Compliance Requirements
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)ISO 9001 certification: Bidders must hold a valid ISO 9001 certificate (or applicable QMS certificate) from an accredited certification body, unless excluded by the tender category. This applies to sub-suppliers as well.
Form A: Must be completed and signed to acknowledge acceptance of Eskom's Supplier Quality requirements.
List of Tender Returnables (240-12248652): Specifies the applicable quality category (1–4) and required documentation.
B-BBEE: No specific B-BBEE level or preference points are stated in the document.
Health & Safety
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)No specific health and safety requirements are stated in the document. The specification references Eskom's Safety, Health, Environment, and Quality (SHEQ) Policy (32-727) as an informative reference.
Contractual Terms
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Preservation obligations:
Contact Information
Source: NTCSA Annexure 2 OHS Tender Evaluation Template-Medium Risk.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"ted to the scope of work. The methodology"}
Submission Guidelines
Source: NTCSA Annexure 2 OHS Tender Evaluation Template-Medium Risk.pdf (unknown)Submit the completed OHS Tender Evaluation Template (Annexure T2) as part of the tender returnables. The OHS annexure lists required submissions that must be returned with the bid; ensure all OHS-related returnables are completed and attached. The submission is otherwise governed by the main tender invitation (not included in this document extract).
Evaluation Criteria
Source: NTCSA Annexure 2 OHS Tender Evaluation Template-Medium Risk.pdf (unknown)OHS evaluation is pass/fail based on the OHS Tender Evaluation Template (Medium Risks). Tenderers must either submit a compliant OHS returnable set or hold an ISO 45001 certificate. No scoring split or preference point allocation is stated in this document.
Technical Specifications
Source: NTCSA Annexure 2 OHS Tender Evaluation Template-Medium Risk.pdf (unknown)The tender relates to the scope of work for which an OHS submission is required. Specific technical scope, deliverables, quantities, and service levels are not stated in the available document.
Compliance Requirements
Source: NTCSA Annexure 2 OHS Tender Evaluation Template-Medium Risk.pdf (unknown)OHS compliance requirements for this tender:
Alternative for certified suppliers: Annexure B plus a valid ISO 45001 certificate (or equivalent auditable OHS system certification) plus a valid Letter of Good Standing.
Health & Safety
Source: NTCSA Annexure 2 OHS Tender Evaluation Template-Medium Risk.pdf (unknown)The OHS Tender Evaluation Template (Medium Risks) sets the OHS evaluation requirements for this tender. Tenderers must provide:
Alternatively, suppliers with a certified auditable OHS system may submit Annexure B, a valid ISO 45001 (or equivalent) certificate, and the Letter of Good Standing in place of the BRA, OHS planhols and CEO-signed OHS policy.
Where the tenderer is not certified, the full OHS submission set (BRA, OHS plan, and OHS policy) is required.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Lake Street, Germiston, Johanessburg, 1401, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
19
Last checked
29 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Contact
021-980-7509[email protected]www.eskom.co.za/Pages/Landing.aspxLake Street, Germiston, Johanessburg, 1401, South Africa
Key Personnel
Learn how to submit a winning bid with these related articles
Your meticulously crafted General sector tender submission can be disqualified for a single, seemingly minor compliance oversight. The reality for South African contractors is that technical competence is no longer sufficient; it is underpinned by a non-negotiable framework of documentary compliance. This regulatory guide: mastering CSD and BBBEE compliance for general sector tenders in south africa provides a comprehensive, step-by-step breakdown of the mandatory registrations and certificates you must secure and present. We detail the precise requirements for CSD, BBBEE, SARS TCS, CIPC, and COIDA, explaining their function within the procurement ecosystem governed by the PFMA and PPPFA. Learn the actionable steps to prepare your business, avoid the most common disqualifying errors, and leverage technology to streamline your compliance process for successful bidding in 2026 and beyond.
For South African General contractors, the path to government procurement is paved with non-negotiable regulatory requirements. The most common barrier to entry is not a lack of capability, but a failure to master the foundational compliance frameworks that govern every bid. This complete regulatory guide to CSD and BBBEE compliance for General sector tender suppliers in South Africa demystifies the process. It provides a meticulous, step-by-step field manual for ensuring your company is fully compliant and audit-ready, enabling you to confidently access the R billions in opportunities across infrastructure maintenance, facilities management, and service delivery within the General sector.
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
This definitive guide provides General sector contractors with the precise, actionable steps required to achieve and maintain CSD and BBBEE compliance for South African public tenders in 2026. Authored by Dr. Sarah Mokwena, a Legal Compliance Specialist, it meticulously walks through the regulatory framework, mandatory registrations, and the critical documentation needed to avoid disqualification. We dissect the common, costly errors made during submission and provide a clear checklist to ensure your bid is responsive and competitive. Learn how to navigate the Central Supplier Database, validate your BBBEE status, and integrate compliance into your tender preparation process.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Supplies: General. Unlock full pricing strategies, bid frequency, and historical win rates.