Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
1 Villiersdorp Rd, - Elgin - Grabouw - 7180
Organization Type
GOVERNMENT
Published
01 Sept 2026
OCDS Reference
ocds-9t57fa-167699
Date & Time
Friday, 11 September 2026 - 12:00
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Venue
null
Categories
Request for Quotation
1 Villiersdorp Rd, - Elgin - Grabouw - 7180
Recommended Certifications
Having these can improve your winning chances: SABS Product Certification, NRCS Certification
AI Document Analysis Stages
Important Dates
Source: Q06-2026_Bid Doc.pdf (TENDER)01 Sept
2026
Tender Published
Tender was published
11 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Q06-2026_Bid Doc.pdf
To download these documents and access AI-powered analysis, visit the main tender page.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 253 661
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
{"closingDate":"11 September 2026","closingTime":"12:00"}
Contact Information
Source: Q06-2026_Bid Doc.pdf (TENDER){"name":"Mr. L Tshambu","email":"[email protected]","phone":"028 425 1157","department":"Supply Chain Management DEPARTMENT Emergency Services","address":"UIRED TO FILL IN AND SIGN A WRITTEN CONTRACT FORM (MBD7)."}
Submission Guidelines
Source: Q06-2026_Bid Doc.pdf (TENDER)Bidders will be required to submit certificate as a SANS/SABS accredited service centre for
SCBA cylinders. Bidders who do not submit SANS/SABS accreditation will not be considered for
evaluation.
Bidders must obtain a minimum of 60 out of 80 points for functionality
Supply and Delivery Address:
Grabouw Fire Deaprtment
Two a Day Group Premisses
Acacia Str.
Grabouw
7160
A. Pre-qualification criteria, sub-contracting and social responsibility
A.1. No sub-contracting between third parties of any kind will be allowed and will lead to non-
compliance as per the criteria disclose under eligible criteria in paragraph C.
B. Evaluation and adjudication
B.1. All items may be evaluated and awarded individually where applicable.
B.2. The estimated value will be used for evaluation purposes only and must not be seen as the
actual value.
C. Eligibility criteria
The evaluation of tenders will be done in terms of compliance with the following criteria. Tenders
that do not comply with all criteria below will not be evaluated further.
C.1. The evaluation of formal quotations will be done in terms of compliance with the following
criteria. Formal quotations that do not comply with all the criteria below will not be evaluated
further. For formal quotations to be evaluated further bidders must:
Obtain a minimum of 60 out of 80 points for the technical evaluation.
Initial
Functionality / Technical Evaluation Criteria:
Note: Bidders must obtain a minimum of 60 out of 80 points for functionality to be considered for
further evaluation.
All supporting documents must be included in the completed bid.
No. Criteria Description Maximum Bidder Score by Page
achievable self- ODM Reference
score score
1 Relevant All Suppliers need to submit 20
Experience proof of relevant years of sales
in Supply services and transactions, as well
and as supply and delivery of goods
Delivery of by the Supplier in the respected
Goods time frame.
Scoring Guide:
Proof: General experience in
number of years allocated
calculation of the average
years of experience.
2 Quality Bidders must provide proof of 20
service quality service offerings
offerings confirmed by satisfied customers
confirmed for similar services.
by Scoring Guide:
satisfied
customers
for similar
services Proof: Bidders must provide
reference letters.
3 Project Ability to manage logistics, 20
Logistics including scheduling, travel to
and delivery site. Bidders should
Delivery include a realistic project timeline
Plan and demonstrate availability.
Scoring Guide:
and on-site logistics = 10 points
contingencies and flexibility =
20 points
Proof: Logistics and Delivery
Plan including time frames and
availability.
Initial
No. Criteria Description Maximum Bidder Score by Page
achievable self- ODM Reference
score score
4 Sole Indicate Sole Manufacturers or 20
Product supplier product in the Republic
Suppliers of South Africa
Scoring Guide:
party distributor= 5 points
manufacturer as sole suppliers =
10 points
points
Proof: Bidders must provide
reference letters
Total points 80
Initial
Details of bidder
Name of firm I entity I enterprise
Trading as (if different from above)
Postal address
Physical address
Name: ___________________________________________________________
Contact Details of the Telephone: ____________________________Fax: _______________________
Person Signing the
Bid: Cellular Telephone: _________________________________________________
e-mail address: _____________________________________________________
Name: _____________________________________________________________
Contact Details of the
Senior Manager Telephone: __________________________________Fax: ____________________
Responsible for
Overseeing Contract Cellular Telephone: ___________________________________________________
Performance:
e-mail address: ______________________________________________________
Name: ____________________________________________________________
Contact Details of the Bidder
proposed Project Manager who
Telephone: _________________________Fax: ____________________________will represent the
Bidder in the
Cellular Telephone: __________________________________________________implementation
processes:
e-mail address: _____________________________________________________
Company Income Tax no. Tax Clearance Certificate
Pin
VAT registration no. CSD Registration Number
Company registration no. Date of Director’s
appointment
Any other Registration applicable to
this Industry
Name of Account holder: ___________________________________
Name of Bank: __________________________________________
Banking Details of Bidder
Account Number: _________________________________________
Branch Code: ____________________________________________
Initial
Previous Experience and References
This schedule is to determine the capability of the bidder to execute the contract.
Does your company have previous experience with regards to goods supplied or services rendered with reference
to this Bid?
Yes If yes, please elaborate using the table below & complete the signatory section at the bottom of
the page
No If no, please complete the signatory section at the bottom of the page
At least three (3) reference letters from companies with whom the service providers are/have conducted business relating
to the terms of reference of this Bid must be included in the Bid document, together with the contact details of the references,
alternatively reference letters must be submitted within a timeframe as to be determined by the Overberg District
Municipality.
Description of project
Contact person name
Contact person telephone number
Email Address
Year Completed Value of project
Description of project
Contact person name
Contact person telephone number
Email Address
Year Completed Value of project
Description of project
Contact person name
Contact person telephone number
Email Address
Year Completed Value of project
Signed at _______________________________ On this _____________ day of _______________________ 20_____
As Witnesses: 1. _________________________________ 2. ____________________________
Bidder (supplier) ______________________________
Initial
Authority of signatory
Indicate the status of the Bidder by ticking the appropriate box hereunder. The Bidder must complete the certificate set out
below for the relevant category.
A b c d e
Company Partnership Sole Proprietor Joint Venture Close Corporation
A. Certificate for company
I, ..........................................................................., chairperson of the board of directors of
..............................................................., hereby confirm that by resolution of the board (copy attached) taken on
................................... 20...... Mr/Mrs ....................................................... acting in the capacity of
.........................................................., was authorised to sign all documents in connection with this Bid and any
contract resulting from it on behalf of the company.
As witness
1........................................... .............................................
Chairman
2........................................... ..............................................
Date
B. Certificate of partnership
We, the undersigned, being the key partners in the business trading as ...............................................................
hereby authorise Mr/Mrs ............................................................, acting in the capacity of
........................................................................... to sign all documents in connection with the Bid for contract
..................................................................................... and any contract resulting from it on our behalf.
Name address signature date
NOTE: This certificate is to be completed and signed by all of the key partners upon who rests the direction of the affairs of the Partnership as a whole.
C. Certificate for sole proprietor
I, ...................................................................................................................., hereby confirm that I am the sole
owner of the business trading as.................................................................................................................
As Witness:
1........................................................... ....................................
Signature: Sole owner
2.......................................................... .....................................
Date
Initial
D. Certificate for Joint Venture
We, the undersigned, are submitting this Bid offer in Joint Venture and hereby authorise Mr/Mrs
.........................................................., authorised signatory of the company
............................................................................................................, acting in the capacity of lead partner, to
sign all documents in connection with the Bid offer for contract ....................................................................... and
any other contract resulting from it on our behalf.
This authorisation is evidenced by the attached power of attorney signed by legally authorised signatories of all the partners
to the Joint Venture.
Name of firm address authorising signature, name &
Capacity
Lead partner
E. Certificate for Close Corporation
We, the undersigned, being the key members in the business trading as
................................................................................................................................... hereby authorise
Mr/Mrs ........................................................................................... acting in the capacity of
................................................................................................, to sign all documents in connection with the Bid
for contract ....................................................................... and any contract resulting from it on our behalf.
Name address signature date
NOTE: This certificate is to be complete and signed by all the key members upon whom rests the direction of the affairs of the Close Corporation as a
whole.
Initial
Enterprise questionnaire
The following particulars must be furnished. In the case of a joint venture, separate enterprise questionnaires in respect
of each partner must be completed and submitted.
Section 1: Enterprise details
Name of enterprise
Contact Person
Telephone
Cell phone
Fax
Physical Address
Postal Address
Central supplier database MAAA
registration number
Section 2: Particulars of companies and close corporations
Company / Close Corporation
registration number:
Section 3: SARS information:
Tax reference number:
VAT registration number, if any:
Section 4: CIDB registration number:
Section 5: Particulars of principles
Principle: means a natural person who is a partner in partnership, a sole proprietor, a director of a company established
in terms of the Companies Act of 2008 (Act. No. ) a member of a close corporation registered in terms of the
Close Corporation Act, 1984 (Act No.)
Full name of principal Identity number* Personal income tax number*
Section 6: Banking Details of companies and close corporations
Bank name and branch: ..................................................................................................
Bank account number: .....................................................................................................
Name of account holder: .................................................................................................
Signed ........................................................ Date .................................................
Name ....................................................... Position .................................................
Bidder .....................................................................................................................................
Initial
Documents of incorporation (ck2)
The Bidder must attach to this page a copy of the certificate of incorporation of his/her company,
close corporation of partnership. In the case of a joint venture between two or more firms, the Bidder
shall attach a copy of the document of incorporation of the joint venture.
Signed ........................................................ Date .................................................
Name ....................................................... Position .................................................
Bidder ........................................................................................................................................
Initial
Mbd 2
Tax compliance status
It is a condition of bid that the taxes of the successful bidder must be in order, or that satisfactory
arrangements have been made with South African Revenue Service (SARS) to meet the bidder’s tax
obligations.
1 In order to meet this requirement bidders are required to request their Tax Compliance Status
which will include a unique PIN which you can provide to any third party (if requested) to
enable them to verify your tax compliance status online via eFiling.
2 Request a TCC via eFiling which will give you the option to print the TCC or request a TCC at
a SARS branch where a SARS agent will be able to print or email the TCC to you.
3 The Tax Compliance Status Requirements are also applicable to foreign bidders / individuals
who wish to submit bids.
4 A Tax Compliance Status is a holistic view of your tax compliance level across all your
registered tax types.
5 If your tax compliance status is compliant, the SARS agent will be able to print or email you
your TCC to the registered email address which SARS has on record for you.
6 Please note: If your tax compliance status reflects that you are non-compliant, you will not
receive a TCC until you have rectified your compliance.
7 The Printed Tax Compliance status pin must be submitted together with the bid. Failure to
submit a Tax Compliance status pin will result in the invalidation of the Bid.
8 In bids where Consortia / Joint Ventures / Sub-contractors are involved; each party must
submit a separate printed Tax Compliance Status Pin.
9 Please note that not all government institutions and private organisations will be able
to utilise the Tax Compliance Status (TCS) PIN at this stage and in such instances, you
must supply a printed TCS. It is envisaged that the PIN will, in time, replace the paper
Tcs.
Yes NO
Is your company already registered on the Overberg District Municipality’s (ODM) Database?
Have you confirmed this with the Supply Chain Management Department of ODM
If yes, please provide ODM Database Supplier Number.
As stated above, bidders must ensure that they are up to date with payments of taxes.
The bidder must attach to this page a Tax Compliance status pin as issued by the South African Revenue Service.
Failure to submit a Tax Compliance status pin will result in the invalidation of the Bid.
Signed ........................................................ Date .................................................
Name ....................................................... Position .................................................
Bidder ........................................................................................................................................
Initial
Mbd 3.1
Evaluation Criteria
Source: Q06-2026_Bid Doc.pdf (TENDER)Functionality / Technical Evaluation Criteria 20 – 21
Responsiveness and Evaluation criteria 37 – 38
Preference Points Claim Form in terms of the Preferential Procurement Regulations 2022 – MBD6.1 51 – 55
Annexure A 69 – 70
weight of the 80/20 preferential procurement system. Bidders must submit a valid Tax Compliance
In order to qualify for preference points for b-bbee]
eria Description Maximum Bidder Score by Page
score score
2 Quality Bidders must provide proof of 20
service quality service offerings
satisfied
customers
for similar
and on-site logistics = 10 points
No. Criteria Description Maximum Bidder Score by Page
party distributor= 5 points
Total points 80
Technical Specifications
Source: Q06-2026_Bid Doc.pdf (TENDER)Terms of reference / scope of work - specifications
The purpose of this formal quotation is to obtain quotations from suitable service providers to provide
Satphone units and airtime to Overberg District Municipality’s Emergency Services
FIRE SUIT – EN469:2005+AC: 2006: CLASSIFICATION Xf2, Xr2, Y2, Z2-
Standard design:
The suit shall consist of tunic and trousers.
Each garment shall consist of an outer shell, moisture barrier, and thermal barrier.
The moisture barrier, thermal barrier shall form the inner shell and shall be stitched into the
outer shell.
The suits shall be made in eight (8) sizes labelled: XSmall / Small / Medium / Large / XL /
2XL / 3XL / 4XL and Special size. Special size suits shall be made to fit for individual
personnel, where standard sizes will not fit and protect adequately.
Fabric and garment requirements:
Outer Material (Shell) – According to EN 469:2005/AC: 2006
54% NOMEX® including antistatic fibres - 46%KEVLAR® Weight 240 g/m2.A blended
aramid non-woven fabric is laminated to a waterproof, breathable
+Ptfe
Moisture Barrier – According to EN 469:2005/AC: 2006
A blended aramid non-woven fabric is laminated to a waterproof, breathable +PTFE Membrane.
Included.
Waterproof
Breathable
Fire Resistant
Heat Resistant
Thermal Liner – According to EN 469:2005/AC: 2006
50% Aramid & 50% Viscose FR Face Cloth quilted to 2 layers of needle punched 80%
Aramid & 20% Meta Aramid Batting.
Proof of the certificate EN 469:2005/AC: 2006 must be included.
Initial
Requirements for protective tunic:
The outer shell shall be of a single layer construction throughout.
All seams shall be double stitched. The coat shall have a double closure front with 50mm
Velcro and a heavy-duty zip. The zip shall comply with the standards.
There shall be no seams on the shoulders. Sleeves shall be constructed in such a way as
afford maximum movement.
The sleeve cuffs shall be reinforced.
The arms of the tunic shall be designed to facilitate the maximum amount of free arm
movement.
Elbow padding is required. The padding shall consist of polymer-coated Kevlar with a heat
resistant material sandwiched between the shell and the Kevlar. The padding shall be
stitched onto the outer shell using double stitching.
The inner jacket shall be attached to the outer jacket and stitched together.
The inner jacket shall be equipped with wristlets and thumb loops in accordance with the
En 469:2005/ac: 2006.
The jacket shall include inverted pleats. The two pleats shall be set in the back of the
outer shell
The tunic shall be bunny style in front and longer toward the back (Tail)
Pockets:
a. Two (2) pleated waterproof side pockets shall be fitted to the tunic. The size of these
pockets shall be 220 mm x 180 mm with a 75 mm pocket-flap held down by two (2)
Velcro squares.
b. A radio pocket shall be fitted onto the left chest. The pocket shall be so positioned not
to hinder the Breathing Apparatus shoulder straps. The pocket shall feature a pocket
flap with an insertion for the antenna. The pocket flap shall be closed with a Velcro
square.
c. All pockets shall be of the same material as the outer shell
d. A pocket shall be placed on one side on the inside of the inner shell. This pocket shall
be constructed of the same material as the inner shell.
Collar: The collar shall be of a double layer of the same material as the outer shell and shall
have a layer of the quilted thermal barrier in the middle thereof.
A storm-flap constructed the same as the collar shall be fitted in such a way as to ensure
a “Dry Suit”. The area over the chin shall have a layer of Nomex Knit.
Initial
Reflective trim
Fluorescent Lime-yellow with a silver strip in the centre reflective trims shall be fitted to the
suit.
Reflective Tape according to EN ISO 15025:2000
The trims shall be 50mm wide throughout.
All trims shall be double stitched.
The trims shall be positioned as specified.
Marking:
Each Tunic and each pair of trousers must have a white printed label of a nominal size of 300 mm x
100 mm. All cut edges must be turned in and the label securely sewn centrally to the inside of the
back of the inner shell at the top of both the tunic and trousers. The label must provide the following
information printed in legible block letters.
a) The manufacturers name or trademark or both
b) The composition of the materials
c) All materials EN 469:2005/AC: 2006 compliant
d) The year of manufacture
e) Washing instructions
f) Size
g) Destination
h) Bar coding system list (Optinal)
i) A numbered tracking system must be provided. The numbers must be embroided onto the
inside of the storm flap of the tunic and onto the bib at the rear of the trouser to which the
suspenders are attached. This is in order to allow the following:
o The manufacturer to verify the batch numbers of the material used in the
manufacture of each tunic and trouser and the production run.
o The end user to track the name of the individual to whom the item was issued.
Insignia – optional:
Municipality Logo in front.
Municipality Back Logo.
Initial
General
The garment shall have no metal clips or rivets.
The manufacturer must undertake to do repairs on a material cost basis.
The suit shall be constructed in such a way that damaged panels can be replaced.
All layers must be designed to allow for this.
It is a condition of the tender that all tenderers submit a SABS Approved Manufacturing
Capability Report Certificate which is not older than twelve (12) months, which certifies the
capability to manufacture the specific items tendered for with their tender.
Failure to submit this report will render the tender null and void.
Figure 1
Flash hoods
Design – two-piece with notched shoulder
Head design bib design
LAYERS: 2 ply LAYERS: 2 ply
LENGTH: From top of head to neck: 13 inches LENGTH: 8 inches (front and back)
WIDTH: Back seam to top of face: 9 inches NOTCHED SHOULDER DESIGN:
Back seam to bottom of head: 11inches
From top of head to bottom of notched
shoulder: 15 inches
OVERALL, HOOD LENGTH: From top of head to bottom of apron: 21 inches SIZING: One
size fits all (universal size). Do not modify, change, or alter the protective hood in any manner.
Initial
Face opening measurements
RELAXED: 5 inches (UL requirement 4.7-5.7 inches)
STRETCHED: 15 inches (Face opening to be sewn with 1⁄2 inch elastic.
Construction
SEAMS: All seams must be merrow stitched then top and bottom covered with a 5-thread cover
stitch for extended durability. All bottom edges must be bound with binding.
THREAD: 100% Nomex
Warranty information
The protective hood must be warranted to be free from defects in material or workmanship for
one year.
Certification
Meets or exceeds NFPA 1971-2007 Edition and must be UL Certified. Meets or exceeds
Cal/OSHA Standards.
P84 (aka P84 / Lenzing)
Material Content: 40% P84 / 55% Lenzing FR / 5% Kevlar
Material Construction: 1 x 1 Rib Knit
Material Weight: 8.0 oz / yd2 (+1 / -.5)
Material Colour Yellow (Standard)
Colour Options Red**, Navy Blue, Grey, and Black (**Red hoods are done with a RED
Available outer / Yellow inner)
Fabric performance values
Thermal protective performance (tpp)
2 ply - as received 29.1 cal/cm2
2 ply - after 5 washes
Hood material burst strength
500 n
Flame resistance test
Initial
After Flame as received 0 seconds
after 5 washes 0 seconds
Char Length (wales x courses) as received 61 mm x 38 mm
after 5 washes 66 mm x 55 mm
Cleaning shrinkage resistance test
Hood Measurement 0%
Face Opening Measurement 2%
Heat and thermal shrinkage resistance test
Hood Measurement as received 1%
after 5 washes 2%
Face Opening Measurement as received 4%
after 5 washes 2%
Seam breaking strength test
803 n
Melt, drip, ignite, separate when exposed to flame
None
Arc thermal performance value (atpv)
1 ply 6.2 cal/cm2 (HRC 1)
2 ply 22.9 cal/cm2 (HRC 2)
Heat attenuation factor (haf)
1 ply 74%
2 ply 89.7%
Kevlar incorporated for added strength and durability
Inherently flame resistant
No harsh chemical treatments
Maintains performance values after laundering
Moderate weight for added thermal protection
Finished to minimize shrinkage
Rib knit allows for stretch and shape retention
Nfpa 70e performance specifications of
ASTM F 1959/F 1959M-06ae1:
HRC Level 1 = minimum 5 cal/cm2 to 7 cal/cm2 HRC
Level 2 = minimum 8 cal/cm2 to 24 cal/cm2
HRC Level 3 = minimum 25 cal/cm2 to 39 cal/cm2 HRC
Level 4 = minimum 40 cal/cm2 and over
Initial
Figure 2
Pricing Schedule
Source: Q06-2026_Bid Doc.pdfName of Bidder: ______________________________________________ Bid Number: Q06-2026
Closing Time: 12:00 Closing Date: 11 September
2026
Offer to be valid for 90 days from the closing date of bid.
Pricing instructions:
schedules will NOT be accepted.
Draw a line across and initial all corrections.
State the rates and prices in Rand unless instructed otherwise in the Bid conditions.
All prices Tendered must include all expenses, disbursements, and costs (e.g. transport, etc.) that may be required
for the execution of the Bidder’s obligations in terms of the Contract, and shall cover the cost of all general risks,
liabilities and obligations set forth or implied in the Contract as well as overhead charges and profit (in the event that
the Bid is successful). All prices Tendered will be final and binding.
should be indicated on the pricing schedule as R0.00. If any products/services will not be Tendered on, in such an
instance no quote should be indicated on the pricing schedule.
supplied are according to the specifications.
of the contract and the estimated number of units of each item, as indicated in the table below will be used for
evaluation purposes, are based on historical trends but should not be used for Bid pricing purposes.
agreed upon to the municipality. Should a service provider at any time fail to adhere to the specified delivery period,
the Overberg District Municipality will be entitled to end the contract after written notices have been issued. Deliveries
not complying with the product specifications and official order will be returned to the service provider at the service
provider’s expense as specified in paragraph 8.7 of the General Conditions of Contract.
The Municipality reserves the right to accept more than one quotation (in the event of several items being offered).
The Municipality reserves the right to award the quotation per line item (in the event of several items being offered).
Initial
Q06-2026: supply and delivery of protective clothing to overberg district
Municipality’s emergency services
Description Estimated Unit Price Total Price
Quantity (R) (R)
Fire-safe balaclava 20
Fire-safe air bunker jacket navy 50mm
TAPE (Small)
Fire-safe air bunker jacket navy 50mm
TAPE (Medium)
Fire-safe air bunker jacket navy 50mm
TAPE (Large)
Fire-safe air bunker trousers navy 50mm
TAPE (Small)
Fire-safe air bunker trousers navy 50mm
TAPE (Medium)
Fire-safe air bunker trousers navy 50mm
TAPE (Large)
Delivery 1
p/km
Sub-total
VAT 15%
TOTAL BID PRICE (Incl. VAT)
Required by: Mr. R Geldenhuys
At: ODM Emergency Services
Does offer comply with specification? YES NO
If not to specification, indicate deviation(s) ..........................................
Note:
All costs must be included in the bid price and delivered to the prescribed destination.
Initial
Mbd 3.1
Pricing schedule
Name of Bidder: ______________________________________________ Bid Number: Q06-2026
Closing Time: 12:00 Closing Date: 11 September
2026
Offer to be valid for 90 days from the closing date of bid.
State the rates and prices in Rand unless instructed otherwise in the Bid conditions.
All prices Tendered must include all expenses, disbursements, and costs (e.g. transport, etc.) that may be required
for the execution of the Bidder’s obligations in terms of the Contract, and shall cover the cost of all general risks,
liabilities and obligations set forth or implied in the Contract as well as overhead charges and profit (in the event that
the Bid is successful). All prices Tendered will be final and binding.
should be indicated on the pricing schedule as R0.00. If any products/services will not be Tendered on, in such an
instance no quote should be indicated on the pricing schedule.
supplied are according to the specifications.
of the contract and the estimated number of units of each item, as indicated in the table below will be used for
evaluation purposes, are based on historical trends but should not be used for Bid pricing purposes.
agreed upon to the municipality. Should a service provider at any time fail to adhere to the specified delivery period,
the Overberg District Municipality will be entitled to end the contract after written notices have been issued. Deliveries
not complying with the product specifications and official order will be returned to the service provider at the service
provider’s expense as specified in paragraph 8.7 of the General Conditions of Contract.
The Municipality reserves the right to accept more than one quotation (in the event of several items being offered).
The Municipality reserves the right to award the quotation per line item (in the event of several items being offered).
Compliance Requirements
Source: Q06-2026_Bid Doc.pdf (TENDER)valid Tax Clearance Certificate or Tax Clearance Certificate PIN and a copy
Tax Compliance Status - MBD2 (Compulsory) 28
TAX COMPLIANCE STATUS TCS PIN: CSD No
Tax compliance requirements
Tax compliance status (tcs) certificate or pin may also be made via e-filing
Tax compliance status system pin
Tax Compliance
Tax Compliance Status Pin Issued (TCS)
Tax Compliance Status Pin Issued unless the Municipality has a valid
Tax Compliance Status Pin Issued, either as an attachment to the bid documents
Tax Compliance Status Pin Issued
Tax compliance status
tax compliance status online via eFiling
Tax Compliance Status Requirements are also applicable to foreign bidders / individuals
Tax Compliance Status is a holistic view of your tax compliance level across all your
tax compliance status is compliant, the SARS agent will be able to print or email you
tax compliance status reflects that you are non-compliant, you will not
Tax Compliance status pin must be submitted together with the bid
Tax Compliance status pin will result in the invalidation of the Bid
Tax Compliance Status Pin
Tax Compliance Status (TCS) PIN at this stage and in such instances, you
Tax Compliance status pin as issued by the South African Revenue Service
TCS PIN: CSD No
Csd number
CSD Registration Number
Central supplier database (csd), a csd number
Central Supplier Database (CSD)
Central supplier database MAAA
power of attorney signed by legally authorised signatories of all the partners
Pricing Schedule – MBD 3.1 29 – 30
B-BBEE Minimum Level: 1
Points Allocation: 80 points
B-BBEE Details: and Specifications 13 – 19
Functionality / Technical Evaluation Criteria 20 – 21
Details of Bidder 22
Previous Experience 23
Authority to sign 24 – 25
Compulsory Enterprise Questionnaire 26
Tax Compliance Status - MBD2 (Compulsory) 28
Pricing Schedule – MBD 3.1 29 – 30
Form of Offer and Acceptance 31 – 32
Declaration of Interest – MBD4 (Compulsory) 33 – 36
Responsiveness and Evaluation criteria 37 – 38
General Conditions of Contract – MBD5 39 – 49
Preference Points Claim Form in terms of the Preferential Procurement Regulations 2022 – MBD6.1 51 – 55
Sworn Affidavit – B-BBEE EXEMPTED MICRO ENTERPRISE MBD6.1(a) 58
Contract Form – Purchases of goods / works – MBD7.1 59 – 60
Declaration of bidders past supply chain management practices – MBD8 61 – 62
Notification of decision 63
Certificate of Independent Bid Determination – MBD9 64 – 66
Key Performance Indicators – MBD 16 67
Important documentation and information 68
Annexure A 69 – 70
Annexure B – Certificate for municipal services 71
Checklist for completeness of bid documentation 72
Important
Do not dismember this Bid Document (do not take it apart).
All other documents of your submission must be attached behind this Bid Document unless stated otherwise.
The bidder must initial every page of the bid document.
Where requested witnesses must sign the document. Failure to do this may invalidate your bid.
The checklist at the back of the bid document must be completed and adhered to.
Initial
Mbd 1
Part a
Invitation to bid
You are hereby invited to bid for requirements of the overberg district municipality
BID NUMBER: Q06-2026 CLOSING DATE: Friday, 11 September 2026 CLOSING TIME: 12h00
Supply and delivery of protective clothing to overberg district municipality’s
Health & Safety
Source: Q06-2026_Bid Doc.pdfBID NUMBER: Q06-2026 CLOSING DATE: Friday, 11 September 2026 CLOSING TIME: 12h00
Supply and delivery of protective clothing to overberg district municipality’s emergency
Q06-2026: supply and delivery of protective clothing to overberg district
Municipality’s emergency services
for the SUPPLY AND DELIVERY OF PROTECTIVE CLOTHING TO OVERBERG DISTRICT
Municipality’s emergency services
[email protected] or call 028 425 1157.
Sealed envelope endorsed “Q06-2026: SUPPLY AND DELIVERY OF PROTECTIVE CLOTHING
TO OVERBERG DISTRICT MUNICIPALITY’S EMERGENCY SERVICES”, must be placed in the
Bid box at the Municipal Offices, 26 Long Street, Bredasdorp, 7280 not later than 12:00 on Friday,
11 September 2026. Quotations will be opened in public thereafter.
(c) Any bid document received with correction fluid (Tippex) corrections shall be disqualified.
opening of the bid to the time the contract is awarded. If a bidder wishes to bring additional information to the
notice of the Overberg District Municipality, it should do so in writing to the Overberg District Municipality. Any
effort by the firm to influence the Overberg District Municipality in the bid evaluation, bid comparison or contract
award decisions may result in the rejection of the bid.
(a) Notice , amendment of the Code of Good Practice, published in Government Gazette No.
29617 on 9 February 2007 in terms of the Broad-Based Black Economic Empowerment Act (Act No.), inter alia determines that:
any enterprise with an annual Total Revenue of R5 million or less qualifies as an Exempted Micro-
Enterprise, provided that sufficient evidence of qualification as an EME is certified in an auditor’s
certificate or similar certificate issued by an accounting officer or verifying agency.
any enterprise with an annual Total Revenue of between R5 million and R35 million qualifies as a
February 2007 OR the Statement (2) issued on 11 October 2013 – thereafter all B-BBEE compliance
measurements will be in accordance with Notice .
(b) Notice , published in Government Gazette No. 36928 on 11 October 2013, whereby the revised
Codes of Good Practice (the codes) was issued under section 9(1) of the Broad-Based Black Economic
Empowerment Act (Act No.), inter alia determines that:
any enterprise with an annual Total Revenue of R10 million or less qualifies as an Exempted Micro-
The service provider shall not, without the District Municipality’s prior written consent, disclose the agreement, or
any provision thereof, or any specification, plan, drawing, pattern, sample, or information furnished by or on behalf
of the District Municipality in connection therewith, to any person other than a person employed by the service
provider in the performance of the agreement. Disclosure to any such employed person shall be made in
confidence and shall extend only as far as may be necessary for purposes of such performance.
The service provider shall permit the Overberg District Municipality to inspect the supplier’s records relating to the
performance of the service provider and to have them audited by auditors appointed by the Overberg District
ordinary mail to the address furnished in his bid or to the address notified later by him in writing and such posting
shall be deemed to be proper service of such notice.
Satphone units and airtime to Overberg District Municipality’s Emergency Services
FIRE SUIT – EN469:2005+AC: 2006: CLASSIFICATION Xf2, Xr2, Y2, Z2-
The suit shall consist of tunic and trousers.
Each garment shall consist of an outer shell, moisture barrier, and thermal barrier.
The moisture barrier, thermal barrier shall form the inner shell and shall be stitched into the
outer shell.
The suits shall be made in eight (8) sizes labelled: XSmall / Small / Medium / Large / XL /
2XL / 3XL / 4XL and Special size. Special size suits shall be made to fit for individual
personnel, where standard sizes will not fit and protect adequately.
Outer Material (Shell) – According to EN 469:2005/AC: 2006
54% NOMEX® including antistatic fibres - 46%KEVLAR® Weight 240 g/m2.A blended
aramid non-woven fabric is laminated to a waterproof, breathable
+Ptfe
Moisture Barrier – According to EN 469:2005/AC: 2006
A blended aramid non-woven fabric is laminated to a waterproof, breathable +PTFE Membrane.
The outer shell shall be of a single layer construction throughout.
All seams shall be double stitched. The coat shall have a double closure front with 50mm
There shall be no seams on the shoulders. Sleeves shall be constructed in such a way as
afford maximum movement.
The sleeve cuffs shall be reinforced.
The arms of the tunic shall be designed to facilitate the maximum amount of free arm
movement.
Elbow padding is required. The padding shall consist of polymer-coated Kevlar with a heat
resistant material sandwiched between the shell and the Kevlar. The padding shall be
stitched onto the outer shell using double stitching.
The inner jacket shall be attached to the outer jacket and stitched together.
The inner jacket shall be equipped with wristlets and thumb loops in accordance with the
En 469:2005/ac: 2006.
The jacket shall include inverted pleats. The two pleats shall be set in the back of the
outer shell
The tunic shall be bunny style in front and longer toward the back (Tail)
Pockets:
a. Two (2) pleated waterproof side pockets shall be fitted to the tunic. The size of these
pockets shall be 220 mm x 180 mm with a 75 mm pocket-flap held down by two (2)
b. A radio pocket shall be fitted onto the left chest. The pocket shall be so positioned not
to hinder the Breathing Apparatus shoulder straps. The pocket shall feature a pocket
flap with an insertion for the antenna. The pocket flap shall be closed with a Velcro
square.
c. All pockets shall be of the same material as the outer shell
d. A pocket shall be placed on one side on the inside of the inner shell. This pocket shall
be constructed of the same material as the inner shell.
Collar: The collar shall be of a double layer of the same material as the outer shell and shall
have a layer of the quilted thermal barrier in the middle thereof.
Each Tunic and each pair of trousers must have a white printed label of a nominal size of 300 mm x
100 mm. All cut edges must be turned in and the label securely sewn centrally to the inside of the
back of the inner shell at the top of both the tunic and trousers. The label must provide the following
information printed in legible block letters.
a) The manufacturers name or trademark or both
b) The composition of the materials
c) All materials EN 469:2005/AC: 2006 compliant
d) The year of manufacture
e) Washing instructions
f) Size
g) Destination
h) Bar coding system list (Optinal)
i) A numbered tracking system must be provided. The numbers must be embroided onto the
inside of the storm flap of the tunic and onto the bib at the rear of the trouser to which the
suspenders are attached. This is in order to allow the following:
o The manufacturer to verify the batch numbers of the material used in the
manufacture of each tunic and trouser and the production run.
o The end user to track the name of the individual to whom the item was issued.
Insignia – optional:
Thermal protective performance (tpp)
2 ply - as received 29.1 cal/cm2
2 ply - after 5 washes
After Flame as received 0 seconds
after 5 washes 0 seconds
Char Length (wales x courses) as received 61 mm x 38 mm
after 5 washes 66 mm x 55 mm
Hood Measurement as received 1%
after 5 washes 2%
Face Opening Measurement as received 4%
after 5 washes 2%
None
Arc thermal performance value (atpv)
1 ply 6.2 cal/cm2 (HRC 1)
2 ply 22.9 cal/cm2 (HRC 2)
Heat attenuation factor (haf)
1 ply 74%
2 ply 89.7%
Kevlar incorporated for added strength and durability
Inherently flame resistant
No harsh chemical treatments
Maintains performance values after laundering
Moderate weight for added thermal protection
Finished to minimize shrinkage
Rib knit allows for stretch and shape retention
Nfpa 70e performance specifications of
ASTM F 1959/F 1959M-06ae1:
HRC Level 1 = minimum 5 cal/cm2 to 7 cal/cm2 HRC
Level 2 = minimum 8 cal/cm2 to 24 cal/cm2
HRC Level 3 = minimum 25 cal/cm2 to 39 cal/cm2 HRC
Level 4 = minimum 40 cal/cm2 and over
Section 4: CIDB registration number:
Section 5: Particulars of principles
Principle: means a natural person who is a partner in partnership, a sole proprietor, a director of a company established
in terms of the Companies Act of 2008 (Act. No. ) a member of a close corporation registered in terms of the
Close Corporation Act, 1984 (Act No.)
Full name of principal Identity number* Personal income tax number*
Section 6: Banking Details of companies and close corporations
Bank name and branch: ..................................................................................................
Bank account number: .....................................................................................................
Name of account holder: .................................................................................................
schedules will NOT be accepted.
Pricing schedule
Q06-2026: supply and delivery of protective clothing to overberg district
Municipality’s emergency services
VAT 15%
TOTAL BID PRICE (Incl. VAT)
Required by: Mr. R Geldenhuys
At: ODM Emergency Services
Does offer comply with specification? YES NO
If not to specification, indicate deviation(s) ..........................................
Note:
Contractual Terms
Source: Q06-2026_Bid Doc.pdfInvitation to Bid – MBD 1 3 – 4
Advert 5
Bid Conditions and Information 6 – 12
Terms of Reference – TOR and Specifications 13 – 19
Functionality / Technical Evaluation Criteria 20 – 21
Details of Bidder 22
Previous Experience 23
Authority to sign 24 – 25
Compulsory Enterprise Questionnaire 26
Tax Compliance Status - MBD2 (Compulsory) 28
Pricing Schedule – MBD 3.1 29 – 30
Form of Offer and Acceptance 31 – 32
Declaration of Interest – MBD4 (Compulsory) 33 – 36
Responsiveness and Evaluation criteria 37 – 38
General Conditions of Contract – MBD5 39 – 49
Preference Points Claim Form in terms of the Preferential Procurement Regulations 2022 – MBD6.1 51 – 55
Sworn Affidavit – B-BBEE EXEMPTED MICRO ENTERPRISE MBD6.1(a) 58
Contract Form – Purchases of goods / works – MBD7.1 59 – 60
Declaration of bidders past supply chain management practices – MBD8 61 – 62
Notification of decision 63
Certificate of Independent Bid Determination – MBD9 64 – 66
Key Performance Indicators – MBD 16 67
Important documentation and information 68
Annexure A 69 – 70
Annexure B – Certificate for municipal services 71
Checklist for completeness of bid documentation 72
Clearly identify the B-BBEE approved registered auditor by the auditor’s individual registration number with IRBA and the
auditor’s logo, clearly record an approved B-BBEE Verification Certificate identification reference in the format required
by the SASAE, reflect relevant information regarding the identity and location of the measured entity, identify the Codes
of Good Practice or relevant Sector Codes applied in the determination of the scores, record the weighting points (scores)
attained by the measured entity for each scorecard element, where applicable, and the measured entity’s overall B-BBEE
provider if the service provider becomes bankrupt or otherwise insolvent. In this event, termination will be without
compensation to the service provider, provided that such termination will not prejudice or affect any right of action
or remedy which has accrued or will accrue thereafter to the Overberg District Municipality
service provider in connection with or arising out of the contract, the parties shall make every effort to resolve
amicably such dispute or difference by mutual consultation.
If, after thirty (30) days, the parties have failed to resolve their dispute or difference by such mutual consultation,
then either the Overberg District Municipality or the service provider may give notice to the other party of their
intention to commence with mediation. No mediation in respect of this matter may be commenced unless such
notice is given to the other party.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
1 Villiersdorp Rd, - Elgin - Grabouw - 7180
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
01 Sept 2026
AI status
Not enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Learn how to submit a winning bid with these related articles
Not every job is a 'tender.' Learn how to access the high-volume world of small orders (RFQs) and how to get invited to bid on jobs under R200k.
A high-stakes guide to food procurement. Learn about R638 compliance, cold chain logistics, and how to win provincial hospital supply contracts.
It's not just about the product; it's about getting it there. Master the logistics standards, POD systems, and insurance requirements for bulk supply.
How small office supplies, stationery, and general goods suppliers use Joint Ventures to win government procurement contracts by combining inventory with B-BBEE credentials.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Supplies: Clothing/Textiles/Footwear. Unlock full pricing strategies, bid frequency, and historical win rates.