ESKOM requires the provision, installation, integration, configuration, testing, commissioning, stabilisation and handover of modular smart rack and containerised 30kva UPS solutions at five kwazulu-natal regional distribution centres (new germany, marburg, howick, vryheid and empangeni). The installation is once off, while support, maintenance and monitoring run for five years. Bidders must meet mandatory sdl&i obligations, including skills development, local procurement content and b-bbee improvement commitments, with a 2.5% Invoice retention and penalty for non-compliance. The most consequential consideration is the mandatory CIDB csdg percentage, failure to meet which renders the tender non-responsive.
Key Requirements
Closing: 12 January 2027 at 08:00; submission method and address not stated.
Mandatory CIDB Skills Development (CSDG) percentage must be met; failure renders the tender non-responsive.
Returnables include SDL&I Bidders Document, valid B-BBEE certificate or sworn affidavit (EME/QSE) or CIPC certificate, CIPC registration, ID copies of shareholders, share certificate, latest financial statements, SBD 6.2 and Annex C (local content declarations) — SBD 6.2 and Annex C are conditions for award.
B-BBEE evidence: sworn affidavit acceptable for revenue up to R10m (EME); QSEs (up to R50m) must comply with QSE scorecard unless at least 51% black-owned; revenue above R50m requires a SANAS-accredited B-BBEE certificate.
B-BBEE improvement milestones are contractual: Level 4 must reach Level 3 by end of year one; Levels 5–8 or non-compliant must reach Level 4 by end of year one and improve one level per year thereafter; B-BBEE Improvement Plan due within 30 days of contract signing.
SDL&I obligations: deliver 1 skill for every R3,000,000 invoiced; submit jobs and local procurement proposals; 2.5% of every invoice (excl. VAT) retained as security and 2.5% penalty for non-compliance.
Sworn affidavits must be valid: no blank spaces, same date for deponent and Commissioner of Oaths, Commissioner cannot be an employee of the enterprise, and "true copy" stamps are not accepted.
The Provision of RDC'FM 800 Implementation and Support and Maintenance Contract, the duration for the Provisioning and Installation of the smart rack and UPS is once off. Support, Maintenance and Monitoring contract duration is Five (5) Years at Five (5) KZN Regional Distribution Centers (RDC) – (New Germany RDC, Marburg RDC, Howick RDC, Vryheid RDC, Empangeni RDC’s)
Tender context
Return to this tender’s issuing organisation, province, or category.
The provision of rdc'fm 800 implementation and support and maintenance contract, the duration for the provisioning and installation of the smart rack and UPS is once off. Support, maintenance and monitoring contract duration is five (5) years at five (5) KZN regional distribution centers (rdc) – (new germany rdc, marburg rdc, howick rdc, vryheid rdc, empangeni rdc’s)
25 Valley View Rd, New Germany 3610, KwaZulu-Natal - Durban - New Germany - 3610
Information & Communication Technology Industry Profile
Critical Requirements
POPIA Compliance
Regulatory Bodies
IITPSA
Tenders in this industry often require registration with these bodies.
Typical Documents
9 items
Company Registration (CIPC)
Tax Clearance Certificate
B-BBEE Certificate
CSD Registration
Company Profile
ISO 27001 Certificate (if applicable)
Technical Certifications
Solution Architecture Documents
Reference Letters
Recommended Certifications
Having these can improve your winning chances: IITPSA Membership, ISO 27001 (Information Security Management), ISO 20000 (IT Service Management), CISSP
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
DocumentFINANCE REQUIREMENTS.zipReview complete
Evaluation Criteria
Source: FINANCE REQUIREMENTS.zip (unknown)
Important Dates
26 Nov
2026
Tender published
Tender Published
Tender was published
12 Jan
2027
Submission deadline
Closing Date
Tender closing date
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
7 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Eskom requires the provision, installation, integration, configuration, testing, commissioning, stabilisation and handover of modular smart rack and containerised 30kVA UPS solutions at five KwaZulu-Natal Regional Distribution Centres (New Germany, Marburg, Howick, Vryheid and Empangeni), followed by a five-year support, maintenance and monitoring contract for the installed solutions.
Eskom requires the provision, installation, integration, configuration, testing, commissioning, stabilisation and handover of modular smart rack and containerised 30kVA UPS solutions at five KZN Regional Distribution Centres (New Germany, Marburg, Howick, Vryheid, Empangeni). The installation is once-off, followed by a five-year support, maintenance and monitoring contract.
Eskom requires the provision, installation, integration, configuration, testing, commissioning and handover of modular smart rack and containerised 30kVA UPS solutions at five KZN Regional Distribution Centres (New Germany, Marburg, Howick, Vryheid, Empangeni), followed by a five-year support, maintenance and monitoring contract for the installed systems. The contract is split into two NEC3-based agreements: an SC3 Supply Contract for the once-off supply and installation, and a TSC3 Term Service Contract for the ongoing support.
Eskom requires the provisioning, installation, support, maintenance and monitoring of RDC'FM 800 smart racks and UPS units at five KZN Regional Distribution Centres (New Germany, Marburg, Howick, Vryheid and Empangeni). Installation is once-off, followed by a five-year support, maintenance and monitoring contract.
Eskom requires the provisioning, installation and commissioning of modular smart rack and containerised 30 kVA UPS solutions at five KwaZulu-Natal Regional Distribution Centres (New Germany, Marburg, Howick, Vryheid and Empangeni), followed by a five-year support, maintenance and monitoring contract. The hardware installation is once-off; the support, maintenance and monitoring contract runs for five years.
Eskom requires the once-off supply and installation of modular smart racks and containerised 30kVA UPS solutions, followed by a five-year support, maintenance and monitoring contract, at five KZN Regional Distribution Centres (New Germany, Marburg, Howick, Vryheid and Empangeni). The contract is split into an NEC3 Supply Contract for the installation and an NEC3 Term Services Contract for the five-year maintenance period.
Eskom requires the implementation, support, and maintenance of RDC'FM 800 smart racks with built-in UPS, internal cooling, automatic fire protection, access control, and monitoring with AI prediction at five KwaZulu-Natal Regional Distribution Centres. The provisioning and installation is once-off, followed by a five-year support, maintenance, and monitoring contract.
Eskom requires the provisioning, installation, support, maintenance and monitoring of RDC'FM 800 smart racks and UPS units at five KZN Regional Distribution Centres (New Germany, Marburg, Howick, Vryheid, Empangeni). Installation is once-off, followed by a five-year support, maintenance and monitoring contract.
Eskom requires the once-off provisioning and installation of smart racks and UPS units, followed by a five-year support, maintenance and monitoring contract, at five KwaZulu-Natal Regional Distribution Centres (New Germany, Marburg, Howick, Vryheid and Empangeni).
Eskom requires the provision, installation, and five-year support, maintenance, and monitoring of RDC'FM 800 smart racks and UPS systems at five KwaZulu-Natal Regional Distribution Centres (New Germany, Marburg, Howick, Vryheid, and Empangeni). The contract covers a once-off provisioning and installation phase followed by a five-year service period.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Similar Tenders
Matched by category & region
Supplier Readiness Hub
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
cancellation: Stage 1: The manufacture, supply and delivery of various Kiosks on “an as and when required” basis for a period of three (3) years for Distribution
Clusters.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Document read
Compliance review
Bid-ready summary
Financial evaluation forms part of bid assessment.
Bidders must submit approved annual financial statements (AFS) not older than 18 months.
A signed director's or member's report is required.
A signed compiler's, accounting officer's, independent reviewer's or audit report is required, depending on the public interest score (PIS).
Where the PIS requires an audit or independent reviewer's report, a compiler's or accounting officer's report must still be submitted.
If the company is not audited, an ITA 34C income tax assessment is required.
The PIS letter must state whether the AFS were internally or externally prepared, and whether the company is owner-managed.
Failure to provide requested financial information within five working days of the finance request results in the financial evaluation being closed.
Pricing Schedule
Source: FINANCE REQUIREMENTS.zip
Financial evaluation requirements include: notes to the AFS must clearly specify current and non-current liabilities subject to interest; member or director loans must be accompanied by a note specifying terms, security, repayment and interest rates; name of holding company if a subsidiary; latest signed group AFS of the holding company may be requested later; information requested via the Procurement Office not received within five working days results in the financial evaluation being closed.
Financial Requirements
Source: FINANCE REQUIREMENTS.zip (unknown)
Financial evaluation requirements:
AFS must include: statement of financial position, statement of comprehensive income, statement of changes in equity, statement of cash flows, and notes to the financial statements.
Notes to the AFS must give a complete breakdown of accounts receivable and accounts payable, distinguishing trade debtors from other receivables and trade creditors from other payables, and showing amounts subject to interest and the terms of that interest.
Notes must clearly specify current and non-current liabilities subject to interest.
Member or director loans must be accompanied by a note specifying whether secured or unsecured, repayment terms, and interest rates.
If the company is a subsidiary, the name of the holding company must be provided.
The latest signed group AFS of the holding company may be requested later.
Public draft, bi-annual, management accounts and unsigned financial statements are not accepted.
Soft copies of AFS or required documents may be requested.
Compliance Requirements
Source: FINANCE REQUIREMENTS.zip (unknown)
Financial compliance:
Approved annual financial statements not older than 18 months.
Public interest score (PIS) with calculations, if not submitting audited financial information.
ITA 34C income tax assessment for companies that have not been audited.
AFS must be valid and received within 18 months after year-end.
Section
Source: FINANCE REQUIREMENTS.zip
Financial evaluation is part of the assessment. Bidders must submit approved annual financial statements not older than 18 months, a signed director's or member's report, and a signed compiler's, accounting officer's, independent reviewer's or audit report as applicable based on the public interest score. Where the PIS requires an audit or independent reviewer's report, a compiler's or accounting officer's report must still be submitted. If the company is not audited, an ITA 34C income tax assessment is required. The PIS letter must specify whether the AFS were internally or externally prepared and whether the company was owner-managed. Failure to provide requested financial information within five working days of the finance request results in the financial evaluation being closed.
DocumentNEC+BOQ.zipReview complete
Description
Source: NEC+BOQ.zip
The tender is for the provision of RDC'FM 800 implementation and support and maintenance contract. The duration for the provisioning and installation of the smart rack and UPS is once off. Support, maintenance and monitoring contract duration is five (5) years at five (5) KZN Regional Distribution Centers (RDC) – (New Germany RDC, Marburg RDC, Howick RDC, Vryheid RDC, Empangeni RDC’s).
Important Dates
Source: NEC+BOQ.zip (unknown)
Starting date: 1 April 2027
Delivery date for goods and services: 1 April 2027
Defects date: 52 weeks after delivery
End of liability date: 3 years after delivery of the whole of the goods and services
Programme submission: first programme within 2 weeks of contract date; revised programmes at intervals no longer than 4 weeks
Period for reply: 1 week
Payment period: 3 weeks
Assessment interval: between the [●] day of each successive month (not specified)
Contact Information
Source: NEC+BOQ.zip (unknown)
Eskom Holdings SOC Ltd
Registered office: Megawatt Park, Maxwell Drive, Sandton, Johannesburg
Marburg RDC: Old Izotsha Road, 2 Uplands Farm, Margate
Howick RDC: 1 Boston Road, Howick
Vryheid RDC: R69, Vryheid East, Vryheid
Empangeni RDC: 1 Bronze Street, Empangeni
Submission Guidelines
Source: NEC+BOQ.zip (unknown)
Returnable documents:
C1.1 Form of Offer and Acceptance: signed offer and acceptance of contract terms.
C1.2a Contract Data provided by the Purchaser/Employer: completed by Eskom.
C1.2b Contract Data provided by the Supplier/Contractor: completed by bidder.
C1.3 Proforma Guarantees: bonds/guarantees as required.
Schedule of Deviations: any deviations from tender documents must be listed here.
Submission method: Not stated in the provided text.
Submission address: Not stated.
Closing time: Not stated in the provided text.
Disqualification risks:
Failure to complete and sign all required forms.
Failure to provide required securities, bonds, guarantees, proof of insurance within two weeks of receiving the signed contract.
Any deviation not recorded in the Schedule of Deviations is invalid.
Evaluation Criteria
Source: NEC+BOQ.zip (unknown)
Evaluation is based on the NEC3 Supply Contract (SC3) and NEC3 Term Service Contract (TSC3) conditions.
The contract includes options X1 (price adjustment), X2 (changes in law), X3 (multiple currencies), X13 (performance bond), X17 (low-performance damages), X18 (limitation of liability).
Bidders must complete the Form of Offer and Acceptance and any Schedule of Deviations.
A performance bond (Option X13) is required in the form set out in the Goods Information.
Bidders must comply with B-BBEE requirements; any change in B-BBEE status must be notified within 7 days, and a decrease may lead to renegotiation or termination.
Bidders must not cede, delegate or assign rights without written consent.
Joint ventures are jointly and severally liable.
Bidders must provide insurance as per Insurance Table A.
Bidders must comply with Eskom's additional conditions Z1 to Z15.
Bidders must provide a tax invoice with Eskom's VAT number.
The contract is governed by South African law and the language is English.
Technical Specifications
Source: NEC+BOQ.zip (unknown)
Scope of work:
Provide, install, integrate, configure, test, commission, stabilise and handover of modular smart rack and containerised 30kVA UPS solutions at five Regional Distribution Centres (RDCs) in KwaZulu-Natal Operating Unit, CentralEast Cluster.
Support, maintenance and monitoring of the installed solutions for a period of five (5) years.
Deliverables:
Supply and installation of modular smart rack and containerised 30kVA UPS solutions (once off).
Ongoing support, maintenance and monitoring for 5 years.
NEC3 Supply Contract (SC3) for supply and installation.
NEC3 Term Service Contract (TSC3) for support, maintenance and monitoring.
Financial Requirements
Source: NEC+BOQ.zip (unknown)
Pricing:
Offered total of Prices exclusive of VAT, plus VAT @ 15%, and total inclusive of VAT.
For TSC3, options A or C: offered total of Prices; Option E: first forecast of total Defined Cost plus Fee.
Payment terms:
Payment period: 3 weeks.
Interest rate: prime rate of interest charged by Standard Bank of South Africa Limited (for Rand amounts) or LIBOR (for other currencies).
Tax invoice must be provided within one week of receiving a payment certificate.
Eskom's VAT number: 4740101508 must be included on each invoice.
Bonds and guarantees:
Performance bond (Option X13) required; amount to be specified.
Parent company guarantee (Option X4) may be required.
Pro forma guarantees are provided in the contract documents.
Liability:
Supplier's liability for indirect or consequential loss: R0.0 (zero Rand).
Supplier's liability for defects due to design: limited to 100% of contract value.
Supplier's total liability: limited to 100% of total Prices.
End of liability date: 3 years after delivery.
Insurance:
Supplier must provide insurance as per Insurance Table A (loss/damage to goods, liability for property damage, bodily injury, etc.).
Purchaser provides insurance as per Insurance Table B (assets all risk, contract works, environmental liability, etc.).
Compliance Requirements
Source: NEC+BOQ.zip (unknown)
B-bbee:
Bidders must comply with B-BBEE requirements.
Any change in B-BBEE status must be notified to the Supply/Service Manager within 7 days.
Updated verification certificate and supporting documentation must be submitted within 30 days of notification.
A decrease in B-BBEE status may lead to renegotiation or termination.
VAT:
Bidders must be registered for VAT in South Africa if applicable.
Eskom's VAT number: 4740101508.
CIDB:
Tenderer's CIDB registration number is required on the Form of Offer and Acceptance (TSC3).
General:
Must comply with all applicable health, safety and environmental laws and regulations.
Must comply with Eskom's additional conditions Z1 to Z15.
Must not cede, delegate or assign rights without written consent.
Joint ventures must notify the Supply/Service Manager of the key person within two weeks of contract date.
Section
Source: NEC+BOQ.zip
Additional evaluation criteria:
Quality assurance requirements are referenced (section 3.3 of scope of work).
Health, safety and environment requirements are part of the contract.
No specific scoring split or minimum qualifying score is stated in the provided text.
DocumentSCOPE OF WORK.zipReview complete
Description
Source: SCOPE OF WORK.zip
The scope covers two parts: (A) provide and install modular smart rack and containerised 30kVA UPS solutions at five KZN RDCs, and (B) support, maintenance and monitoring of these solutions for five years. A clarification meeting with prospective vendors is to be scheduled before tender proposals are submitted. All equipment must be delivered to the relevant RDC sites, and installation and commissioning completed by 31 March 2027.
Important Dates
Source: SCOPE OF WORK.zip (unknown)
Closing date: 12 January 2027 at 08:00 (from tender record).
Installation and commissioning of all equipment must be completed by 31 March 2027.
Clarification meeting with prospective vendors to be scheduled before tender proposals are submitted (date and venue not stated).
Contact Information
Source: SCOPE OF WORK.zip (unknown)
Contact: Vusani Mahlangu
Role: End User
Email: not stated
Telephone: not stated
Submission address: not stated
Service delivery addresses:
New Germany RDC: 25 Valley View Road, New Germany
Marburg RDC: Old Izotsha Road, 2 Uplands Farm, Margate
Howick RDC: 1 Boston Road, Howick
Vryheid RDC: R69, Vryheid East, Vryheid
Empangeni RDC: 1 Bronze Street, Empangeni
Submission Guidelines
Source: SCOPE OF WORK.zip (unknown)
Returnable documents: all National Treasury standard forms (SBD 1, SBD 3.1/3.2/3.3, SBD 4, SBD 6.1, SBD 6.2, SBD 7.1/7.2, SBD 8, SBD 9, Authority to Sign / Board Resolution) must be completed, signed and submitted. Proof of CSD registration and a valid tax clearance (SARS TCS or tax pin) are required. Bidders must submit their proposals before the closing time; late submissions are disqualified.
Evaluation Criteria
Source: SCOPE OF WORK.zip (unknown)
Evaluation split: not stated in the document. Preference points: not stated. Minimum qualifying score: not stated. Bidders must be registered on the CSD and have a valid tax clearance. Bidders must have an operational presence within KwaZulu-Natal and provide OEM accreditation and certification for maintenance of the equipment.
Technical Specifications
Source: SCOPE OF WORK.zip (unknown)
Scope: Provide, install, integrate, configure, test, commission, stabilise and handover of modular smart rack and containerised 30kVA UPS solutions at five KZN Regional Distribution Centres (RDCs): New Germany, Marburg, Howick, Vryheid, Empangeni. Also provide support, maintenance and monitoring for a period of five (5) years.
Modular smart rack solution:
Two 42U standard cabinets stacked side-by-side.
Built-in UPS with minimum rating of 10kVA, accepting input from external 30kVA UPS, PV (solar), and existing generator where available.
Sealed lead acid batteries with 8 hours runtime and 10-year lifespan.
Internal rack cooling with failsafe (e.g. doors automatically open on cooling failure).
Internal automatic fire protection using safe inert gas, per cabinet.
Cabinet-level access control (biometric and/or electronic keypad), manageable via web interface remotely, with manual unlock method.
Rack-level monitoring with proactive maintenance alerts using AI: UPS alerts (on bypass, on battery, battery runtime below 50%), cooling alerts (temperature, humidity, airflow, water leak detection), fire protection early warning, access control alerts and logs.
Two CCTV cameras per rack (front and back), footage stored locally and accessible remotely, pictures sent via email to applicable parties.
30kVA containerised UPS:
External 30kVA UPS with lithium-ion phosphate battery banks providing 72 hours battery time, fast charging within 4 hours.
Housed in a containerised environment for continuous outdoor operation, with protection against rain, water ingress, dust, corrosion, temperature extremes and unauthorised access. Bidder must state container IP rating and environmental operating limits, and provide OEM/manufacturer evidence.
Must interface with PV (solar), generator and municipality.
Double online conversion, automatic static bypass (no break in power during transfer).
Redundant cooling with two AC units, fire protection, access control via keys plus keypad or biometric (monitored and logged), anti-theft and anti-vandal locking mechanisms.
Two CCTV cameras (one inside, one outside), external camera with tamper alerts, footage stored locally and accessible remotely, pictures sent via email.
Power reticulation:
Reticulation from containerised UPS to smart rack and other network cabinets.
Red plugs to power all IT equipment (laptops, desktops, peripherals).
Work to comply with building regulations; COC certificate to be provided on completion.
Installation tailored to each site; civil work may be required at New Germany RDC (estimated 100m route between RDC Ward 3 yard and IM Office). No civil work required at other sites.
Support, maintenance and monitoring (5 years):
OEM-trained and certified technicians for all support activities.
Operational presence within KwaZulu-Natal for onsite support.
24/7 emergency call-out services.
Defined escalation procedures for critical incidents.
Supply and replacement of components as per warranty.
Comprehensive maintenance per OEM specification, including inspection of power distribution and electrical connections, firmware/software updates, maintenance and testing of UPS and battery infrastructure (lead-acid for smart rack, lithium-ion for containerised), HVAC cooling units, environmental monitoring systems, cabinet access control systems.
Detailed maintenance reports after each service.
Availability of replacement parts and spares within South Africa.
Fully operational off-site 24/7 monitoring centre with real-time monitoring, event logging, incident management, environmental monitoring (temperature, humidity, water leak detection), power performance monitoring, remote diagnostics, root cause analysis, automated fault escalation and notification.
Quality Management
Source: SCOPE OF WORK.zip
Maintenance requirements: OEM accreditation and certification to maintain equipment. Comprehensive maintenance per OEM specification. Inspection of power distribution and electrical connections. Firmware and software updates as required by OEM. Maintenance and testing of UPS system and lead-acid battery infrastructure (smart rack) and lithium-ion battery banks (containerised). Maintenance of HVAC cooling units, environmental monitoring systems, and cabinet access control systems. Detailed maintenance reports after each service. Supply and replacement of components where required. Preventative maintenance and fault rectification (health check) for containerised UPS. Availability of replacement parts and spares within South Africa.
Compliance Requirements
Source: SCOPE OF WORK.zip (unknown)
CSD registration: required.
Tax clearance: valid SARS TCS or tax pin required.
B-BBEE: not stated.
CIDB: not applicable (not construction).
OEM accreditation and certification: required for maintenance of equipment.
Operational presence in KwaZulu-Natal: required.
Health & Safety
Source: SCOPE OF WORK.zip
The smart rack solution must include redundancy for power and cooling to ensure uptime during business hours. Internal rack cooling with failsafe (e.g. doors automatically open on cooling failure). Internal automatic fire protection using safe inert gas, installed per cabinet. Access control at cabinet level (biometric and/or electronic keypad) with manual unlock method. Containerised UPS must have redundant cooling with two AC units, fire protection, access control via keys plus keypad or biometric (monitored and logged), and anti-theft/anti-vandal locking mechanisms. CCTV with tamper alerts on external camera.
Environmental
Source: SCOPE OF WORK.zip
Monitoring requirements: fully operational off-site 24/7 monitoring centre. Real-time monitoring of smart rack and UPS infrastructure. Event logging and incident management. Environmental monitoring including temperature, humidity and water leak detection. Power performance monitoring. Remote diagnostics and troubleshooting. Root cause analysis for recurring faults. Automated fault escalation and notification procedures.
Contractual Terms
Source: SCOPE OF WORK.zip
Support obligations: OEM-trained and certified technicians for all support activities. Service provider must have an operational presence within KwaZulu-Natal for onsite support. Provide 24/7 emergency call-out services. Defined escalation procedures for critical incidents. Supply and replacement of components as per warranty.
The tender covers the implementation of RDC'FM 800, including once-off provisioning and installation of smart rack and UPS, and a five-year support, maintenance and monitoring contract at five KZN Regional Distribution Centres. The SHEQ annexure checklist lists numerous safety procedures and standards that the contractor must read, understand and comply with, covering activities such as crane operations, excavations, overhead line work, transformer installation, and working at height. The contractor must also complete a tax status evaluation pack to determine classification under the Income Tax Act.
Important Dates
Source: COMMERCIAL REQUIREMENTS.zip (TENDER)
Closing date: 12 January 2027 at 08:00 (SAST)
Non-compulsory clarification meeting: 06 August 2026 at 10:00 via Microsoft Teams
No other specific contact details provided in the document.
Submission Guidelines
Source: COMMERCIAL REQUIREMENTS.zip (TENDER)
Submission method: electronic via Eskom eTendering system at https://tenderbulletin.eskom.co.za/
Upload documents under folders: Technical, Commercial, Financial, Other.
All documents in PDF, except price list which must be in PDF and Excel.
File limit: 50MB per file; total submission 900MB.
No zip/condensed files; no hard copies accepted.
Submission status must be marked complete before final submission.
Only the most recent version of a resubmission is accepted; previous versions invalid.
Complete and submit the e-Tendering Training Acknowledgement Form.
Sign and submit the Declaration of Insurances confirming required insurance policies are in place.
Acknowledge the SHEQ annexures by signing the checklist.
Complete and submit the Contractor Type Evaluation Pack (tax status) to [email protected].
Returnable forms: SBD 4 (Declaration of Interest), SBD 9 (Certificate of Independent Bid Determination), and any other mandatory forms as specified in the Tender Data.
All mandatory returnables must be completed and submitted by closing time; missing or unsigned forms disqualify the bid.
Tenders must be in English, completed in ink, and signed by an authorised representative.
Late submissions are not accepted; proof of posting does not count as delivery.
Specific Goals (B-BBEE) – scored under 90/10 or 80/20 system; missing proof scores zero.
Ranking – Price + Specific Goals scores added; highest ranked.
Preference point system: 90/10 or 80/20 as per PPPFA.
Objective criteria may be applied per Section 2(1)(f) of PPPFA; functionality and B-BBEE elements cannot be used as objective criteria.
Arithmetical errors: amount in words prevails; Eskom may correct errors with tenderer's concurrence.
Technical Specifications
Source: COMMERCIAL REQUIREMENTS.zip (TENDER)
Scope: Implementation of RDC'FM 800, including provisioning and installation of smart rack and UPS (once-off), and support, maintenance and monitoring for five (5) years at five KZN Regional Distribution Centres: New Germany RDC, Marburg RDC, Howick RDC, Vryheid RDC, Empangeni RDC.
The work involves overhead line and substation activities as per the SHEQ annexure checklist, including but not limited to: operating vehicle-mounted cranes, road crossings, excavations, installation of pole-mounted transformers, stringing conductors, earthing, working at height, and related tasks.
Contractor must read and understand all listed SHEQ annexures (e.g., 240-77858652, 34-318, etc.) and comply with them.
Compliance with OHS Act, NEMA, and other applicable legislation is required.
Financial Requirements
Source: COMMERCIAL REQUIREMENTS.zip (TENDER)
Pricing:
Rates and prices must be in South African Rand, fixed for contract duration, and include all duties, taxes (including VAT) and levies applicable 14 days before closing.
Price list must be submitted in both PDF and Excel formats.
If performance security (bond or demand guarantee) is required, bidder must select at least two financial institutions from Eskom's approved list.
No other financial thresholds or amounts specified in the document.
Compliance Requirements
Source: COMMERCIAL REQUIREMENTS.zip (TENDER)
CSD registration: implied by standard Eskom requirements; bidders must be registered on the Central Supplier Database.
Tax clearance: valid SARS tax compliance status (TCS) required.
B-BBEE: compliance with PPPFA; B-BBEE certificate or affidavit required for preference points; fraud or fronting reported to B-BBEE Commission.
CIDB: if stipulated in Tender Data, must be registered with CIDB at closing or capable of registration within 21 working days after closing.
Contract Skills Development Goals (CSDG): applicable for contracts of R5 million or more (professional/service) or CIDB grade 7+ (construction); must achieve goals.
Contract Participation Goals (CPG): applicable to construction works contracts in GB/CE classes, duration ≥6 months, or ≥25% subcontracting; must engage targeted enterprises.
SHEQ: proof of safety, health, environment and quality systems, policies and capabilities required; costs included in tender.
Independent Contractor Tax Pack: must complete and submit to determine tax status (PSP, labour broker, etc.).
No restriction to do business with Eskom or State-Owned Companies.
Section
Source: COMMERCIAL REQUIREMENTS.zip
Evaluation follows Eskom's Standard Conditions of Tender: basic compliance, mandatory returnables, functionality (if applicable), financial risk analysis, price evaluation, and specific goals scoring. The preference point system is 90/10 or 80/20. Bidders must meet any minimum functionality threshold stated in the Tender Data. Arithmetical errors are corrected per Eskom's rules, with the amount in words prevailing. Objective criteria may be applied only as per PPPFA Section 2(1)(f).
DocumentSAFETY REQUIREMENTS.zipReview complete
Description
Source: SAFETY REQUIREMENTS.zip
The contract covers implementation, support and maintenance of RDC'FM 800 systems at five KZN Regional Distribution Centres. The provisioning and installation of smart racks and UPS is once-off, while support, maintenance and monitoring runs for five years. The contractor must comply with Eskom's SHE specification, which sets minimum health, safety and environmental requirements for the contract duration.
Important Dates
Source: SAFETY REQUIREMENTS.zip (RFP)
Closing date: 12 January 2027 at 08:00 (from tender record).
Effective date of SHE specification: 20 February 2016.
Review date: February 2021.
Contact Information
Source: SAFETY REQUIREMENTS.zip (RFP)
Eskom Safety Manager: Khanyisile Zwane
Eskom Health and Safety Officer: Pierre White
Eskom Information Management Project Lead: Michelle Schlechter
Submission Guidelines
Source: SAFETY REQUIREMENTS.zip (RFP)
Returnable documents: complete and sign all required SBD forms (SBD 1 Invitation to Bid, SBD 4 Declaration of Interest, SBD 6.1 Preference Points Claim, SBD 8 Declaration of Bidder's Past SCM Practices, SBD 9 Certificate of Independent Bid Determination) and any other forms specified in the tender pack. Submit the completed bid before the closing time.
Evaluation Criteria
Source: SAFETY REQUIREMENTS.zip (RFP)
Bidders must be registered on the CSD and hold a valid tax clearance. A valid Compensation Commissioner's Letter of Good Standing is required. The principal contractor and all appointed contractors must be registered with the SACPCMP. A Section 37(2) agreement must be signed. Compliance with Eskom's Life-saving Rules is mandatory. The bid will be evaluated on price and preference points under the PPPFA (80/20 or 90/10 system as applicable).
Technical Specifications
Source: SAFETY REQUIREMENTS.zip (RFP)
Scope of work: Implementation, support and maintenance of RDC'FM 800 systems at five KZN Regional Distribution Centres (New Germany, Marburg, Howick, Vryheid, Empangeni).
Once-off provisioning and installation of smart racks and UPS units.
Support, maintenance and monitoring contract duration: 5 years.
Required features of the smart rack:
Built-in UPS
Internal rack cooling
Internal rack automatic fire protection
Access control at cabinet level (biometric, electronic keypad or swipe card)
Rack level monitoring with external proactive alerts and AI prediction capabilities
Compliance Requirements
Source: SAFETY REQUIREMENTS.zip (RFP)
CSD registration required.
Valid tax clearance required.
Compensation Commissioner's Letter of Good Standing required.
SACPCMP registration required for principal contractor and appointed contractors.
Section 37(2) agreement must be signed.
Compliance with Eskom's Life-saving Rules mandatory.
SHE plan must be developed and submitted.
Section
Source: SAFETY REQUIREMENTS.zip
Bidders must comply with Eskom's Safety, Health, Environmental and Quality Policy and all applicable legislation. The contractor remains accountable for the quality and execution of their health and safety programme.
DocumentQUALITY REQUIREMENTS.zipReview complete
Description
Source: QUALITY REQUIREMENTS.zip
Purpose
Sets the minimum quality requirements for existing and potential Eskom suppliers and the criteria used to evaluate, select, register, assess, monitor and audit them.
Eskom expects suppliers to show a sustained commitment to an ISO 9001 quality management system and to keep improving it, so that service delivery and customer satisfaction improve.
Application
Applies across Eskom Holdings divisions, its subsidiaries, suppliers and sub-suppliers.
Forms part of every Eskom RFI, RFQ and RFP and of contracts for products and services.
Takes effect on the date the specification is authorised.
Document control
Unique identifier 240-105658000; alternative reference QM 58; revision 4; 30 pages; next review May 2030.
Quality kick-off meeting: at the start of the contract and, where required, at the start of each subsequent phase.
Coordination meetings: arranged by the supplier with Eskom before orders for items or equipment are placed, with at least 14 days' advance notice.
Pre-inspection meetings: mandatory, convened by Eskom or its inspection agency/AIA, attended by supplier and sub-supplier representatives including their quality representatives.
Returnable quality documents — Category 4 (the category selected for this tender)
Form A (Tender and Contract Quality Requirements for 240-105658000 and ISO 9001): complete and sign to acknowledge and accept Eskom's supplier quality requirements; the tenderer's quality representative must sign Section E.
A.1 Quality method statement built on the scope of work (Method Statement Template 240-126469599).
A.2 Quality policy approved by top management.
A.3 Quality objectives approved by top management.
B.1 Documented roles, responsibilities and authorities — organisation chart and responsibility matrix that includes the quality management function (ISO 9001:2015 clause 5.3).
B.2 Documented information for control of externally provided processes, products and services, covering evaluation, selection, performance monitoring and re-evaluation of external providers (ISO 9001:2015 clause 8.4).
D.1 Quality control plan, checklist or ITP for the scope of works to ISO 10005, or a draft or example ITP/QCP from similar or previous work.
E.1 Form A completed and signed.
Additional scope-specific returnables may be listed from E.2 onwards in the List of Tender Returnables (240-12248652).
Evaluation Criteria
Source: QUALITY REQUIREMENTS.zip (unknown)
Evaluation approach
Quality is assessed on the Category 4 returnables listed in 240-12248652, using the Supplier Quality Management Tender Evaluation Scorecard (240-168873697) and the QM 58 selection criteria guideline (240-125473040).
Only one quality category applies to a procurement; Category 4 is the category selected here.
Scored sections
Section A — QMS requirements to ISO 9001: method statement, quality policy and quality objectives.
Section B — evidence of the QMS in operation: roles, responsibilities and authorities; control of externally provided processes. Weighting shown in the returnables list: 2.
Section D — quality control plan / ITP for the scope of works. Weighting shown in the returnables list: 1.
Section E — Form A completed and signed. Weighting shown in the returnables list: 1.
Minimum qualifying score and the price/preference split are not set out in this quality specification.
Technical Specifications
Source: QUALITY REQUIREMENTS.zip (unknown)
Contract scope
Implementation of RDC FM800 at five KwaZulu-Natal regional distribution centres: New Germany, Marburg, Howick, Vryheid and Empangeni.
Once-off supply and installation of the smart rack and UPS.
Support, maintenance and monitoring for five years after installation.
Quality deliverables
Contract Quality Plan (CQP) to ISO 10005, specific to the scope of work, submitted before the initial scope kick-off or pre-fabrication meeting and before manufacture begins, whichever is earlier.
Quality Control Plan / Inspection and Test Plan (QCP/ITP) covering contract review, material verification, manufacturing, fabrication, assembly, final testing, commissioning, handover documentation and certification, in chronological order.
A separate QCP/ITP for each sub-supplier scope of work.
Method statement per template 240-126469599.
CQP content
Records management, including material tests, positive material identification and material certification.
Free and uninhibited access for inspection.
Final documentation and the final manufacturing data book submitted before shipment.
Welding controls: welder qualification records, welding procedure specifications and procedure qualification records, reviewed and accepted before manufacture.
Special installation and fabrication procedures (post-weld heat treatment, tube rolling, coatings) accepted before manufacture.
Qualified and, where legally required, statutorily registered personnel for special processes such as NDE, welding, coating and heat treatment.
Training needs identified and records kept; certificates must carry the unit standard/NQF detail and the provider's accreditation number.
Storage, preservation and maintenance instructions for equipment and materials issued before receipt.
Quality monitoring and verification of sub-suppliers by Eskom or its agent.
QCP/ITP content
Eskom contract number and title, supplier order number, area of works, work description with components and activity dates, and a unique QCP/ITP number.
Sequence of operations with inspection and test activities, referenced specifications, drawings or procedures and criticality rating.
Acceptance criteria referenced to the technical specification or applicable standard, with clause numbers.
Intervention points proposed by the supplier, plus provision for Eskom's own hold, witness and review points, signed off by date and signature.
Qualification requirements for QC inspectors, including third-party/AIA inspectors, and a list of proposed test procedures.
Signed acceptance by supplier, sub-supplier and Eskom before work starts.
Control points
Hold point: work may not proceed without Eskom's or its inspection agency's attendance and written authorisation.
Witness point: work may proceed only after Eskom or its agency has been formally notified and has confirmed the inspection is waived.
Eskom selects intervention points and may perform surveillance or audits; signed ITPs and QCPs become addenda to the contract.
Meetings and oversight
Quality kick-off meeting at contract start and at the start of each phase where required.
Coordination meetings before orders are placed, with 14 days' advance notice to Eskom.
Mandatory pre-inspection meetings convened by Eskom or its AIA, with records kept.
Eskom may base resident quality inspectors at supplier or sub-supplier premises and on site; the supplier must provide workspace at no cost.
Eskom may appoint any AIA or inspection agency, and the supplier and its sub-suppliers may not obstruct that work.
Workplace documentation must be available in English and in any workforce-appropriate language.
Compliance Requirements
Source: QUALITY REQUIREMENTS.zip (unknown)
Quality management system
The main supplier and any sub-supplier must develop, implement, maintain and continually improve a formal QMS conforming to the latest ISO 9001 or an applicable equivalent QMS standard.
Category 4 (selected for this tender): a valid ISO 9001 certificate is not required; objective evidence of a documented QMS that complies with ISO 9001 must be submitted.
Where a sub-supplier's scope covers design and development, manufacturing, maintenance, testing, storage, delivery, installation, commissioning or project management, the same QMS requirement applies to it.
New products or services with no SANS equivalent must follow the applicable industry recommended practice or code (for example UL 9540 or IEEE 1790 for BESS).
The supplier must notify Eskom before implementing any change to its QMS or to quality-affecting staff, and Eskom may assess sub-supplier facilities.
Quality management personnel must be suitably qualified; Eskom may require the removal of personnel who lack the relevant competence.
Sub-supplier management
The main supplier must define and manage the quality assurance and control elements for each sub-supplier's scope and run a sub-supplier performance programme covering QMS verification, audits and surveillances, CQP and QCP review, nonconformity and defect management, inspection and test plans, risk management and documentation.
Section
Source: QUALITY REQUIREMENTS.zip
Quality evaluation
The assigned Eskom quality representative selects the applicable quality requirements using guideline 240-125473040 and records them in Form A.
The tenderer completes and signs Form A (Sections A and E) to acknowledge and accept the Eskom supplier quality requirements and ISO 9001 obligations.
Quality returnables are scored against the Supplier Quality Management Tender Evaluation Scorecard (240-168873697) and the List of Tender Returnables (240-12248652).
Category 4 scoring shown in the returnables list
Section A — QMS requirements to ISO 9001: method statement, quality policy, quality objectives.
Section B — evidence of the QMS in operation: 2.
Section D — quality control plan / ITP: 1.
Section E — Form A signed: 1.
Reference standards
ISO 9001 (requirements), ISO 10005 (quality plans), ISO 9000 (fundamentals and vocabulary), ISO 10006 (quality management in projects), ISO 9004 (sustained success).
PPPFA 2000; CIDB best practice guideline A4 on evaluating quality in tender submissions; SANS 10845-1.
DocumentSDL&I.zipReview complete
Description
Source: SDL&I.zip
The tender covers the provision, installation, integration, configuration, testing, commissioning, stabilisation and handover of a modular smart rack and containerised 30kVA UPS solution at five KZN Regional Distribution Centres (New Germany, Marburg, Howick, Vryheid, Empangeni). The installation is once off, while support, maintenance and monitoring run for five years. SDL&I objectives (transformation, local procurement, jobs, skills development) form part of the contract obligations.
Important Dates
Source: SDL&I.zip (unknown)
Closing date: 12 January 2027 at 08:00 (from tender record).
No other dates (briefings, site visits, clarification deadlines) are stated in the document.
Contact Information
Source: SDL&I.zip (unknown)
No contact details (names, emails, telephones) or submission address are stated in the document.
Submission Guidelines
Source: SDL&I.zip (unknown)
Returnable documents (all must be completed, signed and submitted):
SDL&I Bidders Document.
Valid B-BBEE certificate issued by a SANAS accredited verification agency, or a valid sworn affidavit, or a CIPC-issued B-BBEE certificate for EMEs.
CIPC registration document.
Identity documents of shareholder(s).
Share certificate where applicable.
Latest financial statements corresponding to the financial date on the sworn affidavit or B-BBEE certificate.
SBD 6.2 (Declaration for Local Production and Content) and Annex C (Local Content Declaration – Summary Schedule) — mandatory returnables and a condition for contract award.
Annexure D and Annexure E where applicable.
Proof of subcontracting agreement(s) and subcontractor B-BBEE certificates where applicable.
Disqualification risks:
Failure to meet Eskom's CIDB CSDG mandatory percentage renders the tender non-responsive.
Sworn affidavits attested with a "true copy" stamp are not accepted.
Sworn affidavits with blank spaces, mismatched dates, or a Commissioner of Oaths who is an employee or ex officio of the enterprise are invalid.
Evaluation Criteria
Source: SDL&I.zip (unknown)
Preference point system: 90/10 (price 90, specific goals 10) or 80/20 (price 80, specific goals 20) — the applicable system is not explicitly stated in the document.
Specific goals (maximum 20 points under 80/20, 10 under 90/10):
Points are awarded for the specific goal specified for this tender (SDL&I objectives).
Points for specific goals are added to price points; the contract is awarded to the tenderer scoring the highest total.
B-BBEE points (per the 90/10 and 80/20 tables):
Level 1: 10 (90/10) / 20 (80/20)
Level 2: 9 / 18
Level 3: 6 / 14
Level 4: 5 / 12
Level 5: 4 / 8
Level 6: 3 / 6
Level 7: 2 / 4
Level 8: 1 / 2
Non-compliant: 0 / 0
Objective criteria:
Designated sectors: not specified.
CIDB Skills Development: mandatory — failure to meet the CIDB CSDG mandatory % renders the tender non-responsive.
National Industrial Participation Programme: not applicable.
Mandatory subcontracting as condition of award: not applicable.
SDL&I objectives do not form part of scoring but commitments become contractual obligations. Tenderers who submit objectives but do not meet Eskom's targets will not be disqualified.
Tenderers failing to provide documentation for preference points are not disqualified but may score only out of price (80 or 90) and 0 for specific goals.
Technical Specifications
Source: SDL&I.zip (unknown)
Scope of work:
Provide, install, integrate, configure, test, commission, stabilise and handover of a modular smart rack and containerised 30kVA UPS solution at five KZN Regional Distribution Centres (RDC): New Germany RDC, Marburg RDC, Howick RDC, Vryheid RDC, Empangeni RDC.
Provisioning and installation of the smart rack and UPS is once off.
Support, maintenance and monitoring contract duration is five (5) years at the five RDCs.
SDL&I obligations (contractual commitments):
Skills development: deliver on 1 skill (from a specified list, not included in the extract) for every R3,000,000 invoiced to Eskom. Candidates must be from KwaZulu-Natal and representative of SA demographics. Eskom makes no financial contribution; the contractor bears all costs.
Jobs: submit proposals for the type and number of jobs created and retained in South Africa.
Local procurement content: separate local vs imported components in the price schedule; submit proposals for procurement spend on entities with minimum 51% black ownership.
Subcontracting to designated black-owned enterprises: submit activities as a proportion of local procurement content.
Financial Requirements
Source: SDL&I.zip (unknown)
SDL&I penalty and performance security:
Eskom will apply a penalty of 2.5% of the contract value for failure to meet SDL&I obligations.
Eskom will retain 2.5% of every invoice (excluding VAT) as security for fulfilment of SDL&I obligations. Retained amounts are released only upon receipt of SDL&I progress reports, fulfilment of all obligations, and submission of an approved compliance report by the SDL&I Department.
Reporting:
Supplier must submit a report one month after delivery using the Data Collection Template.
Eskom reviews reports within 30 days of receipt and notifies in writing if obligations are not met.
Corrective measures must be implemented before the next report, failing which retention clauses are invoked.
SDL&I Implementation Schedule must be completed and returned to the SDL&I representative for acceptance 28 days after contract award.
Compliance Requirements
Source: SDL&I.zip (unknown)
B-BBEE requirements:
Valid B-BBEE certificate (SANAS accredited agency), or sworn affidavit (EME or QSE), or CIPC-issued certificate for EMEs — condition for contract award.
Revenue up to R10 million (EME): sworn affidavit acceptable.
Revenue up to R50 million (QSE): must comply with all QSE scorecard elements unless at least 51% black-owned, in which case a sworn affidavit is required.
Level 4: achieve Level 3 by end of year one, then improve one level per year.
Level 5-8 or non-compliant: achieve Level 4 by end of year one, then improve at least one level per year from year two.
B-BBEE Improvement or Retention Plan must be submitted within 30 days of signing the contract.
Sworn affidavit validity requirements:
Deponent's name as per ID and ID number.
Designation (director, owner, member) indicated.
Enterprise name as per CIPC registration and business address.
Percentages of black ownership, black female ownership, and designated group (no blank spaces).
Total revenue for the year under review and basis (audited or management accounts).
Financial year end (day/month/year).
B-BBEE status level (only one).
Empowering supplier status indicated (for QSEs, basis selected).
Deponent and Commissioner of Oaths must sign on the same date; Commissioner must sign and stamp.
Commissioner cannot be an employee or ex officio of the enterprise.
"True copy" stamps not accepted.
CSD registration: implied for Eskom contracts (not explicitly stated in the document).
DocumentTECHNICAL REQUIREMENTS.zipReview complete
Description
Source: TECHNICAL REQUIREMENTS.zip
The tender covers two main deliverables: (1) the once-off provisioning, installation and commissioning of modular smart rack and containerised 30kVA UPS hardware at five KZN RDCs, and (2) a five-year support, maintenance and monitoring contract for that hardware. The hardware installation is a single event; the support/maintenance/monitoring runs for five years at the five sites.
Evaluation Criteria
Source: TECHNICAL REQUIREMENTS.zip (unknown)
Evaluation is split into two scored components, each with its own 75% threshold:
Support, Maintenance and Monitoring contract: 250 points total; minimum qualifying score 187.5 (75%).
Provisioning, Installation and Commissioning of hardware: 260 points total; minimum qualifying score 195 (75%).
Support, Maintenance and Monitoring (250 points):
Support (55 points): OEM-trained and certified technicians (10); operational presence in KwaZulu-Natal (10); 24/7 emergency call-out (15); defined escalation procedures for critical incidents (10); supply and replacement of components as per warranty (10).
Maintenance – Modular Smart Rack & Containerised 30kVA UPS (125 points): OEM accreditation and certification (10); comprehensive maintenance per OEM specification (5); inspection of power distribution and electrical connections (5); firmware and software updates (5); maintenance and testing of UPS and lead-acid battery infrastructure (5); maintenance of HVAC cooling and environmental monitoring (5); maintenance of cabinet access control (5); detailed maintenance reports (10); supply and replacement of components (10).
Maintenance – Containerised 30kVA UPS (additional items): OEM accreditation (10); comprehensive maintenance (5); inspection of power distribution (5); firmware/software updates (5); maintenance and testing of lithium-ion battery banks (10); preventative maintenance and fault rectification (5); availability of replacement parts and spares in South Africa (10); operational presence in KZN (5); detailed maintenance reports (10).
Monitoring (70 points): fully operational off-site 24/7 monitoring centre (10); real-time monitoring of Smart Rack and UPS (15); event logging and incident management (10); environmental monitoring – temperature, humidity, water leak (5); power performance monitoring (5); remote diagnostics and troubleshooting (10); root cause analysis for recurring faults (5); automated fault escalation and notification (10).
Provisioning, Installation and Commissioning (260 points):
Modular Smart Rack Solution (120 points): redundancy for power and cooling (10); two 42U cabinets side-by-side (10); built-in UPS with minimum 10kVA rating, external 30kVA UPS input, PV/solar compatibility, generator input, sealed lead-acid batteries with 8-hour runtime and 10-year lifespan (25); internal rack cooling with failsafe (20); automatic fire protection with inert gas per cabinet (15); access control via web-managed biometric/keypad with manual override (15); rack-level monitoring with AI alerts – UPS, cooling, fire, access control, CCTV (25).
30kVA Containerised UPS Solution (85 points): 30kVA UPS with lithium-ion phosphate batteries, 72-hour battery time, fast charging within 4 hours (10); containerised housing for external installation (10); outdoor operation with stated IP rating and environmental protection (10); interface with PV, generator, municipal (5); double online conversion (5); automatic/static bypass with no-break transfer (5); battery technology – lithium-ion phosphate, fast recharge, string quantity vs runtime (15); container features – redundant cooling, fire protection, access control with audit logging, anti-theft/anti-vandal locking, CCTV (25).
Power Reticulation (55 points): reticulation from containerised UPS to smart rack and other cabinets (10); red plugs for IT equipment (10); compliance with building regulations and Certificate of Compliance on completion (15); site-specific detailed design and installation proposal for each RDC (20).
Scoring methodology: Each requirement is scored 0%, 50% or 100% based on the quality and completeness of the submitted evidence. Partial evidence earns 50%; full compliance earns 100%.
Technical Specifications
Source: TECHNICAL REQUIREMENTS.zip (unknown)
Scope: Provision, install and commission hardware at five KZN Regional Distribution Centres (RDCs): New Germany, Marburg, Howick, Vryheid and Empangeni. Also provide a 5-year support, maintenance and monitoring contract for the installed equipment.
Hardware requirements per RDC:
Modular Smart Rack Solution:
Two 42U standard cabinets stacked side-by-side.
Built-in UPS: minimum 10kVA rating; must accept input from external 30kVA UPS, PV (solar), and existing generator where available; sealed lead-acid batteries with 8-hour runtime and 10-year lifespan.
Internal rack cooling with failsafe (e.g., doors automatically open on cooling failure).
Automatic fire protection using safe inert gas, installed per cabinet.
Access control at cabinet level: biometric and/or electronic keypad, manageable via web interface remotely, with manual door override.
Rack-level monitoring with AI-driven proactive alerts: UPS alerts (bypass, on-battery, battery runtime below 50%); cooling alerts (temperature, humidity, airflow, water leak); fire protection early-warning alert; access control alerts and logs; CCTV – two cameras (front and back), local storage, remote access, and email delivery of images.
30kVA Containerised UPS Solution:
External 30kVA UPS with lithium-ion phosphate battery banks, providing 72 hours battery time and fast charging within 4 hours.
Housed in a containerised environment for external installation at each RDC.
Designed for continuous outdoor operation; state IP rating and environmental operating limits (temperature, humidity, corrosion protection) with OEM evidence.
Must interface with PV, generator and municipal supply.
True online double-conversion topology.
Automatic/static bypass with no-break transfer.
Battery technology: lithium-ion phosphate with battery management; fast recharge within 4 hours; battery string configuration vs runtime.
Container features: redundant cooling with two AC units; fire protection; access control via keys plus keypad or biometric, with monitored and auditable logging; anti-theft and anti-vandal locking; CCTV – one internal and one external camera, external camera with tamper alerts, local storage, remote access, and email delivery of images.
Power Reticulation:
Reticulation from the containerised UPS to the smart rack and other network cabinets on site.
Red plugs installed to power all IT equipment (laptops, desktops, printers, peripherals).
All work per building regulations; Certificate of Compliance (COC) to be provided on completion.
Site-specific detailed design and installation proposal for each RDC, covering equipment locations, estimated reticulation distances, red-plug requirements and associated civil/electrical works.
Support, Maintenance and Monitoring (5-year contract):
24/7 emergency call-out service.
Defined escalation procedures for critical incidents.
OEM-trained and certified technicians for all support activities.
Operational presence in KwaZulu-Natal.
Comprehensive maintenance per OEM specification, including inspection of power distribution and electrical connections, firmware/software updates, UPS and battery maintenance/testing, HVAC cooling and environmental monitoring, cabinet access control maintenance.
Supply and replacement of components as per warranty.
Off-site 24/7 monitoring centre with real-time monitoring of Smart Rack and UPS infrastructure.
Event logging, incident management, remote diagnostics, root cause analysis for recurring faults, and automated fault escalation/notification.
Detailed maintenance reports after each service.
Compliance Requirements
Source: TECHNICAL REQUIREMENTS.zip (unknown)
Mandatory evidence and certifications:
OEM training certificates and competency for technicians (must be valid and relevant).
OEM accreditation/certification or authorisation letter to maintain the equipment.
Proof of access to OEM/local supply chain and OEM parts commitment/authorisation.
Relevant electrical competency/qualification for personnel performing electrical inspections.
Electrician/contractor registration and competency evidence.
Commitment to provide a Certificate of Compliance (COC) on completion of electrical work.
Operational presence in KwaZulu-Natal (office address or lease/ownership evidence).
Availability of replacement parts and spares within South Africa.
For the containerised UPS: IP-rating certification/test report or manufacturer declaration, environmental operating limits, corrosion-protection specification.
For the smart rack: OEM datasheets confirming specifications (e.g., 42U, UPS rating, battery runtime, cooling capacity, fire suppression, access control, monitoring capabilities).
Section
Source: TECHNICAL REQUIREMENTS.zip
Additional evaluation criteria for the hardware provisioning component:
Access control system must be manageable via a web interface remotely (10 points).
Fire protection alert – early warning alert functionality (5 points).
CCTV – two cameras (front and rear), local storage, remote access, and email delivery of images (5 points).
Scoring is based on the completeness of OEM documentation, screenshots, sample logs and other evidence submitted.
DocumentInvitation to Tender (ITT) - RDC SERVER.pdfReview complete
Description
Source: Invitation to Tender (ITT) - RDC SERVER.pdf
The tender covers the provisioning and installation of Modular Smart Rack and Containerised 30kVA UPS solutions at five KZN Regional Distribution Centres (New Germany, Marburg, Howick, Vryheid, Empangeni), plus a 5-year support, maintenance and monitoring contract. The supply and installation is once-off; the support, maintenance and monitoring runs for five years.
Important Dates
Source: Invitation to Tender (ITT) - RDC SERVER.pdf (TENDER)
Closing date: 12 January 2027 at 10:00
Compulsory clarification meetings (attendance at both required):
Online (MS Teams): 08 December 2026 at 10:00
Onsite: 09 December 2026 at 10:00, at New Germany RDC, 25 Valley View Rd, New Germany 3610, KwaZulu-Natal
Clarification queries deadline: 5 working days before the tender closing date.
Tender validity period: 180 days from the closing date.
Contact Information
Source: Invitation to Tender (ITT) - RDC SERVER.pdf (TENDER)
Source: Invitation to Tender (ITT) - RDC SERVER.pdf (TENDER)
Submission method: electronic only, via the Eskom E-Tendering site (https://etendering.eskom.co.za). No hard copies accepted. Upload documents under the Technical, Commercial, Financial and other folders. All documents in PDF format; the price list must also be submitted in Excel format. No zip/compressed files. Maximum upload size per document is 500 MB; total submission limited to 4 GB. If resubmitting, only the latest version is accepted; previous submissions become null and void. Ensure the submission status is marked complete.
Returnable forms (must be completed, signed and submitted with the tender):
Annexure A (Authorisation Form): authorises the named signatory to bind the bidder; certified resolution or power of attorney required.
Annexure B (Acknowledgement Form): confirms receipt and completeness of tender documents.
Annexure C (Tenderer's Particulars): bidder contact and registration details.
Annexure D (Integrity Declaration Form): commitment to ethical conduct.
Annexure E (CPA Requirements for Local Goods/Services): declaration on local content (if applicable).
Annexure H (SBD 1 Invitation to Bid): bidder and contact details, signed as the offer cover page.
Annexure I (SBD 6.1 Preference Points Claim Form): claims B-BBEE preference points under PPPFA 2022.
Annexure J (SBD 4 Bidders Disclosure): discloses any connection to state employees.
Tax Evaluation Questionnaire: completed and signed.
E-tendering Help Manual acknowledgement form: completed and signed.
NEC3 Supply Contract (SC3) and NEC3 Term Services Contract (TSC3): both must be completed with all rates, signed, and submitted in PDF.
Pricing Schedule/BOQ: must be fully populated with all rates and submitted in PDF (and Excel copy).
Disqualification risks:
Failure to upload mandatory returnables by the closing deadline.
Incomplete or unsigned non-disqualifiable returnables not remedied within 5 working days of a written request.
Missing proof of attendance at both clarification meetings.
Unpopulated price lists.
Late submissions are not accepted.
Evaluation Criteria
Source: Invitation to Tender (ITT) - RDC SERVER.pdf (TENDER)
Evaluation stages:
Basic compliance: mandatory returnables, eligibility criteria, signed NEC3 contracts, fully populated price lists, and proof of attendance at both clarification meetings. Failure disqualifies.
Functionality/Technical: evaluated on a total weight of 100% with a minimum threshold of 75%. Only bidders meeting this threshold proceed. Two separate functionality assessments: one for the provisioning and installation of the smart rack and UPS, and one for the 5-year support, maintenance and monitoring.
Price: evaluated inclusive of VAT, corrected for arithmetical errors, excluding contingencies, adjusted for variations, and compared on Net Present Value. Unconditional discounts considered; conditional discounts applied only at payment.
Preference points: 80/20 system (for estimated values above R30,000 and up to R50M inclusive of VAT). If uncertain, the lowest acceptable tender determines the applicable system (80/20 or 90/10).
Specific goals: maximum 20 points for B-BBEE status level under the 80/20 system:
Level 1: 20 points
Level 2: 18
Level 3: 14
Level 4: 12
Level 5: 8
Level 6: 6
Level 7: 4
Level 8: 2
Non-compliant: 0
Contract awarded to the tenderer scoring the highest total points (price + specific goals).
Objective criteria (contract award conditions): financial viability, occupational health and safety, and quality. Failure may lead to the second-ranked tenderer being recommended.
Technical Specifications
Source: Invitation to Tender (ITT) - RDC SERVER.pdf (TENDER)
Scope: Provision, installation, support, maintenance and monitoring of Modular Smart Rack and Containerised 30kVA UPS solutions at five KZN Regional Distribution Centres (RDC): New Germany, Marburg, Howick, Vryheid, and Empangeni.
Provisioning and installation of the smart rack and UPS is a once-off supply.
Support, maintenance and monitoring contract duration is five (5) years.
Contractors will be selected per area (per RDC).
The NEC3 Supply Contract (SC3) covers the supply and installation; the NEC3 Term Services Contract (TSC3) covers the 5-year maintenance.
Two pricing schedules (one for each NEC contract) must be fully completed with all rates and submitted in PDF.
Experience & Qualifications
Source: Invitation to Tender (ITT) - RDC SERVER.pdf
OHS competency requirements (CVs and qualifications/certificates):
First Aider (GSR 3(4))
Incident Investigator (GAR 9(2))
Supervisor (CR 8(7))
Risk Assessor (CR 9(1))
Stacking & Storage Supervisor (CR 28(a))
Fall Protection Plan Developer (CR 10, SANS 229994)
Fall Protection Plan (including Rescue plan) (CR 10)
Medical Certificates (Annexure 3, CR 7(1)(g), 7(8))
Baseline Risk Assessment (S5(1)(a), 9(1)(c))
SHE Officer (SACPCMP Professional Registration) (CR 8(5))
Pricing Schedule
Source: Invitation to Tender (ITT) - RDC SERVER.pdf
Pricing requirements:
Two pricing schedules must be completed: one for the NEC3 Supply Contract (SC3) and one for the NEC3 Term Services Contract (TSC3).
All rates must be populated; failure to fully populate results in disqualification.
Pricing schedules must be submitted in PDF format; a copy in Excel format is also required.
Prices evaluated inclusive of VAT, corrected for arithmetical errors, excluding contingencies, and adjusted for variations.
Unconditional discounts considered for evaluation; conditional discounts applied at payment.
Financial Requirements
Source: Invitation to Tender (ITT) - RDC SERVER.pdf (TENDER)
Payment terms:
Contracts valued below R50,000,000 (incl. VAT): payment within 30 days of receipt of undisputed invoices.
Contracts valued above R50,000,000 (incl. VAT): payment within 60 days of receipt of undisputed invoices.
Performance security:
A performance bond may be required if the financial evaluation result is negative.
If a performance bond or demand guarantee is required, the bidder must select at least two financial institutions from the Eskom-approved list (ABSA, DBSA, FirstRand, Investec, Land Bank, Nedbank, Standard Bank).
Financial evaluation requirements:
Public Interest Score (PIS) with calculations, indicating whether AFS were internally or externally prepared and whether owner-managed.
Latest approved annual financial statements (AFS) including comparative amounts, valid within 18 months after year-end.
Signed director's/member's report and signed compiler/accounting officer/independent reviewer/audit report as applicable.
AFS must include statement of financial position, comprehensive income, changes in equity, cash flows, and notes.
ITA 34C Income Tax Assessment for unaudited companies.
Notes to AFS must detail receivables/payables breakdown, interest-bearing liabilities, and member/director loans terms.
Draft, bi-annual, management accounts and unsigned financial statements not accepted.
If requested financial information is not provided within 5 working days, the financial evaluation is closed.
Mitigating factors for unfavourable financial viability: performance bond from a pre-approved institution, parent company guarantee (with parent's AFS), reduced contract, or payment upon milestone delivery.
Compliance Requirements
Source: Invitation to Tender (ITT) - RDC SERVER.pdf (TENDER)
Eligibility criteria (must be met, otherwise disqualified):
Not under any restriction to do business with Eskom or State-Owned Companies.
Not a national of a country on international sanctions lists (applies to subcontractors/suppliers too).
Submit only one tender (unless as part of a JV with joint and several liability).
No conflict of interest.
Tenders signed by authorised persons.
Not restricted by National Treasury.
Not on the Tender Defaulters list.
Must not subcontract 100% of the scope.
Required prior to contract award:
CSD registration (MAAA number)
Valid Tax Clearance Certificate / Tax PIN
Valid COID registration
B-BBEE evidence to claim preference points:
Valid B-BBEE certificate from a SANAS-accredited verification agency, or a sworn affidavit, or a CIPC-issued certificate for EMEs. For JVs, a certificate in the name of the JV.
Supporting documents may be requested: proof of ownership/shareholding (CIPC docs), ID copies of shareholders, proof of disability (if applicable).
If preference point documentation is not provided, the bidder is not disqualified but scores 0 for specific goals and only scores out of 80 for price.
OHS requirements (as part of objective criteria):
Signed acknowledgement of Eskom's OHS legal and other requirements (Annexure B).
Health and Safety Plan addressing project risks.
Detailed costing for OHS (not lump sum).
Baseline OHS Risk Assessment (BRA) with methodology.
Valid Letter of Good Standing (COIDA or equivalent).
OHS policy signed by CEO, complying with OHS Act Section 7.
OHS competency: CVs and qualifications for First Aider, Incident Investigator, Supervisor, Risk Assessor, Stacking & Storage Supervisor, Fall Protection Plan Developer, SHE Officer (SACPCMP registration), and medical certificates.
Alternative: ISO 45001 certificate (or equivalent) instead of the detailed competency list.
Contractual Terms
Source: Invitation to Tender (ITT) - RDC SERVER.pdf
Contract types: NEC3 Supply Contract (SC3) for the supply and installation, and NEC3 Term Services Contract (TSC3) for the 5-year maintenance.
Main option clauses for SC3: X1 price adjustment for inflation, X2 changes in the law, X3 multiple currencies (only if imported hardware), X7 delay damages, X13 performance bond, X17 low-performance damages.
Main option clauses for TSC3: X1 price adjustment for inflation, X2 changes in the law, X3 multiple currencies (only if imported hardware), X13 performance bond, X17 low-performance damages, X18 limitation of liability.
Performance security: may be required if financial evaluation is negative; must choose from Eskom-approved financial institutions.
Mitigating factors for unfavourable financial viability: performance bond, parent company guarantee, reduced contract, or milestone-based payment.
Subcontracting: discouraged from subcontracting with subsidiary companies; must be declared if done.
Section
Source: Invitation to Tender (ITT) - RDC SERVER.pdf
Additional evaluation criteria:
Functionality/Technical: minimum threshold of 75% of total score; only bidders meeting this proceed.
Price evaluation: inclusive of VAT, corrected for arithmetical errors, excluding contingencies, adjusted for variations, and compared on Net Present Value.
Preference points: 80/20 system (or 90/10 if applicable).
Specific goals: maximum 20 points for B-BBEE status level.
Objective criteria (contract award conditions): financial viability, OHS, and quality.
DocumentOCCUPATIONAL HEALTH AND SAFETY PROCEDURES.zipReview complete
Description
Source: OCCUPATIONAL HEALTH AND SAFETY PROCEDURES.zip
Eskom is committed to preventing work-related injuries and ill-health, and will provide a safe and healthy work environment in line with industry standards and legislative requirements. Life-Saving Rules are safety rules enforcing zero tolerance for serious at-risk behaviours that could cause disabilities or fatalities. These rules apply to all Eskom employees, agents, consultants, and contractors, and visitors must also adhere to them. The standard applies at all Eskom sites and to all Eskom divisions, subsidiaries, and entities where Eskom has a controlling interest, unless exempted. The purpose is to clarify the six most prominent causes of serious injuries and fatalities within Eskom and to enforce zero tolerance for non-adherence. The standard is effective from the date of authorisation.
Evaluation Criteria
Source: OCCUPATIONAL HEALTH AND SAFETY PROCEDURES.zip (unknown)
Contractors must comply with Eskom's Life-Saving Rules and Driver and Vehicle Safety Management Procedure. Violations of Life-Saving Rules are treated as serious misconduct and may lead to suspension of contractor activities. Contractors must remove and discipline employees violating Life-Saving Rules within five working days.
Technical Specifications
Source: OCCUPATIONAL HEALTH AND SAFETY PROCEDURES.zip (unknown)
Eskom requires the implementation, support, and maintenance of RDC'FM 800 systems at five KZN Regional Distribution Centers: New Germany RDC, Marburg RDC, Howick RDC, Vryheid RDC, and Empangeni RDC. The provisioning and installation of the smart rack and UPS is once off. Support, maintenance, and monitoring contract duration is five (5) years.
Section
Source: OCCUPATIONAL HEALTH AND SAFETY PROCEDURES.zip
Occupational hygiene involves identifying, evaluating, and controlling environmental factors. Project management is the discipline of planning, organising, motivating, and controlling resources to achieve specific goals. A project is a temporary endeavour with a defined beginning and end, usually time-constrained and often constrained by funding or deliverables. The primary constraints are scope, time, quality, and budget. Project managers manage activities and resources allocated to projects in a cohesive, efficient manner and administer and execute engineering and technology projects within cost, quality, and time.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
25 Valley View Rd, New Germany 3610, KwaZulu-Natal - Durban - New Germany - 3610
Document-Backed
Recently Synced
Source Snapshot Available
AI Enhanced
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
10
Last checked
27 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.