Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
King Phalo Airport - East London - East London - 1632
Organization Type
GOVERNMENT
Published
20 Jul 2026
OCDS Reference
ocds-9t57fa-162812
This tender is for the supply, delivery, installation, configuration, and testing of a scada panel for the electrical complex at king phalo airport. IT is issued by the airports company of south africa and is targeted at specialized contractors with proven experience in scada, automation, and control systems. The bidder must demonstrate significant project experience and provide qualified key personnel.
Date & Time
Monday, 03 August 2026 - 16:00
Venue
King Phalo Airport, Information help desk, East London
Categories
Request for Quotation
King Phalo Airport - East London - East London - 1632
20 Jul
2026
Tender Published
Tender was published
03 Aug
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
NEC3-ECC SCADA PANEL FOR THE ELECTRICAL COMPLEX.pdf
Airports Company South Africa (ACSA) is tendering for the supply, delivery, installation, configuration, and testing of a new SCADA panel for the Electrical Complex at King Phalo Airport (Eastern Cape), including the decommissioning, removal, and certified disposal of the existing panel. The contract is based on the NEC3 Engineering and Construction Contract (Main Option A) and has a 12-month execution period.
Continue with tenders sharing this issuer, category, or province.
Median Estimate
R 138 125
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
AI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Important Dates
Source: CIDB Bid document RFQ12176.pdf (TENDER)Contact Information
Source: CIDB Bid document RFQ12176.pdf (TENDER)Submission Guidelines
Source: CIDB Bid document RFQ12176.pdf (TENDER)Evaluation Criteria
Source: CIDB Bid document RFQ12176.pdf (TENDER)Minimum CIDB contractor grading designation of 2EP or 2EB or higher. Must be tax compliant (SARS PIN or CSD registration). Must provide valid COIDA/FEMA letter of Good Standing. Must attend compulsory site meeting. Foreign suppliers must complete specific questionnaire; if no RSA presence, tax registration may not be required. Joint ventures must provide consolidated B-BBEE certificate.
Technical Specifications
Source: CIDB Bid document RFQ12176.pdf (TENDER)Financial Requirements
Source: CIDB Bid document RFQ12176.pdf (TENDER)Compliance Requirements
Source: CIDB Bid document RFQ12176.pdf (TENDER)These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
FUNCTIONALITY CRITERIA ANNEX C.pdf
Tender for supply, delivery, installation, configuration, and testing of a SCADA panel for the electrical complex at King Phalo Airport in the Eastern Cape, issued by Airports Company South Africa. Evaluation is based 70% on price and 30% on functionality/technical criteria, with a mandatory minimum score of 50 points to proceed further.
CIDB Bid document RFQ12176.pdf
Airports Company South Africa (ACSA) invites tenders for the supply, delivery, installation, configuration, and testing of a SCADA panel for the electrical complex at King Phalo Airport, Eastern Cape. The tender follows CIDB Standard Conditions of Tender and the Preferential Procurement Policy Framework Act (PPPFA).
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
Airports Company South Africa (ACSA)Contact Person
Mlungisi Professor Mgobhozi
Phone
011-723-1400
[email protected]
Address
King Phalo Airport - East London - East London - 1632
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
3
Last checked
20 Jul 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Win ACSA tenders with AI Matching Engine, airport-infrastructure intelligence, compliance analysis, and application support for aviation operations.
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Your meticulously crafted General sector tender submission can be disqualified for a single, seemingly minor compliance oversight. The reality for South African contractors is that technical competence is no longer sufficient; it is underpinned by a non-negotiable framework of documentary compliance. This regulatory guide: mastering CSD and BBBEE compliance for general sector tenders in south africa provides a comprehensive, step-by-step breakdown of the mandatory registrations and certificates you must secure and present. We detail the precise requirements for CSD, BBBEE, SARS TCS, CIPC, and COIDA, explaining their function within the procurement ecosystem governed by the PFMA and PPPFA. Learn the actionable steps to prepare your business, avoid the most common disqualifying errors, and leverage technology to streamline your compliance process for successful bidding in 2026 and beyond.
For South African General contractors, the path to government procurement is paved with non-negotiable regulatory requirements. The most common barrier to entry is not a lack of capability, but a failure to master the foundational compliance frameworks that govern every bid. This complete regulatory guide to CSD and BBBEE compliance for General sector tender suppliers in South Africa demystifies the process. It provides a meticulous, step-by-step field manual for ensuring your company is fully compliant and audit-ready, enabling you to confidently access the R billions in opportunities across infrastructure maintenance, facilities management, and service delivery within the General sector.
Everything South African general contractors need to know about the complete guide to csd and bbbee compliance for general sector suppliers in south africa — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
💡 Want more tendering tips and strategies?
Explore Our BlogContact Information
Source: NEC3-ECC SCADA PANEL FOR THE ELECTRICAL COMPLEX.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"he conditions of contract identified in the Contract Data."}
Evaluation Criteria
Source: NEC3-ECC SCADA PANEL FOR THE ELECTRICAL COMPLEX.pdf (unknown)The contractor must be a legally registered entity in South Africa. They must provide a compliant, annually updated BBBEE certificate. The contractor must be able to provide the specified unconditional performance bond from an accepted bank. Key personnel CVs must be submitted with the tender. For contracts involving design, Professional Indemnity insurance of R5 million is required. The contractor must agree to the extensive additional Z-clauses covering ethics, confidentiality, intellectual property, and step-in rights.
Technical Specifications
Source: NEC3-ECC SCADA PANEL FOR THE ELECTRICAL COMPLEX.pdf (unknown)Supply, deliver, install, configure and test a scada panel for the electrical complex at
King phalo airport. Removal of existing instalation and issuing of disposal certificate.
Contract volume 2
ELS...5024 Cover Page
Confidential
Confidential
Airports company south africa soc limited
Project
Quality Management
Source: NEC3-ECC SCADA PANEL FOR THE ELECTRICAL COMPLEX.pdf2 r 1 r
the Works.
3 All required on-site testing and certification ( R sum R
a) Supply:
Supply a new Scada panel at King Phalo Airport
Supply all necessary hardware, software, accessories, wiring and
Provide manufacturer’s warranty and technical data sheets.
b) Delivery:
Deliver the new Scada panel and accessories to King Phalo Airport’s Electrical Complex
Ensure proper packaging and transport to avoid damage.
Verify all components on delivery against the approved bill of quantities (BOQ)
c) Installation:
Decommission and disconnect the existing Scada panel safely.
Remove the existing Scada panel from site.
Install the new Scada panel, including electrical connections, communication interfaces,
Ensure compliance with local electrical codes and safety standards.
d) Testing and Commissioning:
Perform pre-commissioning inspection and verify correct installation.
Carry out Site acceptance tests (SAT).
Integration with substation /plant automation system.
Carry out end-to-end functional testing under live conditions.
Verification of interlocks and safety logic.
Carry out final performance verification and system stabilization.
Training of ACSA relevant employees and handover.
Submission of commissioning reports and as built documentations,
of 47
ELS...5024 Scope of Work Part C3
and safety inspections and Employer’s safety
officers
The Project Manager shall be entitled to fine the Contractor an amount of R3000.00 for each non-conformance to
Health and Safety matters. This shall not transfer any of the Contractor’s responsibilities in this regard to the
system (with all quality control and assurance procedures and manuals) for review and acceptance by the
Employer. The manual includes pro-forma checklists for all requirements of the Contractor’s quality control and
assurance program and those called for in the Scope.
Acceptance by the Employer of the Contractor’s quality assurance programme, quality plans and/or inspection
and/or test plans, or of those of his Subcontractors will not relieve the Contractor of his obligation to provide
services which meet the requirements of the Contract.
Pricing Schedule
Source: NEC3-ECC SCADA PANEL FOR THE ELECTRICAL COMPLEX.pdfContents: Page No.
Part C1 Agreements & Contract Data [3]
Part C2 Pricing Data [19]
Part C3 Scope of Works [24]
Part C4 Site Information [39]
ELS...5024 Cover Page
Part C1 Agreements and Contract Data, (which includes this Form of Offer and Acceptance)
Part C2 Pricing Data
Part C3 Scope of Work: Works Information
Part C4 Site Information
and drawings and documents (or parts thereof), which may be incorporated by reference into the above listed Parts.
Part c2: pricing data
C2.1. Pricing Assumptions: Option A
measurement. In the event of any ambiguity or inconsistency between the statements in the method of measurement
and this section, the interpretation given in this section shall be used.
he shows on his programme.
no other items will be measured. Costs not covered by the items may be included in the most appropriate items
listed. The Contractor has the liberty to insert items, quantities and rates of his own choosing in the said schedule
as a separate line item.
all general risks, liabilities, obligations, profit, expenses, costs, bonuses, all allowances such as shift and standby
allowances, sick-leave, other leave, brackets, fixings, incidentals, consumables etc. that will be required to
successfully complete this contract as set forth or as implied in the documents on which this Contract is based.
used in this schedule means the complete system or unit as specified in the particular document.
installation costs of any item shall be fully included in the price.
delivering, unloading, storing, unpacking, hoisting, setting, fitting and fixing in position, cutting and waste, patterns,
models and templates, plant, temporary works, return of packaging, establishment charges, profit and all other
obligations arising out of the contractual conditions.
wording will apply.
measured and priced at the rates entered in the Activity Schedule, where appropriate, and shall form an addition
to or deduction from the total of the Accepted Contract Amount. Any items or variations for which rates have not
been included in the Activity Schedule shall be agreed and priced as non-scheduled items.
remaining shall be deducted from the contract sum.
Schedule and any amounts not spent shall be deducted from the contract price. No work for which “provisional”
items are provided shall, be commenced without written instructions from the Project Manager.
by the Employer.
removed from the contract.
of 47
ELS...5024 Pricing Data Part C2
(a) Only project related costs listed below and presented to ACSA will be compensated by ACSA.
(b) Any disbursement costs related to travelling to and from the airport or accommodation for the purpose of the project(s)
is deemed to be inclusive in the agreed fee structure, unless otherwise agreed in writing by both parties. Disbursement
costs not mentioned below (including under note (e)) may be brought to the attention of the ACSA project
representative for approval and agreement on the recoverable amount, prior to incurring such cost.
(c) All rates are exclusive of VAT
(d) Health and Safety Agent will be recovered through Disbursements.
(e) No mark-up on any disbursement cost will be paid.
(f) No payment for disbursement will be made for the following:
of 47
ELS...5024 Pricing Data Part C2
9.1 R 1
panel
Allowable off (Contractor to price for the old
9.2 Scada panel, if contractor intends to buy off 1
Acsa)
of 47
ELS...5024 Pricing Data Part C2
Sub-Total C (Sub-Total (A+B) R
Contingency (10% of Sub Total C) R
Sub Total D (Tendered Amount Excluding Vat) (Sub-Total (C + Contingency)) R
Vat (15% of Sub-Total D) R
*Total Tendered Amount (Sub-Total (D + Vat)) R
*This amount should be carried over to the form of offer PartC1. The total tendered amount shall be fixed, and it is not
subject to fluctuation as a result of inflation, foreign, exchange rate variation, etc.
of 47
ELS...5024 Pricing Data Part C2
allocated opportunity to provide pricing for the Old Scada panel. The price will be deducted to the total invoiced for the
Financial Requirements
Source: NEC3-ECC SCADA PANEL FOR THE ELECTRICAL COMPLEX.pdf (unknown)Bid Bond: Form of Guarantee
Pro forma for performance bond
Performance bond
[To be replicated on bank’s letterhead]
Brief description of contract................................................................................
Name and address of Beneficiary.................................................................
Payment Terms: payment certificates, variation orders, progress reports or financial reports
of 47
ELS...5024 Pricing Data Part C2
Confidential
Confidential
C2.2. The Activity Schedule
Item Description Unit Cost Quantity Total
Section A: Preliminary and
Compliance Requirements
Source: NEC3-ECC SCADA PANEL FOR THE ELECTRICAL COMPLEX.pdf (unknown)No specific requirements found
B-BBEE Details: appoints an Eng. [email protected]
Arbitrator listed in the Panel of Mr. Sam Amod Gauteng [email protected]
Arbitrators below
Adv. Sias Ryneke SC Gauteng 083 653 2281
Mr. Emeka Ogbugo Pretoria +27 12 349 2027
(Quantity Surveyor) [email protected]
Z17 Notification of a compensation event
Z17.1 Delete “eight weeks” in clause 61.3 and replace with “four weeks”. Delete the words “unless the event arises from
the Project Manager or the Supervisor giving an instruction, issuing a certificate, changing an earlier decision or
correcting an assumption.
Z18 BBBEE Certificate
Z18.1 The Contractor shall be expected to annually present a compliant BEE Certificate. Failure to do adhere to these
requirements shall be considered a material breach of the conditions of this Contract, the sanction for which may
be a cancellation of this Contract.
Z19 Communication
Z19.1 Add a new Core Clause 14.5 and 14.6 to read as follows:
The Project Manager requires the written consent of the Employer if an action will result in a change to the
design, scope, and Works information that is 5% or more
Z19.2 The Project Manager requires the written consent of the Employer if an action will result in the Completion Date
being extended by more than 30 days.
Z20 Delegation
As stipulated by Section 37(2) of the Occupational Health and Safety Act No. as amended the
Contractor agrees to the following:
Z20.1 As part of this contract the Contractor acknowledge that it (mandatory) is an employer in its own right with duties
as prescribed in the Occupational Health and Safety Act No as amended and agree to ensure that all
work being performed, or Equipment, Plant and Materials being used, are in accordance with the provisions of
the said Act, and
Health & Safety
Source: NEC3-ECC SCADA PANEL FOR THE ELECTRICAL COMPLEX.pdfestoppel unless the Parties agree otherwise and confirm such agreement in writing.
Z2 Providing the Works:
Z2.1 Delete core clause 20.1 and replace with the following:
design, scope, and Works information that is 5% or more
Z19.2 The Project Manager requires the written consent of the Employer if an action will result in the Completion Date
being extended by more than 30 days.
Z20 Delegation
As stipulated by Section 37(2) of the Occupational Health and Safety Act No. as amended the
Z20.1 As part of this contract the Contractor acknowledge that it (mandatory) is an employer in its own right with duties
as prescribed in the Occupational Health and Safety Act No as amended and agree to ensure that all
work being performed, or Equipment, Plant and Materials being used, are in accordance with the provisions of
the said Act, and in particular with regard to the Construction Regulations
of 47
ELS...5024 Contract Data Part C1.2a
11.2 The working areas are Landside Area
24.1 The Contractor’s Key people are: CV’s to be appended to Tender Schedule
Name:
panel.
6 Erection of safety signage for construction R 1 R
7 r 1 r
safety file for approval to the Employer
equipment and installations relating to this Contract. The Contractor is expected to sign the undertaking in this
regard as attached in the annexes.
It shall be the Contractor’s responsibility to ensure that all relevant labour and safety legislation is adhered to in
rostering staff.
obeyed. A copy of the Safety Rules booklet is available on request from the ACSA Safety Department.
All the applicable requirements of the Occupational Health and Safety Act (1993) and Regulations and any
amendments thereto, shall be met. Where the OHS, Act prescribes certification of competency of persons
performing certain tasks, proof of such certification shall be provided to the Project Manager.
The contractor’s Workmen’s Compensation fees must be up to date. A copy of the Contractor’s WCA registration
shall be produced on request.
The following areas in the company are declared as “HOT WORKS PERMIT” areas:
of a permit to work - obtainable from the ACSA Safety department. Any work done under the protection of a
permit to work shall be in strict compliance with every prescription regarding the permit.
Safety equipment shall be used where applicable (e.g. safety, goggles, boots, harness, etc.) The Contractor, at
his/her own expense shall provide such equipment, for his/her employees. The Contractor shall apply the
necessary discipline and control to ensure compliance by his workers.
co-operate in any drills or exercises, which might be held. Emergency / fire equipment and extinguishers shall
not be obstructed at any time.
must also be taken so as to prevent fire hazards.
The Contractor is required to issue all staff with standard uniforms. This shall as a minimum include: safety shoes,
overalls (clearly marked with Contractor’s company logo) and numbered reflective jackets (as per Airport
requirements). All costs relating to uniforms shall be for the Contractor’s account.
a) Panel Construction:
Indoor, floor-mounted, free-standing design
Heavy-duty sheet steel enclosure (minimum 2.0 mm thickness)
Degree of protection: IP54 or higher
Powder-coated finish with anti-corrosion treatment.
Front access for operation and maintenance.
Clearly labeled equipment, terminals, and wiring.
Adequate ventilation or forced cooling as required.
b) Control and Automation Equipment
Industrial-grade PLC or RTU suitable for MV network applications.
Modular I/O system with minimum 20-30% spare capacity.
Interposing relays for safe interfacing with MV switch gear.
Internal wiring neatly routed, ferruled and numbered.
Environmental
Source: NEC3-ECC SCADA PANEL FOR THE ELECTRICAL COMPLEX.pdfe) Removal and Disposal:
Remove the old Scada panel from site.
Handle and transport old Scada panel as per waste regulations.
Provide a disposal certificate issued by a certified waste management facility.
Ensure full compliance with environmental and safety laws.
The Contractor shall comply with the environmental criteria and constraints stated in Annexure [B] to this Works
Contractual Terms
Source: NEC3-ECC SCADA PANEL FOR THE ELECTRICAL COMPLEX.pdfThe tenderer shall within two weeks of receiving a completed copy of this agreement, including the Schedule of Deviations (if
any), contact the Employer’s agent (whose details are given in the Contract Data) to arrange the delivery of any securities,
bonds, guarantees, proof of insurance and any other documentation to be provided in terms of the conditions of contract
identified in the Contract Data. Failure to fulfil any of these obligations in accordance with those terms shall constitute a
repudiation of this agreement.
Unless the tenderer (now Contractor) within five working days of the date of such receipt notifies the Employer in writing of
any reason why he cannot accept the contents of this agreement, this agreement shall constitute a binding contract between
the Parties.
Signature(s)
Name(s)
Main Option A: Priced contract with Activity Schedule
Dispute resolution Option W1: Dispute resolution procedure
Secondary Options (incorporating X1: Price Adjustment
amendments) X2: Changes in the law
X7: Delay damages
X16: Retention
X17: Low service damages
X18: Limitation of liability
Z: Additional conditions of contract of the NEC3 Engineering and
Construction Contract, April 2013
10.1 The Employer is (Name) Airports Company South Africa SOC Limited,
applicable at KING PHALO AIRPORT
32.2 The Contractor submits revised 4 (four) weeks
programmes at intervals no longer
than
35.1 The Employer is not willing to take The Employer and Others will have access to the works during
over the works before the completion construction or prior to completion. Such access by the Employer and
date Others shall not relieve the Contractor from liability for the completion of
the works in accordance with the Works Information and in terms of this
contract.
84.1 The Employer provides these Refer to the Insurance Clauses which is attached at the end of the
insurances Contract Data
84.2 The Contractor provides the The Insurance Clauses which is attached at the end of the Contract Data.
insurance stated in The insurances are in the joint names of the Parties and provide cover
for events which are at the Contractor’s risk from the starting date until
the Defects Certificate or a termination certificate has been issued.
insurance in respect of death of or Diseases Act No.
bodily injury to employees of the
A Priced contract with Activity Schedule as detailed in Part C2
11 Data for Option W1
W1.1 The Adjudicator is The person appointed jointly by the parties from the list of adjudicators
contained below
W1.2 The Adjudicator nominating body is The current Chairman of Johannesburg Advocate’s Bar Council
W1.4 The tribunal is Arbitration
W1.4 If the tribunal is arbitration, the The arbitration procedure is set out in The Rules for the Conduct of
arbitration procedure is Arbitrations 2013 Edition, 7th Edition, published by The Association of
Arbitrators, (Southern Africa)
W1.4 The place where arbitration is to be Johannesburg, South Africa.
held is
W1.4 The person or organisation who will The Arbitrator is the person selected by the Parties as and when a
choose an arbitrator dispute arises in terms of the relevant Z Clause, from the Panel of
X7 Delay Damages
Delay damages of the works are amount per day is 0.5%, to the maximum of 10% of the Contract value
X16 Retention
X16.1 The retention percentage is 10% of the contract value.
Retention period for performance 52 weeks after completion of the whole of the works, subject to
monitoring satisfactory operational performance of the SCADA panel
X18 Limitation of Liability
X18.1 The Contractor’s liability to the Nil - Neither Party is liable to the other for any consequential or indirect
loss is limited to revenue
X18.2 For any one event, the Contractor’s Total of the losses incurred and/or repairs to the damages caused
liability to the Employer for loss of or
damage to the Employer’s property is
limited to
X18.3 The Contractor’s total liability to the Total of the losses incurred and/or repairs to the damages caused
X18.4 The Contractor’s total liability to the The Contractor’s total direct liability to the Employer for all matters arising
in this contract for
Materials),
Z The Additional conditions of Z1 – Z20
contract are
Z3 Other responsibilities:
Add the following at the end of core clause 27:
Z3.1 The Contractor shall have satisfied himself, prior to the Contract Date, as to the completeness, sufficiency and
accuracy of all information and drawings provided to him as at the Contract Date
Z3.2 The Contractor shall be responsible for the correct setting out of the Works in accordance with the original points,
lines and levels stated in the Works Information or notified by the Project Manager, Supervisor or the Employer.
Any errors in the positioning of the Works shall be rectified by the Contractor at the Contractor’s own costs.
Z4 Extending the defects date:
Add the following as a new core clause 46:
Z4.1 If the Employer cannot use the works due to a Defect, which arises after Completion and before the defects date,
the defects date is delayed by a period equal to that during which the Employer, due to a Defect, is unable to use
the works
Z4.2 If part of the works is replaced due to a Defect arising after Completion and before the defects date, the defects
date for the part of the works which is replaced is delayed by a period equal to that between Completion and the
date by when the part has been replaced
Z4.3 The Project Manager notifies the Contractor of the change to a defect date when the delay occurs. The period
between Completion and an extended defects date does not exceed twice the period between Completion and the
defects date stated in the Contract Data
Z5 Termination
of 47
ELS...5024 Contract Data Part C1.2a
the terms of the performance bond specify its expiry date and the end of the contract period does not coincide with
such expiry date, four weeks prior to the said expiry date, the Contractor extends the validity of the performance
bond until the end of the contract period. If the Contractor fails to so extend the validity of the performance bond,
the Employer may claim the full amount of the performance bond and retain the proceeds as cash security
Z7 Limitation of liability:
Insert the following new clause as Option X18.6:
Z7.1 The Employer's liability to the Contractor for the Contractor's indirect or consequential loss is limited to R0.00
Z7.2 Notwithstanding any other clause in this contract, any proceeds received from any insurances or any proceeds
which would have been received from any insurances but for the conduct of the Contractor shall be excluded from
the calculation of the limitations of liability listed in the contract
Z8 Cession, delegation and assignment
Z8.1 The Contractor shall not cede, delegate or assign any of its rights or obligations to any person without the written
consent of the Employer, which consent shall not be unreasonably withheld. This clause shall be binding on the
liquidator/business rescue practitioner /trustee (whether provisional or not) of the Contractor
Z8.2 The Employer may cede and delegate its rights and obligations under this contract to any person or entity
Z9 Joint and several liabilities
Z9.1 If the Contractor constitutes a joint venture, consortium or other unincorporated grouping of two or more persons,
these persons are deemed to be jointly and severally liable to the Employer for the performance of the Contract.
Z9.2 The Contractor shall, within 1 week of the Contract Date, notify the Project Manager and the Employer of the key
person who has the authority to bind the Contractor on their behalf.
Z9.3 The Contractor does not materially alter the composition of the joint venture, consortium or other unincorporated
grouping of two or more persons without prior written consent of the Employer.
Z10 Ethics
Z10.1 The Contractor undertakes:
Z10.1.1 not to give any offer, payment, consideration, or benefit of any kind, which constitutes or could be construed as an
illegal or corrupt practice, either directly or indirectly, as an inducement or reward for the award or in execution of
this contract;
Z10.1.2 to comply with all laws, regulations or policies relating to the prevention and combating of bribery, corruption and
money laundering to which it or the Employer is subject, including but not limited to the Prevention and Combating
of Corrupt Activities Act, .
Z10.2 The Contractor’s breach of this clause constitutes grounds for terminating the Contractor’s obligation to Provide the
Works or taking any other action as appropriate against the Contractor (including civil or criminal action). However,
lawful inducements and rewards shall not constitute grounds for termination.
of 47
ELS...5024 Contract Data Part C1.2a
clause 92.2. the amount due on termination is A1.
Z11 Confidentiality
Z11.1 All information obtained in terms of this contract or arising from the implementation of this contract shall be treated
as confidential by the Contractor and shall not be used or divulged or published to any person not being a party to
this contract, without the prior written consent of the Project Manager or the Employer, which consent shall not be
unreasonably withheld.
Z11.2 If the Contractor is uncertain about whether any such information is confidential, it is to be regarded as such until
otherwise notified by the Project Manager.
Z11.3 This undertaking shall not apply to –
Z11.3.1 Information disclosed to the employees of the Contractor for the purposes of the implementation of this agreement.
obtain assurances that confidential treatment will be afforded to the information so disclosed;
Z11.3.3 Information which at the time of disclosure or thereafter, without default on the part of the Contractor, enters the
public domain or to information which was already in the possession of the Contractor at the time of disclosure
(evidenced by written records in existence at that time);
Z11.4 The taking of images (whether photographs, video footage or otherwise) of the works or any portion thereof, in the
course of Providing the Works and after Completion, requires the prior written consent of the Project Manager. All
rights in and to all such images vests exclusively in the Employer
Z11.5 The Contractor ensures that all his Subcontractors abide by the undertakings in this clause.
Z12 Employer’s Step-in rights
Z12.1 If the Contractor defaults by failing to comply with his obligations and fails to remedy such default within 2 weeks
of the notification of the default by the Project Manager, the Employer, without prejudice to his other rights, powers
and remedies under the contract, may remedy the default either himself or procure a third party (including any
subcontractor or supplier of the Contractor) to do so on his behalf. The reasonable costs of such remedial works
shall be borne by the Contractor
Z12.2 The Contractor co-operates with the Employer and facilitates and permits the use of all required information,
materials and other matter (including but not limited to documents and all other drawings, CAD materials, data,
software, models, plans, designs, programs, diagrams, evaluations, materials, specifications, schedules, reports,
calculations, manuals or other documents or recorded information (electronic or otherwise) which have been or are
at any time prepared by or on behalf of the Contractor under the contract or otherwise for and/or in connection with
the works) and generally does all things required by the Project Manager to achieve this end.
Z13 Liens and Encumbrances
Z13.1 The Contractor keeps the Equipment used to Provide the Services free of all liens and other encumbrances at all
times. The Contractor, vis-a-vis the Employer, waives all and any liens which he may from time to time have, or
become entitled to over such Equipment and any part thereof and procures that his Subcontractors similarly, vis-
a-vis the Employer, waive all liens they may have or become entitled to over such Equipment from time to time
Z14 Intellectual Property
Z14.1 Intellectual Property (“IP”) rights means all rights in and to any patent, design, copyright, trade mark, trade name,
trade secret or other intellectual or industrial property right relating to the Works.
of 47
ELS...5024 Contract Data Part C1.2a
Z14.2 IP rights remain vested in the originator and shall not be used for any reason whatsoever other than carrying out
the works.
Z14.3 The Contractor gives the Employer an irrevocable, transferrable, non-exclusive, royalty free licence to use and
copy all IP related to the works for the purposes of constructing, repairing, demolishing, operating and
maintaining the works
Z14.4 The written approval of the Contractor is to be obtained before the Contractor's IP made available to any third
party which approval will not be unreasonably withheld or delayed. Prior to making any Contractor's IP available
to any third party the Employer shall obtain a written confidentiality undertaking from any such third party on
terms no less onerous than the terms the Employer would use to protect its IP
Z14.5 The Contractor shall indemnify and hold the Employer harmless against and from any claim alleging an
infringement of IP rights (“the claim”), which arises out of or in relation to:
Z14.5.1 the Contractor’s design, manufacture, construction or execution of the Works
Z14.5.2 the use of the Contractor’s Equipment, or
Z14.5.3 the proper use of the Works.
Z14.6 The Employer shall, at the request and cost of the Contractor, assist in contesting the claim and the Contractor
may (at its cost) conduct negotiations for the settlement of the claim, and any litigation or arbitration which may
arise from it.
Z16 Dispute resolution:
Z16.1 Appointment of the Adjudicator
a dispute arises, from the Panel of
dispute arises from the Panel of
Adv. Sias Ryneke SC Gauteng 083 653 2281
Mr. Emeka Ogbugo Pretoria +27 12 349 2027
(Quantity Surveyor) [email protected]
Z17 Notification of a compensation event
Z17.1 Delete “eight weeks” in clause 61.3 and replace with “four weeks”. Delete the words “unless the event arises from
the Project Manager or the Supervisor giving an instruction, issuing a certificate, changing an earlier decision or
correcting an assumption.
Z18 BBBEE Certificate
Z18.1 The Contractor shall be expected to annually present a compliant BEE Certificate. Failure to do adhere to these
requirements shall be considered a material breach of the conditions of this Contract, the sanction for which may
be a cancellation of this Contract.
Z19 Communication
Z19.1 Add a new Core Clause 14.5 and 14.6 to read as follows:
Part C1: Agreements and Contract Data
C1.3: Form of Guarantee
Guarantor’s............................... of ................. (Registration Number: ....) (hereinafter called “the Bank”) have been
informed that ................................. hereinafter called the ‘Principal’) is your Contractor under such contract, which
requires him to obtain an irrevocable, unconditional performance security.
At the request of the Principal, we .........................................(name of bank) hereby irrevocably undertake to pay you,
the Employer, any sum or sums not exceeding in total the amount of ....................................(the “Guaranteed Amount”)
upon receipt by us of your first written demand stating that such an amount (or lesser amount) as may be claimed is due
and payable to the Employer.
accordance with the above, subject to the proviso that this Letter will not be interpreted as extending the Bank’s liability to
anything more than the Guaranteed Amount.
Notwithstanding anything to the contrary herein contained, the Bank’s obligation shall be construed as principal and not as
accessory to the contract and shall not be delayed or discharged by the fact that a dispute exists between the Employer
and the Contractor.
We undertake to pay you such Guaranteed Amount upon receipt by us, within such period of 14 days, of your first written
demand stating that such an amount (or lesser amount) as may be claimed is due and payable to the Employer.
Part c1: agreements and contract data
C1.4: Acsa insurance clauses
Section a: definitions
perimeter gatehouses and cargo building.
Section b: insurance clauses
1.1 Contract Works
R250 000.
1.2 Public Liability
consultant will be responsible for a deductible (excess) of R275 000
consultant will be responsible for a deductible (excess) of R500 000
1.3 Professional Indemnity
are responsible for Professional Indemnity cover of R5million
between ACSA and the contractor and/or consultant.
2.1 Contract Works
R250 000.
of 47
ELS...5024 Insurance Schedule Part C1.4
2.2 Public Liability
consultant will be responsible for a deductible (excess) of R525 000
consultant will be responsible for a deductible (excess) of R750 000
consultant will be responsible for a deductible (excess) of R750 000
2.3 Professional Indemnity
are responsible for a Professional Indemnity cover of R5million.
of 47
ELS...5024 Insurance Schedule Part C1.4
The form in which a bond or guarantee required by the conditions of contract (if any) is to be provided by the
Contractor is given in Part 1 Agreements and Contract Data, document C1.3, Sureties.
not affect the Employer’s right to termination stated in this contract.
of 47
ELS...5024 Scope of Work Part C3
Section
Source: NEC3-ECC SCADA PANEL FOR THE ELECTRICAL COMPLEX.pdfsoftware, models, plans, designs, programs, diagrams, evaluations, materials, specifications, schedules, reports,
At no time must the Contractor interfere with, or put at risk, the functionality of any fire prevention system. Care
Quality assurance requirements
All work must be executed in accordance with prevailing industry norms and standards relating to quality, such
Within the period stated in the Contact Data, the Contractor submits his complete quality control and assurance
system (with all quality control and assurance procedures and manuals) for review and acceptance by the
Employer. The manual includes pro-forma checklists for all requirements of the Contractor’s quality control and
Acceptance by the Employer of the Contractor’s quality assurance programme, quality plans and/or inspection
Contact Information
Source: FUNCTIONALITY CRITERIA ANNEX C.pdf (unknown)Returnable Documents
Source: FUNCTIONALITY CRITERIA ANNEX C.pdf (unknown)Evaluation Criteria
Source: FUNCTIONALITY CRITERIA ANNEX C.pdf (unknown)Company must have proven experience in SCADA panel/RTU/PLC supply, integration, configuration, testing, system design, software configuration (HMI, logic, alarms), network configuration, and cybersecurity compliance. Key personnel must meet specific qualification and experience thresholds. Bidders scoring below 50 points will not be evaluated further.
Technical Specifications
Source: FUNCTIONALITY CRITERIA ANNEX C.pdf (unknown)Experience & Qualifications
Source: FUNCTIONALITY CRITERIA ANNEX C.pdfCompliance Requirements
Source: FUNCTIONALITY CRITERIA ANNEX C.pdf (unknown)Section
Source: FUNCTIONALITY CRITERIA ANNEX C.pdf (unknown)Data conflicts
None detected
Get deep intelligence on Services: General. Unlock full pricing strategies, bid frequency, and historical win rates.