Cef (pty) ltd, through the sanpc refinery in durban, seeks a service provider to supply heat treatment services over a three-year period. The contract is priced on a schedule of rates covering manpower, equipment, consumables, and mobilisation/demobilisation, with estimated annual quantities provided for internal planning only. Bidders must submit rates for each line item, and the total contract amount is calculated including VAT. the most consequential consideration is that the stated quantities are estimates and do not guarantee any minimum level of work.
Key Requirements
Pricing: Submit a completed schedule of rates for all line items, including manpower (supervisor, technician, assistant, safety officer), equipment (5 KVA and 500 KVA generators, recorder), consumables (ceramic fibre insulation, thermocouple wire, binding wire), and mobilisation/demobilisation (fixed fee per return trip).
Quantities: Use the estimated annual quantities (e.g., 800 hours/year for supervisor, 600 hours/year for safety officer, 1000 boxes/year of ceramic fibre insulation) to calculate the total contract amount including VAT.
Contract period: The service is required for three years, with rates applied across Year One, Year Two, and Year Three.
No guarantee of work: The calculated contract value is for internal contract management only; it is not a guarantee of allocated work and the refinery will not entertain claims based on quantity accuracy.
Closing date: Bids must be submitted by 10 December 2026 at 10:00 (as per the tender record).
Submission: Follow the official tender submission method and address as specified in the full tender document (not provided in the extracted text).
REQUEST FOR TENDER [RFT] FOR THE APPOINTMENT OF A SERVICE PROVIDER FOR THE PROVISION OF HEAT TREATMENT SERVICES AT SANPC REFINERY OVER A PERIOD OF THREE (3) YEARS.
Tender context
Return to this tender’s issuing organisation, province, or category.
Request for tender [rft] for the appointment of a service provider for the provision of heat treatment services at sanpc refinery over a period of three (3) years.
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
Document5. Annexure D - SBD4.pdfReview complete
Evaluation Criteria
Source: 5. Annexure D - SBD4.pdf (TENDER)
Bidders must not be listed on the Register for Tender Defaulters or the List of Restricted Suppliers. Bidders must complete and submit SBD 4 (Bidder's Disclosure) as part of the tender documentation.
Important Dates
20 Nov
2026
Tender published
Tender Published
Tender was published
10 Dec
2026
Submission deadline
Closing Date
Tender closing date
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
9 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
3. Annexure B - Technical Requirements Heat Treatment Services.pdf
CEF (Pty) Ltd requires a service provider for heat treatment services at the SANPC Refinery in KwaZulu-Natal over a three-year period. The tender is evaluated in four stages: mandatory, technical, commercial, and specific goals, with a minimum technical threshold of 70%.
8. Annexure G - Heat Treatment Schedule of Rates..xlsx
CEF (Pty) Ltd, on behalf of SANPC Refinery in Durban, seeks a service provider for heat treatment services over a three-year period. The contract covers manpower, equipment, and consumables, with quantities provided for annual scheduling, though the total value is for internal management purposes only and not a guarantee of work.
CEF (Pty) Ltd, on behalf of SANPC Refinery in KwaZulu-Natal, requires a service provider for heat treatment services on process pipes, vessels, tanks and equipment over a three-year period. The contractor will provide expertise, equipment, manpower and project management for pre-weld, post-weld and hydrogen diffusion heat treatment, working under a schedule of rates and in compliance with SANPC Refinery procedures and relevant standards.
CEF SOC Ltd, on behalf of the South African Nuclear Energy Corporation (SANPC) refinery, seeks a service provider for heat treatment services over a three-year period. The tender requires bidders to complete a mandatory third-party due diligence questionnaire covering corporate, financial, legal, and ethical matters.
CEF (SOC) Ltd requires the appointment of a service provider for the provision of heat treatment services at the SANPC Refinery in KwaZulu-Natal over a three-year period. The tender is issued under RFT number HTS/11/2026, with a closing date of 10 December 2026 at 12:00 midday. Submissions must be made by email to [email protected], and the tender validity period is 120 days from the closing date.
The Central Energy Fund (CEF) requires a service provider to render heat treatment services at the SANPC Refinery for a period of three years. Bidders must submit their responses by email before the closing deadline.
The Central Energy Fund (CEF) (Pty) Ltd, through its subsidiary the South African Nuclear Power Corporation (SANPC) refinery, requires the appointment of a service provider for heat treatment services over a three-year period. The tender is governed by the 80/20 preference point system, with 80 points for price and 20 points for specific goals.
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Appointment Of the Service Provider for The Design, Supply, Delivery, Installation, Integration, Testing, Commissioning, Certification and Maintenance and Support of a Fully Integrated Fire Detection and Suppression System (“FDSS”) for the Identified Sites at King Shaka International Airport (FALE) ATNS Operations Centre And Bluff Radar
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Document read
Compliance review
Bid-ready summary
Section
Source: 5. Annexure D - SBD4.pdf
Bidders must not be listed on the Register for Tender Defaulters or the List of Restricted Suppliers. Bidders must complete and submit SBD 4 (Bidder's Disclosure) as part of the tender documentation.
Document8. Annexure G - Heat Treatment Schedule of Rates..xlsxReview complete
Description
Source: 8. Annexure G - Heat Treatment Schedule of Rates..xlsx
The tender is for the appointment of a service provider to provide heat treatment services at the SANPC Refinery in Durban over a three-year period. The schedule of rates covers manpower, equipment, consumables, and mobilization/demobilization.
Technical Specifications
Source: 8. Annexure G - Heat Treatment Schedule of Rates..xlsx (unknown)
The tender covers the provision of heat treatment services at the SANPC Refinery in Durban over a three-year period. The schedule of rates includes the following line items with estimated annual quantities:
The quantities are estimates for internal contract management only and are not a guarantee of work. The SANPC Refinery accepts no liability for the accuracy of these quantities and will not entertain claims based on them.
Financial Requirements
Source: 8. Annexure G - Heat Treatment Schedule of Rates..xlsx (unknown)
Pricing must be submitted as a schedule of rates per the provided breakdown. The total contract amount is calculated including VAT. The calculated contract value is for internal contract management purposes only and is not a guarantee of allocated work or an actual definite value of the service.
Document2. Annexure A - SOW Heat Treatment.pdfReview complete
Description
Source: 2. Annexure A - SOW Heat Treatment.pdf
SANPC Refinery requires a capable contractor to provide heat treatment services for process pipes, vessels, tanks and equipment over a three-year period. Services include hydrogen diffusion, pre-weld and post-weld heat treatment, and heating of vessels, tanks and other fixed equipment. Work is ad hoc, measured against a Schedule of Rates, and performed at the SANPC Refinery site. The contractor must provide expertise, equipment, manpower, supervision and project management, and comply with all SANPC Refinery rules and regulations.
Important Dates
Source: 2. Annexure A - SOW Heat Treatment.pdf (unknown)
Closing date: 10 December 2026 at 10:00 (from tender record).
No briefing or site visit dates are specified in the source document.
Contact Information
Source: 2. Annexure A - SOW Heat Treatment.pdf (unknown)
No contact information is provided in the source document.
Submission Guidelines
Source: 2. Annexure A - SOW Heat Treatment.pdf (unknown)
Returnable documents: none specified in the source document.
Submission method: not specified in the source document.
Closing time: 10:00 on 10 December 2026 (from tender record).
Evaluation Criteria
Source: 2. Annexure A - SOW Heat Treatment.pdf (unknown)
Evaluation criteria not detailed in the source document. The document focuses on technical and compliance requirements rather than scoring.
The contractor must be capable of providing heat treatment services.
Must comply with the OHS Act and OHS Regulations.
Must have qualified technicians with valid training certifications.
Equipment must have valid inspection/test certifications.
Must not subcontract without prior written approval from SANPC Refinery.
Must supply an organogram and CVs of key personnel.
SANPC Refinery reserves the right to evaluate, test, interview and object to any personnel.
Must have a standby crew for after-hours emergencies with a response time of 1 day.
Must follow the job card system and obtain permits.
Must comply with all SANPC Refinery rules and regulations.
No pre-qualification thresholds (CSD, tax clearance, B-BBEE, CIDB) are specified in the source document.
Technical Specifications
Source: 2. Annexure A - SOW Heat Treatment.pdf (unknown)
Scope of work:
Provision of heat treatment services for process pipes, vessels, tanks and equipment at SANPC Refinery.
Includes all heat treatment requirements for operational, maintenance, projects or shutdown work.
Services include: hydrogen diffusion, pre-weld heat treatment, post-weld heat treatment, heating of vessels, tanks and other fixed equipment.
Work is ad hoc and measured against a Schedule of Rates.
Standards and codes:
Ansi/asme b31.3
ASME Sec I / Sec VIII Division 2
ASME Sec VIII Division 1 par UCS 56
ASTM A262 par E
Astm E-44
Operational requirements:
Contractor to provide plant, equipment, tools, manpower, supervision, management, office personnel and transport.
Standby crew required for after-hours and weekend emergencies; response time of 1 day from request.
Contractor to supply organogram and CVs of key personnel with contact details.
Contractor to draw up heat treatment procedures per job for approval by SANPC Refinery Inspection Department.
Work only to commence after a Works Order / Job Card is issued; invoices must reference the Works Order number and attach the job card.
No subcontracting without prior written approval.
SANPC Refinery may evaluate, test and interview all personnel; may object to unsuitable personnel.
Contractor to provide HSSE management plan.
Contractor to provide power supply to heating equipment if SANPC Refinery cannot; diesel supply to generators if necessary.
All equipment must be inspected/tested with valid certifications available on request.
Technicians must have valid training certifications.
Temperature monitoring units must produce record cards indicating applied temperatures.
Heat treatment equipment must be attended by suitably qualified operators at all times.
No bare wire connections between compensating cables and thermocouples; proper connectors required.
Insulation must be securely fastened with appropriate strapping for the temperature range.
Contractor must follow SANPC Refinery procedure for rate of heating and hold points with zero deviation.
Job card workflow:
Maintenance priorities: C (routine, start +30 days, complete in 3 months), B (routine, start +14 days, complete in 1 month), A (schedule breaker, start +1 day, complete in 1 week), E (emergency, immediate, ASAP + overtime).
'E' priority jobs commence immediately; 'A' priority jobs commence within 24 hours of receiving scoping form and order number.
Contractor to estimate cost and man-hours for Contractor Work Request (CWR) in accordance with Schedule of Prices.
Contractor to compile Work Pack including drawings and Material Take-offs.
Contractor to obtain permits and daily clearances from Maintenance Services Focal Point (MSFP) before commencing work.
Variations require a Variation Order (VO) approved by the Area Engineer before extra work commences.
Work without a job card will not be accepted.
Job cards must be signed by Discipline Supervisor for progress reporting and payment.
Quality of workmanship verified by duly appointed persons.
Material specifications per SANPC Refinery/ISO standards.
Meetings (compulsory):
Contractor representative: daily planning and progress meetings, weekly look-ahead meetings.
Contractor Site Manager: monthly KPI review meeting, quarterly performance and safety review meetings.
Division of responsibilities:
Contractor: timeous application for work permits, gas testing, quality checking (with SANPC), provision of transportation, site huts, ablution facilities, lighting, protective clothing, BA compressor, cranage, lifting gear, safety equipment, firefighting facilities, resuscitator, standby BA set.
SANPC Refinery: issue of daily work permits, approval of quality checking, supply of installed equipment and materials.
Drawings:
Drawings/sketches may be issued by SANPC Refinery to clarify written instructions.
Experience & Qualifications
Source: 2. Annexure A - SOW Heat Treatment.pdf
Experience and qualifications:
Contractor must be familiar and have necessary experience and knowledge of all heat treatment techniques and procedures.
Contractor to supply organogram with full details of personnel structure including CVs of key personnel with contact details.
Technicians must be qualified and have valid training certifications.
All workers to undergo training through a SETA-approved training facility.
SANPC Refinery reserves the right to evaluate, test and interview all personnel designated to perform the services.
SANPC Refinery may object to personnel deemed incompetent, negligent, guilty of misconduct or unsuitable.
SANPC Refinery reserves the right to insist on change of personnel if not coping with work.
SANPC Refinery reserves the right to assess all contractor supervisors before they report for work.
Only approved resources may be used; changes to core resources require approval by SANPC Refinery CCM.
Quality Management
Source: 2. Annexure A - SOW Heat Treatment.pdf
Quality Control Plan (QCP):
Contractor's QCP must cover all tasks and identify all witness hold points for SANPC Refinery interventions.
QCPs to be provided to SANPC Refinery on a regular basis.
QCP must be approved before work starts.
Work quality verified by duly appointed persons; records kept as part of contractor workpacks.
Material specifications per SANPC Refinery/ISO standards.
Heat treatment procedures per job to be approved by SANPC Refinery Inspection Department.
Temperature monitoring units to produce record cards indicating applied temperatures.
Contractor to follow SANPC Refinery procedure for rate of heating and hold points with zero deviation.
Pricing Schedule
Source: 2. Annexure A - SOW Heat Treatment.pdf
Pricing:
Work measured and remuneration based on Schedule of Rates.
Contractor to price call-offs using the job card system.
Contractor to estimate cost and man-hours for Contractor Work Request (CWR) in accordance with Schedule of Prices.
Contractor to provide man-hours expended from the schedule of prices and compare against man-hour norms.
Rates for non-bill items to be agreed with SANPC Refinery.
No fixed price or bill of quantities specified; ad hoc service provision.
Financial Requirements
Source: 2. Annexure A - SOW Heat Treatment.pdf (unknown)
Remuneration:
Work measured and paid based on the Schedule of Rates.
Contractor to price call-offs using the job card system.
Contractor to provide man-hours expended from the schedule of prices and compare against man-hour norms.
Invoices paid against a Purchase Order issued at commencement of agreement.
Invoices must reflect Works Order number and attach job card.
No payment for additional personnel without prior written agreement.
No bond, guarantee, retention or payment terms specified in the source document.
Compliance Requirements
Source: 2. Annexure A - SOW Heat Treatment.pdf (unknown)
Compliance:
Must comply with OHS Act and OHS Regulations.
Must comply with SANPC/CEF rules and regulations.
Contractor safety officer to conduct regular audits and report findings to SANPC/CEF incident management system.
All incidents to be reported within 24 hours to designated SANPC persons including MSFP.
All workers to undergo training through a SETA-approved training facility.
Vehicles brought on site must be roadworthy.
All electrical equipment brought on site must be inspected and approved by SANPC Refinery electrical department.
No specific B-BBEE, CSD, tax clearance, CIDB, or CIPC requirements are stated in the source document.
Health & Safety
Source: 2. Annexure A - SOW Heat Treatment.pdf
Health, Safety and Environment:
Contractor must comply with OHS Act and OHS Regulations.
Contractor must comply with SANPC/CEF rules and regulations.
Contractor safety officer to conduct regular audits to identify and intervene on unsafe situations and near miss acts.
Findings to be reported and recorded in SANPC/CEF incident management system.
All incidents to be reported to relevant clearance issuers and maintenance supervisors.
All safety violations or incidents to be reported within 24 hours to designated SANPC persons including MSFP.
Contractor to provide HSSE management plan.
Contractor to complete SANPC Refinery integrated Risk Assessment Method Statement (RAMS) before work.
Contractor to obtain necessary permits and daily clearances before commencing work.
Contractor to facilitate generation of Safety Certificate.
Contractor to provide safety equipment, firefighting facilities, resuscitator, standby BA set.
All electrical equipment brought on site must be inspected and approved by SANPC Refinery electrical department.
Section
Source: 2. Annexure A - SOW Heat Treatment.pdf
No additional evaluation criteria are stated in the source document beyond the technical and compliance requirements already listed.
Document6. Annexure E - SBD 6.1.pdfReview complete
Description
Source: 6. Annexure E - SBD 6.1.pdf
The procurement is for the appointment of a service provider to render heat treatment services at the SANPC Refinery for a three-year period. No further scope details are available in the provided document.
Submission Guidelines
Source: 6. Annexure E - SBD 6.1.pdf (TENDER)
Returnable forms:
SBD 6.1 (Preference Points Claim Form): claims preference points for specific goals; must be completed and submitted with the bid.
Submission method and address: not stated in the available document.
Closing time: 10:00 (from tender record).
Evaluation Criteria
Source: 6. Annexure E - SBD 6.1.pdf (TENDER)
Evaluation split:
Price: 80 points
Specific goals: 20 points
Total: 100 points
Preference point system: 80/20 (applicable for requirements up to R50 million including taxes).
Specific goals and points claimed (bidders must indicate points claimed for each):
Enterprises with 51% or more black ownership: 10 points
Enterprises with 51% or more women ownership: 5 points
Enterprises with 51% or more youth ownership: 3 points
Enterprises with 10% or more ownership by persons with disability: 2 points
Failure to submit proof for claimed specific goals means those points are not awarded.
The organ of state may require substantiation of any preference claim at any time.
Fraudulent claims may lead to disqualification, contract cancellation, recovery of costs, restriction from state business for up to 10 years, and criminal prosecution.
Technical Specifications
Source: 6. Annexure E - SBD 6.1.pdf (TENDER)
The tender is for the appointment of a service provider for the provision of heat treatment services at SANPC Refinery over a period of three (3) years. No further technical details are available in the provided document.
Compliance Requirements
Source: 6. Annexure E - SBD 6.1.pdf (TENDER)
B-BBEE / Preference points:
Bidders must complete and submit SBD 6.1 to claim preference points.
Proof of ownership for claimed specific goals must be provided.
The applicable preference point system is 80/20.
No other compliance requirements (e.g., CSD, tax, CIDB) are stated in the available document.
Section
Source: 6. Annexure E - SBD 6.1.pdf
Evaluation is based on the 80/20 preference point system: price (80 points) and specific goals (20 points). Specific goals are as listed in SBD 6.1. Bidders must indicate points claimed for each goal and provide supporting proof.
Document7. Annexure F - CEF KYC Questionnaires.pdfReview complete
Description
Source: 7. Annexure F - CEF KYC Questionnaires.pdf
The document is the CEF KYC Questionnaire, a mandatory due diligence form that bidders must complete. It collects corporate, shareholder, management, banking, and project information.
Contact Information
Source: 7. Annexure F - CEF KYC Questionnaires.pdf (unknown)
CEF SOC Ltd
Address: 152 Ann Crescent, Block C, Upper Grayston Office Park, Strathavon, Sandton, 2146
Postal: P O Box 786141, Sandton, 2146
Telephone: +27 010 201-4700
Fax: +27 010 201-4900
Submission Guidelines
Source: 7. Annexure F - CEF KYC Questionnaires.pdf (unknown)
Returnable documents:
CEF KYC Questionnaire: mandatory due diligence questionnaire covering corporate details, shareholders, executive management, banking details, experience, sanctions, data protection, competition, ethics, financial status, and litigation. Must be completed, signed, and returned as a scanned copy to CEF Group nominated personnel.
Attach all required documents listed in the questionnaire.
Submission method: scanned, signed copy returned to CEF Group nominated personnel.
Evaluation Criteria
Source: 7. Annexure F - CEF KYC Questionnaires.pdf (unknown)
The bidder must complete the mandatory due diligence questionnaire. Disqualifying conditions include:
Being subject to sanctions or engaged in dealings with sanctioned countries or entities.
Convictions, prosecutions, or pending investigations related to sanctions, fraud, bribery, corruption, or competition law.
Being barred from competing for government contracts in any country.
Being insolvent, under liquidation, or having business rescue plans in progress or planned.
Pending litigation with regulators or listed companies.
Required confirmations and certificates:
Tax status must be confirmed, and all financial returns for the last three years must be submitted, with a written confirmation certificate from the appointed finance manager.
Adequate data protection measures and policies must be confirmed, with a confirmatory certificate from the appointed Information Officer.
Written employee code of conduct, anti-bribery and corruption policy, and a process for reporting bribery/fraud must be in place, with a confirmatory certificate signed by the Company's secretariat.
Any government ownership or control, or directors/executives who are government public officials, must be disclosed.
Technical Specifications
Source: 7. Annexure F - CEF KYC Questionnaires.pdf (unknown)
The questionnaire requires the bidder to provide:
Corporate details: registered company name, other names, registration number, tax registration number, country of incorporation, date of incorporation, corporate status, number of employees, nature and line of business.
Registered and business addresses, telephone, email, website, branch details.
Source: 7. Annexure F - CEF KYC Questionnaires.pdf
The bidder must provide details of experience in the industry, including years of experience, licenses held (with registration numbers), and the relevant authority or regulator.
Compliance Requirements
Source: 7. Annexure F - CEF KYC Questionnaires.pdf (unknown)
The bidder must complete the CEF KYC Questionnaire, which includes declarations on:
Sanctions compliance.
Data protection and privacy (including certification of information security practices).
Competition law compliance.
Ethics and integrity (including anti-bribery and corruption policies).
Financial status (tax status, financial returns for last 3 years, insolvency, business rescue, liquidation).
Submission method: email only, to [email protected]. Late or misdirected emails will be disqualified. Links in the submission will cause disqualification. Do not copy or blind copy any CEF SCM representative on the submission email.
Returnable documents (all must be submitted with the proposal):
Part 3: Proposal Form (signed offer).
Part 4: Signing Power – Resolution of Board of Directors (authorises the signatory).
Part 5: Certificate of Acquaintance with RFP Documents (confirms familiarity with all conditions).
Part 6: Certificate of Acquaintance with Scope of Work (confirms understanding of the scope).
Part 7: Breach of Law Form (discloses any serious breach of law in the past 5 years).
SBD 1: Invitation to Bid (bidder and contact details).
SBD 4: Bidders Disclosure (declaration of interest).
SBD 6.1: Preference Points Claim Form (claims B-BBEE points under the 2022 regulations).
Valid SARS tax compliance status (or proof of application) and SARS Tax Verification PIN.
Valid B-BBEE affidavit or certificate.
CSD Summary Report or CSD supplier number.
Disqualification risks:
Any returnable document omitted or incomplete.
Submission after the closing time.
Submission to the wrong email address.
Including links in the submission.
Copying or blind copying CEF SCM representatives.
Fraudulent, untrue, or inaccurate information.
Attempting to canvass CEF officers or employees between closing and award.
Phase 1: Mandatory requirements (compliance with returnable documents and eligibility).
Phase 2: Technical evaluation (criteria in Annexure B).
Phase 3: Price and specific goals (preference points).
No minimum qualifying score is stated. The contract may be awarded to the highest scoring bidder unless objective criteria justify otherwise. CEF may undertake post-tender negotiations with short-listed bidders.
The scope of work is defined in Annexure A (Scope of Work and Evaluation Criteria) and Annexure B (Technical Evaluation Criteria), which are not included in the extracted text. The service involves the provision of heat treatment services at the SANPC Refinery over a three-year period. Bidders must refer to the annexures for detailed requirements.
Experience & Qualifications
Source: 1. RFP document - Heat Treatment .pdf
No specific experience or qualification requirements are stated in the available text. The scope of work and technical evaluation criteria are in Annexures A and B, which are not included.
No specific financial requirements (e.g., bid security, guarantees, retention, payment terms, or turnover thresholds) are stated in the available text.
Valid SARS tax compliance status or proof of application, endorsed by SARS, at closing date and time.
Provide SARS Tax Verification PIN for electronic verification.
Consortia/Joint Ventures must submit a separate tax compliance status for each party.
The successful bidder must keep all returnable documents valid for the contract duration; failure to renew may lead to contract termination.
B-bbee:
Valid B-BBEE affidavit or certificate required.
SBD 6.1 Preference Points Claim Form must be submitted.
Csd:
CSD Summary Report or CSD supplier number required.
Legal:
Part 7 Breach of Law Form must disclose any serious breach of law in the preceding 5 years.
Bidders found guilty of serious breaches (e.g., Competition Act) may be excluded.
Bidders must cooperate with due diligence checks (legal, empowerment, technical, creditworthiness, security) within 2 days of notification.
Proposals are subject to legal review by CEF's Legal Counsel.
Bidders may be subject to security screening by the State Security Agency (SSA).
Contractual Terms
Source: 1. RFP document - Heat Treatment .pdf
Contract period: 3 years (stated in the tender title).
The proposal, once accepted, forms a binding contract unless CEF requires a formal contract.
If the successful bidder fails to enter into a formal contract when called upon, or fails to commence services within 4 months of notification, CEF may recover costs of re-tendering.
A penalty clause will be negotiated for non-compliance with material terms, including delayed service provision.
Non-compliance with material terms constitutes a material breach and grounds for cancellation.
CEF may modify the scope, split the award, or make no award.
CEF is not liable for any preparatory costs incurred by bidders.
The contract is governed by South African law; bidders must provide a domicilium citandi et executandi in South Africa. Foreign bidders must name an authorised representative in South Africa with power of attorney.
Confidentiality: all information related to the RFP and any subsequent contract must be treated as confidential; written approval is required to divulge any information related to CEF's business.
Section
Source: 1. RFP document - Heat Treatment .pdf
Evaluation phases: Phase 1 mandatory requirements, Phase 2 technical evaluation (Annexure B), Phase 3 price and specific goals. No further detail available in the extracted text.
Document3. Annexure B - Technical Requirements Heat Treatment Services.pdfReview complete
Description
Source: 3. Annexure B - Technical Requirements Heat Treatment Services.pdf
The procurement is for the appointment of a service provider to provide heat treatment services at SANPC Refinery over a period of three (3) years. The scope includes mandatory compliance with specific certifications and the submission of technical documentation.
Company experience (25% weighting): up to 5 reference letters from clients for heat treatment services provided between 2020 and date of tender. Scoring: 5 letters = 5 points, 4 = 4, 3 = 3, 2 = 2, 1 = 1, 0 = 0.
Supervisor experience (25% weighting): CV of proposed supervisor. Scoring: >8 years = 5, >5-7 years = 4, >3-5 years = 3, >2-3 years = 1, <2 years = 0.
Scope: Provision of heat treatment services at SANPC Refinery over a period of three (3) years.
Mandatory technical requirements:
Valid Compensation Fund certificate.
ISO 14001:2015 (EMS) certificate issued by QSCert-South Africa (FSSC 22000 Certification Body).
ISO 9001:2015 (QMS) certificate issued by South African Certification and Auditing Services (SACAS).
Quality Management System policy demonstrating ISO 9001 compliance.
Calibration certificates for heat treatment temperature chart recorders.
Method statements required (not older than six months):
Post weld heat treatment on piping.
Hydrogen evacuation.
Heat treatment for pressure vessel weld repair.
Method statements must indicate type of equipment, procedures applied, and be signed by the client representative and the bidder's supervisor or technician.
Methodology
Source: 3. Annexure B - Technical Requirements Heat Treatment Services.pdf
Method statement requirements:
Submit samples of method statements for heat treatment executed for three items: post weld heat treatment on piping, hydrogen evacuation, and heat treatment for pressure vessel weld repair.
Method statements must not be older than six months.
Must clearly indicate type of equipment and procedures applied.
Must be signed by the client representative and the bidder's supervisor or technician.
Unsigned or undated copies will not be accepted.
Scoring for method statements (25% weighting):
3 valid statements: 5 points.
2 valid statements: 3 points.
1 valid statement: 1 point.
0 valid statements: 0 points.
Experience & Qualifications
Source: 3. Annexure B - Technical Requirements Heat Treatment Services.pdf
Experience requirements:
Company experience (25% weighting):
Provide signed and dated reference letters from clients on client letterhead for heat treatment services provided between 2020 and date of tender.
Unsigned, undated, or non-letterhead letters score zero.
Bids must be submitted on the official forms provided, not re-typed.
Bids must be delivered by the stipulated closing time; late bids will not be considered.
Returnable forms:
SBD1 (Invitation to Bid): completed, signed, with supplier details and tax compliance information.
Proof of authority (e.g., company resolution) for the signatory.
Foreign suppliers must complete the questionnaire in SBD1 Part A.
SBD7 (Contract Form): to be signed by the successful bidder.
Failure to provide or comply with any required particulars may render the bid invalid.
Evaluation Criteria
Source: 2. Annexure A - SBD1.pdf (RFP)
Bids are subject to the Preferential Procurement Policy Framework Act (PPPFA) and its regulations.
Bidders must be tax compliant and provide a SARS TCS PIN or CSD number.
Bids will not be considered from persons in the service of the state, companies with directors who are persons in the service of the state, or close corporations with members who are persons in the service of the state.
Technical Specifications
Source: 2. Annexure A - SBD1.pdf (RFP)
Provision of heat treatment services at SANPC Refinery.
Contract period: three (3) years.
Compliance Requirements
Source: 2. Annexure A - SBD1.pdf (RFP)
Tax compliance:
Bidders must be tax compliant and submit a SARS Tax Compliance Status (TCS) PIN.
If no TCS PIN is available, a CSD number must be provided.
For consortia, joint ventures, or sub-contractors, each party must submit a separate TCS certificate/PIN/CSD number.
TCS PIN can be obtained via e-filing at www.sars.gov.za.
A printed TCS certificate may be submitted with the bid.
State employment:
Bids will not be considered from persons in the service of the state, companies with directors who are persons in the service of the state, or close corporations with members who are persons in the service of the state.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
152 Ann Cres, Strathavon, Sandton, 2031, South Africa
Document-Backed
Recently Synced
Source Snapshot Available
AI Enhanced
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
8
Last checked
20 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.