237 Jabu Ndlovu Street - Pietermaritzburg - Pietermaritzburg - 3201
Organization Type
GOVERNMENT
Published
23 Nov 2026
OCDS Reference
ocds-9t57fa-179345
Summary
The department requires the supply, delivery, installation and commissioning of new air‑conditioning units at the kwazulu‑natal museum in pietermaritzburg, covering multiple galleries, a cold‑room compressor replacement and associated technical work. Bidders must submit all mandatory documents, achieve a minimum technical score of 65 % and provide a firm fixed price on the official schedule, with the most consequential consideration being compliance with the 65 % technical threshold and the required CIDB grade 3me and b‑bbee level 1 evidence.
Key Requirements
Mandatory hand delivery by 15 December 2026 at 12:00 to KwaZulu‑Natal Museum, 237 Jabu Ndlovu Street, Pietermaritzburg; bid must be signed in the submission register.
Compulsory site briefing sessions must be booked in advance (25‑30 November 2026, weekdays) and attendance is required.
All mandatory returnable documents must be submitted, including SBD 1, SBD 4, SBD 6.1, complete pricing schedule/BoQ, CIDB grade 3ME registration, valid SARS tax compliance PIN (or TCS certificate), CSD registration number and documents, valid B‑BBEE certificate or sworn affidavit, latest audited financial statements, and proof of authority for the signatory.
Bidders must achieve at least 65 % of the technical/functional score (65 points) in Stage 2; failure disqualifies from price evaluation.
Price must be submitted as a firm fixed price on the official pricing schedule, with full BOQ pricing, cost breakdown, and price escalation basis; any unpriced line item or non‑conforming format disqualifies the bid.
The bid is valid for 30 days from the closing date (15 December 2026); an extension may be requested but must be on the same terms.
Disqualifying omissions include late delivery, missing mandatory documents, unpriced BOQ items, canvassing museum staff, false declarations in SBD 4, or being listed on the Register for Tender Defaulters or List of Restricted Suppliers.
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
12 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Supply, delivery, installation and commissioning of inverter air-conditioning units across 18 areas of the KwaZulu-Natal Museum in Pietermaritzburg, including a cold-room compressor replacement maintaining minus 20°C, with all electrical connections, COC certification, commissioning and user training.
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
APPOINTMENT OF A CONTRACTOR FOR THE PROVISION OF DESIGN & BUILD MODULAR GUARD HOUSE INSTALLATIONS FOR A PERIOD OF 18 MONTHS AT CLUSTER 3 AIRPORTS (KING SHAKA INTERNATIONAL AIRPORT, CHIEF DAWID STUURMAN INTERNATIONAL AIRPORT, KING
PHALO AIRPORT)
Based on 4 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Document read
Compliance review
Bid-ready summary
The KwaZulu-Natal Museum requires new air-conditioning systems to be supplied, delivered, installed and commissioned at its premises at 237 Jabu Ndlovu Street, Pietermaritzburg, covering galleries and offices across the ground, first, second and fifth floors, plus a compressor replacement for the walk-in cold room.
Procurement framework
Subject to the Preferential Procurement Policy Framework Act, 2000 and the Preferential Procurement Regulations, 2022, the General Conditions of Contract and any special conditions.
The Museum's General Conditions of Purchase apply.
The Museum is not obliged to award, is not obliged to award to a single supplier, and may split the award between suppliers at its discretion.
Awards, amendments and cancellations are published on the National Treasury e-Tender Portal and, for construction-related work, on the CIDB website.
Bid conditions
The bid is a binding offer; any exceptions must be stated clearly and specifically.
Changes to a submission are not accepted after the closing date and time.
The Museum may modify the goods or services and call for re-bids, reject non-conforming bids, and reject late bids or bids lodged at the wrong venue.
A contract may be cancelled if information supplied by the bidder proves incorrect after conclusion.
If the preferred bidder does not sign or commence within a reasonable period, the award may pass to the next ranked bidder at the quoted price.
Contractual terms proposed by a bidder are subject to acceptance or rejection by the Museum's legal counsel before any award.
Personal data supplied in a bid is processed only for evaluation and award purposes.
A complaint must state the tender description, tender reference number, closing date, supplier name, supplier contact details and the detailed complaint.
Pass/fail screening of the mandatory documents listed under submission.
Where a document is missing, the most responsive bidder may be asked to submit it within three working days; failure to do so is an automatic disqualification.
Stage 2 — Technical / functionality (100 points)
Minimum qualifying score: 65%. Bidders below 65% are not evaluated further.
Company experience: 30 points — at least three completion or reference letters, each for work of a similar nature valued at R500 000 or more, supported by the purchase order or award letter.
Methodology and project delivery plan/schedule: 15 points.
Project Manager / Site Supervisor: 10 points — qualification in Mechanical Engineering, HVAC or Building Services plus at least three years managing comparable air-conditioning installations.
Air-Conditioning and Refrigeration Technician: 10 points — trade-tested with valid SAQCC Gas or SARACCA registration and at least three years post-qualification experience.
Electrical Artisan: 10 points — trade-tested and competent for the electrical connections, holding the registration legally required for the work.
Installation Assistants: 5 points — at least two assistants with practical air-conditioning installation experience.
Health and Safety Representative / Officer: 5 points — competent in working at heights, electrical safety and lifting operations.
Audited annual financial statements: 15 points — statement of financial position, statement of financial performance and cash flow.
Stage 3 — Price and specific goals (100 points, 80/20 system)
Price: 80 points, scored on the standard 80/20 formula against the lowest acceptable tender.
Specific goals: 20 points, awarded pro rata to the percentage owned, using the formula: points allocated × percentage owned.
Black ownership: 8 points.
Women owned: 4 points.
Youth owned: 4 points.
Disability owned: 2 points.
Locality (KwaZulu-Natal based entity): 2 points.
The SBD 6.1 table in the tender allocates the 20 specific-goals points to B-BBEE Level 1, evidenced by a sworn affidavit or B-BBEE certificate; CIPC or CSD registration reports are used to verify claims.
Failure to submit the proof required for a specific goal means those points are not claimed.
Market-related price
If the highest-scoring price is not market related, the Museum negotiates with the highest, then second, then third ranked bidder; if no market-related price is agreed, the tender is cancelled.
Supply, delivery, installation and commissioning of new air-conditioning systems throughout the Museum, including making the required window openings.
Areas to be covered
First floor: Music, Zimbabwe, African Culture, Sisonke and Caves Gallery; Freedom Gallery; Marine Gallery; Soccer Gallery; Temporary Exhibitions Area; Pietermaritzburg History Gallery; Snake/Reptile Gallery; Indian History & Culture Gallery; Multimedia Centre (opposite the LRC); Technical Office.
Second floor: Cold Room / Walk-in Freezer — compressor replacement that must hold minus 20°C using current cold-room refrigerant specifications.
Ground floor: Mammal Hall; Frank Bush Hall / African Invertebrates Gallery; Bird Galleries; Interns Room; Technical Workshop.
Ground and first floors: Learners Resource Centre.
Fifth floor: Photo Copy Room.
Equipment and technical requirements
All units inverter-driven, energy efficient and factory new.
Warranty: 1 year on workmanship and 5 years on the compressor; minimum 12 months on all newly installed units from commissioning.
Refrigerant: R32 compliant with SANS 10147. R410A and R22 are not accepted.
Built-in dehumidifier / dry mode operated by remote, mandatory on the specified units.
Materials: copper piping, Armaflex, vibration mounts and condensate pumps.
Electrical: all connections plus a Certificate of Compliance.
Commissioning, testing and user training included.
Reporting and handover
A legible report or job card after each installation, with before-and-after photographs of the site.
A completed Legal Requirements Compliance Form after every new installation.
A completed HVAC & Refrigeration Technical & Commissioning Checklist.
A completed Commissioning Checklist Form after every new installation.
Warranty documentation for all new units.
A Certificate of Compliance for every new installation, with a minimum 12-month guarantee from commissioning.
Working hours
Normal working hours: 07:30 to 16:00 on weekdays.
Museum operating hours: 04:00 to 19:00, Monday to Sunday.
No work on Saturdays, Sundays or public holidays, or outside normal hours, without permission from the Chief Technical Officer.
All planned work is done in normal working hours at the tendered BoQ rates.
Delivery programme
A detailed project delivery schedule must be submitted covering mobilisation, site assessment and measurement verification, equipment procurement and delivery, installation preparation, installation, testing and commissioning, quality assurance and inspection, and handover and close-out.
The programme must show start and finish dates, durations, milestones, dependencies and critical activities, resource allocation, coordination to limit disruption to Museum operations, quality and safety controls, and a proposed completion and handover date; a Gantt chart is preferred after award.
A final detailed programme must be approved before installation starts.
Weekly progress reports are required, covering work completed against programme, percentage complete, outstanding items, delays and reasons, corrective measures and planned work for the next period.
Methodology
Source: KZN_Museum_Air_Conditioning_Tender.pdf
Methodology and project delivery plan — 15 of the 100 technical points
A clear project methodology and work plan with a delivery schedule must be submitted with the bid.
The plan must show how the installation will be executed within the contract period.
Minimum activities to be covered
Project mobilisation: project team appointment, site establishment, safety arrangements, equipment and resource mobilisation.
Site assessment and verification: inspection of installation areas, measurement checks, electrical supply capacity, drainage requirements and mounting arrangements.
Procurement and delivery: ordering and delivery of units, accessories, copper piping, electrical materials and other components.
Installation and execution: units, refrigerant piping, electrical connections, condensate drainage and associated components.
Testing and commissioning: pressure testing, leak detection, vacuuming, refrigerant charging, electrical testing and operational commissioning.
Quality assurance and inspections against the specifications and applicable standards.
Handover and close-out: commissioning reports, certificates of conformity, warranties, operating manuals, training and completion documentation.
Programme requirements
Start and completion dates and estimated durations for each activity.
Key milestones and deliverables, dependencies and critical activities.
Allocation of personnel, equipment and resources.
How installations will be coordinated to limit disruption to Museum operations.
Quality control, health and safety compliance and site inspections.
A proposed project completion and handover date.
A Gantt chart format is preferred after award; a final detailed programme must be approved before work starts.
Experience & Qualifications
Source: KZN_Museum_Air_Conditioning_Tender.pdf
Company experience — 30 points
At least three completion or reference letters for work of a similar nature, each with a value of R500 000 or more.
Each reference must be supported by the purchase order or award letter.
Key personnel and points
Project Manager / Site Supervisor (10 points): qualification in Mechanical Engineering, HVAC or Building Services, with at least three years managing air-conditioning installation projects of a similar nature. Evidence: CV, certified qualifications and project references.
Air-Conditioning and Refrigeration Technician (10 points): trade-tested refrigeration mechanic or equivalent qualification, valid SAQCC Gas or SARACCA registration appropriate to the work, and at least three years relevant post-qualification experience. Evidence: CV, trade certificate, valid registration card or certificate and experience references.
Electrical Artisan (10 points): qualified, trade-tested electrician competent to perform the electrical connections and associated work, holding the registration or authorisation legally required. Evidence: CV, trade certificate and applicable registration.
Installation Assistants (5 points): at least two assistants with practical experience in air-conditioning installation, mounting, pipework, insulation and equipment handling, working under qualified supervision. Evidence: CVs and proof of relevant training or experience.
Health and Safety Representative / Officer (5 points): competent person for site-specific health and safety, working at heights, electrical safety and lifting operations. Evidence: CV, safety training certificates and appointment letter where applicable.
Financial standing — 15 points
Latest audited annual financial statements showing the statement of financial position, statement of financial performance and cash flow.
Supporting evidence may be requested for evaluation purposes only.
Quality Management
Source: KZN_Museum_Air_Conditioning_Tender.pdf
Quality control during installation
Installations are inspected and verified against the technical specifications and applicable standards.
Testing and commissioning covers pressure testing, leak detection, vacuuming, refrigerant charging where required, electrical testing and operational commissioning.
The Museum may conduct technical inspections and verify quality, quantities and costs of all work, including varied work, before payment.
Records and handover
A legible report or job card after each installation, with before-and-after photographs.
A completed Legal Requirements Compliance Form after every new installation.
A completed HVAC & Refrigeration Technical & Commissioning Checklist.
A completed Commissioning Checklist Form after every new installation.
Commissioning reports, certificates of conformity where applicable, warranties, operating manuals, training and completion documentation on handover.
A Certificate of Compliance for all new installations, with a minimum 12-month guarantee from commissioning.
Warranty documentation for all new units; minimum 12 months from commissioning, with 1 year on workmanship and 5 years on the compressor.
Programme control
The delivery programme must provide for quality control, health and safety compliance and site inspections.
Weekly progress reports must state work completed against the approved programme, percentage complete, outstanding items, delays and reasons, corrective measures and planned work.
Any anticipated delay affecting completion must be reported immediately with mitigation measures.
The Museum may require reasonable amendments to the programme; a revision does not automatically create an extension of time or additional payment.
Pricing Schedule
Source: KZN_Museum_Air_Conditioning_Tender.pdf
Pricing schedule / Bill of Quantities
The attached pricing schedule or BoQ must be completed and submitted in the issued format; a different format may render the bid non-responsive.
Every line item must be priced; an unpriced line disqualifies the bid.
Prices in South African Rand, inclusive of all applicable taxes.
Firm price offer with the basis stated, a cost breakdown, and the escalation basis and formula.
Unconditional discounts are considered only at the final evaluation stage.
Delivery period in working days from date of order, at the bidder's earliest possible period.
Preliminaries to be included
Mobilisation, site establishment and supervision.
Health and safety compliance.
Site protection and dust control.
Transport, delivery and handling.
Testing, commissioning and handover.
Waste removal and final cleaning.
Provisional sum.
Other necessary preliminaries specified by the bidder.
Preliminaries are allowed only with motivation and Museum approval.
Order and payment
Purchase orders must be actioned within 48 hours unless the material lead time is longer, in which case proof must be provided.
Payment within 30 days of receipt of a correct tax invoice.
All planned work is carried out during normal working hours at the tendered BoQ rates.
Variations are priced at accepted BoQ rates where they apply; otherwise a new rate is negotiated and approved before the work starts.
All prices in South African Rand, inclusive of all applicable taxes.
Firm price offer, with the basis clearly stated.
The Bill of Quantities / pricing schedule must be completed in full; any unpriced line item disqualifies the bid.
A cost breakdown must be provided, together with the price escalation basis and formula.
Pricing must follow the issued schedule exactly; a different format may render the bid non-responsive.
Unconditional discounts are considered only at the final evaluation stage.
Delivery period: bidders offer their earliest possible period, stated in working days from date of order.
Preliminaries to be priced
Mobilisation, site establishment and supervision.
Health and safety compliance.
Site protection and dust control.
Transport, delivery and handling.
Testing, commissioning and handover.
Waste removal and final cleaning.
Provisional sum.
Any other necessary preliminaries, specified by the bidder.
Preliminaries are allowed only with motivation and Museum approval.
Payment
Payment within 30 days of receipt of a correct tax invoice.
Final payment is withheld until all waste is removed and the site is clean, subject to the Certificate of Compliance and retention.
Purchase orders must be actioned within 48 hours unless the material lead time exceeds that, in which case proof must be supplied.
Financial evaluation
Latest audited annual financial statements, including statement of financial position, statement of financial performance and cash flow, carry 15 of the 100 technical points.
Supporting evidence may be requested for evaluation purposes.
No bid security or performance guarantee is required in this tender.
CIDB registration at grade 3ME. Failure to submit is an automatic disqualification.
Registration on National Treasury's Central Supplier Database (CSD); no award may be made to an unregistered bidder. Only foreign suppliers with no local entity are exempt.
Valid SARS tax compliance status PIN, or a printed TCS certificate. Each consortium, JV or subcontracting party submits its own PIN and CSD number.
No bid is considered from a person in the service of the state, a company with such a director, or a close corporation with such a member.
Bidders listed on the Register for Tender Defaulters or the List of Restricted Suppliers are automatically disqualified.
B-bbee
A valid B-BBEE certificate or sworn affidavit is a mandatory returnable document.
B-BBEE Level 1 carries the 20 specific-goals points in the SBD 6.1 table; claims are verified against CIPC or CSD registration reports.
Ownership, women, youth, disability and KwaZulu-Natal locality claims are scored pro rata against the percentage owned.
Statutory and professional
Valid SAQCC Gas or SARACCA registration for the air-conditioning and refrigeration technician.
Trade-tested electrician holding the registration or authorisation legally required for the electrical connections.
Certificate of Compliance for all new electrical installations.
Full compliance with all applicable national and local laws by the successful bidder.
Returnable forms
SBD 1 (Invitation to Bid): signed offer cover page.
SBD 4 (Bidder's Disclosure): declares state employment and conflicts of interest.
SBD 6.1 (Preference Points Claim): claims the specific-goals points.
Proof of authority for the signatory, such as a board or company resolution.
Health & Safety
Source: KZN_Museum_Air_Conditioning_Tender.pdf
Site safety obligations
The contractor must comply with applicable construction safety requirements, including working at heights, electrical safety and lifting operations.
A competent Health and Safety Representative / Officer must be appointed, with a CV, relevant safety training certificates and an appointment letter; this carries 5 of the 100 technical points.
Health and safety compliance, site protection and dust control must be priced as preliminaries in the BoQ.
Work outside normal hours, on weekends or on public holidays requires permission from the Chief Technical Officer.
Installations must be coordinated to minimise disruption to the Museum's operations and public.
Waste must be cleared daily and disposed of at a registered dumping site, with a disposal certificate submitted; final payment is withheld until the site is clean.
Environmental
Source: KZN_Museum_Air_Conditioning_Tender.pdf
Waste and site cleanliness
All waste must be removed on completion of each day's work.
Waste must be disposed of at a registered dumping site, and a certificate from that site must be submitted.
Final payment is not released until all waste is removed and the site is clean, subject to the Certificate of Compliance and retention.
Refrigerant and equipment standards
Refrigerant must be R32 compliant with SANS 10147; R410A and R22 are not accepted.
The cold room compressor replacement must maintain minus 20°C using current cold-room refrigerant specifications.
Units must be inverter-driven and energy efficient.
Site protection and dust control must be provided and priced as a preliminary item.
Contractual Terms
Source: KZN_Museum_Air_Conditioning_Tender.pdf
Contract basis
The Museum's General Conditions of Purchase form the contract; no oral variation by any Museum employee is valid.
The contract is governed by South African law, with non-exclusive jurisdiction of the South African courts.
Duration and completion
The project must be completed within the contract period, counted from the official site handover or commencement instruction.
A final detailed implementation programme must be approved before installation begins.
Variations and expansions
The Museum may instruct reasonable variations or expansions where operationally necessary and subject to funds and delegated approval.
Variations may cover additional units, relocation or adjustment of units, extra electrical connections, cabling and drainage, changed mounting or installation configurations, and work arising from unforeseen site conditions.
Each variation needs a written motivation, technical assessment and cost breakdown with rates and prices.
No varied work may start without prior written approval and an authorised variation instruction.
Accepted BoQ rates apply where the work is covered; where no rate exists, a new rate must be negotiated, justified and approved before work starts.
Variations may not materially change the nature of the procurement or circumvent competitive bidding.
Variations are not an automatic entitlement and the Museum may reject any that are not technically justified, affordable or compliant.
Extensions of time
A written application is required, covering delays caused by the Museum, unforeseen site conditions, delayed approvals or site access, force majeure, and approved variations affecting the programme.
The application must state the reasons, supporting evidence, the effect on the programme and the time requested.
The Museum may grant or refuse; an extension does not automatically carry additional payment, standing time or costs unless expressly approved in writing.
Any extension of the contract period needs written motivation, confirmed operational need, available funds and delegated approval, formalised by a signed contract amendment.
Verbal or informal instructions from unauthorised officials do not authorise additional expenditure.
The Museum may inspect and verify quality, quantities and costs of varied work before payment, and the contractor must keep records of all approved variations for audit.
Delivery, risk and warranty
Title and risk pass to the Museum on acceptance.
The Museum may reject non-conforming items or work by written notice; rejected items are returned at the supplier's risk and cost, and the supplier bears the cost of replacement.
The supplier warrants the work and goods are fit for purpose and free of defects for one year from acceptance, unless another period is stated in the order.
The supplier indemnifies the Museum against claims arising from negligence, infringement of rights, breach of statutory duty, defective design, materials or workmanship.
Subcontracting requires the Museum's prior approval; the successful bidder remains liable for performance.
No payment is made for containers or packing materials.
Funding contingency
The Museum may cancel the tender at any stage before award if it cannot secure sufficient budget.
The Museum is not liable for any loss arising from failure to source funding or non-award for that reason, and bidders waive any right to institute proceedings on those grounds.
Section
Source: KZN_Museum_Air_Conditioning_Tender.pdf
Stage 1 — compliance screening
Mandatory documents and requirements are pass/fail; a missing item disqualifies the bid.
Where a document is outstanding, the most responsive bidder may be given three working days to submit it, failing which the bid is automatically disqualified.
Stage 2 — technical and functionality, 100 points, minimum 65%
Company experience: 30 points. At least three completion or reference letters for comparable work, each valued at R500 000 or more, backed by the purchase order or award letter.
Methodology and project delivery plan: 15 points.
Project Manager / Site Supervisor: 10 points. Relevant qualification in Mechanical Engineering, HVAC or Building Services and at least three years managing similar air-conditioning installations.
Air-Conditioning and Refrigeration Technician: 10 points. Trade-tested refrigeration mechanic or equivalent, valid SAQCC Gas or SARACCA registration, at least three years post-qualification experience.
Electrical Artisan: 10 points. Trade-tested and competent for the electrical connections, holding the applicable registration or authorisation.
Installation Assistants: 5 points. At least two assistants with practical installation, mounting, pipework, insulation and equipment-handling experience.
Health and Safety Representative / Officer: 5 points. Competent in site-specific safety, working at heights, electrical safety and lifting operations.
Audited annual financial statements: 15 points. Statement of financial position, statement of financial performance and cash flow.
Bidders scoring below 65% do not proceed to Stage 3.
Stage 3 — price and specific goals, 100 points
Price: 80 points under the 80/20 system, scored against the lowest acceptable tender.
Specific goals: 20 points — black ownership 8, women owned 4, youth owned 4, disability owned 2, KwaZulu-Natal locality 2.
Points are allocated pro rata: points allocated × percentage owned.
The SBD 6.1 table in the tender allocates the 20 points to B-BBEE Level 1, evidenced by a sworn affidavit or B-BBEE certificate.
CIPC registration documents or the CSD registration report verify the claims.
Unclaimed or unproven specific goals score nothing.
Administrative responsiveness
Completeness of the response, all returnable documents and certificates, warranties and bid formalities are checked; incomplete bids are disqualified.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Prevention and Combating of Corrupt Activities Act (PRECCA)
Act 12 of 2004
high
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Public Procurement Act, 2024 (PPA)
Act 28 of 2024
high
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Promotion of Access to Information Act (PAIA)
Act 2 of 2000
medium
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Promotion of Administrative Justice Act (PAJA)
Act 3 of 2000
medium
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Sector-specific rules
These rules are linked to the work category, industry, or regulated service area.
5
Electricity Regulation Act (ERA)
Act 4 of 2006
high
Relevant to electricity, generation, transmission, distribution and energy-service procurement.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance. Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
National Environmental Management Act (NEMA)
Act 107 of 1998
high
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance. Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Occupational Health and Safety Act (OHS Act)
Act 85 of 1993
high
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance. Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Mineral and Petroleum Resources Development Act (MPRDA)
Act 28 of 2002
medium
Relevant to mineral resources, mining rights, prospecting and mining-related procurement.
Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
National Energy Regulator Act
Act 40 of 2004
medium
Relevant to regulated electricity, piped-gas and petroleum-pipeline activities.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance.
237 Jabu Ndlovu St, Pietermaritzburg, 3201, South Africa
Document-Backed
Recently Synced
Source Snapshot Available
AI Enhanced
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
24 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.